Loading...
1g-1. Pioneer Pass: Approve Final Plat0 CITY OF CHANHASSEN 7700 Market Boulevard PO Box 147 Chanhassen, MN 55317 Administration Phone: 952.227.1100 Fax: 952.227.1110 Building Inspections Phone: 952.227.1180 Fax: 952.227.1190 Engineering Phone: 952.227.1160 Fax: 952.227.1170 Finance Phone: 952.227.1140 Fax: 952.227.1110 Park & Recreation Phone: 952.227.1120 Fax: 952.227.1110 Recreation Center 2310 Coulter Boulevard Phone: 952.227.1400 Fax: 952.227 1404 Planning & Natural Resources Phone: 952.227.1130 Fax: 952.2271110 Public Works 1591 Park Road Phone: 952.227.1300 Fax: 952.227.1310 Senior Center Phone: 952.227.1125 Fax: 952.227.1110 Web Site wwad.chanhassen.mn.us MEMORANDUM TO: Todd Gerhardt, City Manager FROM: Bob Generous, Senior Planner DATE: September 13, 2010 OKCO SUBJ: Final Plat for Pioneer Pass, Planning Case #10 -09 PROPOSED MOTION "The Chanhassen City Council approves the final plat for Pioneer Pass creating 41 lots, 5 outlots and right -of -way for public streets, plans prepared by James R. Hill, Inc., date stamped received August 20, 2010, subject to the conditions of the staff report." City Council approval requires a majority vote of City Council present. PROPOSAL /SUMMARY The applicant is requesting final plat approval for the first phase of Pioneer Pass, which includes 41 single - family lots, a neighborhood park, right -of -way for public streets including the extension of Bluff Creek Drive from Bluff Creek Boulevard to Pioneer Trail, an outlot for access to the property to the east, and outlots for stormwater ponds and the Bluff Creek primary corridor. The entire development will eventually include 94 single- family lots (see preliminary plat below). Staff is recommending approval of the final plat for Pioneer Pass subject to the conditions of the staff report. BACKGROUND On July 12, 2010, the Chanhassen City Council approved the Preliminary Plat creating 94 lots, 4 outlots and right - of -way for public streets; a Conditional Use Permit for development within the Bluff Creek Overlay District with a Variance for encroachment into the Primary Zone for the construction of a stormwater pond; an Interim Use Permit to allow site grading prior to final plat approval; and a Wetland Alteration Permit for the grading and filling of wetlands on site. 4 'Lya �3. •• ' Chanhassen is a Community for Life - Providing for Today and Planning for Tomorrow Todd Gerhardt Pioneer Pass Final Plat September 13, 2010 Page 2 of 27 SUBDIVISION REVIEW The developer is requesting final plat approval to create 41 single-family lots as part of the Pioneer Pass development. In this phase, the city park will be graded, Bluff Creek Drive will be extended to Pioneer Trail, the stormwater ponds will be installed, the wetland mitigation will be created and the southern half of the development will have City streets, sewer and water constructed. PIONEER PASS PIONEER PASS INSET A ­Wi A CREEK BOULEVARD zo o INSET Y" INSET B E PIONEER PASS INSET A CREEK BOULEVARD E JAMES R Todd Gerhardt Pioneer Pass Final Plat September 13, 2010 Page 3 of 27 COMPLIANCE TABLE Area (sq. ft.) PIONEER PASS Depth (ft.) Notes Code (RLM District) INSET B 50 110 Setbacks: Front -25'; side -5' (garage side), 10' (house side); rear -25', Bluff Creek Primary -40' ;Coverage: 35% L1 131 12,600 102 137 Corner lot L2 B1 9,618 83 127 L3 BI 9,310 J a `- -, : ask. • > �_ b a sn.: ' ",^ to 124 , _ L4 B 1 9,498 72 131 L5 BI 10,701 e 137 ' .::._» .. •� r �. L6 B1 ,. � is }3 90 It L7 131 9,745 67 128 COMPLIANCE TABLE Area (sq. ft.) Width (ft.) Depth (ft.) Notes Code (RLM District) 9,000 50 110 Setbacks: Front -25'; side -5' (garage side), 10' (house side); rear -25', Bluff Creek Primary -40' ;Coverage: 35% L1 131 12,600 102 137 Corner lot L2 B1 9,618 83 127 L3 BI 9,310 78 124 L4 B 1 9,498 72 131 L5 BI 10,701 86 137 L6 B1 10,703 90 265 L7 131 9,745 67 128 L 8 B 1 11,074 67 142 L9 131 14,685 90 175 Corner Lot Ll B2 12,600 83 138 Corner Lot L2 B2 9,643 70 133 L3 B2 10,633 72 129 L4 B2 9,327 72 129 L5 B2 9,324 72 129 L6 132 10,625 71 130 L7 B2 10,660 72 128 L8 B2 11,462 106 145 L9 B2 15,043 121 170 Corner Lot L10 132 13,772 164 119 L11 132 10,646 102 131 L12 132 10,625 88 130 Todd Gerhardt Pioneer Pass Final Plat September 13, 2010 Page 4 of 27 GRADING The current high point of the property is generally located east of the Bluff Creek Boulevard roundabout. The site is currently being graded according to the Interim Use Permit granted on July 12, 2010. The grading plan shows that a small area within K. Hovnanian's Liberty on Bluff Creek development will be graded with the project. The developer is in the process of obtaining an easement from the homeowners association to complete grading and restoration in this area. Area (sq. ft.) Width (ft.) Depth (ft.) Notes Code (RLM District) 9,000 50 110 Setbacks: Front -25'; side -5' (garage side), 10' (house side); rear -25', Bluff Creek Primary -40' ;Coverage: 35% L13 B2 10,625 82 130 L14 B2 10,625 86 130 L15 B2 10,624 81 130 L16 B2 9,909 77 130 L17 B2 11,723 86 142 Corner Lot L1 B3 13,756 67 165 Bluff Creek Primary L2 B3 14,285 70 187 Bluff Creek Primary L3 B3 14,901 70 195 L4 B3 15,523 70 192 L5 B3 11,799 67 159 L6 B3 12,497 64 153 L7 B3 15,288 64 165 L8 B3 11,716 67 150 L9 B3 10,876 68 139 L10 B3 9,972 72 139 L11 B3 9,972 72 138 L12 B3 10,651 75 137 L13 B3 10,726 71 135 L14 B3 10,764 83 136 L15 B3 12,039 95 134 Corner Lot Outlot A 38,344 Road Access for property to east, 0.88 ac. Outlot B 747,538 Bluff Creek Primary zone, wetland mitigation, storm water pond, 17.161 ac. Outlot C 823,000 Phase 2 development area, 18.893 ac. Outlot D 18,232 Storm water pond, 0.419 ac. Outlot E 379,345 City Park, 8.709 ac. ROW 284,201 6.524 ac. TOTAL 2,761,224 63.389 ac. Avg. Lot size this p hase 11,477 GRADING The current high point of the property is generally located east of the Bluff Creek Boulevard roundabout. The site is currently being graded according to the Interim Use Permit granted on July 12, 2010. The grading plan shows that a small area within K. Hovnanian's Liberty on Bluff Creek development will be graded with the project. The developer is in the process of obtaining an easement from the homeowners association to complete grading and restoration in this area. Todd Gerhardt Pioneer Pass Final Plat September 13, 2010 Page 5 of 27 MnDOT has approved the off -site grading required to construct a collector road (Bluff Creek Drive) to Pioneer Trail. If importing or exporting material for development of the site is necessary, the applicant will be required to supply the City with detailed haul routes. The low floor elevation of Lot 15, Block 3 must be minimum three feet above the 100 -year elevation of the adjacent pond. This may result in changing the house style from a lookout to a walkout. The grading plan must be revised to show that the high water level for Pond 7 (Outlot D) does not extend into the MnDOT right -of -way. The grading within the park must be revised to eliminate the channelized flow to the creek. Drainage and utility easements are required over all of the outlots. RETAINING WALLS The grading plan identifies a retaining wall on the northwest portion of the plat, about 100 feet east of the temporary terminus of Hemlock Way. The maximum height of this retaining wall is four feet; therefore, the wall must be designed by a Structural Engineer registered in the State of Minnesota and a building permit is required. Retaining walls constructed with the development will be the responsibility of the homeowners association. UTILITIES Trunk sanitary sewer and watermain to serve the proposed development were constructed with the 2005 MUSA Expansion Improvements, City Project 04 -05. Lateral sanitary sewer and watermain within the development will extend from the existing trunk facilities within Bluff Creek Boulevard. An additional lateral sanitary sewer connection is proposed from the existing 8 -inch stub at Freedom Lane, within the Liberty on Bluff Creek development to the west. Due to the grade variation within the site, some segments of the sanitary sewer will exceed 16 feet in depth. Sanitary sewer that is 16 to 26 feet deep must be SDR 26; sewer in excess of 26 feet deep must be SDR 18. The developer will install 12 -inch trunk watermain within Bluff Creek Drive. The City will reimburse the developer the cost difference between 8 -inch lateral and 12 -inch trunk watermain. A water service stub must be installed for the park area at a location acceptable to the Parks and Recreation Director. The developer shall install a pressure reducing valve vault in the southern portion of Bluff Creek Drive. The City will determine the location and design of the vault in conjunction with the final plat design. The developer will be reimbursed for the cost of the vault. Todd Gerhardt Pioneer Pass Final Plat September 13, 2010 Page 6 of 27 The property is subject to sanitary sewer and water hookup charges for all of the lots. A portion of these fees will be collected with the final plat and is calculated as follows: Partial Payment of Sanitary Sewer Hookup: 41 units x $608 /unit = $24,928.00 Partial Payment of Watermain Hookup: 41 units x $1,618 /unit = $66,338.00 The remainder of these hookup fees will be collected with the building permit at the rate in effect at that time. The Met Council SAC charge will also be collected with the building permit. The developer will be responsible for extending lateral sewer and water service to the lots; therefore, the sanitary sewer and water connection charges do not apply. All of the utility improvements are required to be constructed in accordance with the City's latest edition of Standard Specifications and Detail Plates. Permits from the appropriate regulatory agencies will be required, including the MPCA, NPDES, Dept. of Health, Carver County, MnDOT and Watershed District. STREETS The developer will construct Bluff Creek Drive from the existing roundabout to Pioneer Trail. The southern 400 feet of this street lies outside of the plat and within Minnesota Department of Transportation (MnDOT) right -of -way for Highway 212. Based on the final alignment of Highway 212, MnDOT has indicated that this right -of -way will likely be turned back in the future. Prior to final plat approval, the City and the developer must work with WDOT to obtain the necessary approvals and/or agreements necessary to construct this street. The developer proposes to construct two public streets within this phase of the development. All public streets shall be 31 feet wide within a 60 -foot wide right -of -way. The owner of the exception parcels should work with MnDOT, the County and the City to determine future access to these areas. The Arterial Collector Roadway Fee will be waived since the developer will be constructing Bluff Creek Drive (a collector road). The10 -foot wide bituminous trail shall be constructed on the west side of Bluff Creek Drive; sidewalk shall be constructed on the east side. Both the sidewalk and trail shall extend to Pioneer Trail. ASSESSMENTS There are three deferred assessments (with interest) on the parent property: 1. 2005 MUSA Area Expansion: $301,044.41(principal amount) 2. Bluff Creek Boulevard Improvements: $1,017,682.41(principal amount) 3. Highways 101 and 212/Lyman Blvd. improvements: $188,659.46 (principal amount) Todd Gerhardt Pioneer Pass Final Plat September 13, 2010 Page 7 of 27 The September 13, 2010 City Council consent agenda includes the proposed reapportionment of these assessments. If the consent agenda is approved, $546,582.48 (plus $122,272.88 interest as of September 13, 2010) will be apportioned to the lots and blocks within the Pioneer Pass final plat and $706,557.84 (plus $158,060.06 interest as of September 13, 2010) apportioned to Outlot C of the Pioneer Pass plat. Staff proposes to reapportion this assessment as follows: $668,855.36 - 41 units = $16,313.55 /unit Outlot C: $864,617.90 These assessments are for 7 years at 6% interest. The letter of credit will include $1,253,140.32 for the assessments within the Pioneer Pass plat. GRADING, DRAINAGE AND EROSION CONTROL Wetlands In October of 2005, Graham Environmental Services delineated seven wetlands on the property identified as the Peterson property. Of these wetlands, three are located on the subject property to be platted as Pioneer Pass. Wetlands A, B, I and F were found to be jurisdictional wetlands in the Graham report. Wetland A was mitigated for by the City of Chanhassen for the construction of Bluff Creek Drive. Wetland I will be mitigated for as part of this project. The mitigation area is to be located northerly on the property in that area which will be developed in Phase 11. Because this area is not to be disturbed at this time and insufficient hydrology will be available until then, the applicant is not planning on creating the mitigation area at this time. Under the rules in effect at the time the wetland alteration was approved, the applicant can, at the discretion of the LGU, delay mitigation provided that a letter of credit or other surety is secured equal to at least 110% of the construction cost of the mitigation. The applicant has provided this in an amendment to their letter of credit. The current plan shows a buffer area around the Mitigation Area only, not the remaining wetlands on the property. Chanhassen City Code requires that a buffer be preserved or created around all wetlands on a property. Because this area was in agricultural production and is not likely to support a community of native vegetation, the applicant will need to establish a native buffer. This will need to be shown on the plans and buffer signs will need to be placed. The applicant will need to work with City Staff concerning the purchase and placement of the signs. Retaining Walls The grading plan identifies a retaining wall as shown in red on the diagram below. The maximum height of this retaining wall is 15 feet; therefore, the wall must be designed by a Structural Engineer registered in the State of Minnesota and a building permit is required. The wall must be located entirely on the private lots and not within the drainage and utility easement or the outlot. Todd Gerhardt Pioneer Pass Final Plat September 13, 2010 Page 8 of 27 Surface Water Management Connection Charges The applicant is proposing to develop this piece in two phases. The currently proposed phase has 13.545 acres of assessable area. Further, the applicant will receive credit for that area which is to be treated by the proposed NURP basins — Pond 6 and Pond 7. This area is equal to 11.76 acres and will have one outlet from the site. Total credit is $17,435.20 for the phase. Water Quality Fees Because of the impervious surface associated with this development, the water quality fees for this proposed development are based on single - family residential development rates of $2,540 