Loading...
1h. Public Works Facility: Approve Change Order No. 4 CITY OF CHANHASSEN 7700 Market Boulevard PO Box 147 Chanhassen, MN 55317 Administration Phone: 952.227,1100 Fax: 952.227.1110 Building Inspections Phone: 952.227,1180 Fax: 952.227.1190 Engineering Phone: 952,227.1160 Fax: 952.227,1170 Finance Phone: 952,227.1140 Fax: 952,227,1110 Park & Recreation Phone: 952.227,1120 Fax: 952,227.1110 Recreation Center 2310 Coulter Boulevard Phone: 952,227.1400 Fax: 952,227,1404 Planning & Natural Resources Phone: 952.227.1130 Fax: 952.227.1110 Public Works 1591 Park Road Phone: 952'427.1300 Fax: 952,227,1310 Senior Center Phone: 952.227.1125 Fax: 952,227.1110 Web Site www.ci.chanhassen.mn.us .i~ MEMORANDUM TO: Todd Gerhardt, City Manager Paul Oehme, Director of Public Works/City Engineer -r () ~ AJ.,., A~ December 14, 2009 vzqY' FROM: DATE: SUBJ: Public Works Facility, Project 08-03: Approve Change Order No.4 Package PROPOSED MOTION "The City Council approves Change Order No.4 package in the amount of$7,663.75 for the Public Works Facility. City Council approval requires a simple majority vote of the City Council present. BACKGROUND On February 23, 2009, the City Council approved the plans and specifications and authorized the ad forbids. On March 23, 2009, the City Council approved bids for steel and concrete for the facility and reviewed other bids and quotes. On April 13, 2009, the City Council approved bids and quotes for the remaining items of the facility. DISCUSSION Staff is requesting Council consider approving changes to contracts for revisions for the Public Works facility. Included in this request are minor, miscellaneous changes to the project caused by unforeseen site conditions and requested changes by the Building Department based upon interpretation of the building code. Also included in this work are revisions to the office area for security needs. Contract changes like these are normal for large scale projects and contingency funds were set aside in the budget. The City's construction manager, RJM Construction, has reviewed the costs and finds them consistent with current market pricing. The project remains on schedule and on budget. Below is a brief description of the changes requested: Revised Pressure Washer and Lube Pipe Revisions Deduct -$538.00 This item is to delete hardware to the pressure washer and lube pipe design. Chanhassen is a Community for Life - Providing for Today and Planning for Tomorrow Todd Gerhardt Public Works Facility: Approve Change Order December 14, 2009 Page 2 Duct Revisions at Mezzanine for Shops $2,377.39 This addition is for extension of air ducts along with return air drops to the shop based on the Building Official's interpretation of the building code. Door Hardware and Security Revisions at Main Exterior Door $4,098.25 This request is for changes to the security system and electrical contact, power supply and lockset at the main entrance doors to the offices. The new equipment will be able to communicate with the security system that is planned for the building. Deduct for Resinous Coating Allowance Deduct -$2,000.00 This deduct is for removal of the allowance for a pattern design and color arrangement if the City had chosen to incorporate a pattern in the floor in the lunch room. Hallway Ceiling Height Soffit Modification $613.00 This change was to delete ceiling tile and replace with drywall in the main office hallway. This change was necessary to fit the overhead utilities in this area. Revised Countertop in Administration Office Area $1,777.00 This change.was necessary after review of the office assistant work space location. The new work space location requested by the office assistant will allow her to view who is entering and exiting the building better. The new location of the work space requires the countertop to be extended and widened to 30" in depth. Exterior Window Revisions at Maintenance and Lunch Room $1,735.00 This change is to replace the fogged glass with a tinted glass panel that is consistent with other glass panel windows. These panels were fogged originally because they were thought to need