1b. 2011 Street Rehabilitation Project: Accept Feas Study - Call PH IOW MEMORANDUM
CITY OF TO: Paul Oehme, Director of Public Works /City Engineer
CIIANHASSEN FROM: Alyson Fauske, Assistant City Engineer
7700 Market Boulevard DATE: December 13, 2010 040 •
PO Box 147
Chanhassen, MN 55317 SUBJECT: 2011 Street Rehabilitation Project No. 11 -01: Accept Feasibility
Study; Call Public Hearing
Administration
Phone: 952.227.1100
Fax: 952.227,1110 PROPOSED MOTION
Building Inspections "The City Council accepts the feasibility report for the 2011 Street
Phone: 952.227.1180
Fax: 952.227.1190 'Rehabilitation Project No. 11 -01 and calls the public hearing for January 24,
2011.
Engineering
Phone: 952.227.1160 City Council approval requires a simple majority vote of the City Council
Fax: 952.227.1170 present."
Finance
Phone: 952.227.1140 BACKGROUND
Fax: 952.227.1110 At the October 11, 2010 work session, staff reviewed with Council the proposed 2011
Park & Recreation Street Improvement project areas.
Phone: 952.227.1120
Fax: 952.227.1110 On October 25, 2010 the City Council authorized the preparation of the feasibility
study.
Recreation Center
2310 Coulter Boulevard DISCUSSION
Phone: 952.227.1400
Fax: 952.227.1404 Every. year the City considers streets that are in poor condition to be rehabilitated or
reconstructed. For the 2011 Street Improvement Project, staff is proposing to
Planning & rehabilitate approximately 2.9 miles of streets. The street segments within the
Natural Resources proposed project were identified by the City's Pavement Management software in
Phone: 952.227.1130
Fax: 952.227.1110 conjunction with site investigations.
Public Works Also included in this project is expansion of parking in the southeast City Hall
1591 Park Road parking lot.
Phone: 952.227.1300
Fax: 952.227.1310 The proposed improvements generally consist of milling and overlaying the pavement
Senior Center surface. Severe pavement distresses will be removed and replaced. Minor drainage
Phone: 952.227.1125 improvements are also included within the project areas. Watermain gate valve and
Fax: 952,227.1110 hydrant bolt replacements are proposed for these areas.
Web Site
www.ci.chanhassen.mn.us
Chanhassen is a Community for Life - Providing for Today and Planning for Tomorrow
2011 Street Rehabilitation Project
December 13, 2010
Page 2
of Eriel...c. .
o
0 w 0
poll ()_,;".1%
Q .
HIGHWAY5 i
-a -
Coulter Blvd m 4i "ti;f4,' 0
iii; 1,r 2 ..... „,
,„.,..4. ...........,
The project also includes miscellaneous sidewalk and concrete curb and gutter replacement at various
locations throughout the city. Approximately 2,000 feet of trails is proposed to be resurfaced along
the Highway 5 corridor and in the Stone Creek neighborhood.
The feasibility report was prepared by the Engineering Dept. staff. It is estimated the City will save
between $85,000 and $100,000 with feasibility report preparation, design and construction
observation not being outsourced.
The trail and parking lot improvements (Project Area #4 and #5, respectively) were not included in
the feasibility report since the cost of these improvements will not be assessed.
A copy of the feasibility report is available in the Engineering Department.
Project Area #1: Urban Commercial
This project area consists of 0.71 e ' , " SAP � ' y =� i`
miles of streets within the k "" 7 7:,
western portion of the downtown a . � / =
core. � – • i I ,. . 4 : 1 att7r4 1 - -- Qo
A 3" mill and overlay is .� _
anticipated on W. 78 Street and Ay o .,�
L - y WeSt 78th Streets -
'
2" overlay on the side streets. 4 t. ! -';e' 'i j _ —- -t. m f T
Included in the project would be `-' ' �`II , . _ , ? . -- ' -4 ' Fir
new loop detectors at all the ' " ch D' Q r
signalized intersections. Some . P _ 'c
damaged curb and gutter will also `� 1 �"
be replaced. `g h i?i ' 1
2011 Street Rehabilitation Project
December 13, 2010
Page 3
Project Area #2: Urban Residential
There are approximately
1.07 miles of streets within ..
this project area. t - '' - �` " ¢ , , ca �:
. f t1+ .,I- gjt I an .,
The project generally . 4 a t 1 ,..,` , { ` , `, ' Ch ppe a , I ,r
consists of replacing >, _ ; , , 1,,,-0 , + . ' G _. A " cn
damaged and settled curb, 2 ') i , 2 . - #
��o
repairing severely p r � �` - � �° * 0 k t �' ,�" ,
` �.
, Q Saalla Veil ar
distressed pavement areas, T
c o t''.. " '.\>-- � '1 �� "- -- "�.
edge milling the streets and ,„1*, . ' '\ �' - v > L ri
placing a paving a 2" a>.. a = ' i T
` , 0� j � p y
overlay. 0 t : � ��� > , = ' f , G0 , — 0
to , . 4 z a .�
Drainage improvements to . '", 4 .,n�ei , .� - -',
the intersection of Kerber ° , i � x * = i A. i If
Boulevard and Santa Vera i I A - •t a .€ I
Drive are also proposed. „' � � ,, � , '�* '. �_.__: - -... -
The bolts to some gate and hydrant valves should be replaced at this time. It's thought some of these
valves may experience problems in the near future because of the age of the system and soils
condition.