per acre. Assessable area is equal to the area of Blocks 1, 2 and 3 and the right -of -way less the public right - of -way for Bluff Creek Boulevard. This net equals 13.545 acres. Therefore, the gross water quality fees associated with this project are 13.545 acres multiplied by $2,540 /acre or $34,404.30. Water Quantity Fees The SWMP has established a connection charge for the different land uses based on an average citywide rate for the installation of water quantity systems. This cost includes land acquisition, proposed SWMP culverts, open channels, and storm water ponding areas for runoff storage in addition to mitigation for flood damage. Single - family residential developments have a connection charge of $2,640 per developable acre. This results in a water quantity fee of $35,758.80 for the proposed development. SWMP Credits This project proposes the construction of three NURP basins. The applicant will be credited for 50% of the water quality charge for each acre draining to a NURP basin on site. Sub - catchment areas 2, 6, 7 and 9 are all treated in the three NURP basins. Credit for this treatment will be $14,935.2 or [$2540(0.5)* 1 1.76ac]. There will be one outlet structure with BMPs for rate control and the removal of floatables. This structure warrants a $2,500 credit. At this time, the total net SWMP fee, due payable to the City at the time of final plat recording, is $52,727.90. Drainage The applicant provided a summary of the HydroCAD model. While there is some change to the watershed boundaries, approximately the same areas are draining to the same receiving waters post - development as pre- development. They have reduced the 100 -year runoff rates in post - development conditions. There are two exceptions to this. Subcatchment area 3S now runs west to Bluff Creek Drive where the existing infrastructure appears adequate to handle this relatively minor increase in discharge rate. The other exception is subcatchment 8S in the southeast corner. This area will now discharge to MnDOT right -of -way. The applicant has received approval from the Department of Transportation to redirect runoff to this area. The model has been revised to reflect the post- development conditions which will be more similar to C hydrologic group soils. Todd Gerhardt Pioneer Pass Final Plat September 13, 2010 Page 9 of 27 To avoid further degradation to the existing gully due to erosion the applicant has moved the outlet for pond 6 per the direction of City staff. This new outlet also avoids additional encroachment into the Bluff Creek Overlay District. Energy dissipation and soil stabilization best management practices need to be employed so that new gullies, rills or escarpments do not form. Materials such as Scour StopTM, Erosion Control Blanket P42TM, or other similar turf reinforcement mat products shall be installed in conjunction with traditional rip -rap and this design must be provided to the City for their review and approval. The establishment of woody vegetation in the form of dense shrubs, such as sandbar willow, beyond the outlet would be strongly encouraged as well. Bluff Creek Overlay District The subject property is encumbered by the Bluff Creek Overlay District to the north, northeast and southwest. While the mitigation area and stormwater pond will encroach into the Bluff Creek Overlay District, this will not occur with this phase but rather upon development of the northern portion of the property. By moving the outlet for Pond 6, encroachments into the Bluff Creek Overlay District have all been avoided for this phase of development. The future proposed encroachments will require a conditional use permit and a variance. Other Agencies The applicant shall apply for and obtain permits from the appropriate regulatory agencies (e.g., Minnesota Pollution Control Agency, Minnesota Department of Natural Resources (for dewatering), Carver SWCD, Minnesota Department of Transportation, et al) and comply with their conditions of approval. BLUFF CREEK OVERLAY DISTRICT The City of Chanhassen established the Bluff Creek Overlay District (BCOD) by ordinance in 1998 to protect the Bluff Creek Corridor, wetlands, bluffs and significant stands of mature trees through the use of careful site design and other low- impact practices. This parcel is partially encumbered by the Bluff Creek Overlay District. No alterations are allowed within the primary corridor or within the first 20 feet of the setback from the primary corridor. All structures must meet the 40 -foot setback from the primary corridor. If any alterations are proposed on property within the Bluff Creek Overlay District, a conditional use permit must be obtained prior to alterations occurring. All structures must meet a 40 -foot structural setback from the Primary Corridor boundary as required by Chanhassen City Code. In addition, no grading is allowed within the first 20 feet of the Primary Corridor. The applicant is proposing to construct a stormwater pond, a wetland mitigation area and approximately 160 feet of sanitary sewer within the Bluff Creek Overlay District (BCOD). No roads, lots or other infrastructure are to be placed within the BCOD. Because of the need to mitigate, there is no reasonable alternative to creating on -site mitigation without encroaching into the Primary Zone of the Bluff Creek Overlay District. This area is most likely to have suitable soils, hydrology and vegetation for a successful mitigation area. At this time, there will be no encroachment into the primary zone as this will happen with the subsequent phase. When this does occur, as a condition of approval, the applicant will be required to develop a revegetation plan for the Primary Corridor. Todd Gerhardt Pioneer Pass Final Plat September 13, 2010 Page 10 of 27 WETLAND ALTERATION PERMIT In May of 2006, the City as the LGU responsible for the administration of the Wetland Conservation Act, approved the permanent impact of 0.47 acres of Type 1, (PEMAf) Palustrine Emergent Vegetation Seasonally Flooded, farmed wetland. These wetlands were identified as A and I in the Graham Environmental Services (GES) report and is shown to the left. The originally approved development plan and Wetland Alteration Permit called for these impacts to be mitigated on -site through the creation of 0.48 acres (20,909 ST) of new wetland credit and 1.22 acres of public value credit in the form of NURP ponds and wetland buffer. The approved plan called for 10,190 square feet of wetland buffer and 43,124 square feet of ponding. Even though the MN Rules changes in 2007 and much of this mitigation would not be eligible for credit, the Wetland Alteration Permit was approved under the 2002 rules. However, Chanhassen Code, Section 20 -419, states that "the permittee shall begin and complete the development authorized by the wetland alteration permit within one year after the date the council approves the permit application." It has been four (4) years since approval was granted. The current plan proposes to create 18,464 square feet of new wetland credit. This is 2,445 square feet short of the 20,909 square feet required by the approved replacement plan. The approved replacement plan called for 10,190 square feet of buffer. The proposed plan shows 15,303 square feet of buffer. In 2006, the Wetland Conservation Act required that at least the first 1:1 replacement is new wetland credit. Mitigation Area #1 must be revised to provide no less than 20,909 square feet of new wetland credit. This will meet WCA requirements. Under new State rules, stormwater ponding would not be allowed for use as public value credits. Since a portion of the impacts have already occurred prior to mitigation, the City may increase the replacement ratio. To mitigate for these wetland losses, the applicant must create the 20,909 square feet of new wetland credit and 20,473 square feet of public value credit in the form of wetland buffer. This buffer area cannot count the stormwater pond. Wetland Impact New Wetland Credit I Public Value Credit A 527 SF Not Applicable — mitigated for under previous plan I 20,473 SF 20,909 SF 120,473 SF Z 4,206 SF Not Applicable — mitigated for under previous plan TOTAL 20,909 SF 120,473 SF Todd Gerhardt Pioneer Pass Final Plat September 13, 2010 Page 11 of 27 This mitigation area must have its own detailed plan including two cross - sectional views, a description of the soils and how they will be suitable to wetland characteristics, a detailed planting schedule and vegetation management plan including annual benchmarks for plant establishment, a discussion of the hydrology and supporting documentation that it will be adequate to support the intended wetland conditions, a five -year monitoring plan consistent with the MN Wetland Conservation Act, and surety money equal to 110% of the cost of the wetland and buffer creation. Based upon preliminary review of the plan, it is unclear that there will be adequate hydrology directed to the mitigation area to assure success. The selected contractor and applicant must also provide the City with a signed Board of Soil and Water Resources "Contractors Responsibility and Landowner Statement" form and a "Deed Restrictions and Covenants" form. Because of phasing the site development, the applicant is proposing to postpone the creation of the wetland mitigation until Phase 2 of the project. In lieu of this, the applicant has amended the letter of credit to include the estimated cost of wetland construction as provided by James R. Hill, Inc. REVIEW CONDITIONS OF APPROVAL The preliminary plat for Pioneer Pass creating 94 lots, 4 outlots and right -of -way for public streets, plans prepared by James R. Hill dated June 4, 2010, was approved subject to the following conditions: 1. Building Official: a. The developer must submit a list of proposed street names for review and approval prior to final plat of the property. *This condition shall be modified as follows: The north -south collector street shall be shown as Bluff Creek Drive. b. Developer to provide 1:200 scale plat drawing (with lot numbers, block numbers and street names only) for addressing purposes. *This condition still applies. c. Demolition permits must be obtained before demolishing any existing structures. *This condition still applies. d. A final grading plan and soils investigation /correction report must be submitted to the Building Inspections Division before permits can be issued. *This condition still applies. Todd Gerhardt Pioneer Pass Final Plat September 13, 2010 Page 12 of 27 e. Retaining walls over four feet high require a building permit and must be designed by a Structural Engineer registered in the State of Minnesota. *This condition still applies. f. Each lot must be provided with separate sewer and water services. *This condition still applies. g. The developer and/or their agent shall meet with the Inspections Division as early as possible to discuss plan review and permit procedures. *This condition still applies. 2. Engineer: a. The developer must coordinate the proposed grading within the Liberty on Bluff Creek property and the restoration with the homeowners association. *This condition still applies. b. The developer must obtain approval to complete the off -site grading required to construct a collector road (Bluff Creek Drive) to Pioneer Trail. *This condition has been met. c. If importing or exporting material for development of the site is necessary, the applicant will be required to supply the City with detailed haul routes. *This condition still applies. d. Additional catch basins will be required along Street A. The number and location will be determined with the final plat submittal. *This condition does not apply to this addition. e. The developer's engineer must work with City staff to improve the proposed drainage patterns at the back of Lots 11 through 14, Block 2. *This condition does not apply to this addition. Todd Gerhardt Pioneer Pass Final Plat September 13, 2010 Page 13 of 27 f. A drain tile service stub must be provided for any lot that drains from the back to the front. *This condition does not apply to this addition. g. The low floor elevations of Lots 33 to 35, Block 1 must be adjusted so that they are minimum three feet above the high water level of the adjacent pond. *This condition shall be revised as follows: The low floor elevation of Lot 15, Block 3 must be minimum three feet above the 100 -year elevation of the adjacent pond. h. Verify the first floor elevation of Lots 1 through 3, Block 1. *This condition does not apply to this addition. i. Retaining walls constructed with the development will be the responsibility of the homeowners association. *This condition still applies. j. Sanitary sewer that is 16 to 26 feet deep must be SDR 26; sewer in excess of 26 feet deep must be SDR 18. *This condition still applies. k. The sanitary sewer between Lots 5 and 6, Block 1 must be installed within a steel casing pipe. *This condition does not apply to this addition. The developer will install 12 -inch trunk watermain within Bluff Creek Drive. The City will reimburse the developer the cost difference between 8 -inch lateral and 12 -inch trunk watermain. *This condition still applies. m. A water service stub must be installed for the park area at a location acceptable to the Parks and Recreation Director. *This condition still applies. Todd Gerhardt Pioneer Pass Final Plat September 13, 2010 Page 14 of 27 n. A pressure - reducing valve is required within the homes with a low floor elevation of 935 feet or lower. *This condition no longer applies. o. The developer shall install a pressure- reducing valve vault in the southern portion of Bluff Creek Drive. The City will determine the location and design of the vault in conjunction with the final plat design. The developer will be reimbursed for the cost of the vault. *This condition still applies. p. The property is subject to sanitary sewer and water hookup charges for all of the lots. The 2010 Met Council SAC charge is $2,175 per unit. The City's 2010 trunk utility hookup fees are $2,026 per unit for sanitary sewer and $5,393 per unit for water. A portion of the trunk utility hookup fees will be collected with the final plat: for 2010 the portion collected with the development contract is $608.00 /unit of the sanitary sewer hookup fee and $1,618.00 /unit of the water hookup fee. *This condition shall be revised as follows: The property is subject to sanitary sewer and water hookup charges for all of the lots. A portion of these fees will be collected with the final plat and is calculated as follows: Partial Payment of Sanitary Sewer Hookup: 41 units x $608 /unit = $24,928.00 Partial Payment of Watermain Hookup: 41 units x $1,618 /unit = $66,338.00 The remainder of these hookup fees will be collected with the building permit at the rate in effect at that