Loading...
1h. 2010 Pond Cleanout Project CITY OF CHANHASSEN 7700 Market Boulevard PO Box 147 Chanhassen, MN 55317 Administration Phone: 952.227.1100 Fax: 952.227.1110 Building Inspections Phone: 952.227.1180 Fax: 952.227.1190 Engineering Phone: 952.227.1160 Fax: 952.227.1170 Finance Phone: 952.227.1140 Fax: 952.227.1110 Park & Recreation Phone: 952.227.1120 Fax: 952.227.1110 Recreation Center 2310 Coulter Boulevard Phone: 952.227.1400 Fax: 952.227.1404 Planning & Natural Resources Phone: 952.227.1130 Fax: 952.227.1110 Public Works 1591 Park Road Phone: 952.227.1300 Fax: 952.227.1310 Senior Center Phone: 952.227.1125 Fax: 952.227.1110 Web Site www.ci.chanhassen.mn.us .i~ ~I r5li "RiIIM MEMORANDUM A.D. TO: Paul Oehme, Director of Public Works/City Engineer 'f' Terrance Jeffery, Water Resources coordinator~ February 8, 2010 {pl~. FROM: DATE: SUBJECT: 2010 Pond Cleanout Project No. SWMP18D: Approve Quotes and A ward Contract PROPOSED MOTION "The City Council approves the quotes and awards a construction contract in the amount of $66,852.50 with Kusske Construction Company for the 2010 Pond Cleanout Project No. SWMP18D-09-01." City Council approval requires a simple majority vote of the City Council present. BACKGROUND In order to meet water quality treatment and rate control standards, it is necessary to maintain a minimum volume within a given pond. Ponds are designed to trap sediment and this entrapment of sediment leads to a reduction in volume within the pond necessitating regular maintenance of the ponds. Based upon field review by City staff as well as resident concerns, eleven ponds were sampled in 2009 according to MPCA protocols for possible dredging. These ponds are shown on the attached map. In addition, Chanhassen is an MS4 City permitted under the National Pollution Detection and Elimination System (NPDES). Under our NPDES permit, we are required to inspect 20% of our ponds annually and maintain these ponds to their design parameters. On January 14,2009, quotes for this cleanout were requested from Kusske Construction Company, Minger Construction Company and Parrott Contracting. The three quotes received are summarized as follows: Chanhassen is a Community for Life. Providing for Today and Planning for Tomorrow Paul Oehme 2010 Pond Cleanout Project February 8, 2010 Page 2 Kusske Minger Parrott Submitted prior to the ./ ./ ./ deadline V olume of Cleanout ./ ./ ./ Offsite Disposal of Materials ./ ./ ./ Site Restoration ./ ./ ./ Base Bid $47,862.50 $51,689.90 $66,734.50 Bid Aft 1 $13,355.00 $17,498.80 $16,104.50 Pond 9 $5635.00 $23,782.30 $7,188.50 Total Bid $66,852.50 $92,971.00 $90,027.50 Based upon the three quotes received and the previous work performed by Kusske Construction Company in the City of Chanhassen, staff is recommending approving the lesser quote submitted by Kusske Construction Company and authorizing the pond cleanout work be performed by Kusske Construction Company. Staff is recommending that five of the eleven tested ponds be cleaned this year. The remaining six ponds will receive top priority in next year's dredging schedule. DISCUSSION Staff is requesting the Council approve the quotes and authorize the construction contract with Kusske Construction Company. These ponds are high priority ponds and staff has received numerous comments on the need to clean these ponds. Braun Intertec sampled each of the ponds included on the map. In all cases the ponds were found to be below the threshold for Soil Resource Value (SRV) 1. Therefore the excavated pond sediments may be reused without restrictions. FUNDING The project is planned to be funded with the Surface Water Management Plan (SWMP) funds and was identified in the 2010 CIP SWMP-032. Staffhad budgeted $25,000 from SWMP funds for the project. The proposed road improvement project on Audubon