Loading...
1e. Change Order No. 1, Sanitary Sewer Pipe, Lake Ann CITY OF CHANHASSEN 7700 Market Boulevard PO Box 147 Chanhassen, MN 55317 Administration Phone: 952,227,1100 Fax: 952,227,1110 Building Inspections Phone: 952,227,1180 Fax: 952,227,1190 . Engineering Phone: 952,227,1160 Fax: 952,227,1170 Finance Phone: 952,227,1140 Fax: 952,227,1110 Park & Recreation Phone: 952,227,1120 Fax: 952,227,1110 Recreation Center 2310 Coulter Boulevard Phone: 952,227,1400 Fax: 952,227,1404 Planning & Natural Resources Phone: 952,227,1130 Fax: 952,227,1110 Public Works 1591 Park Road Phone: 952,227.1300 Fax: 952,227,1310 Senior Center Phone: 952,227,1125 Fax: 952,227,1110 Web Site www.ci.chanhassen.mn.us ie.. ..... rr MEMORANDUM TO: Todd Gerhardt, City Manager ""'''t;- Paul Oehme, Director of Public Works/City Engineer FROM: DATE: April 12, 2010 SUBJ: Approve Change Order No.1 for Sanitary Sewer Service Pipe Installation at Lake Ann Park - Project No. 09-02 PROPOSED MOTION "Approve Change Order No.1 for the Well #4 raw watermain improvements in the amount of $33,700.30 for sanitary sewer service pipe installation at Lake Ann Park and amend the 2010 Park and Trail Capital Improvement Program to include $34,000 for the project." Approval requires a simple majority vote of the City Council present. BACKGROUND On November 23,2009, the City Council awarded a construction contract to GM Contracting for directionally boring a raw water line to deliver the well water from Well #4 to the East Water Treatment Plant for treatment. This project specified the use of the directional boring technology to minimize restoration costs and disruption to the traveling public. DISCUSSION The Chanhassen Athletic Association, in cooperation with the City and local business community, is hoping to make improvements this spring and summer to the ball field concession stand in Lake Ann Park. These improvements would include making the shelter a permanent concession facility by expanding the food service area within the existing structure, adding stainless steel sinks and counters and running hot and cold water. A potable water line is already available in place near the shelter. In the future, construction of modem restroom facilities is also planned for this site. The same sewer line that is proposed for the concession stand project will be able to service these future restrooms. Chanhassen is a Community for Life - Providing for Today and Planning for Tomorrow Todd Gerhardt Approve Change Order No.1 for Sewer Pipe Installation April 12, 2010 Page 2 It is the desire of the Athletic Association to serve concessions during their games and over tournament weekends. Not having concessions severely restricts their ability to host tournaments and grow their community baseball program. The concession improvements are proposed to be completed through a "community build" project utilizing donated design work, labor, and materials from the local business community. The value of this work is expected to exceed $20,000. In order to make these improvements, a sewer line would need to be constructed at this time. Staff obtained three quotes to directionally drill 870 feet of 6-inch sewer pipe from the picnic shelter and connecting the pipe to the existing sanitary lift station on the south side of Lake Ann. A sanitary manhole will also need to be constructed in the boulevard for maintenance of the service. Directionally boring the sewer pipe will be quicker, have less restoration costs and will be less disruptive than open cutting the sewer pipe. OM Contracting provided the lowest price for this work with a quote of $33,700.30. Minger Construction quoted a price of $37,242.00 and S.M. Hentges and Sons a price of $42,570.00. The quoted price includes hooking up to the existing lift station and the manhole installation, but does not include a small amount of restoration work that would be needed. This restoration work planned will be completed by Park and Recreation Department staff. Funding for these improvements is proposed from the Park Dedication Fund (100%). This project is not currently identified in the Park