time. The Met Council SAC charge will also be collected with the building permit. q. All of the utility improvements are required to be constructed in accordance with the City's latest edition of Standard Specifications and Detail Plates. *This condition still applies. Permits from the appropriate regulatory agencies will be required, including the MPCA, NPDES, Dept. of Health, Carver County, MnDOT and Watershed District. *This condition still applies. s. Prior to final plat approval, the City and the developer must work with MnDOT to obtain the necessary approvals and/or agreements necessary to construct the portion of Bluff Creek Drive that will lie within the MnDOT right -of -way. Todd Gerhardt Pioneer Pass Final Plat September 13, 2010 Page 15 of 27 *This condition still applies. t. The grade of the public streets must be adjusted so that they do not exceed 8%. *This condition has been met. u. The owner of the exception parcels shall work with MnDOT, the County and the City to determine future access to these areas. *This condition still applies. v. The outstanding assessments, plus accrued interest must be paid with the final plat or reapportioned to the lots within the final plat. This condition shall be modified as follows: Each lot within the Pioneer Pass final plat will be subject to a $16,313.55 assessment over 7 years at 6% interest for the 2005 MUSA improvements and Highways 101/212 and Lyman Boulevard improvements. Outlot C will be subject to a $864,617.90 assessment for the 2005 MUSA improvements and Highways 101/212 and Lyman Boulevard improvements. Based on review of the construction plans for the development, staff is recommending that the following conditions be added: a. The grading plan must be revised to show that the high water level for Pond 7 ( Outlot D) does not extend into the MnDOT right -of -way. b. The grading within the park must be revised to eliminate the channelized flow to the creek. c. Drainage and utility easements are required over all of Outlots A, B, C and D, Pioneer Pass. d. The 10 -foot wide bituminous trail shall be constructed on the west side of Bluff Creek Drive; sidewalk shall be constructed on the east side. e. Both the sidewalk and trail shall extend to Pioneer Trail. 3. Environmental Resource Specialist: a. The applicant shall plant 343 trees within the development. Each lot shall have a minimum of two overstory, deciduous trees planted in the front yard. *This condition still applies. Todd Gerhardt Pioneer Pass Final Plat September 13, 2010 Page 16 of 27 b. The applicant shall install the total required bufferyard along Bluff Creek Boulevard and Outlot C. *This condition has been met. c. The applicant shall develop a restoration plan including native plants for the Bluff Creek Overlay district north of Block 1. The plant species shall be selected from the Bluff Creek Management Plan Appendix C. The final plan must be reviewed and approved by the City before installation. *This condition still applies. d. Lots 13, 14, 25 and 26, Block 2 shall receive an increased number of evergreen plantings to shield the properties from oncoming traffic headlights. *This condition has been met. e. The applicant shall revise the landscape plan to show more variation in boulevard plantings. No more than 10 trees of a species may be grouped together. *This condition has been met. f. Tree protection fencing shall be installed prior to construction around all areas designated for preservation and/or at the edge of proposed grading limits. *This condition still applies. g. No burning permits shall be issued for tree removal. All trees removed on site shall be chipped and used on site or hauled off. *This condition still applies. 4. Fire Marshal: a. Additional fire hydrants will be required and some will need to be relocated. Contact the Fire Marshal for which hydrants are in question. *This condition has been met. b. Water main and fire hydrants shall be installed and made serviceable prior to combustible construction (2007 MSFC Sec. 503.1.1.). Todd Gerhardt Pioneer Pass Final Plat September 13, 2010 Page 17 of 27 *This condition still applies. c. A three -foot clear space shall be maintained around fire hydrants (2007 MSFC Sec. 508.5.4.). *This condition still applies. d. Temporary street signs shall be installed as soon as construction begins. Signs shall be of an approved size, weather resistant, and maintained until replaced by permanent signs (2007 MSFC Sec. 505.2.). *This condition still applies. e. Fire apparatus access roads and water supply for fire protection is required to be installed. Such protection shall be installed and made serviceable prior to and during time of construction except when approved alternate methods of protection are provided (2007 MSFC Sec. 501.4.). *This condition still applies. 5. Park Director: a. Successful transfer of Outlot C (8.7+ acres) to the City of Chanhassen through a combination of dedication and fee purchase for development and use as a neighborhood park. *This condition still applies. b. Extension of trail (west side of road) and sidewalk (east side of road) paralleling the planned connector street south to their respective connection points at the intersection of Pioneer Trail and Bluff Creek Drive. *This condition still applies. c. Install a sidewalk on Street D from Street A to Bluff Creek Drive. *This condition has been partially met and shall be modified as follows: Install a sidewalk on Mayapple Pass. Todd Gerhardt Pioneer Pass Final Plat September 13, 2010 Page 18 of 27 6. Planner: a. Lot 20, Block 2, shall be adjusted to meet minimum 110 feet of lot depth. *This condition is not applicable in this phase. b. A 30 dBA attenuation shall be provided by the building design and construction along with year -round climate control for the homes adjacent to the TH 212 /Pioneer Trail night- of -way. *This condition still applies. c. The developer shall pay $23,649.00 as their portion of the 2005 AUAR. *This condition shall be modified as follows since only 43.6 percent (41 lots /94 lots) of the project is being developed at this time: The developer shall pay $10,315.00 as their portion of the 2005 AUAR for this phase of the project. d. The property owner may donate Outlots A and B to the City, or if retained under private ownership, dedicate a roadway /trail easement and drainage and utility easement over Outlot A, and conservation easement, trail easement and a drainage and utility easement over Outlot B. *This condition still applies. 7. Water Resources Coordinator: a. The HydroCAD model shall be revised to accurately reflect the post - development soil conditions or evidence shall be provided that soils post development will have a water transmission rate between 0.15 and 0.30 in /hr. *This condition has been met. b. All conditions for the wetland alteration permit must be met (Chapter 20 Article VI). *This condition still applies. c. Wetland I, as delineated by Graham Environmental Services, Inc., needs to be shown on Sheet 1.2 and other applicable plan sheets. *This condition has been met. Todd Gerhardt Pioneer Pass Final Plat September 13, 2010 Page 19 of 27 d. Wetland buffers and setbacks shall be shown around all wetland features on or adjacent to the subject property on the plat and grading plans (20 -412). *This condition does not apply to this phase. e. Where, if at all, the buffer encroaches onto a private lot, a drainage and utility easement is required (20 -412). *This condition does not apply to this phase. f. Wetland buffers must be planted with native vegetation per Section 20 -412. *This condition does not apply to this phase. g. Make the Soil Boring report available to the City (18 -40). *This condition has been met. h. SWMP fees, estimated at $119,830.52, will be due to the City at final plat (4 -30). *This condition shall be modified as follows: SWMP fees of $52,727.90 shall be paid for this phase of the development prior to the recording of the final plat. i. The applicant or their agent must secure permissions from the Minnesota Department of Transportation to discharge subcatchment area 8S to MnDOT right -of -way. *This condition has been met. J. As stated in Section 18- 40(4)2v, Drain tile service must be provided to any lots where drainage is directed from back to front. This condition exists along Street B between lots 16 & 17 as well as lots 18 & 19. Because of the presence of Hamel loam, a soil with a known seasonally high water table less than one foot below the surface, drain tile shall be extended from Lot 12 to the CBMH in front of Lot 19 of Block 2. Drain tile is also encouraged in front of lots 1, 2, 3, 41 and 42 of Block 3, and Lots 1, 2 and 3 of Block 2. The soil boring report will be beneficial in making this determination (18 -40). *This condition still applies. k. The swale between Street B and Street C must be within a drainage and utility easement. Care should be taken to design the grading so that surface drainage from Street C isn't directed into the residences along Street B (18 -76). Todd Gerhardt Pioneer Pass Final Plat September 13, 2010 Page 20 of 27 *This condition does not apply to this phase. 1. The outlet for Pond 2 is to be moved as far west as is practical (19 -144). *This condition does not apply to this phase. m. Applicant must demonstrate how the City can access Pond 2 for future maintenance. *This condition does not apply to this phase. n. The outlet for Pond 6 is to be moved so that the discharge point is approximately 75 feet from the proposed location. Energy dissipation and soil stabilization best management practices such as ScourStopTM, Erosion Control Blanket P42TM or similar shall be used in addition to rip -rap (18 -62). *This condition shall be modified as follows: The developer needs to show detail drawing of discharge point and how energy dissipation will be achieved. o. A SWPPP specific to this site shall be prepared and submitted to the City and Carver SWCD (18 -40). *This condition shall be modified as follows: A SWPPP specific to this site shall be prepared and submitted to the City and Carver SWCD (18 -40). 1) All surface waters and existing wetlands, which can be identified on maps such as United States Geological Survey 7.5 minute quadrangle maps or equivalent maps within one mile from the project boundaries, which will receive stormwater runoff from the construction site, during or after construction. Where surface waters receiving runoff associated with construction activity will not fit on the plan sheet, they must be identified with an arrow, indicating both direction and distance to the surface water. The SWPPP must identify if the surface water is a special or impaired water. 2) The SWPPP must incorporate the requirements of Part III ( Stormwater Discharge Design Requirements), Part IV (Construction Activity Requirements) and Appendix A for the project. A narrative describing the timing for installation of all erosion prevention and sediment control BMPs required in Part III, Part IV and Appendix A must also be included in the SWPPP. Todd Gerhardt Pioneer Pass Final Plat September 13, 2010 Page 21 of 27 p. Areas where proposed and existing grades are to be matched shall be done so that no concentrated flow conditions are created. These areas include, but are not necessarily limited to, the backyard of Lot 7, Block 1, the backyards of Lots 1 and 2 of Block 1 and adjacent to the extension of Bluff Creek Boulevard at the intersection with Pioneer Trail (18 -62). *This condition is still applicable. q. Type 3, weed -free mulch shall be used in outlot B. *This condition is still applicable. r. Inlet protection will be required on the existing CBMH at the northerly intersection of Bluff Creek Boulevard and proposed Street A (18- 62/63). *This condition does not apply to this phase. s. A note shall be included on sheets 3.2, 3.3 and 3.4 indicating that inlet protection will be required on all backyard CB until final stabilization is achieved. *This condition is still applicable. t. After the slopes are graded but before the erosion control blanket and seed is placed, the use of silt fence with J- hooks, straw wattles, rock logs, bioroll or other BMP will be required to break up any run 75 feet or longer (18 -62). *This condition is still applicable. u. Bluff Creek needs to be identified on the plan set and the SWPPP and erosion plans must clearly indicate that it is an impaired water for turbidity and that no discharge of untreated water will be allowed to the creek or to the fringe wetland (19 -145). *This condition is still applicable v. A detailed turf establishment plan shall be provided (19 -145). *This condition is still applicable w. A note needs to be included on the plan set that top soils are to be scraped and stockpiled and the soil stockpile area(s) need to be shown on the plan (19 -145). *This condition is still applicable Todd Gerhardt Pioneer Pass Final Plat September 13, 2010 Page 22 of 27 x. Signage for the Bluff Creek Overlay District must be posted on every other property corner and at major lot angle changes where residential yards meet the primary zone. *This condition is still applicable y. Based on review of the construction plans, staff recommends the inclusion of the following condition: Seed mixes shall be consistent with current MnDOTBWSR cooperative mixes. See MnDOT publication Native Seed Mix Design for Roadsides and BWSR State Seed Mixes: http: / /www.bwsi•.state.mn.us /native vegetation/state_ seed mixes.pdf . RECOMMENDATION Staff recommends that the City Council approve the final plat for Pioneer Pass, plans prepared by James R. Hill, Inc., dated 7/16/10 revised through 8/18/10, and dated 8/20/10, subject to the following conditions: 1. Building Official: a. The north -south collector street shall be shown as Bluff Creek Drive. b. Developer to provide 1:200 scale plat drawing (with lot numbers, block numbers and street names only) for addressing purposes. c. Demolition permits must be obtained before demolishing any existing structures. d. A final grading plan and soils investigation /correction report must be submitted to the Building Inspections Division before permits can be issued. e. Retaining walls over four feet high require a building permit and must be designed by a Structural Engineer registered in the State of Minnesota. f. Each lot must be provided with separate sewer and water services. g. The developer and/or their agent shall meet with the Inspections Division as early as possible to discuss plan review and permit procedures. 