fogging to hide the wall panels in the interior. The fogged panels do not hide the wall panels very well and should be changed out to match the other tinted glass. Air Conditioning Unit AC- L Condensate Piping Revisions $869.00 This change was requested by the Building Department for removal of the condensation water from the AC unit in the office meeting room based on building code interpretation. Relocate Unit Heaters 3 and 4 in the Parks Shop $1,440.00 This request is to move the ceiling mounted unit heaters to the corner of the parks shop to be out of the way of the wood working work bench and exterior door. Delete Pendant Controls for Vehicle Hoists Deduct -$4,200.00 These controls are used to set the vehicle hoist while the mechanic is at the vehicle instead of at the control panel. The pendant control has the same controls on a cord that allows one mechanic to position the hoist in the proper position before lifting a vehicle. These controls can be deleted as long as another mechanic can help set the hoist as the hoist is raised into the proper position. g:\eng\public'-2008 projects\08-03 chanhassen maintenance (pw) facility\121409 bkgd co4.doc Todd Gerhardt Public Works Facility: Approve Change Order December 14, 2009 Page 3 Hardware Revisions to Door 105C - Vehicle Maintenance $749.00 This change is to upgrade the 10ckset and power supply for this door to communicate with the security system for the building. Hardware Revisions to Door 115C from the Office Reception Area into the Lunch Room $940.00 This change is to add a lock and crash bar to this door so no one in the reception area can enter the lunch room without unlocking the door first. Utility Shop Office - Paint Precast Ceiling in Exchange of Drop Ceiling Tile Deduct -$196.89 Total Requested Changes: $7,663.75 The change order amount is proposed to come out of the contingency amount budgeted for the project. The project is still projected to be under budget by $413,701. Since the project is 95% completed staff does not anticipate any more changes to the contracts. The total amount of changes to the project was less than 2% of the construction contracts. A typical project ofthis size would see about 5% of the construction contract in change orders. A contractor has a delay claim into RJM Construction that is requesting for additional groundwater pumping due to a higher than anticipated groundwater table. RJM is reviewing the claim and will be making a recommendation to the City about the validity of the claim. Attachment: RJM Letter of Recommendations and Budget Summary g:\eng\public'-2008 projects\08-03 chanhassen maintenance (pw) faciJity\121409 bkgd co4.doc CONSTRUCTION COlll>MATl:: OFfiCE: HVlY. 7 CORPORt;TC CHJTCR 7003 VI. LAKE <iT. SUITE 400 LOUiS PARK, MN 55426 PHONE 95;>83'1'8600 FAX 952-&32-9600 SATEL!.lTE OfFICES PLAZA VII M!NNEAPOLlS. MN NQIHHLAND eXECUTIVE MN NORMAND ALe LAKE OffiCE PARK SLQOMINGTON. MN December 4,2009 Mr. Todd Gerhardt City of Chanhassen 7700 Market Boulevard Chanhassen, MN 55317 Re: City ofChanhassen Public Works Facility Recommendation for Project Change Order 4 ChanhassenCity Council Meeting Dear Mr. Gerhardt, At the next City Council meeting RJM Construction recommends that the City Council approve Project Change Order 04. The total amount of this Change Order will .be for $7,663.75. This Change Order will be deducted froIn the project contingency which will leave $215,864.39 in project contingency. Change Orders are a normal process in construction. A project contingency of $346,872 was budgeted for changes such as the individual Change Requests listed on the attached "Chanhassen Public Works Change Order #4." In addition to the project contingency,.the overall Chanhassen Public Works project is under budget by $413,701. Attached is a list of individual Change Requests that comprise this proposed Change Order. Each of these proposed Change Requests have been reviewed for approval by RJM Construction and Oertel Architects fOf accuracy in quantities and market pricingJof the requested work. Each of these proposed Change Requests have since been reviewed by project