Loading...
1d. Audubon Road Reconstruction: Authorize Prep of Feas Study CITY OF CHANHASSEN 7700 Market Boulevard PO Box 147 Chanhassen, MN 55317 Administration Phone: 952.227.1100 Fax: 952.227.1110 Building Inspections Phone: 952.227.1180 Fax: 952.227.1190 Engineering Phone: 952.227.1160 Fax: 952.227.1170 Finance Phone: 952.227.1140 Fax: 952.227.1110 Park & Recreation Phone: 952.227.1120 Fax: 952.227.1110 Recreation Center 2310 Coulter Boulevard Phone: 952.227.1400 Fax: 952.227.1404 Planning & Natural Resources Phone: 952.227.1130 Fax: 952.227.1110 Public Works 1591 Park Road Phone: 952.227.1300 Fax: 952.227.1310 Senior Center Phone: 952.227.1125 Fax: 952.227.1110 Web Site www.ci.chanhassen.mn.us .1~ MEMORANDUM <10 . TO: Paul Oehme, Director of Public Works/City Engineer \' { FROM: Alyson Fauske, Assistant City Engineer (At O~. DATE: November 9, 2009 SUBJECT: Audubon Road Reconstruction, City Project 10-02: Authorize Preparation of Feasibility Study; Begin Land Acquisition Process with Property Owners PROPOSED MOTION "The City Council is recommended to authorize staff to prepare a feasibility study for the Audubon Road Reconstruction and begin land acquisition discussion with property owners. City Council approval requires a simple majority vote of the City Council present. " BACKGROUND On July 13 2009, staff discussed next year's proposed street reconstruction projects with the City Council at the work session. On August 10, 2009, City Council awarded the preliminary design consultant contract to SRF Consulting Group, Inc.' PROJECT OVERVIEW Audubon Road from Lake Drive West to Lyman Boulevard (CSAH 18) is a municipal collector roadway and is scheduled to be reconstructed next year. The pavement is in poor condition and shows severe pavement distress. The roadway is a rural section with gravel shoulders. On the steep hill portion of the roadway, the gravel washes out after large rain events and can become a safety problem if not regraded several times a year. Audubon Road should be urbanized and widened to approximately the same pavement width as is currently north of Lake Drive West. The Parks Department Trail Comprehensive Plan calls for extending a trail down to Lyman Boulevard. A small area of land will need to be acquired at the south end of Audubon Road to accommodate the trail. Most of the acquisition is planned to be temporary construction easements. The appraisals for the property are almost complete. Minor repairs to the watermain are proposed and depending on the profile of the roadway may need to be lowered in some areas. The pond on the south side of Lyman Boulevard was oversized in conjunction with the Lyman Boulevard Chanhassen is a Community for Life. Providing for Today and Planning for Tomorrow Audubon Road Reconstruction November 9,2009 Page 2 reconstruction project to treat the runoff from this section of Audubon Road when it is improved. A storm sewer pipe has been stubbed on the north side of Lyman Boulevard for the future reconstruction of Audubon Road. SRF completed the preliminary design for the project. It is proposed that City staff complete the feasibility study, final design, bidding process, construction observation and contract administration to save on project costs. SCHEDULE If this project moves forward, staff anticipates the following project schedule: Neighborhood Meeting Accept Feasibility Report; Call Public Hearing Public Hearing Approve Plans & Specifications Bid Opening Neighborhood Meeting Assessment Hearings/Award Contract Start Construction Substantial Construction Complete Final Wear Course Complete FUNDING November 16,2009 January 11,2010 February 8, 2010 February 22, 2010 March, 2010 April, 2010 May, 2010 May, 2010 August 27,2010 June, 2011 The preliminary budget for the proposed street reconstruction work was included in the 2010 CIP at $3,000,000. Funding for the project will be from municipal bonds and assessments. Properties with driveway access to Audubon Road are proposed to be assessed. The assessment methodology and estimated assessments will be included in the feasibility report. Attachments: CIP page Resolution Location Map g:\eng\publicL201O proj ects\ 1 0-02 audubon road imp\auth prep offeas rpt II-09-09.docx I Capital Improvement Program I: City of Chanhassen, MN Account # 1 601-0000-4751 Account # 3 2009 thru 2013 Contact Paul Oehme Department Street Improvements Type Improvement Useful Life Category Streets/Highways Priority n/a Total Project Cost $3,000,000 I Project # ST -022 Project Name Audubon Street Project I Description 1 I, Annual project to rehabilitate and reconstruct streets in the City. Account #2 2010 - Audubon Road Lyman Blvd, to Lake Drive West I' Justification I I',: The City uses a Pavement Management System to monitor the condition of the City streets. While proper preventative maintenance extends the life of the street and is cost effective, a street will eventually deteriorate to a point that further maintenance is no longer cost effective. Rehabilitation projects extend the life of the street. In cases with utility or poor subgrade needs to be replaced or where streets have deteriorated to I:,.... a point where rehabilitation will no longer be practical, reconstruction of the street is necessary. A feasibility study is written to consider the mertis of the project and scope of work. I Expenditures Construction 2009 2010 2011 2012 2013 Total 3,000,000 3,000,000 Total 3,000,000 3,000,000 I I I. :." ." Funding Sources 2009 . Assessment/Revolving Assess 2010 2011 2012 2013 Total 3,000,000 3,000,000 Total 3,000,000 3,000,000 I I. oPmtional Impact/Other. This project may decrease maintenance costs. I -, I I I I'. 107 CITY OF CHANHASSEN CARVER AND HENNEPIN COUNTIES, MINNESOTA DATE: November 9. 2009 RESOLUTION NO: 2009- MOTION BY: SECONDED BY: A RESOLUTION AUTHORIZING PREPARATION OF FEASIBILITY STUDY FOR THE AUDUBON ROAD RECONSTRUCTION; BEGIN LAND ACQUISITION PROCESS WITH PROPERTY OWNERS PROJECT NO. 10-02 WHEREAS, the area of Audubon Road that is proposed for reconstruction in 2010 extends from Lake Drive West to Lyman Boulevard (CSAH 18) and is a municipal collector roadway, and NOW, THEREFORE, BE IT RESOLVED that the Chanhassen City Council hereby authorizes preparation of a feasibility study for the Audubon Road Reconstruction Project and gives authorization to begin the land acquisition process with property owners. Passed and adopted by the Chanhassen City Council this 9th day of November, 2009. ATTEST: Todd Gerhardt, City Manager Thomas A. Furlong, Mayor YES NO ABSENT AUDUBON ROAD IMPROVEMENT AREA .....? '----- ...._..,.___.,~''''__4" ........_____. -1 r-LYMAN.BLVD ) /