2. Engineer: a. The developer must coordinate the proposed grading within the Liberty on Bluff Creek property and the restoration with the homeowners association. Todd Gerhardt Pioneer Pass Final Plat September 13, 2010 Page 23 of 27 b. If importing or exporting material for development of the site is necessary, the applicant will be required to supply the City with detailed haul routes. c. The low floor elevation of Lot 15, Block 3 must be minimum three feet above the 100- year elevation of the adjacent pond. d. Retaining walls constructed with the development will be the responsibility of the homeowners association. e. Sanitary sewer that is 16 to 26 feet deep must be SDR 26; sewer in excess of 26 feet deep must be SDR 18. f. The developer will install 12 -inch trunk watermain within Bluff Creek Drive. The City will reimburse the developer the cost difference between 8 -inch lateral and 12 -inch trunk watermain. g. A water service stub must be installed for the park area at a location acceptable to the Parks and Recreation Director. h. The developer shall install a pressure- reducing valve vault in the southern portion of Bluff Creek Drive. The City will determine the location and design of the vault in conjunction with the final plat design. The developer will be reimbursed for the cost of the vault. i. The property is subject to sanitary sewer and water hookup charges for all of the lots. A portion of these fees will be collected with the final plat and is calculated as follows: Partial Payment of Sanitary Sewer Hookup: 41 units x $608 /unit = $24,928.00 Partial Payment of Watermain Hookup: 41 units x $1,618 /unit = $66,338.00 The remainder of these hookup fees will be collected with the building permit at the rate in effect at that time. The Met Council SAC charge will also be collected with the building permit. j. All of the utility improvements are required to be constructed in accordance with the City's latest edition of Standard Specifications and Detail Plates. k. Permits from the appropriate regulatory agencies will be required, including the MPCA, NPDES, Dept. of Health, Carver County, MnDOT and Watershed District. Todd Gerhardt Pioneer Pass Final Plat September 13, 2010 Page 24 of 27 1. Prior to final plat approval, the City and the developer must work with MnDOT to obtain the necessary approvals and/or agreements necessary to construct the portion of Bluff Creek Drive that will lie within the MnDOT right -of -way. m. The owner of the exception parcels shall work with MnDOT, the County and the City to determine future access to these areas. n. Each lot within the Pioneer Pass final plat will be subject to a $16,313.55 assessment over 7 years at 6% interest for the 2005 MUSA improvements and Highways 101/212 and Lyman Boulevard improvements. Outlot C will be subject to a $864,617.90 assessment for the 2005 MUSA improvements and Highways 101/212 and Lyman Boulevard improvements. o. The grading plan must be revised to show that the high water level for Pond 7 ( Outlot D) does not extend into the MnDOT right -of -way. p. The grading within the park must be revised to eliminate the channelized flow to the creek. q. Drainage and utility easements are required over all of Outlots A, B, C and D, Pioneer Pass. r. The10 -foot wide bituminous trail shall be constructed on the west side of Bluff Creek Drive; sidewalk shall be constructed on the east side. s. Both the sidewalk and trail shall extend to Pioneer Trail. 3. Environmental Resource Specialist: a. The applicant shall plant 343 trees within the development. Each lot shall have a minimum of two overstory, deciduous trees planted in the front yard. b. The applicant shall develop a restoration plan including native plants for the Bluff Creek Overlay district north of Block 1. The plant species shall be selected from the Bluff Creek Management Plan Appendix C. The final plan must be reviewed and approved by the City before installation. Tree protection fencing shall be installed prior to construction around all areas designated for preservation and/or at the edge of proposed grading limits. d. No burning permits shall be issued for tree removal. All trees removed on site shall be chipped and used on site or hauled off. Todd Gerhardt Pioneer Pass Final Plat September 13, 2010 Page 25 of 27 4. Fire Marshal: a. Water main and fire hydrants shall be installed and made serviceable prior to combustible construction (2007 MSFC Sec. 503.1.1.). b. A three -foot clear space shall be maintained around fire hydrants (2007 MSFC Sec. 508.5.4.). C. Temporary street signs shall be installed as soon as construction begins. Signs shall be of an approved size, weather resistant, and maintained until replaced by permanent signs (2007 MSFC Sec. 505.2.). d. Fire apparatus access roads and water supply for fire protection is required to be installed. Such protection shall be installed and made serviceable prior to and during time of construction except when approved alternate methods of protection are provided (2007 MSFC Sec. 501.4.). 5. Park Director: a. Successful transfer of Outlot C (8.7+ acres) to the City of Chanhassen through a combination of dedication and fee purchase for development and use as a neighborhood park. b. Extension of trail (west side of road) and sidewalk (east side of road) paralleling the planned connector street south to their respective connection points at the intersection of Pioneer Trail and Bluff Creek Drive. c. Install a sidewalk on Mayapple Pass. 6. Planner: a. A 30 dBA attenuation shall be provided by the building design and construction along with year -round climate control for the homes adjacent to the TH 212/Pioneer Trail right - of -way. b. The developer shall pay $10,315.00 as their portion of the 2005 AUAR for this phase of the project. c. The property owner may donate Outlots A and B to the City, or if retained under private ownership, dedicate a roadway /trail easement and drainage and utility easement over Outlot A, and conservation easement, trail easement and a drainage and utility easement over Outlot B. Todd Gerhardt Pioneer Pass Final Plat September 13, 2010 Page 26 of 27 7. Water Resources Coordinator: a. All conditions for the wetland alteration permit must be met (Chapter 20 Article VI). b. SWMP fees of $52,727.90 shall be paid for this phase of the development prior to the recording of the final plat. c. As stated in Section 18- 40(4)2v. Drain tile service must be provided to any lots where drainage is directed from back to front. This condition exists along Street B between lots 16 & 17 as well as lots 18 & 19. Because of the presence of Hamel loam, a soil with a known seasonally high water table less than one foot below the surface, drain tile shall be extended from Lot 12 to the CBMH in front of Lot 19 of Block 2. Drain tile is also encouraged in front of lots 1, 2, 3, 41 and 42 of Block 3, and Lots 1, 2 and 3 of Block 2. The soil boring report will be beneficial in making this determination (18 -40). d. The developer needs to show detail drawing of discharge point and how energy dissipation will be achieved. e. A SWPPP specific to this site shall be prepared and submitted to the City and Carver SWCD (18 -40). 1) All surface waters and existing wetlands, which can be identified on maps such as United States Geological Survey 7.5 minute quadrangle maps or equivalent maps within one mile from the project boundaries, which will receive stormwater runoff from the construction site, during or after construction. Where surface waters receiving runoff associated with construction activity will not fit on the plan sheet, they must be identified with an arrow, indicating both direction and distance to the surface water. The SWPPP must identify if the surface water is a special or impaired water. 2) The SWPPP must incorporate the requirements of Part III ( Stormwater Discharge Design Requirements), Part IV (Construction Activity Requirements) and Appendix A for the project. A narrative describing the timing for installation of all erosion prevention and sediment control BMPs required in Part III, Part IV and Appendix A must also be included in the SWPPP. Areas where proposed and existing grades are to be matched shall be done so that no concentrated flow conditions are created. These areas include, but are not necessarily limited to, the backyard of Lot 7, Block 1, the backyards of Lots 1 and 2 of Block 1 and adjacent to the extension of Bluff Creek Boulevard at the intersection with Pioneer Trail (18 -62). Todd Gerhardt Pioneer Pass Final Plat September 13, 2010 Page 27 of 27 g. Type 3, weed -free mulch shall be used in outlot B. h. A note shall be included on sheets 3.2, 3.3 and 3.4 indicating that inlet protection will be required on all backyard CB until final stabilization is achieved. i. After the slopes are graded but before the erosion control blanket and seed is placed, the use of silt fence with J- hooks, straw wattles, rock logs, bioroll or other BMP will be required to break up any run 75 feet or longer (18 -62). J. Bluff Creek needs to be identified on the plan set and the SWPPP and erosion plans must clearly indicate that it is an impaired water for turbidity and that no discharge of untreated water will be allowed to the creek or to the fringe wetland (19 -145). k. A detailed turf establishment plan shall be provided (19 -145). 1. A note needs to be included on the plan set that top soils are to be scraped and stockpiled and the soil stockpile area(s) need to be shown on the plan (19 -145). m. Signage for the Bluff Creek Overlay District must be posted on every other property corner and at major lot angle changes where residential yards meet the primary zone. n. Seed mixes shall be consistent with current MNDOT /BWSR cooperative mixes. See MNDOT publication Native Seed Mix Design for Roadsides and BWSR State Seed Mixes: http: / /www.bwsr.state.mn.us /native vegetation /state seed mixes.pdf . ATTACHMENTS 1. Development Review Application. 2. Letter from Mark Sonstegard to Kate Aanenson dated August 18, 2010. 3. Reduced Copy Pioneer Pass Final Plat. 4. Reduced Copy Pioneer Pass 1 St (sic) Addition Final Grading, Drainage & Erosion Control Plan. 5. Reduced Copy Pioneer Pass lst (sic) Addition Final Sanitary Sewer, Watermain, Storm Sewer, Street Construction & Erosion & Sediment Control Plan. gAplan \2010 planning cases \10 -09 pioneer pass\final plat \final plat staff report.doc Planning Case No. C3 1 o -° Q 9 CITY OF CHANHASSEN 7700 Market Boulevard — P.O. Box 147 Chanhassen, MN 55317 — (952) 227 -1100 DEVELOPMENT REVIEW APPLICATION CITY OF CHANHASSEN RECEIVED AUG 2 0 2010 CHANHASSEN PLADJNING DEPT PKIN I Prong O ner Name and Address: K Contact: Ma. k Phone: Fax: q3 - - o H Email: NOTE Consultation with City staff is required prior to submittal, including review of development plans Comprehensive Plan Amendment Conditional Use Permit (CUP) Interim Use Permit (IUP) Non - conforming Use Permit Planned Unit Development* Rezoning Sign Permits Sign Plan Review Site Plan Review (SPR)* !� Subdivision* - Yi1141 rla+ Temporary Sales Permit Vacation of Right -of- Way /Easements (VAC) (Additional recording fees may apply) Variance (VAR) Wetland Alteration Permit (WAP) Zoning Appeal Zoning Ordinance Amendment Notification Sign - $200 (City to install and remove) X Escrow for Filing Fees /Attorney Cost ** - $50 CUP /SPR/VAC/VAR/WAP /Metes & Bounds - $450 Minor SUB TOTAL FEE $ 2S00— pr( ce-= k4Q . '% An additional fee of $3.00 per address within the public hearing notification area will be invoiced to the applicant prior to the public hearing. *Five (5) full -size folded copies of the plans must be submitted, including an 8 %" X 11" reduced copy for each plan sheet along with a digital copy in TIFF -Group 4 ( *.tif) format. * *Escrow will be required for other applications through the development contract. Building material samples must be submitted with site plan reviews. NOTE: When multiple applications are processed, the appropriate fee shall be charged for each application. SCANNED PROJECT N LOCATION: LEGAL DES TOTAL ACREAGE: �� WETLANDS PRESENT: X YES NO PRESENT ZONING: REQUESTED ZONING: R �.M PRESENT LAND USE DESIGNATION: c)117d /t — I /V REQUESTED LAND USE DESIGNATION: REASON FOR REQUEST: I Ann/ -ie.1 — & C FOR SITE PLAN REVIEW: Include number of existing employees: and new employees: This application must be completed in full and be typewritten or clearly printed and must be accompanied by all information and plans required by applicable City Ordinance provisions. Before filing this application, you should confer with the Planning Department to determine the specific ordinance and procedural requirements applicable to your application. A determination of completeness of the application shall be made within 15 business days of application submittal. A written notice of application deficiencies shall be mailed to the applicant within 15 business days of application. This is to certify that I am making application for the described action by the City and that I am responsible for complying with all City requirements with regard to this request. This application should be processed in my name and I am the party whom the City should contact regarding any matter pertaining to this application. I have attached a copy of proof of ownership (either copy of Owner's Duplicate Certificate of Title, Abstract of Title or purchase agreement), or I am the authorized person to make this application and the fee owner has also signed this application. I will keep myself informed of the deadlines for submission of material and the progress of this application. I further understand that additional fees may be charged for consulting fees, feasibility studies, etc. with an estimate prior to any authorization to proceed with the study. The documents and information I have submitted are true and correct to the best of my knowledge. Signature of Applicant Signature of Fee Owner Date Date g: \pian\forms \development review application.doc SCANNED RYLAND HOMES® August 18, 2010 Ms. Kate Aanenson Community Development Director City of Chanhassen 7700 Market Boulevard PO Box 147 Chanhassen, MN 55317 Re: Pioneer Pass -Final Plat Application Dear Ms. Aanenson: TWIN CITIES DIVISION 7599 Anagram Drive Eden Prairie, MN 55344 952 - 229 -6000 Office 952 - 229 -6024 Fax www.ryland.com Ryland Homes is pleased to submit to the City of Chanhassen a final plat application for Pioneer Pass. This phase of the development includes forty one (41) single- family lots, the completion of a collector street from Bluff Creek Boulevard to Pioneer Trial and the creation of the 8.7 acre city park. Included with this letter please find the Final Plat Application Form, along with all of the necessary plans and items required for final plat consideration. Phase two development is scheduled to start in 2012 with the completion of the remaining fifty three (53) lots. If you have any questions with this application, please call me at (952) 229 -6007. Sincerely, Mark Sonstegard Land Development Manager Twin Cities CITY OF CHANHASSEN RECEIVED AUG 2 0 2010 CHANHASSEN PLAVINING DEPT SCANNED PIONEER PASS .. Eramn n,,r ices, MnNm a . LIJ IJ LI_ h =7� r Jv '5 LIJ bW \ J rA Ar. /4 U nr N .