Staff proposes a separate assessment roll for Santa Vera Drive west of Kerber Boulevard since the
area is all multi - family units.
Project Area #3: Rural Residential
Staff proposes that a full depth mill and overlay be -- '� —
performed due to the condition of the streets. The e ' ., iitott ic.,:
millings of the streets would be used as aggregate `
bast. - _ t
go ` ` a
A 3" of pavement section would be placed. No curb ' ` a .r „S `�
and gutter is proposed in the project area since the ��� . : : `
.Timberwood l ' (
development is not serviced by City sewer and water Po ° 4
and there are no plans to extend these services to the ,o `' o °
i.
area at this time. -a �e�aQ�e
_
L.
% o,.
Staff proposes to discuss with the property owners a>) ;ekwo
making a roadway connection to Stone Creek Drive 0 °aRod,e
in conjunction with the project. 4 03 , -
CD
2011 Street Rehabilitation Project
December 13, 2010
Page 4
PROJECT FUNDING
Funding for the project is anticipated to come from several sources. Forty percent (40 %) of the street
improvement cost would be assessed back to the benefiting property owners, per the City's
assessment practice. The remaining 60% of the street cost would be a City cost.
Funding Source Amount Budgeted
Assessments/Revolving Assessment Fund $1,200,000
Street Pavement Maintenance Fund $ 300,000
Capital Replacement Fund $70,000
$1,570,000
Each project area would have its own proposed assessment, which is summarized below:
Project Area #1: Urban Commercial
Total estimated project cost: $490,988
40% assessed = $196,395.20
Assessment methodology: Benefitting Area
Address Benefitting Area (ac) Estimated Assessment
960 West 78th Street 1.93 acres $8,373
920 West 78th Street 1.48 acres $6,421
900 West 78th Street 1.68 acres $7,288
800 West 78th Street 13.25 acres $57,483
7711 Market Boulevard 2.98 acres $12,928
7812 Market Boulevard 0.455 acres $1,974
7820 Market Boulevard 0.46 acres $1,996
7824 Market Boulevard 0.95 acres $4,121
7836 Market Boulevard 4.455 acres $19,327
7900 Kerber Boulevard 2.2 acres $9,544
7808 Kerber Boulevard 0.96 acres $4,165
761 West 78th Street 1.22 acres $5,293
851 West 78th Street 10.08 acres $43,730
951 West 78th Street 1.38 acres $5,987
975 West 78th Street 0.85 acres $3,688
963 West 78th Street 0.94 acres $4,078
2011 Street Rehabilitation Project
December 13, 2010
Page 5
Project Area #2a: Medium/High Density Residential (Santa Vera Dr. from Powers Boulevard
to Kerber Boulevard)
Total estimated project cost: $109,385
40% assessed = $43,754
Assessment methodology: Unit Benefit
Number of assessable units: 174.5
Estimated unit assessment: $251
Project Area #2b: Single - Family Residential (local streets east of Kerber Boulevard)
Total estimated project cost: $285,224
40% assessed = $114,090
Assessment methodology: Unit Benefit
Number of assessable units: 75 (includes 3 units for the City Park and 5 units for the
apartment building at the corner of Saratoga Drive and Laredo Drive)
Estimated unit assessment: $1,521
Project Area #3: Rural Residential
Total estimated project cost: $365,373
40% assessed = $146,149
Assessment methodology: Unit Benefit
Number of assessable units: 38
Estimated unit assessment: $3,846
Cost estimates include 5% indirect costs and 15% contingency. A 10% contingency was used for the
commercial area since the scope of work in this area is more clearly defined.
SCHEDULE
The proposed project schedule is as follows:
Public Hearing; Order Plans & Specifications January 24, 2011
Approve Plans & Specifications; Order Ad for Bids February 28, 2011
Assessment Hearing April 25, 2011
Project Begins May, 2011
Substantial Completion August, 2011
Attachment
G:\ENG\PUBLIC \_2011 PROJECTS \11-01 2011 street project \12 -13 -10 accept feasibility.doc
CITY OF CHANHASSEN
CARVER AND HENNEPIN COUNTIES, MINNESOTA
DATE: December 13, 2010 RESOLUTION NO: 2010 -
MOTION BY: SECONDED BY:
A RESOLUTION ACCEPTING FEASIBILITY STUDY AND CALLING A PUBLIC
HEARING FOR THE 2011 STREET IMPROVEMENT PROJECT NO. 11-01
WHEREAS, pursuant to resolution of the Council adopted October 25, 2010, a report has
been prepared by City staff with reference to the above - referenced project, and this report is being
received by the Council on December 13, 2010, and
WHEREAS, the report provides information regarding whether the proposed project is
necessary, cost - effective, and feasible,
NOW, THEREFORE, BE IT RESOLVED by the Chanhassen City Council:
1. The Council will consider the improvement of such project in accordance with the report and the
assessment of abutting property for all or a portion of the cost of the improvement pursuant to
Minnesota Statutes, Chapter 429 at an estimated total cost of the improvements of $1,570,000.
2. A public hearing shall be held on such proposed improvements on the 24 day of January, 2011
for the 2011 Street Improvement Project No. 11 -01 in the Council Chambers of City Hall at 7:00
PM and the clerk shall give mailed and published notice of such hearing and improvement as
required by law.
Passed and adopted by the Chanhassen City Council this 13 day of December, 2010.