Loading...
1b. Hill Street Drainage Improvements: Award Contract CITY OF CHANHASSEN 7700 Market Boulevard PO Box 147 Chanhassen, MN 55317 Administration Phone: 952.227.1100 Fax: 952.227.1110 Building Inspections Phone: 952.227.1180 Fax: 952,227.1190 Engineering Phone: 952,227.1160 Fax: 952,227,1170 Finance Phone: 952,227.1140 Fax: 952.227.1110 Park & Recreation Phone: 952.227,1120 Fax: 952.227.1110 Recreation Center 2310 Coulter Boulevard Phone: 952,227.1400 Fax: 952.227.1404 Planning & Natural Resources Phone: 952,227.1130 Fax: 952.227,1110 Public Works 1591 Park Road Phone: 952,227.1300 Fax: 952,227.1310 Senior Center Phone: 952,227,1125 Fax: 952.227,1110 Web Site www.ci.chanhassen.mn.us -1-b MEMORANDUM D <1- TO: Paul Oehme, Public Works Director/City Engineer \ FROM: Terrance Jeffery, Water Resources Coordinator ~ ,,~. DATE: February 8, 2010 SUBJ: Hill Street Drainage Improvements: Award of Contract SWMPI2-2009-02 PROPOSED MOTION "The City Council approves a construction contract in the amount of $66,582.30 to Blackstone Contractors, LLC for work to be performed for the Hill Street Drainage Improvement Project No. SWMPI2-2009-02. " City Council approval requires a simple majority vote of the City Council present. BACKGROUND The City Council authorized the advertisement for bids on November 9,2009. The plans included a base bid intended to address the known deficiencies in the storm sewer conveyance system and the channel erosion and sedimentation. Also included was a bid alternative for the installation of an environmental manhole to provide additional water quality treatment for the runoff. This project involves several improvements to the channel and storm sewer conveyance system between T.H. 101 and Lotus Lake. The following improvements were included in the base bid: 1. Stabilization of an eroded gully located between the two existing houses. 2. Removal of approximately 100 feet of corrugated metal pipe with known breaches and conveyance hindrances. 3. Installation of 183 feet of HDPE pipe. 4. Installation of three storm sewer manhole structures including two sump manholes. 5. The reshaping of the swale to Lotus Lake to provide a more laminar flow and to stabilize the swale. 6. Revegetation of the area including the use of a turf reinforcement mat within the swale. 7. Construction of a non-weight bearing retaining wall to mask the outfall from T.H. 101. An alternate bid item was included in the bid for construction of a special design drainage structure - environmental manhole. The special designed structure would need to be in excess of 16 feet deep with an inside diameter of 10 feet to treat the water from this drainage area. The structure would still only g:\eng\swmp projects\swmpI2-2009-02 lotus lk drainage at th 101 outfall- hill street\award construction_02081O.doc Chanhassen is a Community for Life - Providing for Today and Planning for Tomorrow Paul Oehme Hill Street Drainage Improvements February 8, 2010 Page 2 be able to treat only rain events over one inch (1 "). This results in a number of logistical issues with the installation and maintenance. Because of these issues and the absence of any financial partners, staff is not recommending that the environmental manhole be included as part of this project. BIDS Bids for the project were opened on Thursday, December 17,2009 at 10:00 a.m. Twelve (12) total bids were submitted. The bids received are as follows: Blackstone Contractors, $66,582.30 $58,125.00 LLC Minnesota Dirt Works $70,890.00 $34,193.00 Doboszenski & Sons, Inc. $73,648.34 $44,052.57 Quirin Excavatin , LLC $79,394.75 $50,750.00 Veit & Com an , Inc. $79,731.19 $51,796.00 Peterson Com anies, Inc. $82,572.20 $55,900.00 Kusske Construction Co. $88,186.60 $67,775.00 Min er Construction, Inc. $93,853.49 $59,110.00 Sunblad Construction, Inc. $95,201.20 $69,991.00 Sunram Construction, Inc. $99,695.89 $51,999.91 G.F. Jedlicki, Inc. $104,780.88 $49,514.91 Burschville Construction Inc. $115,781.25 $80,500.00 *The engineer's opinion of the base bid cost was $72,412.75. Blackstone Contractors, LLC has not worked in the City before. Staff has completed a reference check and their work in other cities has been found acceptable. Additionally, WSB & Associates has had communications with others who have worked with Blackstone and also have found their work to be acceptable. The project is tentatively scheduled to start the week of February 8, 2010 with a substantial completion date of March 12,2010. Staff has been in contact with the property owners in the area regarding the project scope and schedule. This project was budgeted for 2010 in the CIP Project SWMP-040. Funding for the project is proposed from the Surface Water Management Fund. The City has sent a request to the Riley-Purgatory-Bluff Creek Watershed District requesting that they cost share on this project. Attachment: 1. CIP Page 2. Project Area Maps 3. Letter from WSB & Associates, Inc. dated 1/19/10 c: Gordy Stauff, Construction Manager Bruce Karvonen, Blackstone Contractors, LLC Tracy Rust g:\eng\swmp projects\swmp12-2009-02 hill street drainage improvement\award construction _02081 O.doc .....-_.____..___._.~~_~,.~~.~'~~._.........._"""'".~"'.""""'==..""""..'''.=''<>''.,....,~""..v~,__~__~"~,,"'w',,..............."""..,~.. '~~'., Capital Improvement Program City of Chanhassen, MN Project # SWMP-040 Project Name TH 101 Inlet Project Account #1 720-7025-4751 Account #2 2010 thru 2014 Acconnt #3 Account #4 Description I This project involves stabilizing a channel which directs flow from TH 101 into Lotus Lake. Department Surface Water Management Contact Paul Oehme Type Improvement Useful Life Category SWMP Priority nla Total Project Cost: $115,000 Justification I The adjoining property owners are concerned about the erosion on their properties as a result of stormwater discharge through the site. This area is resulting in sediment deposition into Lotus Lake and a 6 foot plunge pool has formed within the Lake at the terminus of the channel. Expenditures Construction Total Funding Sources Other Agency Contribution Surface Water Utility Fund Total 2010 115,000 115,000 2011 2012 2010 15,000 100,000 115,000 2011 2012 Budget Impact/Other I Some turf management may be required the second year after completion of the stabilization. 119 2013 2013 2014 Total 115,000 115,000 2014 Total 15,000 100,000 115,000 Site Location Map ';~ '" Subject Properties W+E S 1 inch = 375 feet Lotus Lake =Eo ~~ -u-u :;0:;0 00 c... c... ITIIT1 ~~ ZZ C C + ;::;::8 alal ITIIT1 :;0:;0 O(/) ~=E 0);:: ~-u I~ ~<O <.HI o co G)I ~~ o Z G) PI' (/) -I o :;0 ;:: (/) ~ ITI :;0 -u > Z (/) I ITI ~ '" o " (J1 (/) I ITI ~ (/) "895.9 .89.5.68 . + 896.8 8 896.00 '89/.0 . .89,6.99 . 'i' _898.1, 8 897.00 '699.0 . .89,7.74. ';' 900.9 8 897.99 'go'6.4 . 909.9 '91'1.0 . .912.30. 'j' 917.0 o o . WSB "" Associates, Inc. <0 ~ <0 O(/)O 0 '" OrOO 0 0 0 0 Z-IZO (/) -IZ .., -I- -I":;O(/) .... 