—C IN ME, D 200 PLOT A EAYr uxf Or mE FE .... �. 6 -• rua�iu Oi2AwTWmN A !1 +Y � 'e 8E RINGS ARE BASED UN THE NORTH LIVE OF NE 1/4 DF THE NE 1/4 OF SEC. 2T, T. IH. P.. 2,1 WHICH it ASSUMED TO HAVE A BEARING OF N RR•OR".0' w. NOTE'. NU MONUMENT SnBOL SHORN AT ANY STATJTE REWIRED LOCATION INDICATES A PLAT MONUMENT MAT — BE SET YAIWN ONE YEAR FROM THE h SHALL RE 1/2 14 H OF . 1 INCH IRON PIPES xJMENTS MARKED BY R.L S. ND. 12294. 6 DERGIES 1/2 NW IRW gq+UMENT FW4D O DEND1E51 /. I"CH A :4 NLW RED MONRYNT SET AND MARKED BY UCFHSE N0, 11294 KNOW ALL PERSONS BY THESE PRESENTS: Thal Tile. Ry4wd Omvp, He., nAknklM eapnaaon. aM Petrron- Jnrgrcs Farm Lad Campwry, a MNlesan Ilmikd BabBNy rompam, ko mvrcrt of 0k f IbwJn6 de,aiked pnlpeny shwaed iR the f2wmy of Caner, SWeM MlnrcaNl4 n wit NortMAM Qlnnorof tlm Nnnhenet Qlalnr, Season 21, Township I IF. Rktke 23, Carver County, MlsAe sot AM Tltat panof IM SnWM•xa Qlmda Af dm Noldkwl Q,uIWr,SnIbn 21. Tmmdtip I Id, Rnnpe 23, CAMI W VTNO.1 ,111[ MINNESOTADEPARTMENT ly,M SPORTATON RIGHT OF WAY PLAT NO. IPA), aaannllnPto dk ra•.ordaf pMt Ihemnf. (. arvrr Caeny, MlnaMxa. Hmecaemd rhowmw WM,rvnyaiAMIplmkdm PIONEER PASS,Amldob,.N, RV anddem —.the Nlhlic Rx public IAU Ru9m' the sweep wldalni MIkMe Ihoewemm�M m shmvn on mice pint fix drduaDa am11u11Ny purpaus.mty. In wiwmsswbereM, said TN RYhrM Orwp, Inc, a h1AO'hvvl corpoanal, lu4 eauw41 them pmmMS Io 4,iprcd try Ns proper MTiav Wis skYO! ,w_. ilu Ry1AOd G-P, Inc. By: it, SI'ATEOFhfINNESOTA CWNTYOF The farepang IAMmmeM wm AckrwwkdPedbeBAA ire thn _ deynl ID_. by Nr nrlhn Rylmd 4toW. IRrc,A Maryinlulmgwmikn. on Mlalfof the anpamtkn. Nom,y Publft, CoonlY, MIT—A MY (b—H1I on ExpNen J..13l, 20_ In 1W PR,IWW1qRR, rirm Wd Qmq+my, llmtaoseal tlra, present, 0 be A W by lice popnr orFarmla_ da nr ,w_. PenrumJM'gma Fmm Land Compwsy By: Ill SFATIO Al ItIESOTA COUNTYCF T%fofift instilmentwas eck— lod,'l bafem me lhk_ day n( ,211_, by IU am ..AJagrca F.awL d CanlnnY• a Mmrcmu IimNM Wbility rompeny, on behtlfof Ibe company. Nanry PDbik, Couky J 20 e Ms' CommNelon EtpimrMJlnry]I, w_ 1IR iby,,RRylhM I hove mrveyed AM plmW kA pmpenY rkudMl on abl, plot as 110NEFTf PASS; Iha( lhn 14,h reMIMM+m W IM -"Y; Ibm All111 -1 we m1wily ahrvnsm 1W I t In fat eml hANheddOMn nt; ftHtii All wonuw- will M mrreWly placed In the WA dA, sG In mmkim M MI— Slalaks 303.0; SIMNI -1; HIM IM mW11e b—dnry Rees Are careclly &.qR ekdm t" ,C n,i Ikn Ihem Art rw wet lnnds m deRllyd W A111-1 Stiles 505.02, Snh1lNOOn I.o, pxblie biph —)soMi than ns A— HAVId C. Paeraw, LAM SHw:yor. U.— No. 12M4 STA'r'E OF MINNFSOT'A C(R.INTYOr• The ImplitB lArlwmeet was ncknuwkdpM below me Wk dey of ,20_, lN' HmRId C. PAIa,41tL Land snreewr, Ihkna No. 12PA Nbtry PUblk, CaImY, I 31.21J MyCOmminbn Eapias nnlury 31.20_ COUNTY SURVEYOR, CAR VIER CT111NTT, MINNh'Sfyl',A. PH,Rmt Io CTnpkr345,]HIM11aaImes of I W 1, wi, PFAI Ins been apprm'N thh dny'of 2JJ_ Ry. k +hn G. Flremycr, GrverCOlwty tnrveyor 0 rY COUNC IL OF THE t.TTY OF CH:INHACSRN. h11N. F.SOTA. This plot or PIONEUR PASS was App and A-ped by dte City CMMCB offM Chi' of Chanhasue, mi.—A. a s 1 9Wa=fii l held to this_ dey If ,20_ -11, mmpllaww w11h IN, p *]— fMf nrcsaa SIeN4A Settinn 505.03, SubdMH112. All NA WRA wRl be mt as tWdfk,l by' the City CmRdI and es etam t on Ihk plM. MsaxdinP Io Ml m"m Btemle 511.,2, Sobdlvlshaa 1. (TTY COUNCIL OF TOE ll'1 "Y OF CHANHA SRRN, MINNESOTA. RY B,Y Mato' Ckrk couN'rl'AUUI'f1.1H, CARVER('. UN'FV MINNESOTA. IMmhy anity lhMlmespnyMkb mdpdoryenn hav<ban pnM for lend2,cdbedm W,pia[ Uated tnn_aAynr _.w_. By MMk Wndpan.0 m,QwmyAMlnr COUNTY RF.CORUFR, CARV ER I:OUNfY.MIM4ES(YrA. I ikmby a011ythet lids plat of PiONFER PASS was flkdthfs dy,f ,w_ m ddc k _ M. AI T t,NND, l Na. _ By GO W. Fit— Ir.. Caver CsonlY Reconkr CITY OF CHANHASSEN RECEIVED AUG 2 0 2010 CHANHASSEN PLA4JNING DEPT SCANNED I / i SCANNED PIONEER PASS PLAT FILE NO. C.R. DOC. NO. INSET A SCALE P! FLEW D 50 3:4 —1. = 16 1- BEARINGS ARE BASED UN THE NORTH LINE OF NE 1/4 CF THE NE 1/4 OF SED. 27, T. 116, R. 2.3 VAIICH IS ASSUMED TO HAVE A BEAH:ND OF N BA•OA'!0' 'N. R =Sap .00 , NOTE. NO MONUMENT S— 9HOM AT ANY STATUTE REOUIRED LOCATION INDICATES A PLAT MONUMENT p>a22 \� THAT — BE SET —N ONE TEAR FROM THE RECORUINO DATE OF THIS PLAT SAID MONUMENTS ;HALL BE 1/2 INCH x 14 INCH IRON -ES MARKED BY R.L.S. NO 12194. gZ J N2 � � -' � s '�S>• • nfNOTES 1/2 " R04 MONLM NI FOONL' p • �_ X F/) 0 DENOTES 1/1 NOR x 14 INCH IPM MM; BIT ;ET AND "W R =42 147. A , '., q? .d•' �, MAR ED BY 01£NSE ND. 12294. - - 245.59 N00 °2 - - / ; rain uuulwM uwnacHT 0 _ ............._ . . _i�.._.. 1e1._a�.m 9>J y e 51 s BLUFF CREEK BOULEVARD sJ9b A aryy � tttlMU WJWUUMUUNUNF.T - - -�" v j � / 3 OUTLOT E h� 0o ay °b - - 1 a0.00 < 5 589 °30'S'W �- 1224.67 S00 °2905 E -� CITY OF CHANHASSEN RECEIVED AUG 2 0 2010 CHANHASSEN PLANNING DEPT JAMES R. HILL INC. —T 2 OF 0 BMEETH SCANNED I PLAT FILE NO. PIONEER PASS ICR DOC. NO. 253.89 N00 '26 . ... ... ... INSET Q 2 V 171.84 S08-5 'y ac 4 - 5 .,A. IN 'U, 6 3 A! 7 — AND U-TYEI—AENTS AGE S,o- gi - F I 9 Al 1 bl: 9 -J L 1. 1 6 n BE ING 5 FEET IN —M. UNLESS OTHERVAS INDICATE, ADJOINING SIDE LOT LINES. AHO BEING 10 FEET 8 ��4 VA , UNLESS —RAISE Z\ S OCATED, AMONING R G- OF VVAY -4" <1 \4 ONES AND REAR LOT LINES, AS HOV ON ME PLAT 0, 10 7 > 8 AAMCS ARE BAS. ON — NOR LINE OF NE 1/ —CH 4 OF THE IS HE 1/ ASSWED 4 OF TO SEC 2 116. N, 2 A "'A 2 1 OF 4 w 6 6 EOVIRED LOCATION INCICATES A PLAT MONWENT -ks— w NOTE N ONUMENT S�GNRQL SHOM AT ANY STAMTE I) THA MILL BE SET —N ONE YEAR FROM ME RECOR INO DATE OF THIS PLAT. SAIO MONUMENTS s I 13 A S H ALL BE 1/2 INCH . 1 INCH IRON PIPES i I \ 12 ATHED BY RLS. NO. 72294. 5 1 3 -', . \ N DENOTES 1/2 14-H I RON MOMMENT POUND 0 DENCRES 1/2 INCH 14 NCH IRON URNW- SET AND BY NO. 12294. 14 4 13 a 1 4 A 0 i' CITY OF CHANHASSEN 15 .. ; l ° J. RECEIVED 3 IN 3 14 0 or 15 AUG 2 0 2010 2 X-- CHANHASSEN PL, DEPT - � c T- -115 40-00 17 : - R:420 00 JAMES R. HILL, INC. —ET 0 O 0 — SCANNED PIONEER PASS 1ST ADDITION CHANHASSEN, MINNESOTA FINAL GRADING, DRAINAGE & EROSION INDEX SIT SHEET 1.1 CONTROL PLAN SITE INFORMATION 1.2 -1.3 FOR EROSION k SEDIMENT CONTROL DETAILS 2.1 FINAL GRADIN DRAINAGE & 3.1 -3.3 RYLAND HOMES EROSION CONTROL PLAN 7599 ANAGRAM DRIVE, EDEN PRAIRIE, MN 55344 STREET PROFILES 4.1 -4.2 PHONE: (952) 229 -6000 FAX: (952) 229 -6024 FINAL LANDSCAPE PLAN 5.1 DETAILS 6.1 O � A VRLIIY CASEMENFS 5�• i I BEING S FEET 1. ... AN. ADJOINING SIDE LOT UNES AND 10 FEET IN NipTH A ND ADJOINING STREET LINES AND P EAR 101 LINES.. UESS OTNERWIGE INDICATED ON E PLAT, BENCHMARK SM Ct RR. SPIKE SOUTH FACE. OF 1ST POWER PDX WEST OF ORIvEWAY - N. SIDE OF P IRAL - CLE— 910.:14 MAW BS OATUM SM 02 PROP " UNE ON PROPOSED R/W LINE. ZI.M 91567 NAW 0 DATUM Y �' A„P, UM CITY SETBACKS _ PROJECT CONTACTS I'NaEOr Er+r+.NEE. LS roEE c —ER. P.E. - IAM R. IIAL. INN - 600 - (652) 6064 (0) F ES FEET 1 !E Hi (612) - M— N) SIDE (HOUSE) S FEET SCALE' N FEE- O\S10F MARK SOUS -AND - LAND OEVCLOPMENI MAN—R - R— HOMES (951)- 2.ITGO (0) SIDE F6ARACE) $ tEE1 , ;A' r O PA .. PUBLIC WDNi1S OIRECI II71 ENGINEER -Ott OF —A65EN (95:)•127••1166 (0) SIDE (STREET) REM 20 FE.E.T 25 FEET 1 IPFA - 150 bAt NP 0E6 OfF1O.R: CCwIIACiOR fiYRESENTAtIVE: COti1RAC *OR V PFAWTENONT E. -' p... —A TEOOI gBR'N —11 KUM— - GOBUZINSKI Y SONG :AM .. ODOM— k SONS (GV1 751.216 (0) (6121- 262 -585R (1121-490-6500 0\ ( "Ne:1SPOK:f:10`: R;iIR OF, JOIN KI In No. / I LEGEND EASING ASPHALT SURFACE _=N N cn Mai G Z cc :w . E %STING CONCRETE SURFACE EASIINO GRAVEL SURFACE COSTING DEUNFATF.D WETLAND ... K AND DELINEATION O METING TREE LINO /TREES 1 -TING CONTOUR 1 !E Hi z /-• CASTING SMEARY A ESTING SANITARY E.R >$ STORM SEW T.R -0 EA* NO O EI0STI0 OVEPHEAO POWER Q — '� • UNF./I+OWEP PO.ES EASTING NEIL E--1 B • EISMNG ELEPHONE PEDESTAL ::.a•x.xa•:xn.xnax•.x•a•.x•ax . a xaex EAST, G FENCE B MIND SOL BORING A ki 1000 s .s BLUFF CREEK OVERLAY DISTRICT LION PROPOSED RF.TNNING WALL PROPOSED CONTOUR PROPOSED STORM SEWER PROPOSED ORAINTILE PROPOSED RPRAP F E" ' + ' 9 ' [ i G Q It T--I W IT: g 1 1PIMM PROPOSED SPOT ELF.—ON PROPOSED CONCRETE SURFACE PROPOSED ASPHALT SURFACE a Ey a W PROPODED A NOPE NON - PERFORATED PROPOSED CURB W .....x. PROPOSED HEAVY -DUTY SILT FENCE :f •.•_+ +uux+ .•- PROPOSE•D SILT FENCE Q -•" ROPORD HEAVY -OUYY SILT FENCE (10 BE INSTALLED AFTER COMFLE110N 1--1 LL OF GPADING) DRAWN BY CUR PROPOSED SILT FENCE INSTALLED GE Of GRADING)c�R COMPLE110N DATE 7/16/10 . .. PROPOSEO TREE PROTECTION FENCE I�- - - -� -- - - - - -�- TEMPORARY SEDIMENTATION GAS WTLET PIP: PROPOSED TEMPORARY ROCK REVISIONS _ IE^ CONSIRUCTION ENTRANCE PROPOSED TEMPORARY Oro /IC NEr .1— a s. w SnBTT MEA- 4..._ SCEWA N'FAIIOI BASIN PROPOSED 10 AOUARC /SAFETY r—s BEND. (10:1 MAX SLME) a /I1�Ia —Pax UNDISTURBED AREA ROPOSEO SEE. k —.1 CATEGORY 3 EROSION COLIRUL Fin /lo xsv Cx BLANKET PROPOSED REM YARD CB PROTECTION PROPOSED DITCH BLOCKING(MPDOT TOPE 3 TO BE INSTALLED AEMN COMPLETION OF GRADING) PROPOSED WJMCO CAD FILE 21996 -21TS .........._......._ n FUTURE STORM SENFA PROJECT NO. FUTURE CONCRETE SURFACE 21886-21 1.1 r � a p An t >t � a .v 1 � 1 r � a p An .v y k" t *� USGS MAP I inch = 1000 feet BENCHMARK OM n: R.R. SLAKE S-11 FACE OF IST POKR POIE WEST OF DRIVEWAY - N. SIDE OF PIONEER —L. - EI.E— 910.3u NAM 8a DAI M 8M 02: W AEDM R/w MWUUMENY a SW PP,DPFRTY IJNE ON PROPOSED R/W tJNi. EIEV.v 913.6] NAW 89 DATVu H,drdoile Sea Ore., Sell Tert— A Sand, loamy sand or sandy loam a Sit barn or laps C Sandy day loan o Clay loom, Wty day loom, sandy day, sity day, or day fj S 7 z a � � SOIL GROUP MAP 1 inch - 200 feet i �s�� cv a� g E r o s , till ( {fl`1f Xi; t _� #- I�fJt tr {.. f f X0 1 f rYfffJ fJJr �� 7((. • �1, �} lrra M -Mol f f f r ' ,,, C •4 y ff5JN�l J£.ty..:!f �!!f' L�'t J {$ i ); .'r .t, t fi � ��Y. �'. rr 1 :rt .i:. f f lfP� %Y \ ' ?..r...-,• - {r: a+✓� ( / '' /a!{ ! ♦ H' �� :$ � .�f��r.:�frt; � � i. � .. rl t'� f � � � �� �. � � °�' ,r,.. ►J ,! /'- � '� �4t' + i �} a t '� �sp��'�, r, it � h.'.mY� �� r ,'e t� � �1� , 71 3 � w } �! ? I ; Si '•r z ;i. f Sa a .s? ;� 1, ',:"� .e y^ .{,.,'.. ' `i'ly,C "!' Fi S * 't , � / _! 2 �'.f`yf id .4"s! 'p•1 rH, � §5�. 1i'•' r rs7�.:�`�,�• i ,y l�.?�y € •y � �k'�, YY �1 _'3 1 may. te ` r ... •. ', .'. � . y f i x ." rv"y 'Y .;.� a ..l Or r f{r>< �J : I 1 JI 1 t Z. ORAVM 8Y DATE `: ., ... EXISTING m DRAINAGE ,. .... ,. „ :,: . ..m � i " .'� PROPOSED DRAINAGE ..•, EMSIO RESASIONS 1 inch = 200 feet 1 inch = 200 feet BENCHMARK OM p1: R.R. SPIKE SOUTH FADE OF 1ST POM POLE MIST OF DRIVEWAY - N. SIDE OF i MONEF.R TRNI - ELEV.. 910.34 NANI Pe OATUM 9M /2: TOP PLUM R/W MONUMENT O SOUTH PROPERTY UNE ON PROPOSED R/M' UNF.. 913.4) NAVO W DATUM CAD ME 21996 -21SI PROJECT NO. 21996 -21 is T Z-- - Me c d 0 E�99 M. w= T T fty T Z-- - Me . .. . ...... CATCH BASIN INLET PROTECTION SEDIMENT FILTER SACK E TEMPORARY SEDIMENT TRAP l -V �Zwf It J K.7 li " .: b57 M � _. riw FLARED END SECTION INLET PROTECTION TREE PROTECTION FENCE Inl raa Saar s• mrm--. EROSION ANKFT—C HORIZONTAL SLOPE GRADING (TO K IMALU PtR D MANUFACTURE'S !MO pMlgx I . IRE.—T CROSS SECTION PROFILE VIEW DITC CHECK — MnDOT TYPE 3 c d 0 E�99 M. w= Cc IE . .. . ...... CATCH BASIN INLET PROTECTION SEDIMENT FILTER SACK E TEMPORARY SEDIMENT TRAP l -V �Zwf It J K.7 li " .: b57 M � _. riw FLARED END SECTION INLET PROTECTION TREE PROTECTION FENCE Inl raa Saar s• mrm--. EROSION ANKFT—C HORIZONTAL SLOPE GRADING (TO K IMALU PtR D MANUFACTURE'S !MO pMlgx I . IRE.—T CROSS SECTION PROFILE VIEW DITC CHECK — MnDOT TYPE 3 n,01 AmCa L. avM cw =IT P..TrC;: " 7111 ' .TER A.Zll gg P.J 0 Ong a S ri p o 12R� DRAWN BY CJK T. 9 1 DATE y 7/16/10 REVISIONS PROJECT CONTACTS --, CI—FR "m 0 -.r.. .1,. IAtJi. -IMC. �—IC M)RXS DAC.CTW/01Y j.,- EM - 07Y IW CII—A-A ll�— --: IX.1 - —A C MAMR REM EII.IIA: =11 s.s —A- 014 (T.) c d 0 E�99 Cc IE n,01 AmCa L. avM cw =IT P..TrC;: " 7111 ' .TER A.Zll gg P.J 0 Ong a S ri p o 12R� DRAWN BY CJK T. 9 1 DATE y 7/16/10 REVISIONS PROJECT CONTACTS --, CI—FR "m 0 -.r.. .1,. IAtJi. -IMC. �—IC M)RXS DAC.CTW/01Y j.,- EM - 07Y IW CII—A-A ll�— --: IX.1 - —A C MAMR REM EII.IIA: =11 s.s —A- 014 (T.) BENCHMARK OF BUI #I: R.R. SPIKE ROTH FACE OF iST I`OWER POLE WE T OF DRIVEWAY - N BM 12 PIO EE R TAIL EL E , 9 SO HAVO 0e DATUM = AE I� NE 0 I 130 -- ELM. MAT NAVD Be DATUM d :,b 1 PROP U ON PO OSED P/r! .;b y y f1 Ind � \ ��b �;5 � •v sv % ,{ �' ♦ B 926.7 �' I , ' $ \ ca � �ooA C :ff 0756 .3 9J7,.�. i ` -- 1\ \ \ \ ^y 1• �1 g - ONTRACTOR $H . - EROSION CONTROL PROTECTION a FOR ALL TEMPORARY TOPSOIL s° r STOCKPILES LOCATED ON—SITE. ' 1 0 2. BLUFF IS AN 1 • WATER FOR C AND IMP 'DISCHARGE WATER WALL BE ALLOWED! REEK OR TO THE FRINGE WETLAND b s�fi ,! PoSER OUT.ET , \ �1 , \' yAA.O <8 y J� w ..\ 1 t t PEA DETAIL ON (' �.•, d Tj '', x\ ! lz E­ >• : v wr ,� ? \ i t '•,� _. ` � � w . t `� .. S _ t \ � � U o l 5 t P . w tT c m 12 t q W a R t 14 OAR 57 toe 3 t \ ,: Y 34 $� 1 Q DRAWN BY OATS OUTLOT El { P , �Q 'ov w a _ "� ° N927.0 7/16/10 RENSIONS UTLOT D nno rc.� ul au. si m.w n an a.w.s ;x.., r d t t 2 n, I .�:� Ij IDs p 16 -1. \ C4 �\ x : l I w ei;no"m• -11.7 ' fd �*S � � i .V. , I I - «f _ 1 1 R€ � • b T \ � / 11 "w ' 1 � . • . , ',.. ` ; : i f t ; 7 FILE Nei 1_ 1, 1 , °ao• � 4 � BLU ' ,. ' : ; i • 0 ,``• 1 - - ._1r . s. 1 4 1 PROJECT NO. sr - to , 21998 -21 ; r \ '.. •, ',...:..�� � -1" nos , it k 1. CONTRACTOR SHALL PROVIDE EROSION CONTROL PROTECTION FOR ALL TEMPORARY TOPSOIL STOCKPILES LOCATED ON-SITE. 2. BLUFF CREEK IS AN IMPAIRED WATER FOR TURBIDITY AND NO >., DISCHARGE WATER WILL BE ALLOWED' '-TO THE CREEK OR TO THE FRINGE WETLAND Dv .... ... .... p PND . 927.0 AWL 93 UTLOT \ ql!E 5-r- - 0. 1 MA l , gn J, am 1p, � R—owdlo raw .. ....... . .59pM m Z -1. N ........ .. I :.1 I I, ��II I I,. � � I ITSY�r q 7 3 -R) A I P Al - it _', /, IN NI 0 0 S SCA E IN MET DO 15D 1 I.t "ENCHMARK J LF� OM It: R.R. VINE SM114 FACE W IST POWER PME WEST OF DRIVEWAY - N. SIDE OF PIONEER MAIL - EIT.V, 910.34 NAM) N DATUM 16 11. Cl! TOP ALUM R/W MONUMENT 0 SOUTH 1. CONTRACTOR SHALL PROVIDE EROSION CONTROL PROTECTION FOR ALL TEMPORARY TOPSOIL STOCKPILES LOCATED ON-SITE. 2. BLUFF CREEK IS AN IMPAIRED WATER FOR TURBIDITY AND NO >., DISCHARGE WATER WILL BE ALLOWED' '-TO THE CREEK OR TO THE FRINGE WETLAND Dv .... ... .... p PND . 927.0 AWL 93 UTLOT \ ql!E 5-r- - 0. 1 MA l , gn J, am 1p, � R—owdlo raw .. ....... . .59pM m Z -1. N ........ .. I :.1 I I, ��II I I,. � � I ITSY�r q N5 E g 7 A -R) A I P Al - it _', /, IN NI 0 0 S SCA E IN MET DO 15D 1 I.t "ENCHMARK J OM It: R.R. VINE SM114 FACE W IST POWER PME WEST OF DRIVEWAY - N. SIDE OF PIONEER MAIL - EIT.V, 910.34 NAM) N DATUM o • 1 11. Cl! TOP ALUM R/W MONUMENT 0 SOUTH 0 0 PROPERTV UN ON P OPOSED R/W UNE. ELEV­ 03.67 NAY 00 DAN. N5 E g t \ q +t q1 S � \ q \ \ a — j r EOF e s m 1 fi `„ V PIE �. ,'1117 �_ ,i✓T � *ptMa Y REVISIONS . i n A I fv { A I ET ^ \ II'VIVI_vt. en o Pew a�NFr arc1 _•J ��S I ' 1� CONTRACTOR SHALL PROVIDE �m xl ' EROSION CONTROL PROTECTION _ , FOR ALL TEMPORARY TOPSOIL I I ' `STOCKPILES LOCATED ON- SITE. l I '"1 50 feel i I i 4 >, a� 1 J UM 01. POLE SPINE S011 VEDA OF D P NEST DRIVEWAY - N. N, SIDE IDE OF 2. BLUFF CREEK IS AN IMPAIRED i jl \ PIONEER TRAIL IL - FLF.V.