1b. 2011 Street Rehabilitation Project: Accept Feas Study - Call PH IOW MEMORANDUM CITY OF TO: Paul Oehme, Director of Public Works /City Engineer CIIANHASSEN FROM: Alyson Fauske, Assistant City Engineer 7700 Market Boulevard DATE: December 13, 2010 040 • PO Box 147 Chanhassen, MN 55317 SUBJECT: 2011 Street Rehabilitation Project No. 11 -01: Accept Feasibility Study; Call Public Hearing Administration Phone: 952.227.1100 Fax: 952.227,1110 PROPOSED MOTION Building Inspections "The City Council accepts the feasibility report for the 2011 Street Phone: 952.227.1180 Fax: 952.227.1190 'Rehabilitation Project No. 11 -01 and calls the public hearing for January 24, 2011. Engineering Phone: 952.227.1160 City Council approval requires a simple majority vote of the City Council Fax: 952.227.1170 present." Finance Phone: 952.227.1140 BACKGROUND Fax: 952.227.1110 At the October 11, 2010 work session, staff reviewed with Council the proposed 2011 Park & Recreation Street Improvement project areas. Phone: 952.227.1120 Fax: 952.227.1110 On October 25, 2010 the City Council authorized the preparation of the feasibility study. Recreation Center 2310 Coulter Boulevard DISCUSSION Phone: 952.227.1400 Fax: 952.227.1404 Every. year the City considers streets that are in poor condition to be rehabilitated or reconstructed. For the 2011 Street Improvement Project, staff is proposing to Planning & rehabilitate approximately 2.9 miles of streets. The street segments within the Natural Resources proposed project were identified by the City's Pavement Management software in Phone: 952.227.1130 Fax: 952.227.1110 conjunction with site investigations. Public Works Also included in this project is expansion of parking in the southeast City Hall 1591 Park Road parking lot. Phone: 952.227.1300 Fax: 952.227.1310 The proposed improvements generally consist of milling and overlaying the pavement Senior Center surface. Severe pavement distresses will be removed and replaced. Minor drainage Phone: 952.227.1125 improvements are also included within the project areas. Watermain gate valve and Fax: 952,227.1110 hydrant bolt replacements are proposed for these areas. Web Site www.ci.chanhassen.mn.us Chanhassen is a Community for Life - Providing for Today and Planning for Tomorrow 2011 Street Rehabilitation Project December 13, 2010 Page 2 of Eriel...c. . o 0 w 0 poll ()_,;".1% Q . HIGHWAY5 i -a - Coulter Blvd m 4i "ti;f4,' 0 iii; 1,r 2 ..... „, ,„.,..4. ..........., The project also includes miscellaneous sidewalk and concrete curb and gutter replacement at various locations throughout the city. Approximately 2,000 feet of trails is proposed to be resurfaced along the Highway 5 corridor and in the Stone Creek neighborhood. The feasibility report was prepared by the Engineering Dept. staff. It is estimated the City will save between $85,000 and $100,000 with feasibility report preparation, design and construction observation not being outsourced. The trail and parking lot improvements (Project Area #4 and #5, respectively) were not included in the feasibility report since the cost of these improvements will not be assessed. A copy of the feasibility report is available in the Engineering Department. Project Area #1: Urban Commercial This project area consists of 0.71 e ' , " SAP � ' y =� i` miles of streets within the k "" 7 7:, western portion of the downtown a . � / = core. � – • i I ,. . 4 : 1 att7r4 1 - -- Qo A 3" mill and overlay is .� _ anticipated on W. 78 Street and Ay o .,� L - y WeSt 78th Streets - ' 2" overlay on the side streets. 4 t. ! -';e' 'i j _ —- -t. m f T Included in the project would be `-' ' �`II , . _ , ? . -- ' -4 ' Fir new loop detectors at all the ' " ch D' Q r signalized intersections. Some . P _ 'c damaged curb and gutter will also `� 1 �" be replaced. `g h i?i ' 1 2011 Street Rehabilitation Project December 13, 2010 Page 3 Project Area #2: Urban Residential There are approximately 1.07 miles of streets within .. this project area. t - '' - �` " ¢ , , ca �: . f t1+ .,I- gjt I an ., The project generally . 4 a t 1 ,..,` , { ` , `, ' Ch ppe a , I ,r consists of replacing >, _ ; , , 1,,,-0 , + . ' G _. A " cn damaged and settled curb, 2 ') i , 2 . - # ��o repairing severely p r � �` - � �° * 0 k t �' ,�" , ` �. , Q Saalla Veil ar distressed pavement areas, T c o t''.. " '.\>-- � '1 �� "- -- "�. edge milling the streets and ,„1*, . ' '\ �' - v > L ri placing a paving a 2" a>.. a = ' i T ` , 0� j � p y overlay. 0 t : � ��� > , = ' f , G0 , — 0 to , . 4 z a .� Drainage improvements to . '", 4 .,n�ei , .� - -', the intersection of Kerber ° , i � x * = i A. i If Boulevard and Santa Vera i I A - •t a .€ I Drive are also proposed. „' � � ,, � , '�* '. �_.