Road has made the need for adequate storage and treatment of increased importance in this area. Because of this need pond location #7 was included in the base bid. This pond is by far the largest pond requiring the largest volume of sediment removal. This pond alone accounts for nearly 60 percent of the project cost and over 70 percent of the volume of sediment to be removed. Staff is recommending that funding for pond location #7 come out ofthe Fees for Services budget in the Surface Water Management Fund as this pond would likely not have been included in the scheduled pond cleanout were it not for the timing ofthe proposed Audubon Road project. G:\ENG\SWMP PROJECTS\SWMP18D Pond Maintenance\SWMP 18D 09-01 2009 Pond CleanoutlPond Cleanout RFP\St.ftReport_.w.rdbid_02081O.doc Paul Oehme 2010 Pond Cleanout Project February 8, 2010 Page 3 SCHEDULE If Council authorizes the construction contract, the work schedule will be as follows: February 8, 2010 A ward Contract at City Council Meeting February 9-12, 2010 Dewater Ponds February 15,2010 Begin Excavation March 1,2010 Substantial Completion May 14,2010 Final Stabilization and Restoration Complete Attachments: Location Map CIP Page G:\ENG\SWMP PROJECTS\SWMPI8D Pond Maintenance\SWMP 18D 09-01 2009 Pond CleanoutlPond Cleanout RFP\StafiReporl_awardbid_ 020810.doc b ~!. ~ ~~ ~~, I I/~J 'T i ~I~\ - V'' ;1 < ~~ J7- , "'~ vi ~ == ^ ~-ffi~ ~ ~ '" C ~ 1~( 1: . CO ~ 'I- --~- 11 ~ , U I I---- D", ~ :~ ~ ~~~~ ~~ ' ~~nt~V1J - ~~ --=t; ~ ^ I tOJ: o~~~ ill _ /~~ ,Alf ~ .^ ~ ~I ~~)Zl j(j*~ ~ ~ - ,- , lj\ I T 'iij ~I , ~ >i IIltl = "'" ";~R 0" I JIj ! f> "t: a ~'Ff t \ ~ IJl\ . ~ " "'" /\ .iJ y~ ~ 1 Iii - ~~" " E = 1f-/0:~ -- ~ - ~ if t. .~ ~~ ~'e'" QJ~3\ i II ~ t I f----I~. LJ~ ~ l ~~ti IPOWER~~'?~I~" ~~ L--D~~ ~_'V~~:(~(~ \~l~1 R-.G ~ . ~ ~lII~ ~~~'<ZtW~~ jJJ; ~'1Ii d' W Zlm '- ~~,,~~ - ~ II:~I --~. ~ ~~TC IR ~~V\~~l!r)16iBrS~' ~ ~ mdl · IJ ~ -= ~ ~B If \;j>llIrf A ~, =4i R "\ ~ llli'ill >Y1ilf ~ ,^",'6;i, , !i1Jl1j I, a. (~ _~ ~1l!'S _ ApPEND" " .. , ""'"'~h=\' MAP A ~ '" ~ --=t ~h hassen . ~" . City of C an Location Map tenance 2009/10 Pond Main I~~ N N ..,., !~~~ .--;:; Q::J 0 0 ~ 11 -U [fJ .~ c....... -U 0 o 0 ~ ~3 :J 0.. , ~ -- 0.. tI'l ;:;:;ro 0 ~ Ul ::-lco _ o (j) co - OJ -- :J l~ .5..1 - I Capital Improvement Program City of ChanhasSen,' MN 2010 thru 2014 Department Surface Water Management Contact Paul Oehme Account #1 720-7025-4751 Account #2 Account #3 Type Improvement Useful Life Category SWMP Priority nfa Project # SWMP-032 Project Name Stormwater Pond Improvements Account #4 Description I Total Project Cost: $205,000 This project will provide inspection and cleaning if required of all City stormwater ponds on a rotating four (4) year schedule, to identify any management needs and perform needed repairs and improvements. This may include sediment removal, placement of blanket, rip-rap or other erosion control BMP's, vegetation management and assessment, repair and replacement of inlet and outlet structures. Justification I There are over 170 stormwater ponds in the City of Chanhassen, all requiring regular maintenance to assure they function to National Urban Runoff Program recommendations. This measure has also been identified in Chanhassen's National Pollution Discharge Elimination Municipal Separate Storm Sewer System permit. Prior 50,000 I Total Expenditures Construction 2010 35,000 35,000 2011 25,000 25,000 2012 35,000 35,000 2013 25,000 25,000 2014 35,000 35,000 Total 155,000 155,000 Total Prior Funding Sourc_es 2010 2011 2012 2013 2014 Total 50,000 I Other Agency Contribution 10,000 10,000 10,000 30,000 Total Surface Water Utility Fund 25,000 25,000 25,000 25,000 25,000 125,000 Total 35,000 25,000 35,000 25,000 35,000 155,000 Budget Impact/Other I This will require an input of other public works staff hours. 115