• 9 O.SA NAVV 80 DATUM WATER FOR TURBIDITY AND NO CC G zJ E 9 ^ `I ,`DISCHARGE WATER WILL BE ALLOWED,. ` PTO THE CREEK OR TO THE FRINGE WETLAND OUTLOT F / � / I ST_ 1 07 z z t \ q +t q1 S � \ q \ \ a — j r EOF e s m 1 fi `„ V PIE �. ,'1117 �_ ,i✓T � *ptMa ( - w • 1 m i I 011 TLOT •' C p , i r ' e p Y REVISIONS . i n A I fv { A I ET ^ \ II'VIVI_vt. en o Pew a�NFr arc1 _•J ��S I 12 �m xl _ SCALE W FEET I I 0 50 100 150 l I '"1 50 feel i I i 4 >, a� 1 J UM 01. POLE SPINE S011 VEDA OF D P NEST DRIVEWAY - N. N, SIDE IDE OF CAD FILE 21 998 -21 0 i jl \ PIONEER TRAIL IL - FLF.V.• 9 O.SA NAVV 80 DATUM PROJECT NO. CC G zJ E 9 ^ `I M . 9S PON U I D ` ( - w • 1 m i I 011 TLOT •' C p , i r ' e p Y REVISIONS . i n A I fv { A I ET ^ \ II'VIVI_vt. en o Pew a�NFr arc1 _•J ��S I j �m xl _ SCALE W FEET 77 E iI I I I I I I I I I I I I F i 1 �,J INVESTMENTSILLC - '1 . ZO OO �. O w add , yp o0 aar REVISIONS . i n A I fv { A I ET ^ \ II'VIVI_vt. en o Pew a�NFr arc1 El.ro SP4'Ca (AA a 3+0 abV IER qtt wNMWg _ SCALE W FEET I I 0 50 100 150 l I '"1 50 feel I i 4 >, a� 1 J UM 01. POLE SPINE S011 VEDA OF D P NEST DRIVEWAY - N. N, SIDE IDE OF CAD FILE 21 998 -21 0 PIONEER TRAIL IL - FLF.V.• 9 O.SA NAVV 80 DATUM PROJECT NO. '� c. OM y], TOP ALUM N MONUMENT 9 SOVTN NE PROPERtt LINE PROPOSED N/W ONE. 21998 -21 3.3 .J � \ ELEV.a 913.01 NA. ND 80 DAIUU ......... 915 910 x �I 910 PROFOSeo ._7 905 905 I � I 1 +23 tlo PN CJ { 900 9 ], s � a. PN v 4 900 M 938 E 895 _ 895 890�� 890 14+00 1 +00 18+ 1 +00 71 a 5 l �l EMST PROPOSW CEMERWdE r �:...._ ....... Nw, 01 .PN t � �.` 940.62 N RV. I Q ffi 5 +00 5 +00 .m 7+00 8 +00 9 +00 BLUFF CREEK BLVD BLUFF CREEK BLVD Sn UNE 000 PN 37 8 N H(EV, C.10000' 12x00. PA 971.62 pN [tEV, : M -0. E � •a. d a V 955 C S OG J r 950 ...� 945 �7 940 C13 � EF s . IJ Ill �Y� m i 4g lif W REVISIONS CAD FlLE 21996 -21PRF PROJECT NO. 21998 -21 4.1 }j W 8 730. PIA g s f2 F i 94] 9.2 N ElEV " q S C „; - vc Is000' 930 . ._... . 1 ' ' - _ - _ . _ 9 930 925 � �. ? '- _. 925 920 9 920 _ . .. _ ,... ......__. d . . 133000 94RT3P)1 N — EWi. , l 4 1 � I i i u� 8 X � ± . ......... 915 910 x �I 910 PROFOSeo ._7 905 905 I � I 1 +23 tlo PN CJ { 900 9 ], s � a. PN v 4 900 M 938 E 895 _ 895 890�� 890 14+00 1 +00 18+ 1 +00 71 a 5 l �l EMST PROPOSW CEMERWdE r �:...._ ....... Nw, 01 .PN t � �.` 940.62 N RV. I Q ffi 5 +00 5 +00 .m 7+00 8 +00 9 +00 BLUFF CREEK BLVD BLUFF CREEK BLVD Sn UNE 000 PN 37 8 N H(EV, C.10000' 12x00. PA 971.62 pN [tEV, : M -0. E � •a. d a V 955 C S OG J r 950 ...� 945 �7 940 C13 � EF s . IJ Ill �Y� m i 4g lif W REVISIONS CAD FlLE 21996 -21PRF PROJECT NO. 21998 -21 4.1 930 . ._... . 1 ' ' - _ - _ . _ 9 930 925 � �. ? E O3RN0 CE E( wt _. 925 920 9 920 _ . .. _ ,... 71 a 5 l �l EMST PROPOSW CEMERWdE r �:...._ ....... Nw, 01 .PN t � �.` 940.62 N RV. I Q ffi 5 +00 5 +00 .m 7+00 8 +00 9 +00 BLUFF CREEK BLVD BLUFF CREEK BLVD Sn UNE 000 PN 37 8 N H(EV, C.10000' 12x00. PA 971.62 pN [tEV, : M -0. E � •a. d a V 955 C S OG J r 950 ...� 945 �7 940 C13 � EF s . IJ Ill �Y� m i 4g lif W REVISIONS CAD FlLE 21996 -21PRF PROJECT NO. 21998 -21 4.1 BLUFF CREEK BLVD Sn UNE 000 PN 37 8 N H(EV, C.10000' 12x00. PA 971.62 pN [tEV, : M -0. E � •a. d a V 955 C S OG J r 950 ...� 945 �7 940 C13 � EF s . IJ Ill �Y� m i 4g lif W REVISIONS CAD FlLE 21996 -21PRF PROJECT NO. 21998 -21 4.1 V 955 C S OG J r 950 ...� 945 �7 940 C13 � EF s . IJ Ill �Y� m i 4g lif W REVISIONS CAD FlLE 21996 -21PRF PROJECT NO. 21998 -21 4.1 STREET A STREET D • vil �" N� { � 1 X w A4 � �i�i �i I t 960 .......... a.00. PyT �.. _ _ - ? _... .. .. . _.._ •.... ,. .. .... _ 960 954. N E1EY. 0) � i i w _000�oo z, r I ! 955 ..... _ _ __. i EOrnNO aRrcRUNE PROPOSED _ -C *RUNE _ 955 8 g 950 8 -- — , , . n.5 950 945 945 �eek_� � 940 :. a 8� ! S r val I I 940 935 I � _ �._. - gopx - bNFi•E" _ _ ___.. _ _ 935 . 970 k3 M o�af� r e 930 _. .... ... ;.. _ �. } .. 930 925 5 i f 925 I Rs 920 E ? 920 O +DO 1 +00 2:P +0 44-00 - 5+00 6 +00 STREET D SCALE W FEET 0 I W 200 ]00 1 Ma. 100W -;1 Landscape Notes: DEVELOPMENT WIDE LANDSCAPE PLAN: �, v. w.✓ vrwMaw��wr +rwrrwrr"brrrrw ✓�«rws9wr✓w�✓wr r•. w+ � .srw.�++�u.✓w.✓r✓+a..U..�✓s�«{w �• �� «✓• +�mw wa�w"s " rr w�.M' ✓«.�«"�uwrnrwu«� rB� .rr taN N�w.1..r.wrwNrr PLANTING PALETTE: w ID OLMN: COMMON NAME IATW NAME BOE MW.) ROOT I COMMEM CIXlU'FAWBTReb A B C 1] 316 3112 BAIBAM Fq NORWAY pPRUCE BUCK NIUB BPPUL£ AMU B.H.nU PMUMfU Pkw12 Wr.a SHOT. pNOf. pNOT. Bb Bb pb FULL FpiM FLLL FORM iW.iOpM D DECauous 9l meb A- PBiE PHU NGT. 0412 9FECBV =W FUL Ppp1 F G 41 0 x]w REOMDNOUHOEN COMMON NACKeERRT nq. MMNOB.n.cPRN' CN9.NNBNW4 x.s•cu. 26• eb Bb F.uTNrnRnL H---L H AUTUMN ALAS MMIE nli'd.0 �� 2vmp Bb N HEALM . x 112 OIBCOVERY e1M Ulmw U"IBMM w. IRNNU 9Mmary WCAL. BBB HEALTHVIFULL K WNLE OUmw.M 31.9' CN.. BBB PR L 45 {9 FALL FIESL- FIESTA BU­LS AUruaYUMn eNI.Y 26•CAI. Bhp UM HFALTHYFULL W B BUROAK WXRE9PPE pWW Owms m.aetry. B m N 29'CAL. x•CAL Bb BBB ePRINOgp SOMEC O ] PRAtaEFlPE CRABAPPLE e MRp %AUHfM TCAL B NFALTNYBl1LL OECK)UW09MUb O R 8 10 IBANn OpOWOl.O CamU.MU. tUrT 912 AAIENCANCRMlbRRT0UN1 Vb.rwn BlNpirn 712 COMMIXI PUI9PIP LBAC 0 WANY BOAI xOAL xpu POT HFALTHYRULL POT HPKTHYFVLL PoT NPKTH= CONIFEROUS TREE PLANTING - SECTION L. C1 �g a 5j 0 a � K Ah4i S.1 A -° Are�r, o —A— „rFxK�,nglB ra, �u�rw: uxifss Noorm xwox til rKSC od.` oDauGns M'. xl'VOxWlln N' LN5' OMIN+CPAR ID URIV.'F. INf D�C Cx°LL' CiGVAKN Nona' SK2N M P[OaaFC UxDLx AP,M �o, ; b MF r�Dx YD x,,,,DRN�ND ANY px�(vN( b >, -. N GnFS uCTAO MG DP � B00 -ibi -nab). ux'o a.alxo v*ias wni -cnK un�i5ry ccwM -: o 'Jxbrwpna. . u(<c«s5nxrpx As CAFIW SGP ow ¢v. wNmACi DoanfNrs WALL . RRRO u ACCNAUpf MM A(c ovtA aCCV[RPMaS A All l01 AxD [AB(xcxi gMMVp58 MC SU0.ECt ro nNAt v5A1 Ov'L WiM Wt N�a.N ° OL ra,iLN v[ Qy rK 4x0 W' -A Rw ms "no "owiw x'N°aiw:wo�xi '° rzo MD xucnox lxmAx' ar. n A. iWPO4 A 5[pYLNiAnCN 8ABN8 AND WYI'ALL 5'ACUR[S A. wu' ° i i x c °1 + Av r PO MD �ax . w 'L' AN C (aww rnumRUn�ax). ° n s�ixmRwp a w� �, scAa ` cwsralpnbx. Mn NNxi t [RPmN .ru R.iiroi�.v: AL answf ca±CAl�;ass KcESSAxY .x aom TO BR AR On A u cr ADU.PUSr nawm. A Cdlma lAGL1K3 SNAU Bf — . r BY MC wxgAC DP AE SpPUC mAauc rRATpxs. ANr 11- dlSML 5RaG1 M[ ro BE afYOVm A6 CNLLD rM 1 nl[SE rUNB a a:iciia er ° iwc eA.- .a. wn rwc+on's n.EN "I w �v nocn ,ae w ,cconoMn' Nwai ADIN. BYs I n¢ ecxs+ :i¢AS m¢s ro +n z Lr b xAY51, br �M twavvd. �P o•.!^^ Sala rxax -_ca AT ttamC,n .:M 190tlfD �r - a �: rI.Rx4NID [D SeL Al­ iwA o %rnoae ^ vo l -1 I1- oK vi:a�uce 1 nxcx —A, cDNrzxr N I I C OVµ�wry��tU " A UNVUx oP pb; p' SIA.AAD PROCIW DO PY,' D FD x NIfAS BCLOw M[ UaPFR T-c "0" b SUBORAq: K R'A S KT. wAK OR VANKMC IArR. ML cPNmACroN wAl �x "Kr TM *xAi w.l sau Bc xoi umL iNlw mafr rfaaxiAa rwns L = oL�,b,AKMO �a nM D,. ,i,vaB ��i Das,r a [ w nn A //p U gq xc iaeRMa ° ray wrsc � alNf of SLA AcCOWA wSM nfSF VLM9 un YEGM.,n E TV xDw��Li° A �e"ezo ° c s i. r iila 5 S" �` °R As o *wig dnco 7F xCf+Kxc "" A.S. Am05 sU, A ?, w ARrw xx( MO OCNVTY KCDS i0 Bf te—. D T. � N11rYx wNl rDUNUA'nOx C�[v�npiR. � w *� Or YSR WALL BF AnuKp 1 -1 S ', 'D B° ,uOr M fO FO q <w51RU C�M I W IxD DC a ML NAvu0v vD!' YAPO SSMACRV 0'.. r0 !Hf. PlAaa.R 1. v'fVW +P A-'. FAµV UrNSJp MIF q]l cG:dnw6 M[ FNdw twC0 "99D, x[v'90xaAWn pY i0 M CA. P U.. spin + 0. 'K COUpnavS 4x0 —A. [ n4 au50 a M W[ MEAv 'C d+[arICHlY xOnn. n:r raSANYp Nn: q _ , . Ox 2MUSYESpv� 0 0 FVnU µ [C. All D:biuxe[D a eP, s fr:s.Al wwl Be IT.. . R iaDO uIR ° AT " A ' 1.IA Mus suu BL uwwm 'nrN nr Mf � e[ vli�rz +ni.:i i pus -P. AU. n'iw uor "Ra -AT- nl. .1. A frt ° n'Bm''AAw C '', SN.B i �i �u�neo v0 BC lAND AttD wiD�M VUD SiV awWE d.J %­.. Diq aN w $aiADL[ xFAxS R1Nx XCdxO MRR up54.Bw I, Mr ✓ M1ACiCn i Cd+ur uWO " M.AS. O T, Sxu �B[ Lu' St M td *N0a °A ORCR�aR AA d DL�Pw ON 1.,: .11 00 Oi E *AgavEp BNUI Bf K -SQAW +Y +NE InACi0R;1 L'AM.xe[. I. , x —.1. FARYiK LOTS AID IQLS UT- TOR wat[53 x[YS INM axc CDxS1NUCINMI vrf vKY a' px T AND t' vTf w p x0.w fpl Mr. vn' er. a5�' rYSP B,PfA.R I wD n 0.l0' rpr LNpBCM[D /AVw MEAS SP.ELYS_f- B91E$. MFM Aa0vOFD M JAYC5 KKL q�C M ql Y ABWTT BBD" �iNEVRM Is rwu°[�o w � wua wi L c"Diia ° v °n'avws alDw� -.. b'-'--- -- I� f C — _...._.'..... . _ ........ +..._.......... ._s i RAMP) FR SECTION (F) RAMBLER LOOKOUT SECTION (LO) RfI�- •. R d AM9LER SIDE LOOKOUT SECTION (SLO) RAMBLER WALKOUT SECTION (WO) RAMBLER SIDE WALKOUT SECTION (SWO) LOT BENCHING DETAIL RECOMMENDED HOUSE TYPES J pnw «4 b6 g t q WlW rrwW1 LA- .M'�o[x '[LLVA _ Swo 1�� a w um�"'ivw� � w'�w'o nN�rcn WT irr "�anfVm , wti r A g"[A•' SLU A. ra Awe a o.+wSKs x650 MRC'AI�S,r'/�iA m Y Srui ) E PMOPOfED OSxlaia v�P ,w ,< �-9206 � ENBTwO OrNTWP srosAa onAHAa ( 920.0 malm a.Be Divncx RWO afw.o�om NwQ rwf wazsrro aMAx aoB�82B.0 rnsco aADB aAVATwn AMY;m gbvEWAY (Bi0 Sli) SETt � �) FSYVARpS� Ai 101 CanA[ aROPq<D a0w 2**6 asxmf DR., 5 -100' ( STATION TYPICAL LOT t w6 'I^ m 4� r Tr M ® AAN w .n .� ®.. ALL 3:1 SLOPES MUST BE EITHER SEEOED k STABILIZED NT01 FIBER BLANKET OR, IF SOBDINO, THE SOD SHALL DE STAKED (TW.) PROPOSED BUILDING SITE ORAOC uilrimu�"'� 5Ld1- Sil[PT BACMNa. YAlDtl4 Sgwmb Al (ro ' TD ac"xe °r mnm e: ms am®l M TO MOOIw[ w YJlCT YARAAL) BUILDING SITE & TR T e- RAD O !RECTON DETAI -.l .� ®.. ALL 3:1 SLOPES MUST BE EITHER SEEOED k STABILIZED NT01 FIBER BLANKET OR, IF SOBDINO, THE SOD SHALL DE STAKED (TW.) PROPOSED BUILDING SITE ORAOC RFNCHMARK RL( IN: R.R. SPIKE SWRi FACE Of 1ST POWER POLE. 'MT OF DRIVEWAY - N. SIDE OF PIONEER TRAIT. - ELEV, 950.34 NAM 08 OATDM 0(A 12. ROPF.RTY LANE ON PROPOSED R/w LINE. rt.= 913.0) NAVD M DATUM AWANc xCKH 0 1 D F SWAM B[NC11 ME Pap "D DE %NRE �' .. RW NO. J50 SEW 3 IN, —A. B[NGI xEFD xDT BE SCW W. b Yr OLE I / -FINISHED GROUND uilrimu�"'� 5Ld1- Sil[PT BACMNa. YAlDtl4 Sgwmb Al (ro ' TD ac"xe °r mnm e: ms am®l M TO MOOIw[ w YJlCT YARAAL) BUILDING SITE & TR T e- RAD O !RECTON DETAI RFNCHMARK RL( IN: R.R. SPIKE SWRi FACE Of 1ST POWER POLE. 'MT OF DRIVEWAY - N. SIDE OF PIONEER TRAIT. - ELEV, 950.34 NAM 08 OATDM 0(A 12. ROPF.RTY LANE ON PROPOSED R/w LINE. rt.= 913.0) NAVD M DATUM AWANc xCKH 0 1 D F SWAM B[NC11 ME Pap "D DE %NRE �' .. RW NO. J50 SEW 3 IN, —A. B[NGI xEFD xDT BE SCW W. b Yr OLE I / -FINISHED GROUND PIONEER PASS 1ST ADDITION BTIESHEET SITE INFORMATION 1.2 -1.3 y CHANHASSEN, MINNESOTA EROSION & SEDIMENT CONTROL DETAILS z1 FINAL SANITARY SEWER, WATERMAIN, STORM FINAL EROSION k SEDIMENT CONTROL PLAN 2.2 SEWER STREET CONSTRUCTION & EROSION & S BLUFF CREEK BLyUWA1ERMAIN CONSTRUCTION 31 BLUFF CREEK BLVD 3.2 SEDIMENT CONTROL PLAN HEMLOCK WAY 3.3 pC� 9 ti HEMLOCK WAY 3.4 FOR MAYAPPLE PASS 3.5 4 RYLAND HOMES � EEf CONSTRUCTION N 4.1 -4.4 E \ 7599 ANAGRAM DRIVE, EDEN PRAIRIE, MN 55344 BLUFF CREEK BLVD 5.1 sr Asa PHONE: 952 229 -6000 FAX: 952 229 -6024 BLUFF CREEK BLVD 5.z cc HEMLOCK WAY 5.3 PASS . _ MAYAPPLE 5 4 DETAILS 8.1 - 8.2 SITE II CMSTNG ASPHALT SURFACE IJ mom E%ISRNG CONCRETE SURFACE 1 t F.XISTNC GRAVEL 'SURFACE 1 . m ,: - I I •••j ' f / � E %ISnNG DELINEATED WETLAND y t E i ' - . -� WE TL JELINEA'IION j , ! b 5 F i 9 _ f 1, 7 F �) EVS1114 REE C T LINE /TREES SCS�C� y O EASING WATERMAIN 8xj lL SANITARY SEWERED1�� 7] CX STING STORM SEWER E.".G O Il uN E • - Y-:RNF.AU POWs '••'" ° .... �. %: kV I F. /POWER P(XF.S E -tr+,: _. ....: f Ir J` 1 `., o EX WELL ____ .•A] __________ , 1 -SING TELEPHONE PEDESTAL 13 �� y °q � EIC N NG FENCE CURB - y • 1 I s \1 OV I EtlSRG Q SITE MAP \ EnSTNG H E AV fEN E SILT FENCE ...:.:.....: . - ' -- " - s- �•' '4' 1 s r '\ E%ISIINC POST GRADING SILT FENCE ^ ....:.. :::....: ' Fi NO BcJ9[ r..Ea ...._.__. ^ .^ x .f, rr C3^ - - - '- EXISTING TREE PAR SEDI MENTATION FENCE v ( ^' EXISTING TEMORARY SEDIMENTATION W1LEi P VIPE s1GRU sEWEe STRUCTURE SCHEDULE {.� rr .\ I 1 ;. T 01"1 ,r.-`� CO G 3 I .>; ( A oT0 ,:�f NSTRUCTON ROCK f,�i1l x rH EXISTING TEMPORARY S [�•]] i I - - •• ' SE DIMENTAnON BASIN 3 p EXISTING 9 J r m d •- r_r : : BENCH (10:1 4AX ETM g e v. _v I J i : L. -o• _ XISnNG SEED k MAOOi _v ¢,.» - - I BLANKERY 3 EROSION CONTROL CATEG i ^\ ' I 4_ E %ISTNG WTMCO ^C" ✓ w mea x. `r r.v �.�{ 1 T I ! b \ i BWFF CREEK OVERLAY DISTRICT SIGN -^'' W �A LS - PROPOSED STORM SEWER W f 2 A L °•r• ''':� — r• — �•••m� PROPOSE. A' PERFORATED URAINT.LE w PROPOSED RIPRAP PROPGRED WATERMAIN Q "` ` "•a .�- -v ... ±" , PROPOSED SANITARY SEWER 1 A •a ' "'° "' -- PROPOSED SANITARY $ERNCE -a PVC $OR 26 a f - - - -- - - - -1 M(111$1 WATER S011E -1' COPIER TYPE. k Nll PROPOSED CONCRETE SUNFACE DRAWN BY G A 4ESM[NA 1 Dj - OPOSEO ASPHAL SUCE CJK IR T RFA n22 .sOO DATE ��Jff . PROPOSED CURB 8/20/10 I ' PROPOSED SEED k MADOT CATEGORY 3 REVISIONS EROSION CONTROL BI.ANXET(TO BE INSTAIAEO AFTER COMPLETIDN OF UnUTY CONSTRUCTION) OR I Afl A unu EASEUEN]S MINIMUM CITY SETBACKS PROPOSED REAR YARD CB PROTECTION(TO Aef oW ® FRONT 25 FEET BN y1: R.R. SPIRE INSTALLED ATTER C PUETION OF UDUTY NE SOUTH FACE OF 1ST POWER CONSTRUCTION) SIDE (HOUSE) 5 FEET PEE WEST OF ORAIEWAY - N. SIDE OF PROPOSED DITCH BLOCKING(MADOT TYPE SIDE (GARAGE) 5 FEET PIONEER TRAIL - ELEV.- 910.34 NAND BB DATUM 3 TO BE INSTALLED AFTER COMPLETON L5 SIDE (STREET) 20 FEET /W MONUMENT O SOUTH Df UTILITY CONSTRUCTION) SCALE IN FEET BM A2: TOP ALUM R O 150 300 450 REAR 25 FEET RROPER LINE. ON PROPOSEp R/W LINE E`i PROPOSED WMCO(TO BE INSTA0E0 AFTER ELEV.• 913.67 NAND 06 DATUM COMMF,TION OF MEET CONSTRUCTION) ' P 1 WcM1 •ISO 1.0 PROPOSED HEAVY -DUTY SILT FENCE iD r - ' ' = BE INSTALLED AFTER COMPLETION OF .__. PROJECT CONTACTS UTILITY CONSTR1CFDA) GOPHER STATE ONE STATE ONE C� L2D : ^T DI NEEH G . G. CDC-ER. .POPE$ Ii. I,:A. NC CALL 1TI HWRS BffORE YOU DICI (9'v2)- HSD -S•]Aa (0) PROPOSED SILT FEN (T BE INSTALLED IWW OTY AR 651 - 154 - 0022 ( I .C^.,tl -GXLO (M7 AFTER COMPIETON OF UTILITY CONSTRUCTgA) CAD FILE BEING 5 fEEr w WIDTH AND ADJOINING MN. T0U TREE 1_6pp_252 - 1166 'R, acxs EG U Nu D'ti on k MANAS. K .. +e4f5 (52) .S� — (0) 21996 - 21TSU AND LOT ONES. AND 10 FEET IN WIDTH -, SE G WXixS PR :COX ul r E. n. a C - Iu cIrh —=N (5. > / 169 (0) PROJECT NO. AND AD ON NG S MEET LINES AND C G EA n a G TROP' MP A ESt, ]5] 2JIB (0) FUTURE S ANIT ARY REAR LOT LNE% UNLESS OTHERWISE n. FIFA) xxx��%%%N '^-""- '"` —' ---' FUTURE SANITARY SEWER INDICATED ON THE PLAT. �;XUTPACIOi W ..R. TND.,':'. T. FF (YFRrNNFD (x %XJ %xx %%% %v FUTURE STIX4M SEW¢! 21996 - CCC =- J FUTURE CONCRETE SURFACE 1.1 �T ,..,, � r ! ,� f .;..ei ' �R � �.., '�J � 1 � ' -�•-l- �ik'rial F,.. g I EE Cry r yE GROUP g "" S IL G OUP ' CIO f t r # A r J�rr 1 N g $ s NIQ r � a > t 1 , B /D v y ..� i J >t y ✓ j 1 �" f i j I j • SOID • I I ROVP 11 i ✓�� l 11.• T I C, y � i 1 GROUP - i 1 r.. 111i' oft A BALAwp /.^raJSl i f ♦ w r � A' TM WIL K \ ,! ¢E �.:' = %'+•^` s ) e r ��. !.. e$ I L 'w, {~ •,,,� ' � 1 l � ,.. SOIL GROVP c \ r } j E 7 O Cn lit i L YY w .'' , .r� .t /i•rt )y { % B /o' 1 �"'. " ' r y "�'` ."