__: - -... - The bolts to some gate and hydrant valves should be replaced at this time. It's thought some of these valves may experience problems in the near future because of the age of the system and soils condition. Staff proposes a separate assessment roll for Santa Vera Drive west of Kerber Boulevard since the area is all multi - family units. Project Area #3: Rural Residential Staff proposes that a full depth mill and overlay be -- '� — performed due to the condition of the streets. The e ' ., iitott ic.,: millings of the streets would be used as aggregate ` bast. - _ t go ` ` a A 3" of pavement section would be placed. No curb ' ` a .r „S `� and gutter is proposed in the project area since the ��� . : : ` .Timberwood l ' ( development is not serviced by City sewer and water Po ° 4 and there are no plans to extend these services to the ,o `' o ° i. area at this time. -a �e�aQ�e _ L. % o,. Staff proposes to discuss with the property owners a>) ;ekwo making a roadway connection to Stone Creek Drive 0 °aRod,e in conjunction with the project. 4 03 , - CD 2011 Street Rehabilitation Project December 13, 2010 Page 4 PROJECT FUNDING Funding for the project is anticipated to come from several sources. Forty percent (40 %) of the street improvement cost would be assessed back to the benefiting property owners, per the City's assessment practice. The remaining 60% of the street cost would be a City cost. Funding Source Amount Budgeted Assessments/Revolving Assessment Fund $1,200,000 Street Pavement Maintenance Fund $ 300,000 Capital Replacement Fund $70,000 $1,570,000 Each project area would have its own proposed assessment, which is summarized below: Project Area #1: Urban Commercial Total estimated project cost: $490,988 40% assessed = $196,395.20 Assessment methodology: Benefitting Area Address Benefitting Area (ac) Estimated Assessment 960 West 78th Street 1.93 acres $8,373 920 West 78th Street 1.48 acres $6,421 900 West 78th Street 1.68 acres $7,288 800 West 78th Street 13.25 acres $57,483 7711 Market Boulevard 2.98 acres $12,928 7812 Market Boulevard 0.455 acres $1,974 7820 Market Boulevard 0.46 acres $1,996 7824 Market Boulevard 0.95 acres $4,121 7836 Market Boulevard 4.455 acres $19,327 7900 Kerber Boulevard 2.2 acres $9,544 7808 Kerber Boulevard 0.96 acres $4,165 761 West 78th Street 1.22 acres $5,293 851 West 78th Street 10.08 acres $43,730 951 West 78th Street 1.38 acres $5,987 975 West 78th Street 0.85 acres $3,688 963 West 78th Street 0.94 acres $4,078 2011 Street Rehabilitation Project December 13, 2010 Page 5 Project Area #2a: Medium/High Density Residential (Santa Vera Dr. from Powers Boulevard to Kerber Boulevard) Total estimated project cost: $109,385 40% assessed = $43,754 Assessment methodology: Unit Benefit Number of assessable units: 174.5 Estimated unit assessment: $251 Project Area #2b: Single - Family Residential (local streets east of Kerber Boulevard) Total estimated project cost: $285,224 40% assessed = $114,090 Assessment methodology: Unit Benefit Number of assessable units: 75 (includes 3 units for the City Park and 5 units for the apartment building at the corner of Saratoga Drive and Laredo Drive) Estimated unit assessment: $1,521 Project Area #3: Rural Residential Total estimated project cost: $365,373 40% assessed = $146,149 Assessment methodology: Unit Benefit Number of assessable units: 38 Estimated unit assessment: $3,846 Cost estimates include 5% indirect costs and 15% contingency. A 10% contingency was used for the commercial area since the scope of work in this area is more clearly defined. SCHEDULE The proposed project schedule is as follows: Public Hearing; Order Plans & Specifications January 24, 2011 Approve Plans & Specifications; Order Ad for Bids February 28, 2011 Assessment Hearing April 25, 2011 Project Begins May, 2011 Substantial Completion August, 2011 Attachment G:\ENG\PUBLIC \_2011 PROJECTS \11-01 2011 street project \12 -13 -10 accept feasibility.doc CITY OF CHANHASSEN CARVER AND HENNEPIN COUNTIES, MINNESOTA DATE: December 13, 2010 RESOLUTION NO: 2010 - MOTION BY: SECONDED BY: A RESOLUTION ACCEPTING FEASIBILITY STUDY AND CALLING A PUBLIC HEARING FOR THE 2011 STREET IMPROVEMENT PROJECT NO. 11-01 WHEREAS, pursuant to resolution of the Council adopted October 25, 2010, a report has been prepared by City staff with reference to the above - referenced project, and this report is being received by the Council on December 13, 2010, and WHEREAS, the report provides information regarding whether the proposed project is necessary, cost - effective, and feasible, NOW, THEREFORE, BE IT RESOLVED by the Chanhassen City Council: 1. The Council will consider the improvement of such project in accordance with the report and the assessment of abutting property for all or a portion of the cost of the improvement pursuant to Minnesota Statutes, Chapter 429 at an estimated total cost of the improvements of $1,570,000. 2. A public hearing shall be held on such proposed improvements on the 24 day of January, 2011 for the 2011 Street Improvement Project No. 11 -01 in the Council Chambers of City Hall at 7:00 PM and the clerk shall give mailed and published notice of such hearing and improvement as required by law. Passed and adopted by the Chanhassen City Council this 13 day of December, 2010. ATTEST: Todd Gerhardt, City Manager Thomas A. Furlong, Mayor YES NO ABSENT