0' :;o1Tl)>-I IO CZO:;O / 1fc! OO-lC -IfTlOO '" CO(/) O-U:;O:::J 0 <0, Z:;o(/)O 0))> )>OIZ .^ <.HITI O:;O)>Z :::J-IF~ :5;0-1TI ... -I Z(/) 0 -< UJ" -I )> , , I. .j ( . \ \ . .\ . '1' . I' I' I \ f f I .1. . I. I I \'" =-'\ ~l I I I I \ ~~p~' fTl(J). .. - "I )> =0J . F + :- o. . m @ 'CO ,c.. ,- ~~. <D Q)>o-ofll . :';:'0 0 ...... ~O ~ 0 .2.,.. CO (Xl to , to to 0" !"'fXl9 '(>J0JtJT "''''0 . cnzur C:;:fTl . s;:.........."--": -0 ~ i I@en 0J !'" '1-' 0l0J 00' ~:I , o' -0 l'fTl n I I JTl.z' )> :-;' Z . ~Q~ i~ ~'~5i::Q!;l . Z-I-o -o-ls:fTl ~.~. SJ)> , S:-I-I~ JTl.O UJ . ~ lIlS: . ,lIl,::r;I. :;;c3~G') r.;:t}r;o . 'S: )> (DUJ~O rr1rTJ ~ -s:':;:' ~.~. fTl 'Z . '0' _n 701 Xenia Avenue South, Suite 300 Minneapolis. MN 55416 www.wsbeng.com a-._7S:J.641.qXJ.Fa763-M1-1700 INFRASTRUCTURE I ENGINEERING. PLANNING J CONSTRUCTION i ! 'W <S5 !'" o r @.~ 'CO Ol - . .1. '-!>- 0J ~O ~ ='.. I I I'~. , I i 1 tOtO . 0 :;. -..J. ., 0 . 8;2.: ...........(j) . ~2S' s: .~. . to o o (54"0) SPECIAL i i I I . .. ,a;> z;;j~8: i? "T'):;O)> Z' '" fii:ri F';d ~ , -< )>' o D' -I @ .STJ.O+OO . 8 TC=;916.00 0J (60':0) . .SPECIAl: . . L -:--. -.- <0 o <0 '" o HILL STREET DRAINAGE IMPROVEMENTS CITY OF CHANHASSEN o I I ____J---,' ,----' \ I \ \ \ I t ": / ' / I / / / / ,eI ~~ lIl/;a C /CJ. / / 0 ./ ///~ I ~ ~ / ill ~lf) I 17"1'0/ ~Ol FI Cf)1 r-+- / I / /' j \\1 I ./ ./ / I : RVg8 ~ :~;::~ !~~ljg JOY] -< jl~r;(:;oo 'ITI/ 0 III IZ/;-IF-I 1--!~lIl~ l;t"~ I~ 0........ 1---- I:i!~ Y G) /1 I I ~ 1/ I / 1 / Y / I / ~ : I // I / 0 '-J , :1 I j/' I I ::J ()1 ,:1 ) /,.-J I / ~ 0 II 111:)0 I / ~ II I /~ I I I I ~ C:l ill t HERE!N' CERTIFY THAT nus PI.AN, SPECIF1CATION, OR REPORT WAS PREPARED B't' WE OR UNDEJl: JIJ' DIRECT SUPER'v'ISI<)t<I AND TK4.T I AM It MY UCENSED PROFI:SSIONAL ENGINEER UNDER 1HE lAWS Of THE STATE Of l.lINNESOTA """"""". ...n: """""''''0. AS NOTED DESlGHS"I'; BAF JAK TODD E. HU8MER OATE:Novl!Imber 9, 2009 uc. NO: 24-043 OlECKID B"I": PROJECT NO: TI:H 1694-13 ...n: . WSB & ASliociotes, {nt:. Infrastructure _ Engineering _ Planning _ Construction 701 Xenia Avenue South Suite 300 Minneapolis, MN 55416 Tel: 763-541-4800 Fax: 763-541-1700 January 19,2010 Honorable Mayor and City Council Members City of Chanhassen 7700 Market Boulevard P.O. Box 147 Chanhassen, MN 55317 Re: Hill Street Drainage Improvements City of Chanhassen Project No. SWMP 12-2009-02 WSB Project No. 1694-13 Dear Mayor and Council Members: Bids were received for the above-referenced project on Thursday, December 17, 2009, and were opened and read aloud. A total of twelve bids were received. The bids were checked for mathematical accuracy and were tabulated. The Engineer's Estimates for the Base Bid and the Base plus Alternate Bid were $72,412.75 and $134,712.75, respectively. It is our understanding that the City does not have adequate available funds to award the Base plus Alternate Bid. Therefore, we recommend that the project be awarded upon the Base Bid only to the low bidder of Blackstone Contractors, LLC, Corcoran, Minnesota, in the amount of $66,582.30. We recommend that the City Council consider these bids and award a contract to Blackstone Contractors, LLC, based on the results of the bids received. Sincerely, WSB & Associates, Inc. ~~ Todd E. Hubmer, PE Project Manager Enclosures cc: Todd Gerhardt, City ofChanhassen Paul Oehme, City of Chanhassen Bruce Karvonen, Blackstone Contractors, LLC tsf K:\OI694-13\Admin\Construction Admin\L TR RECMMDTN-121709.doc