�� 1& v� ' �8 4 / " 17 � 3 f ti USGS MAP 1 Inch 1000 feet / f ~�� O - a 9° S01 } DR AVVN BY SOIL GROUP MAP DAT CJK DATE 1 inch = 200 feet 8/20/10 z n REVISIONS BENCHMARK OM y): R.N. SFKE SOOT! FALL OF 1ST POWER aqE W.5T DE DRIVEWAY - N. SIDE OF PIONEER TRAIL - ELE- 910.30 NAVD 86 DAT1M H drdeale Sol Groue Sol Tatum 8M 12: TOR ALUM R/W MONUMENT 0 $D PROPERTY UNE ON PROPOSED R/W UNE. A Sand, loamy land, or WDdy 100. ELEV.• 913.87 NAW 88 0ATU4 B Sgt loom or loam C sand day loo,,, D Clay loam, .nty doy loom, randy day, arty day, or cloy CA 9 E 6 -21 21 u' PROJECT NO. 21996 -21 i. % IV aa rrr, �1Yr rrT fJr;'lrn rr . I 6• f rrr, „ri5 y ■� .gR 1,.4'2 • !r f y�\ —iY '�rrr r 6 Fr +. f4<: R Q f EXISTING DRAINAGE 1 inch = 200 feet z RFNCH LARK BM p1: R.R. SPIKE Sc 1 FACE Of 1ST POWER POLE WEST OF DRIVEWAY — N. SDE OF PIONEER TRAR — ELAN- 910.34 RAW ee DATUM BM #2: TOP ALUM R/W MONUwAT O 5OUTN PROPERTY UNE. ON PROPOSED R/W UNF.. EIEY.. 913,67 NAVO e6 DATUM C.V b� i I lid t J !-i, f z y y 9 F �i z � ll W 6/20/10 RENSIDf.15 PROJECT NO. ■ t 2199621996 -21 /.3 PROPOSED DRAINAGE 1 inch = 200 feet z at am"LAMINT, CA %1, 9 =Ur sr N rP — . 7 CATCH BASIN INLET PRoTEcnON - SFOIME14T I'll TER RACK TEMPORARY SEDIMENT TRAP rLW FLARED EF�CFCTION IN FT PRO noN TREE PROTECTION FENCE J' 'o-. . — we CONT EROSION 1A.K11CA..R1 I (TO BE INSTALLM PER UANUMMME'S PECIIII(ATIONS) HOR GRADIN I WEW CROSS SECTION PROFILE NEW DITCH CHECK - MnDOT TYPE 3 PROJECT CONTACTS -4cy -- CAT, . L — .TEc,: 7,,LL — AGG — REGATE V UF 11 .f . . . .. ...... ..... 11 � O'Ni - O. C—. P.E. -- JAWSR. HiLt. I NC. m o mm- i., - ,131%; J M )IM 13IN: -K S%M.— - LAND D(.WLOPWF.Nt MAN-11 - RY­D -(.� P.IL .1likil. - -X W0 l 01, IX C,­,, NPOES OF'F'ICER: 11. TO (,01A., M (fill) 6480 (M) (651)-757-2719 (0) 1,2=:,,, c* (D �- E jib Z;rr m UMAX. A i i 7 OUTLOT C r �\ I 1 i � I � i I i 1 \ 11 111 \ IR 1\ \ 1 11 1 \ T \ Nom WN CH AQUATIC —.I Y STOPM lC N RG 06NPBC0 BY UTlltt E LATE MUST TIM BC MO MULED MM 1A 6TUI C MTC SLED IMMEBIAIEIY AFTE UTI L CONSTRUCTION. Ci 2� 2 ALL REM YBRO CATCH BASINS MUST HAYS INLET PROTECTION y NSTALLED ON TNEM IMMEOATELY AFTER NSTAL..LTON. L S NUT PROTECTION (MMOD MUST BE INSTALLED IN ALL STREET �_ w I S i CATCH OASINS UPON CON —TION M STREET CONSTRUCTION. V) L_� ( A OPOSEO 511 FENC[/O TON — XIIS /CR PROTECTION k f .. ROSION CONTROL BL NNET MUST BE NSTALLOO IMMEMATIly AFTER N m UTllry CONS`NL.ODN. 6 P 1 - 1. A. CIL—C SIT PENCE OR EROSION CON.01 ....IT TNtFN /k/ 0 BY — CONTRACTOP MUST BE —CED OR — BACK Y� ( UP MMENATMY — UTU11 CONSM 1 ON (INODENTN. 10 1y CONSTRUCT.) yl `j Y 6. SOD MUST BE NSTALLED BEWND ALL CONCRETE CURB k y 44JJ Y \ i CIITTF.R/90EWM.N MO ALL AREA PSNRRCD BY CONSTRUCTION MUST BE CO. Sl AND MULCHED yUTA)yLY UPON (n F Co_". OF PRIVATE UT", (OlE) gW$TRW:TION Y ' L $CNE IN FEET s \ 0 60 L2D LBO .......... ' 1 Ina . 60 RR61 BENCHMARK ( BM YU R.R. SPINE SOUTH FACE OF 1ST POWER POLL WEST OF DRIVEWAY - N. SIDE OF PIONEER 'IRAIL - ELEV , 910.74 NAW AB (IANM BM Y2 TOP PLUM R/W MONUMENT O SOVT1 PROPERTY LINE ON PROPOSED R/W UNE. \� b ELE— 91;167 NAW BB OAHU "will 1 11 =60 R ? � ° o � 1 " ` ISM F P. x � A4 � x3,$ i•'A'�'k3� ��� � � � T Yi E/V � q�Q d DRAWN BY CJK N' DATE 8/20/10 ya' REVISIONS . I I CAD FILE J�F PROJECT NO. ` I 21996 -21 12 1 1935 OUTLOT E 3 OU�L(01T b" 2 N N CREEKg 1 1935 OUTLOT E OU�L(01T b" N OUTLOT C $C IN FEET cl, 15• Rw UM #I: R.R. SPIKE SOU� FACE OF IST P(AVER P ' DRIVEWAY OLE H EST 0, P clt�. - H. SIDE 01' 10IIEC. 1-1. 910.3 NAVD BH 0-1. T RCP - BLUFF CREEK BLVD BM 02• OP ALUM R/W MO WENT & SCI.I� P E L E T 913.6) 1. 1 ZA W I B O DI C % Mi /w I I W C ... . ........ .. . .......... . ... ....... .. ...... ......... . . ....... FAjM(, C W?Mux:g ........... .... 2 ........ . .......... . . .......... .. 955 950 . ......... t T ... .... . ... . ... . . ....... ... ............... .. . ..... .... ........... . . .......... .. . . ..... .................. ......... . . i FIR TERLINE CP -- 7 — 7 7 9451 ...... . ..... . .. . ... . ... .... . . . ...... 2 Dip 7 935 . . ........ 7, ._1 2 RCP ............ ......... . ... . ................. . ................... . - ........ ..... ... .... ....... . ........ ........ ........ ..... . .. .... ...... . 930 211 pvc `CR . ........ . .......... ........ . ..... ............. J ........... . . ...... .. ........... Sm ............ . . - ............. . . .......... ......... . ... ........... 1 ...... . ..... . ........ 925 — F OUTSIDE VA I I..... , , ,_ .....— .- m --,_, T-9 IM Rr 1. 915 F00 1+00 2+00 3+00 4+00 5+00 6+00 11+00 12+00 DRAWN BY CJK DATE 8/20/10 REVISIONS CAD FILE 2199S-21SS PROJECT NO. 21996 - 21 1 1930 1 - - - - - - -- - -- 1 - -- 4 o/ FS A 5 12 °t � � a J � # J'h I m 3 13 NS. i5 % -6 16 17 O�' 7 '2q 1211 8 01 A OUTLOT C 1 0 N i 11*11 . VF IN 14 z 15 1 1 � BENCHMARK 0 _3 ON #1: RA. SPIKE SOUTH FACE OF IST POWER POLE WEST OF DRIVEWAY - N. SIDE OF SCAL IN FEET to� - ELEV I. P IONEER TRAIL ., 910.34 NAVI) W DAWN o 1. OT D aN '2; TOP ALUM L R 1 4 E W MONUMENT 0 SOUTH ON PROPOSED R/W UN I ML PROP E. WAY 913.67 NAV) 88 DATUM I'D 8 r Si t n I 945 ............. 4 . .. ... ........... ..................... ..... .... - PROPOr! CENTER �E . ............. . .. ..... ..... . ... .............. ';i -22.05 . .......... 94.5 U 940 - 240 935 x w. oo 935 P4 eENTERUNE, f R .1p 930 r4sTIN0 . 930 ORAVT BY C K .... . ...... ..... . . ..... . .... ..... ......... .......... .. . ....... ....... ....... ..... - ... ........... . .. -T- . . ... ............ DATE 4 8/20/10 REMSIONS 925 ... . . . ........ ... ...... ------- d ... . ......... ..... . 925 at 920 1111 11 , .......... ........ . ... . ..... .. . .......... I ... ..... ... ....... . . .......... ........ . .. PW - mR25 Q O;tOI " ---- 7 - . ......... R 201* ' --o- "PVC. SOJV 2V� *-0:40V . . ..... 220 SOX 35 v 915 i4V: R 35 9 o.. .......... — ---- -- 915 a CAD FILE 21996-21SS 910 ........ ...... . ....... .... . % . ... ....... ..... .... .... .... . ... . ..... . . ......... 910 — PROJECT NO. 21996-21 q si 905 25+00 _4;LO0 3+00 2+00 21+00 20+00 la6O 18+00 ' � -------- 'I r --------- - - - (� II I - 1 I 2 11 1 3 4 OUfiLOT E ', —'L... —..._. .. 8 f .... ,, .. - t SI ` ':: x v' i NDE LEOEN ti e•. r >4 I S I e}80 1 1 u �ii M>'.A �.XI. 1 (IiG 1 Gt «AEA y i Dy 2 R_ 3 xe W _ D /' / i; �,y en> i t aU WEB __ _ _ -_ -J L- __ - -.1 i �• ' I .,,,,' • a Do1wnG11 / / �, WVWnF> O,t..'�' '� ' � •..J L -- `"^.; \ 1' ex1 1• i+FE Y Wn01ro uK � � Ai V Y 7 — WA � -' -�� _ —- - -- --- — — - 6 F'•STMIM« - w MwLax rA>)i e -a K• eEw� '', „- nA -lweo' ,� ; i m""�' Y SCALE x FEET 8Ce e 8 i e OU Tl OT E \ 8 �I 7 /7 t` '.� . BM Yt: R.R. SPIRE SOUIN FACE OF IST POWER 4 } V \ PONE WEST OF DRIVEWAY - N. NDE 7 OF MOWER FRAIL - ELEV.- 910.36 NAW 88 DATUM x OM M]: TOP ALUM R/W MONUMENT O SW1N ` PROPERTY I1NE ON PROPOSED R/W UNE. O HEMLOCK WAY ELEV. � 913.67 NA`. PB DATUM A 1 t SEMN 7 - 945 t g I 4 E10STING GENTEAL «E I I d Yd 1 ._'d !. 945 .i qq - __.... {. _. yq o � .�'1 21 M _.. F 940 ( 1 ( } i 940 1 . , 1. 935 935 a r • ROP ( • i � jjl j , 444 o 930 930 .� 1 I I 925 '. - 75 j I Tg� I �E F �� : 1. ;..:..... :925 DRAWN BY ..... .i _ _ .�_..._ ......,� "* b Y _i.HA 4_ _ 8 1 i I _ + .� ...._ ...I I _ c ,nc 920 - »r /'• L 1 2 .6 PC 90 50 2 6.* O �i R 119 8 C -SDR 20 •OIOF j I -' 920 6%40/10 REVISIONS - = t ._ 915 1 j I 1 '�• i r I I I � _ i i. t� f 910 I ' I 910 .;, z - ... _.__... r. F .,.. 905 _ _ _ ;._. _ 1 _ _ t _ --- ; 905 CAD s N ------ h. ... zt ; I ' PROJECT NO. 21996 -21 900 ._ 900 a.a 9 OUTL OT E J:.> < Ind 51 X 4 --- — ----- ------ --- co) 7 2 E g V 2 . ...... 7 w.% r--- 9 8 n 11i- 5.919.0 % ------------ dtl 4 a ?, SCAu IN FEE' D 50 Im 15o N.1— IAM Gj 5 50 12 A, BENCHMARK O RIM 11; R R. SPIKE SOU� FACE OF 1ST POWER P POU WEST OF DRIVEWAY - A. SIDE OF I IONEER TRAIL - ELEV.- 910.34 NAW U OM� 0 14 AL 1W R/W UNE, I� 1 F- 15 , ` " \ \ \; J ` ' \ 6 PROP ly LINE PRCPOS�I) LLEI.� u, , MO 0`, 67 N— 88 DA I MAYAPPLE PASS r 955 V iEgi' 84 955 . ..... . ... . . ......... . Qln ... ....... E. InNO OENIE�JNE 71-INE >i Ali 950 ....... ...... ... . . ....... 950 7. 0 0. 945 945 P4 r DRAWN BY ....................... ... I ........... 940 .... . ... . ...... . .. ...... ..... . . ..... .... . ........ . ......... ... . ... . ....... ... . ......... ............. . . .. , ... ......... . ......... ......... ......... . . . 940 cjK DATE /20/ 935 --- 935 REMSIONS . .... . .... ... . .......... ..... . .......... . . .......... . . . .. . ..... ..... A . 8 - I x 930 ..... .. ...... ..... ....... ..... . ...... .............. . .............. I .. . ......... I . . ..... . .... . .......... ... - ........ . .... . . ... . .... ........ .. . -:9 925 925 —4 b. 920 920 CAD FILE 9 21996 -21SS PROJECT NO. a -21 915 21996 3.5 I I 91 I I �. 1 ,5 6 +00 7t00 6+00 4+00 -- =+Do 2+00 1+00 0+0 1 i , 1 1945 915 NOTES . ALL Dwaxvas — TO IN, A. or axe DR... -P.. N OTED. -ITY UST BL' MIDFD AND MULCHED — ,--.A. SEED MIX IMMEDIATELY AFTER UTILITY DONSIRUCDON, 3 ALL REAM YARD CATCH BASINS MUST NAYS INLET PROTECTION 'STALLED ON DIEM - FoATEL' AFTER NSTALLATON. ET PRORCTION (N1MC0 UST BE WST — IN ALL STREET CATCH BASINS UPON COMPL DON OF STREET CO.NST DRON. S. ALL PROPOSED SILT FENCE/OITa CHECKS /CB PROTECTION A DIGSON CONTROL BLANKET MUST BE LNSIALLED IMMEDIATELY AFTER L_ CONSTRUCTION. DOYM tl1LI CONINACTOfl A W09 REPL ACED OR PVT BACK UP - EDUTELY A UWW CRSI FOK(INCIOENTAL TO COt1S1AUCD0V). 7. SCO MUST BE MSTALLED BURNO ALL CONCRETE: MRS A aTfER/SIDE -1 AND ALL — pSTWBED BY UDLITY COMMTON OF PRIVATE UTILITY (GTE) CONSDNCDON OUfLO,T I I y I i 1 I \ ++ 1 T f � SCALE IN PEST D u Too uD E41 Irol BENCHMARK DM pT: f OF ORIWWAY °f - T POWER N. SIDE OF \ ++ \ \ Y\ 1 \ ( \ T T PIONEER TRAIL - ELEV.- 910.34 RAW BE DATUM BM p2 TOP ALUM R/W MONUMENT 0 SOUTH PROP RV LINE ON PROPOSED R/w UNE. ELEV.� 91367 NAW Be DATUM rzmrw y In I IA. I r A I � 955 � : { _ _ ' _ �� 7- W _ �� X11 ' ,� �.:. j �. � - Pt ::..... 950 IS. D33 1A _ _..... .._.. 0.5 0 I OOR _ f t2P X 18 .RCP W O PROPO I 21 RCP..: a•vQb o f OOP'_. 46 0.4 St' RCP o LQ? E 0CP" CT 3 0 19= ! a' PM cPRRA°PDESE° _ 4 I NOTES . ALL Dwaxvas — TO IN, A. or axe DR... -P.. N OTED. -ITY UST BL' MIDFD AND MULCHED — ,--.A. SEED MIX IMMEDIATELY AFTER UTILITY DONSIRUCDON, 3 ALL REAM YARD CATCH BASINS MUST NAYS INLET PROTECTION 'STALLED ON DIEM - FoATEL' AFTER NSTALLATON. ET PRORCTION (N1MC0 UST BE WST — IN ALL STREET CATCH BASINS UPON COMPL DON OF STREET CO.NST DRON. S. ALL PROPOSED SILT FENCE/OITa CHECKS /CB PROTECTION A DIGSON CONTROL BLANKET MUST BE LNSIALLED IMMEDIATELY AFTER L_ CONSTRUCTION. DOYM tl1LI CONINACTOfl A W09 REPL ACED OR PVT BACK UP - EDUTELY A UWW CRSI FOK(INCIOENTAL TO COt1S1AUCD0V). 7. SCO MUST BE MSTALLED BURNO ALL CONCRETE: MRS A aTfER/SIDE -1 AND ALL — pSTWBED BY UDLITY COMMTON OF PRIVATE UTILITY (GTE) CONSDNCDON -- F5 N v Ind z E' 0 O 'n^. �UEA M�E S W W QI O n ■ REVISIONS ■ PROJE 21998 -2E wt OUfLO,T I I y I i 1 I \ ++ 1 T f � SCALE IN PEST D u Too uD E41 Irol BENCHMARK DM pT: f OF ORIWWAY °f - T POWER N. SIDE OF \ ++ \ \ Y\ 1 \ ( \ T T PIONEER TRAIL - ELEV.- 910.34 RAW BE DATUM BM p2 TOP ALUM R/W MONUMENT 0 SOUTH PROP RV LINE ON PROPOSED R/w UNE. ELEV.� 91367 NAW Be DATUM IA. r A I.......: 955 � : { _ _ _ �� 7- W _ �� X11 ' ,� �.:. j ���. ::..... 950 _ ... . ... . ... .. .... ... _ _..... .._.. PROPO 1 PRCPO GRADE j, GRAI9ESE0 945 cPRRA°PDESE° _ INSTitLL�27' FAEIOO tw/ I ' 1RA ARD. T UST 3 i I � - PRITPOSE9 �.� _ . 940 YY i.Lma T 1 ._:_.. . 935 o- t as ol3.iB�iE ! STIR 28' -12' RCD I . 4 HNLP Bid., I. >. T\ ... • ....... 8 PVLI _ . j GRADE .._._ : ............I. .. ... _ o I:OD1L Y .. 3f -12, REP, 930 1 '._ 1 DIP 118 RC CL3 o 0 s°{ ,� 1 - e- PVC .... ... ,_ ..,� ... ...... .. .. .. ..... ..._....... T ... _ ........ �1 925 I I PSc: � N I r 920 -- F5 N v Ind z E' 0 O 'n^. �UEA M�E S W W QI O n ■ REVISIONS ■ PROJE 21998 -2E wt NOTES 1. U. OuK a' N510NS NNE YU 1HE BACK a1NB UNLESS UTNf . NBTW.. 2 A.A. BC-I A STOANAATER POND AREA OSA—D BY APP N I ftlATE SEE % MMml TTLY A F AND ULCNED T N W1M AfIFA URUIY CONSIRUCRON. N ALL REAR YARD CATO N BASINS MUST HAVE INLET PROTECTION STAUFUI ON THEM INNLIHATCLY AFTER NNSTALLAHCN. LET PROTECTION COI INSTALLED IN ALL STREET fATCN o—S UPON N LETOI N IST B[ OF STR..T CONSTRUCTION. S ALI. PROPOSED $Al FRNCE/1)'aN CHECKS /C9 PAOTECTION A EN." CONTROL B,.vl MUST BE INSTALLED IMMEDIATELY AFTER 611LITY CONSTRUORON. 6, ALL ECSTNO 9LT FENCE OR EROSION OONTRM 8. KEY TAKEN DOWN BY UTILITY CONTRACTOR MU91 BE REPLACED CK PUT BACK UP IMMEDIATELY AFTER UALIIY CONSUUCTON.(INCIDUTAL TO CONBiRUC11oN). 7. SOD MUST BE INSTALLED BEHIND ALL CONCRETE CURB A WTTER /ODE. AND ALL AREA DISTURBED BT UTLITY WN91RUCTION MUST BE SEEDED ANO MULCHED IMMEDIA1ELV UPON CONPLERON OF PRIVATE URUTY (OTE) CONSTINUCTIOR. N SCALE IN FEET 0 SD O 50 FN. 50 Mt BENCHMA PME O AC PEST OiORIVE O Yf T N. SIDE OF MONEER TRNL -• ELEV.. 910.30 RAW 06 DAWN BM ; 121 TOP ALUM R/W MONUMENT 9 SOUTH PROPERLY UNE ON PROPOSED R/W LINE. ELlY.� 913.6! N­ BB DAWM I _ s { -' - - - -' 1 4n BLD 7 I ......- .; ...:.y STA 16.93 14 ..... .._ .. ¢ J SkA _� 00 ° rRR*HWL 9JD. .. 0. � SE - -- OUTLOT D caw 125 ;- I .... ST..10.95 CIEW 120 FES 200 STA13.00 1 �. FES Q0 W¢TALL Ri' FES JOO W/ ` TRASH WARD. 12 LAST3 -! -3pNTS iNV..9 }].00 PLACE; 21' RCP 0V� I _ t ...._ 925 FILTER MARKET AT FES. ]' ✓� % M. 129 STA.13+00 1$OiCY, a CLJ RIPFtAA..tI - NLTER OLANNET AT PCS.. - - \ IF RT POND 8 \ OLE 917.0 :j I ` ! 1 , 100YR.HWL 920.9 N A US 0 \ FES 900 _ OUl'L0�' Ib L �� 920 ; ;CONa Ij0 - \FEES a9 19 PCp CLS 9 1 BOx ! 500 1 L L - 9170 - \ \\ \ LIL - 915 _._... . _ .._. .. \ 1 - - n _.. - . 9691 jONl ex ARAP I NOTES 1. U. OuK a' N510NS NNE YU 1HE BACK a1NB UNLESS UTNf . NBTW.. 2 A.A. BC-I A STOANAATER POND AREA OSA—D BY APP N I ftlATE SEE % MMml TTLY A F AND ULCNED T N W1M AfIFA URUIY CONSIRUCRON. N ALL REAR YARD CATO N BASINS MUST HAVE INLET PROTECTION STAUFUI ON THEM INNLIHATCLY AFTER NNSTALLAHCN. LET PROTECTION COI INSTALLED IN ALL STREET fATCN o—S UPON N LETOI N IST B[ OF STR..T CONSTRUCTION. S ALI. PROPOSED $Al FRNCE/1)'aN CHECKS /C9 PAOTECTION A EN." CONTROL B,.vl MUST BE INSTALLED IMMEDIATELY AFTER 611LITY CONSTRUORON. 6, ALL ECSTNO 9LT FENCE OR EROSION OONTRM 8. KEY TAKEN DOWN BY UTILITY CONTRACTOR MU91 BE REPLACED CK PUT BACK UP IMMEDIATELY AFTER UALIIY CONSUUCTON.(INCIDUTAL TO CONBiRUC11oN). 7. SOD MUST BE INSTALLED BEHIND ALL CONCRETE CURB A WTTER /ODE. AND ALL AREA DISTURBED BT UTLITY WN91RUCTION MUST BE SEEDED ANO MULCHED IMMEDIA1ELV UPON CONPLERON OF PRIVATE URUTY (OTE) CONSTINUCTIOR. N SCALE IN FEET 0 SD O 50 FN. 50 Mt BENCHMA PME O AC PEST OiORIVE O Yf T N. SIDE OF MONEER TRNL -• ELEV.. 910.30 RAW 06 DAWN BM ; 121 TOP ALUM R/W MONUMENT 9 SOUTH PROPERLY UNE ON PROPOSED R/W LINE. ELlY.� 913.6! N­ BB DAWM I _ s { I _ :......._' 1 4n BLD 7 I ......- .; ...:.y ._� GRADE oa�u P , _ t _ ....... ..... .._ .. ¢ & . ..�, . .. 