Loading...
1b. 2011 Street Rehab Project: Auth Prep of Feas Study MEMORANDUM IO . Al T O: Paul Oehme, Director of Public Works /City Engineer 1 • CITY OF �y CHANHASSEN FROM: Alyson Fauske, Assistant City Engineer ,, 7700 Market Boulevard DATE: October 25, 2010 0<-4 PO Box 147 Chanhassen, MN 55317 SUBJECT: 2011 Street Rehabilitation Project No. 11 -01: Authorize Preparation of Feasibility Study Administration Phone: 952.227.1100 Fax: 952,227,1110 PROPOSED MOTION Building Inspections The City Council authorizes the preparation of a feasibility report for the 2011 Phone: 952.227.1180 Fax: 952.227.1190 Street Rehabilitation Project No. 11 -01 and approves the resolution. Engineering City Council approval requires a simple majority vote of the City Council Phone: 952.227.1160 present." Fax: 952.227.1170 Finance BACKGROUND Phone: 952.227.1140 At the October 11, 2010 work session, staff reviewed with Council the proposed 2011 Fax: 952.227.1110 Street Improvement project areas. Park & Recreation Phone: 952.227.1120 DISCUSSION Fax: 952.227.1110 Every year the City considers streets that are in poor condition to be rehabilitated or Recreation Center reconstructed. For the 2011 Street Improvement Project, staff is proposing to 2310 Coulter Boulevard rehabilitate approximately 2.9 miles of streets. The street segments within the Phone: 2270 proposed project were identified by the City's Pavement Management software in Fax: : 9522.227.14.1404 4 conjunction with site investigations. Planning & Natural Resources 7 1_/ ( / ; ' Phone: 952.227.1130 0`0 � - Fax; 952.227.1110 �� 1 � 1 m Public Works - ^� m i 1 1591 Park Road o f � Phone: 952.227.1300 / Q �' `�_ ■ Fax: 952.227.1310 - - - - HIGHWA Y:5 ._ _ Senior Center Coulter Blvd m s` Phone: 952.227.1125 e 1.-1 L. Fax: 952.227.1110 - --:� d 11 Web Site N Project Area #1: Commercial www.ci.chanhassen.mn.us I IN Project Area #2: Urban Residential ! • Project Area #3: Rural Residential L J -7` ® Project Area #4: Trail ( SI Project Area #5: Parking Lot Improvements G:\ENG\PUBLIC\_2011 PROJECTS \11 -01 2011 street project \10 -25 -10 order feasibility doe Chanhassen is a Community for Life - Providing for Today and Planning for Tomorrow Paul Oehme 2011 Street Rehabilitation Project October 25, 2010 Page 2 The proposed improvements generally consist of milling and overlaying the pavement surface. Severe pavement distresses will be removed and replaced. Minor drainage improvements are also included within the project areas. Watermain gate valve and hydrant bolt replacements are proposed for these areas. The project also includes miscellaneous sidewalk and concrete curb and gutter replacement at various locations throughout the city. Approximately 2,000 feet of trails is proposed to be resurfaced along the Highway 5 corridor and in the Stone Creek neighborhood. Also included in this project is expansion of parking in the southeast City Hall parking lot. A feasibility report will be prepared by the Engineering Dept. staff. The anticipated project savings will be between $85,000 and $100,000 if feasibility report preparation, design and construction observation are not outsourced. Project Area #1: Urban Commercial This project area consists of 0.71 miles of streets within the western portion of the downtown core: • West 78 Street between Powers Boulevard and Market Boulevard ranges between 60 and 90 feet wide, with medians. These sections were built in the early 1990's and were sealcoated in 1995. • Kerber Boulevard south of West 78 Street was constructed in 1972, overlaid in 1996 and sealcoated in 1997. • Picha Drive was constructed in 1972 and sealcoated in 1997. • Target Lane was constructed in 1993. x _ . — I 1' P iii ' l..- � . � /� a t g j ` So • - ,:- - ------- v ' i .", : :1 . -,.....„ i:= : • - ....