and Trail Capital Improvement Plan. Approval of this work will require that the City Council amend the 2010 Park and Trail Capital Improvement Program to include $34,000 for the project. ATTACHMENTS 1. Quote Sheets 2. Project Location Map g:\eng\public\_2009 projects\09-02 well #4 raw watermain\bkgd 041210 co I (2).doc 4/1/20 J 0 03:30PM Quote CONTRACTING, I Ne. l.Jl'dergl'ound Utility (,:onrrrrc[or 19810 515th Ave, P.O. Box 736, Lake Crystal, MN 56055 Contact: Mike Urban Phone: 507-726-6433(Ext.211) Fax: 507-726-6399 Ouote To: City of Chanhassen Attn: Gordy Job Name: Bid Date: Owner: Revision Date: Lake Ann Park - Sewer I )/24/09 City of Chanhassen 4/1110 - 3:30 P.M. Phone: Fax: ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE AMOUNT 10 6" HDPE SANITARY SEWER - DIRECTIONAL 870.00 LF 29.95 26,056.50 DRILLED 20 CONNECT TO EXISTING LIFT STATION 1.00 LS 4,651.47 4,651.47 30 SANITARY SEWER MANHOLE COMPLETE 1.00 EA 2,992.33 2,992.33 (8FT DEPTH) GRAND TOTAL $33,700.30 NOTES: No Permits, Performance Bonds, or Traffic Control No Restoration Included No Erosion Control Included after GM Contracting is completed and off site Quote includes installing a 48" sanitary manhole complete with casting and chimney seal(Manhole is estimated at 8ft) Quote includes pipe, fusing, and installation Quote includes connecting to the existing lift station(up stream end of pipe will be capped for others to connect) Quote includes disposal of drilling fluid One mobilization included This quote is based on work being completed in conjunction with the work for the Well #4 Trunk Watermain Improvements Project. The directional drilling of the sanitary sewer must be completed before the drilling operations are completed on the Well #4 Project. The connection to the existing lift station must be completed before all ofthe connections are completed on the Well #4 project. If the work in this quote can not be done before the work at the Well #4 project is complete, the following expenses will need to be added to this quote. Drill Mobilization - $4500.00 Drilling FluidlReclaimer - $2000.00 Connection Crew Mobilization - $2500.00 Page 1 of 1 ..~..........................-.................. .. --=--1IIIIIr. . ---~ MInger Con!!ifitruc:tlon" Inc.. &..o&'ral Contracting P.O. .sOX...236 CHANHASSEN. MN 5531.7 PHONE: 952-368-9200 FAX: 952-368-9311 To: Address: City of Chanhassen Chanhassen, MN 55317 Contact: Phone: Fax: (952) 227-1100 (952) 227-1110 Project Name: Project Location: Lake Ann Sanitary Sewer Extension Chanhassen, MN Bid Number: Bid Date: 4/5/2010 Item # 1 2 3 Item Description Connect To Lift Station 6" HDPE IPS SDR 11 48" Sanitary MH 0-8' Depth Estimated Quantity Unit 1.00 EACH 870.00 LF 1.00 EACH Unit Price Total Price $1,750.00 $36.60 $3,650.00 $1,750.00 $31,842.00 $3,650.00 Total Bid Price: $37,242.00 Notes: . This quote includes: - Restoration of site with grass seed and cat 3 erosion blanket . This quote excludes: - Bond - Perm its - Traffic control - Erosion control - Survey - Stubing of pipe into concession building . If you have any questions or concerns regarding this quote please feel free to give me a call. Thank you for the opportunity and we look forward to continue working with the City of Chanhassen Luke Minger ACCEPTED: The above prices, specifications and conditions are satisfactory and are hereby accepted. CONFIRMED: Minger Construction, Inc. Buyer: Signature: Date of Acceptance: Authorized Signature: Estimator: Luke Minger (952) 368-9200 lukem@mingerconst.com 4/5/2010 9:49:57 AM Page 1 of 1 ~~'fQ) p.o. Box 69 Jordan, MN 55352 (952) 492-5700 Phone (952) 492-5705 Fax Date: April 2, 20 I 0 Proposal Submitted To: Attention: Job Name: Job Location: Architect: Date of Plans: Base Bid: Amount: Exclusions: City of Chanhassen Gordy Stauff Lake Ann Park Sewer quote Chanhassen NA o Direction drilling 42,570.00 Restoration, surveying, permits. Inclusions: tie in and mobilization. Proposal may be withdrawn if not accepted in 20 days. Sin<erely, h ~ Jeremy Gylland Project Manager 870 If of 6" hdpegravity sewer drilled, 1 ea 8' MH with ~\ Proposed 6" Sanitary Sewer Service Lake Ann Park