930 INSTALL 9 fES 200 W/ DRUM I PROP pp GRAD 1E 1 I .... II� I 1RASNWARO. TIE UST 3 JG I�% 9NV..925M PUCE �. I W¢TALL Ri' FES JOO W/ ` TRASH WARD. 12 LAST3 -! -3pNTS iNV..9 }].00 PLACE; ". ...... I _ t ...._ 925 FILTER MARKET AT FES. .. 1$OiCY, a CLJ RIPFtAA..tI - NLTER OLANNET AT PCS.. - :j PROPOSED-1 GRADE ` ! 1 , US 0 920 a9 19 PCp CLS 9 1 BOx ! a t - 9170 - !W97.1LL 12 IFTS 300 tRASdW ne utt O1]A - 915 _._... . _ .._. .. .� -._ _ . . ... - - n _.. - . 9691 jONl ex ARAP - I I I ( . x, RGP -2 0901E 4 ipo 4TER ET Ai FE9. h : } -TRASH AR0. TIfi T .101N IRV eF F � KCY A4 F��6.� - ........ .. . -. '. 1 _ gi _ .,:. -. - 910 I' CP_ d _.._ 43'-1 I as 99 RCp oox _: TIN _ 905 f I _ ..: ; . 900 I 18 I A �� RR #g ! f -. e 8 895 ! �ggL 890 NOTES 1. U. OuK a' N510NS NNE YU 1HE BACK a1NB UNLESS UTNf . NBTW.. 2 A.A. BC-I A STOANAATER POND AREA OSA—D BY APP N I ftlATE SEE % MMml TTLY A F AND ULCNED T N W1M AfIFA URUIY CONSIRUCRON. N ALL REAR YARD CATO N BASINS MUST HAVE INLET PROTECTION STAUFUI ON THEM INNLIHATCLY AFTER NNSTALLAHCN. LET PROTECTION COI INSTALLED IN ALL STREET fATCN o—S UPON N LETOI N IST B[ OF STR..T CONSTRUCTION. S ALI. PROPOSED $Al FRNCE/1)'aN CHECKS /C9 PAOTECTION A EN." CONTROL B,.vl MUST BE INSTALLED IMMEDIATELY AFTER 611LITY CONSTRUORON. 6, ALL ECSTNO 9LT FENCE OR EROSION OONTRM 8. KEY TAKEN DOWN BY UTILITY CONTRACTOR MU91 BE REPLACED CK PUT BACK UP IMMEDIATELY AFTER UALIIY CONSUUCTON.(INCIDUTAL TO CONBiRUC11oN). 7. SOD MUST BE INSTALLED BEHIND ALL CONCRETE CURB A WTTER /ODE. AND ALL AREA DISTURBED BT UTLITY WN91RUCTION MUST BE SEEDED ANO MULCHED IMMEDIA1ELV UPON CONPLERON OF PRIVATE URUTY (OTE) CONSTINUCTIOR. N SCALE IN FEET 0 SD O 50 FN. 50 Mt BENCHMA PME O AC PEST OiORIVE O Yf T N. SIDE OF MONEER TRNL -• ELEV.. 910.30 RAW 06 DAWN BM ; 121 TOP ALUM R/W MONUMENT 9 SOUTH PROPERLY UNE ON PROPOSED R/W LINE. ELlY.� 913.6! N­ BB DAWM � WAWj EKyST 7,' " NTS INV 0pe f{ PLACE 10 CY OE CLt AIPRAE t 1� 9LAFMEf AZ:fES. - u nEV f 9 o Spx M112' DIPS ! a 0 &ao I REVISIONS PROJECT NO. 21996 -21 4.2 I _ s { sq f DRUM I I .... INSTALL to REVISIONS PROJECT NO. 21996 -21 4.2 NOTES 7 ----------------- 1. All .—ON1 ARE TO TIE E— Of GURB INUI. GTHIR­1 HE-. I �. ..A.0 E.G. lk E.N.-TE. — ARCA U.SlUR.E. 91 UTUET GGN—c— UCl BE C�EGEG AND MULCHED APPBORRIXIE ELED - MNEGIAIELY AFTER UTILITY CONISINUCRIX. - - - - - - - - - - - 4 5. ALL HEAR YARD CATCH BASINS MUST HAW INUT PROTECTION INSTALLED ON THEM IMMEDIATELY AFTER INSTALLATION, 123 T 4� GIDON �MAACO) RE INSTILLED I ALL. GTRCCT LINE 10 AI S I O C V DIMPLE ON 1. N. OF SWEET CONSIftGRUN, 1. ALL HNO—D — lE.CE/D.TGN CHECKS/. P.—CRON �DN CONTREL ER MUST BE INSTALLED WMEERAMY AFTER 4 5 U _ c-RE-ON, 6. ALL � SDNG SLT RENCE OR VICSON CONER01. SLANKV TAKEN 3 X 2 0 — .1 .1— GGITRAG TOR MUST BE REILACED . PUT IIACI P IMMED'AlELY AFTER TUT`F CONSTRUCTURI(INCIDENT& 10 C .s.L.E.q COMIN 12 7. SGO MUST BE INSTALLED B—D ALL CONCRETE CURB 12 K AND ALL AREA WMROW BY UlDUfY CONSTRUG BEEDED AND Ull.,D ..CVATELY LIGH C."'ON OF PA-1 vNUET (GTE) co—Rucim. 6 3 fl- T COFINfat 1 1 , 1, FILE R13.67 N— 88 DATGM , 15 C 2 1 1 S -2 7 7 16 1 1" 17 OT D SIA —,I 1 8 ----) w - 24 RGPI 9 10 SC IN FEET OUTLOT C &N SO 1.1 1 I'D STA 13 BENCHMARK BW #1: R A. !DFIKE SOUTH ACE OF ISE POWER POLE %EST OF ORIW.WAY - R. SIDE Of 14 �, I ''I - I- ,- I z 0 PIONEER TRAIL - ELEV, 910.34 NA� 86 DATUM EM lZ T0P ALU R/W M�VMENT * SOUTH PROPERTY LINE CH PROP D R/W UNE. a FILE R13.67 N— 88 DATGM OT D &N N; IIN 955 .. ........... . ......... I I .......... . ..... . . .......... ... ............ ......... . 955 245 .................. . . . ....... .... ...................... . ........... T PRGIR GRAD 04 950 950 940 940 T, 945 945 935 13 _5 *A. 940 940 930 . ..... k .... ...... 30 DR CJK DATE 8/20/10 935 ......... . .......... i . ............ . ........ HDKRII:�.�IZX .......... . .. 93 5 925 :: .: I ... . ........ .... ........ PT - .... ....... 925 REMSIONS A , 9-30 .... ..... .... ..... 4 .. ............. .. 930 920 .. . ........... .......... ..... . 12 T . . . ............ . .. ......... . ... . . .. . ......... _O 925 925 915 915 92 0 920 910 910 CAD FILE .... . . ............ . . ....... ........ . ....... .... . ........... ........... I ... . ........ ... . ...... _g . ..... 21996-21ST i PROJECT NO. 2496-21 91 5 .__1905 j 24+00 2 NOTES SOME IN FEET ISO _ �— F I t -------- � r ---- = I ----- I t. A(y OYEHSOHS ARE TI) iXE BACK Di WPB UNLESS OTNFRW9E Ol. 11 SO ISO ` V 'I' ACUATC DB.. 6 STORMWAIER R.. [ SFD .1 T.TY DONTR C I Wdi 50 11 . AND YULEO W APPROPRIATE SEED IM T TY BE CONS'PUC RESEED CN K YEC RELY AFTER USnON. UTU I 1434 REAR YARD CATCH BASNS MUST HAVE INLET PROTECTON INS 11" ON THEM 0M n: R.R. SPIKE SOUTH FACE Of 1ST POWER ♦ R~, ', �' n � \ CONN 101 y E, ;J ---------- ----------- _ / / 1 I i' -, / _ — — 1 I I 3 1 I j MYEGAIELY AFTER INSTALLATION. N PPOTCCTION (OMM) MUST BE WSTALLED IN ALL STREET CATCH BASINS ON GOYP..— D" STREET CONSTRUCTION. 1 I S..W. PPOPOSF.D SILT FENCC/DITOI CHECKS /CO PROYECYWN M EPD$ION CONTR01. POLE WEST OF ORIVEWAY - N. BIDE a STA.12456 PIONEER TRAA. - ELEV, 910.34 NAND 88 OAIUM 1Y A ,' BM /2: TOP ALUM R/W MONUMWT O SCUM PROPERTY UNE ON PROPOSED R/W UNE. l NAVO •_ = \ yy N I I 1 OU LOT E I' i ! 1 1 1 I % BLANKET MUST BE INSTALLED IMMEDIATELY AFTER UTUTY CONSTRVCTION. I 4 B. ALL EASTWO SLT FENCE OR ER090N CONTROL BUNKET TAKEN 00W BY UTUTY ELEV,. 913.67 68 DATUM .' B I I 1 I 1 CONTRACTOR BE REPLAC. DR PUT BACK UP DAMMIATFI.Y AFTER UTIUTY N i j C CDNSYAU"cN OR MST TO CONSTRUCTION). CBA.5 +37 1 1 / 7. 90D MUST SE INSTAL BEMND ALL CONCRETE CURB 4 WiTER/SIDEWAUK AND l� 1 I I I 1 1 ; ALL APLA 0'M GEA BY UTIVTY CONSTRUCTION MUST DC .�DED AND MUI.ORM lA 1 �H -. _ J L - I % 11YAE (ELY WON COMPLETION OF PMVAiE UTUtt (CM) fANB1PVCn ON. �'CBMH \\ , 107 N` ER\ FUf . LOT COR �/� S¢ to c6uH IN LOT eoRHER 7 STA.15438' ---------- NA S' ! STMI4480 F BTA 0437 CB NH '05 - `, L, s •lr_ -�- 't ` STA.0 ^ ' I J I ` i ^` ;� /STA.13450 9 CB 109 - LOT CORNER V V> '; -- i 5 ..' ``VA Q -_ / "� v � O 10 ' i 3 ` ` \L ` L `\ 1 9 ' \\ TEMPORARY FES c' {/f I %. .. STA 2+25. 6.0 RT $ \ \ \ �-R'� `L `` <' \`1 \ f OUTLOT E \ 2 8 's8� z - -J 950 ss .... f �� g 'n 'g 1 9 �`8! ��M y 54 95U A U ...... .... ,� I . .... ..: qq ..... m 3 q q d _ t 7 6 7, E St of qM 9 LEErui 945 t t .._....._.. _. _ ....... .:......._... ........._ .......: ._... a ...:... .......:.. p i. ... _ .....: j 945 ti O E)QSFNC (.BADE 940 ..... .......... A�"DE"° d bsc9 i �... I . 1 ...... I 1. > I I 940 P4 b 935 r T A Y PROPOSED 935 N a 44- ^ ! g A i E 12 L 930 INSTALL TEMPORARY IS FES W TRA PROPOSED e z. a ,1 y9�` 7b t7 RCP C494,O:I7x ^.. • I .. 2e 2 _ -., .- - - ......: T .'. -...._ .. I.. .... .... . Y ......:.. _..... ..... 930 07 �0E O K - U1ADE i f A 1 E � 6' DIP I p 7:W% 36p ^ty NEE r DRAWN Y R 9 925 RIPRAP k TIM B TIM R LANKET ..........�i FES .,....... ....... A :.... 4 yM1l ' d5 c � 33.et2' R DI �: t _ 6 � � � 925 CJK 1PQ 1 .. _.. .1: . CL3�0664 d ... O6 _ _ __ PVC ... '. ._... _ ... � I.. , ...... ....._... i �. .. A % .:, `,. x - ?� B.. vIN� .''_Be• vc 1 DATE 6 REMSIONS 920 .,........ '..... - -{I 920 915 F -' ,:.• (, i I I 915 M5 4`a � ox 910 ............ ...... ' I _ 910 905 .?- :W. -._ 1 ..,. _.. r i . -::� �_ _.Im,.__ _ T._ ....._._... 4 � c __ .... r _ ..........::. _. _ ��.' _ _ l} _ ._ _ �._......... _t._ -t,. I _ _ _ _ 905 AD FILE 21896 -21ST 1 900 1 I a I ! E i a a , x L,.... I PROJECT NO. - 21996 21 $ I -900 4.4 A k 0. 11 ED 0,11 2 OUTLOT D o. 2 15 L ---- --- – CON R "CREW PED AN C CONSTRU CONSTRUCT CREEK 6 L AN RAN, 61 CRETE 30* At ---- B CUA $ 9 6 UTTER (TVP). f I ----- 10 BIT14NW5 TRAIL - OUTLOT E OUTLOT C 5' CONCRETE I CURB & CUTTER (TYP) Be'. CONCRETE S`OEWA`X 9.99.28 MUFF CREEK OLVO CURB DATA N A 7.69 37, ""OC' WAY MAYAPPLE PASS J L. SIRE MEEK T.229.25 ME I- vvv �CV-U-T 10 O-OAETE 861 CONCRETE Bela CONCRETE PEDESTRIAN CURB III GuTTEA (TYP). oun & CUTTER (TTP) AMP 71 - RAMP D/c Aw a/c A. 5 C ONCRETE SIOEW— NOTES CURB DATA 1. AU. OVIENSIONS SI— "E 10 7IIE DAM Of MAD UNUF�SS A -2 O—WISE NOTOD. 11 2,34 BEGIN S . A-70T1 MAD . CUTTE A' RADII _ TDI —Ex r 4�, 41 LDN OONCREYE OS A an.$ UNLESS q..00% C,U. IN FEET T-197.50 DECK 10' 3. M EU.—ION —U�CIO. RA. AN. .1. IUSUIS ED W. TOP SO 100 ISO OUTUM 0, OF ." A. S t 91" OUTLOT c AK 1 50 1.1 1.1&10 —.I— RAM 10 BE A JO BACK UNIE35 —... NOTED. I. 4, NU`T 111TECTON 31 MUST BE I"ITAIUET, I Slll�l CA T, C ,. DETA 1I1E*At.K BEGIN a , , VW SECEON BENCNAIARK BLUFF CREEK BL - I BASKS UPON COMPAW OF STREET MUSTAUC1104. &I "of"V XX OETAIQ OT I, BM 01: R.R. SPIKE SOU� PACE OF 1ST POWER SAWCUT 33 LF EX BITUMINOUS ..... W DOD MUST K UIDT— BE ALL CEIACAETE MAD & 5' CONCRETE SIDEWALK LOCATION lo' erumiNous PDX WEST OF DRIVEWAY - N. SIDE OF REMOVE. DISPOSE OF OFFSJTE. US n T VIOEWAIJ( AKO A11 MIKA 1ADRARDED Y UTUTY CON PIONEER TRAIT. - ELEV.. 910.34 NAW ED, DATUM D, OF BLUFF CREEK BL FIELD VERIFY & MATCH BWFF EECDED AND U... Im"WAM, UP. MNP;.E1 CREEK BLVD ER. BITUMINOUS. #2: TOP No UMENT III "' "W ,RO,AW. TY LINE W E 91167 ON PROPOSED R/W LINE. E BLUFF CREEK BLVD 91167 MAUD 118 DATUM 14 IN A 955 . . ...... ............ I ................... . ........ .. ........ t . .......... . ..... ......... . . ..... .. .. . ..... . . ....... 955 ...... .... . 9. ............ 950 950 ... ......... . ... ... ............. . ... ... .... .. . ...... . ............... . . . ......... PR . . .......... . .. ...... .... T pi 945 945 tqo)m PM 940 DO ... ...... . ---o0i ..... .... .... . . .... . ... ....... ...... .... ... . ... .. .... ..... . . ..... . ...... P. ... . ...... 940 222 Pp FAEV 7.00;0,D Am vc-loo ll+.)O.(O P M-O.w 935 1 931.52 IVI CLEY. .... ........ .... . .. .... ....... ......... ..... ...... . ..... . ... ... 935 . ........... . ............... .... . ... ...... ...... t V_JOO . .... .. 930 . ................... I.. . ......... . . .. . ... . .......... . ...... .............. . ... . ....... . ...... .... - ... . ..... . ....... .. . ............ . ... . 9,30 . ... ...... ............. . . . j ........... ........... . . ...... ........ .. ..... ......... t a 925 ........... . ..... . .... ...... I .. ........ ... 925 .... . .... .... . ..... ..... ........ . . .... .... ... 7 920 01 .......... . . ... ............. ...... ..... 920 A 9 9115 m i 9 8 9 3 A, .4 ------- - - - - - - - - - - - - - - - - - - - ---------- --- 3 4 --------- - I u 2 N x 4 5 A 11 3 � ; MYAWR PA s EYE 4 1 12 6 12+3!L03 INEOIN CONST. 13 SURMOUNTABLE CRETE CURB WFTERt Q CONCRETE M NLdl? — WAY - SUMM—TABLE CURB WTTM (TYP). 12+55.0 • 7 20 A CONCRETE 17 16 —.—LE 'CURB GUTTER (TYP). �. INSTALL 2- SALVAGED 20' RA 9 5+0.26 HEIM 5' CONCRET� 8 PERMANENT BARRICADES �. j ' 2 WAY -9.28 SuFF EEX 8L SDEWALX . 30' Rn (—I , - , , \ 9 10 N NOTES OUTLOT E 8 —SONS SNU- nRE TO ME BACK 1Y' C.AtB U—SS NO— 13 NO 5' CURE . OATEN (—. Al R- D N AN — U NLESS OTIER"SE U, 8, Rw C ONCRETE 15� 101 1� .1 I—SECII. N.11 .0 C�TUN B�— TO BE TOP OF � — —4 & W— UNIE —.0. Now.n. I.— or I CURB UNLESS OTNm%w oTO, S. Nal OTVQ&(..CO US' SINEEI CA'ICN �`OpJ( 1 SCA 1. FEET 0 SO 100 1 1 so SO I.. z E z Q 0 TC IN ALL ONSM— BENCHMARK C LOT D 6, Sw MUST BE INS— DEN- ALL —BE. OURS W M /SU)C� AREA DISTURSED By UTUITY 0NSTPJC7IGN UT. U.— -WATELY UPON IOUPLETON Ol _TE uBuw (BIE) R. ft R.R. -I.E IACI Of IST 10W. POLE WE T OF DRPvtWAY - N. SIDE OF NONEER FIRML - ELEV, 9%0.34 NA� W DATJM _�UTLOT W C11ON GM 12: TOP ALUM R/W MONUMENT 0 SMITH HEMLOCK WAY tUMVIEVI 0 DETAIL) PROPERTY LBIE ON PROPOSED R/- UNE. ELE— 91�.87 HAW OR DAWN a=NCRETE SIDE 945 T �77-77 - 1 ". I- � I I I ..,: .1-1-1-1- L ............... �i .. .......... PRWOM 90i T 9 112 IR 1�1..J- .M2 a V. - . ......... . ..... . .......... . ..... . ........ . ..... . .... ............. 940 j t ook M._1 5o 940 r. P. DRAWN BY CJK 935 24 00 935 W 75.00' ks-O w .................. .... .. ........ ........ . ... . .. .. ........... . ......... . .. .. S OATE /20/10 930 f REVISIONS X .. ....... ....... . ..... . ......... ... ......... uui� ......... . t: ... . . .... ..... IIIN. CENI�RJNEl i I . ...... . ..... ..... ...... . .......... ...... . ....... 930 925 aw ... . .......... . .................... . . ... . .......... ..... . ..... . ..... . .......... . ... i .......... . .......... ......... . ... . . ..... ............ .. .... ..... . ......... 925 920 4 ..... . .... . . . ......... ........ ......... ........ ........... ... . ..... . .... .... ... ..... ....... T .......... .. . ....... . . 920 915 T 'N 915 CAD FILE 21996 -215TR *2 PROJECT NO. 910 1 1 i p 910 21096 21 L= 22+00 21+00 1 Tm 16+00 15+00 14+00 Ind j5 ■ REVISIONS ■ PROJECT NO. 0 1 NOTES 1 .,BON9 AM `0 Nc .—B, 2W RAO. R. 011. —MV. —F� (11 �41 AII ­­­ —1 7 BA 11,11EIFIl "THERANSE 0. AN X Cl LI CATCH -- ON Al —MECT. R-I AN. —. B.. TO C TOx DUTLOT E OBR, . 1. --PON ... 10 O< A 70 IAD- (TYP.) T. n6 SACK o,HE v C,,M, vN,.ESS % Nom. 6 P— (AB..) -Qwt M,NBF"—N —�N —B OF —BTRV0— EMLOO —90.20 H W 1. IAJmRftDiEW 5. wl U III— MININD Al4 CQVCRSR. .11 LN AND ALL AREA DISTURBED BY — —SPRIC'FOR AND �C 110 1—DIAMY UPON COMPIZTON OF I, _ U71fl7y ( GTE) 4 , NTA 1 , IBLE 1 CRE 'CURB 2 3 TTER T'r - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - % I 3 i - ----- i N I AD V `- ---- - ----- - - -- - 77 ---- --- 4 bw LE ccHc� CURB ' W TAA MR (TYP). 10 x I 8+OB.W WAYAPPt.E P 4 90 8FF OEM N) 6#78 w O SCALE IN FOEt 50 f00 1S0 2 12 BENCHMARK RM #I: R.R. SPINE SCV� FACE OF 1ST POWER 6 POLE WEST OF ORIVE— - N. SIDE OF PIONEER FRAIL - ELEV. 910.34 NAW 88 OAIUM 13 To, R/w mo VmENT 0 sou� PRO, �RTY UNE ON PROPOSED R/W LINL ELEV. 914.67 NAW all DATVM MAYAPPLE PASS 4 M 960 ............. ....................... ..... .. . .. ... . ............... ........ 4+o) t 954.03 P.0 Pm EUV�, ... .... ... .......... ... I ..... . - . . .............. q.. ............ . . ...... . ...... ..... .......... . . ........ . ....... .. . .... ... . . ......... I . ...... ...... 955 w-;Oo.00 . . . . ....... ....... .. . ..... . ........ ...... . 9 PROP6SED CEN HE .... . ... . ..... ........ . ... .. . ........ ... . ..... ..... .......... . . ........ . ........... ..... .... ........ . ... - . .......... . . . 950 + ....... .... . ............. ....... .... so V, 945 WARP Ok T 2 .... .......... . .... ...... ... .. ... ..... . .... .... .... ...... ........... .. ................ ..................... .............. . +0 �1lr 940 243.84 P W; ... ........ - ----- . . ........... 4 ....... .... .. ..... - ..... . .... ... . ....... INA Mr C 1 935 ... ............ ... . ...... ............. 93 ELEV. ............ 1 50;W 9-30 ...... . ... . . .......... . ......... . ..... ..... ... ......... .... ... ......... . . . . ...... . .......... . .......... . ... ............ . ... . ..... . .. 925 I 1.7— 1 � �— •-j -- -.- �� ; i I. I I. j � ( i s 8 i, I � I 920 tl 4' +00 +00 8+00 ---D+oo 4+00 3+00 2+00 Ind j5 ■ REVISIONS ■ PROJECT NO. 0 1 m ga 5-i Mz � a- _ e X: a. Mw l- ... ... . . .. t H Wil 'TR W MjEm�� r --4 .... ... .... O LE O sill 4m co E H a �� as RIES I ffe . ..... .. e ---------- JDy jJ RIES I ffe . ..... .. e ---------- JDy