-1 , : it , : : ' „,, --- -,,.. ' t �- . . : West - 78th 1 �Stree t -,se :. it „= Pi - :; k .,- , - ' - 4 i '4 H14:/44 .,,,' - '1 N, i' - - 7,s: Z. - 74.r. i 2 : : G: \ENG\PUBLIC\ 2011 PROJECTS \1 1 -01 2011 street project \10 -25 -10 order feasibility.doc Paul Oehme 2011 Street Rehabilitation Project October 25, 2010 Page 3 The Pavement Condition Indices are shown on the map below; a score of 100 represents a new street. The PCIs range from 19 to 72 within this project area, however staff recommends a mill and overlay is warranted on the roads with higher PCI's since these segments are collector roads. The streets segments with the lower PCI's are not collector roads and would benefit from a mill and overlay. The average PCI for the area is 46 which is within the general guidelines for overlays. Pavements between 45 and 65 are generally considered needing an overlay. A 3" mill and overlay is anticipated on W. 78 Street and 2" overlay on the side streets. Included in the project would be new loop detectors at all the signalized intersections. Project Area #2: Urban Residential At the September27, 2010 worksession the portion of Santa Vera drive between Powers Boulevard and Kerber Boulevard was not included m the proposed project. Following the discussion at the work session staff evaluated the condition of this street segment and determined that it is also a candidate for resurfacing. Based on preliminary cost estimates, there is sufficient funds budgeted to include this area in the project. -,-,> . _ �� (1 38 .. E ; _ ,p P wr ..... , ,...,, 7. ...„ , ... - . , . ,, , i ,;fsif„?ti ,... > ,'V _ � ,' , ' C-. 41 ,14,...4.,,s...,,,,,:41, 4„ ,:., ' Hlitair ›.,,,, •:. VIIIIT ' ti -• 4 W,..T ''*- A M - 1 m t * - 4( ` U '% 20 t RI • f 1 , \ C I t • (� , c ..di dam L� t'� g .i n1 �i . `. a . i ' "' r ..@ There are approximately 1.07 miles of streets within this project area. The street widths range from 23 to 33 feet wide. Santa Vera Drive (Kerber to Saratoga), Chippewa Trail and Chippewa Circle were constructed in 1987 and sealcoated in 1990 and 1997. Santa Vera Drive (Kerber to Powers) was constructed in 1995. Saratoga Drive and Circle were constructed in 1978 and sealcoated in 1992 and G:\ENG\PUBLIC\ 2011 PROJECTS \11 -01 2011 street project \10 -25 -10 order feasibility.doc Paul Oehme 2011 Street Rehabilitation Project October 25, 2010 Page 4 1997. The project generally consists of replacing damaged and settled curb, repairing severely distressed pavement areas, edge milling the streets and placing a paving a 2" overlay. Santa Vera Drive west of Kerber Boulevard would have a separate assessment since the area is all multi - family units. Drainage improvements to the intersection of Kerber Boulevard and Santa Vera Drive are also proposed. Project Area #3: Rural Residential Highway 5 �� J tea r <i , The streets within this project area were constructed in 1990 in conjunction with the Timberwood Estates development. ' evelopment. "' *> , rii i e ' The streets were sealcoated in 1992. The streets in this area ,. r � r 9 d �. — - - .1 1 ' are 25 feet wide without curb and gutter. ,. a, Timberwood PGO -,.. Staff proposes that a full depth mill and overlay be performed 13 .o , . 17 o oa , due to the condition of the streets. The millings of the streets V'0,. e1 , 3 9! `�. : � would be used as aggregate base. A 3" of pavement section • 1 $ ---:- Y ' yak oo (.. � �. would be placed. No curb and gutter is proposed in the 38 a0dge �' 3 ' project area since the development is not serviced by City 19 i sewer and water and there are no plans to extend these s ' services to the area. 9f 29 Staff proposes to discuss with the property owners making a ; roadway connection to Stone Creek Drive in conjunction with the project. Project Area #4: Trail Improvements Along with overlay projects, the City has included trail segments that are in need of repair or replacement. The Parks Maintenance Department used updated trail pavement condition data and site investigation to determine the proposed trail segments in the 2011 resurfacing project. Below are areas that trails are proposed to be replaced. These trail segments show signs of significant deterioration and should be replaced. The estimate for this work is $75,000. ,111511,1r OPP + —, i z N ", > sat 44 ' <. - c o . fi .4 a ': 1-1? C ,2 rcl Highway 5 = r �. ' .