team representatives from the City of Chanhassen. If you should have any questions, please feel free to contact me. Thank you for your assistance with this approval. Sincerely, 4.g~ Project Manager Cc: Jeff Oertel, Oertel Architects Chanhassen Public Works Project Change Order #4 Description Proposal Request 10 - Revise Pressure Washer Piping and Lube Revisions Proposal Request 17 - Duct Revisions atMezzanine for MAU 5 RFI .90 - Door 1158 Hardware Revisions and Proposal Request 18 - Exterior Door Hardware Revisions Deduct for Resinous Coating Allowance RFI 91- Hallway Ceiling Height ~ Add Soffit Revise Countertop in Admin. 116 Proposal Request 19 - Window Type C and N Revisions RFI 87 ~ Air Contitioning Unit, AC~ 1, Condensate Piping Revisions Relocate UH 3 and UH 4in Parks Shop Delete Pendant Controls for Vehicle Hoists Proposal Re.quest 21 - Hardware Revisions Door 1 05C ~ Vehicle Maintenance Proposal Request 22 - Door 115C HardwCilre Revisions Delete ACT in Room 112, Utility Shop, and Add Painted Ceiling Total Change Order 4 CON STRUCTION Amount ($538.00) $2,377.39 $4,098.25 ($2,000.00) $613.00 $1,777.00 $1,735.00 $869.00 $1,440.00 ($4,200.00) $749.00 $940.00 ($196.89) $7,663.75 CONSTlWCTION CORPORATE: OFFICE HWY.7 CORI'ORA TE CENTER 7003 \,/, CAKE SUITE 400 51. LOU!S PARi<, MN 55426 PHONE 952-837-8600 FAX 952'832-9600 SA TECUn OFFICES PLAZA VI! MINNEAPOLIS, MN NORTHLAND EXECUTIVE MN NORMANOALL LAKE OFFICE PAR" nLOOMINGTON, MN Chanhassen Public Works Bid SlImmary December 4, 2009 DESCRIPTION Contractor I E~I::te Public Bids Awarded March 2320()9 4A MasonrvCombined Davco Concrete cateoorV38 rete Walls Fabcon CataciOiV 3C - Precast Plank Molin II Cateo0rV5A - Structural steeIlJoists!DeckinafMisc. Steel Material Thumbeck $4 Public Bids Awarded At>ril ~ Cate 0 5B - Structural Steel!, ' teel Erection Linco $132,500 Cow ,,,_.fMma. Hm,,"~_ _,c."_", $197,600 Cate 0 7A - est $489,600 Cate 0 8A - refronts tern $135700 Cate 0 9A. sum oar stems lion Painlino ~~;"- ter $239.541 $137,000 Svstems $6\16,000 Cat~ 15B. HVAC and Control SYStems General Sheetmetal $412,500 Catecorv 16A - Electrical DvnamicE:lectric $5510490 Quotes Awarded Anril 13.2009 Earthwork Olson Construction $82,640 Site Concrete CaDital Concrete $44,861 precast Bunker Divider Walls Hanson Silo ComDanv $17,435 Fences & Gates CenturY Fence $2,000 Modular Retalnino Walls Structures Hardscanes $24,232 Site Utilities SI. Paul Utilities and Excavatinc $88,800 Sectional Overhead Doors JAPI Gare D~r Store $88.700 Overhead Coilina Doors Door Co. $16.166 Acoustic Ceilinas $7,1105 SklOaoe Lerov Sians $9,357 Overhead Crane SYstems Aero Material HandlinG $51,740 Window Treatment Prairie's Edae, lnc, $1,795 Fire Protection Service Fire Protection $82,540 Quotes Awarded Anril 27, 2009 Tile CD Tile and Stone $30,370 CarneVResilient Multlole ConceDt Interiol'$ $1,771 Resinous Coatinos QC ComDanies, $52,730 Allowance Awarded Mav 26. 2009 Salt Structure Grevstone/DavcolOlson $106.456;72 Chanae Order 1 Awarded Julv 17. 2009 Vario.us $43,479.35 Chsnae Order 2 Awarded Auaust 17, 20()9 Various $63.797 Cha"ae Order 3 Awarded October 7 20()9 Various $16.067 Chanae Order 4 Recommendedfor Award December 14 2009 Various $7,664 Public Bid Awarded Auaust 10, 2009 Asnhalt Pavina Bituminous Roadwavs $285,795 Misc BudtJetslAllowsnces Earthwork - Site Proiect Allowance $75.000 Backfill Landscape Areas Proiect Allowance $14.205 Landscaoe & Irrigation Hartman Tree Fiarm $14.692 ADDliances Best Buv $7,007 Alternates Awarded Alternate 6 - TPO roofina at all areas. $54.490 ~ Alternate 10 - Provide skvliahts - $22,627 I ve CONSTRUCTION CORPORA IE OFFICE H't}Y, 7 COHPOF?ATf: CeNTEr? 7003 W. l.AKE ST. SUITE 400 LOUiS PAm<, MN 55426 PHONe 952-B37'"86CO r AX 952.8]:,.9600 SATELLITE OFFICES PLAZA VI! M1NNEAPOL!$,-MN NOHTHI.AND eXECUTIVE CENTEH BLOOMINGTON, MN NORMANOAl.l. lAKE OfFICl. PARlI BLOOMINGTON, Chanhassen Public Works Bid Summary December 4, 2009 $310,000 $25,000 $54,276 $32.000 $8,000 $58,856 $50,000 $538.132 ctions Ha orth Design F&es Arch., Mech.lElec. Desi n Fees Subtotal $429 485 $429.485 Total Project Budget $8.386,299 $8,800,000 $413,701