- t Ova shth Coulter Blvd ;r 1 f i 7,..�sgr� ,�� -- i . ll r�. r v l � . is a ! 4— _ . r Highway 5 7 - `• ,. � t , ( A dw iv 1 y y t r G:\ENG\PUBLIC\ 2011 PROJECTS \t 1 -01 2011 street project \I0 -25 -10 order feasibility doe Paul Oehme 2011 Street Rehabilitation Project October 25, 2010 Page 5 Project Area #5 South East City Hall Parking Lot Expansion This project is proposed to maximize the existing parking lots at City Hall. Currently, the parking lots at City Hall are full when seniors, the library and the k4 - City have events planned during the day. Ptillatt 1 City staff has tried to schedule events so parking At° �ik M demand is spread out during the day; however these ., • •' �_ „ initiatives have only been somewhat successful. 1 t l The proposed parking lot expansion would remove : t t* e most of the center median from the parking lot, move the north curb line 3' to the north and reconstruct the ' art parking lot entrances. The work would allow for 11 additional parking stalls. The cost for the project is estimated at $70,000 and be funded by the Capital Replacement Fund. PROJECT FUNDING Funding for the project is anticipated to come from several sources. Forty percent (40 %) of the street improvement cost would be assessed back to the benefiting property owners, per the City's assessment practice. The remaining 60% of the street cost would be a City cost. Each project area would have its own proposed assessment. The storm sewer and watermain improvements replacement costs would be funded by the respective utility funds in the annual utility budgets. The following is the anticipated recommended project budget and funding sources: Funding Source Amount Budgeted Assessments/Revolving Assessment Fund $1,200,000 Street Pavement Maintenance Fund $ 300,000 Capital Replacement Fund $70,000 $1,570,000 SCHEDULE The proposed project schedule is as follows: Neighborbood Meeting November, 2010 Accept Feasibia Report December, 2010 Public Hearing/Order Plans & Specifications January, 2011 Approve Plans & Specifications /Order Ad for Bid February, 2011 Assessment Hearing April, 2011 Project Begins May, 2011 Substantial Completion August, 2011 Attachment G:\ENG\PUBLIC\ 2011 PROJECTS \11 -01 2011 street project \10 -25 -10 order feasibility.doc CITY OF CHANHASSEN CARVER AND HENNEPIN COUNTIES, MINNESOTA DATE: October 25, 2010 RESOLUTION NO: 2010 - MOTION BY: SECONDED BY: A RESOLUTION AUTHORIZING PREPARATION OF FEASIBILITY STUDY FOR THE 2011 STREET IMPROVEMENTS PROJECT NO. 11-01 WHEREAS, the areas for improvements in 2011 are as follows: Project Area #1: Urban Commercial West 78 Street between Powers Boulevard and Market Boulevard Kerber Boulevard south of West 78 Street Picha Drive Target Lane Project Area #2: Urban Residential Santa Vera Drive between Powers Boulevard and Kerber Boulevard Saratoga Drive and Circle Chippewa Trail and Chippewa Circle Project Area #3: Rural Residential Timberwood Estates Development - Timberwood Drive, Acorn Lane, Maplewood Terrace, Oakwood Ridge, Renaissance Court Project Area #4: Trail Improvements Project Area #5: Southeast City Hall Parking Lot Expansion NOW, THEREFORE, BE IT RESOLVED that the Chanhassen City Council hereby authorize preparation of a feasibility study for the 2011 Street Improvement Project. Passed and adopted by the Chanhassen City Council this 25 day of October, 2010. ATTEST: Todd Gerhardt, City Manager Thomas A. Furlong, Mayor YES NO ABSENT