4. Adoption of 2011 Final Levy, Budget & CIP4
CITY OF
CAANgASSEN
7700 Market Boulevard
PO Box 147
Chanhassen, MN 55317
Administration
Phone: 952.227.1100
Fax: 952.227.1110
Building Inspections
Phone: 952.227.1180
Fax: 952.227.1190
Engineering
Phone: 952.227.1160
Fax: 952.227.1170
Finance
Phone: 952.227.1140
Fax: 952.227.1110
Park & Recreation
Phone: 952.227.1120
Fax: 952.227,1110
Recreation Center
2310 Coulter Boulevard
Phone: 952.227.1400
Fax: 952.227.1404
Planning &
Natural Resources
Phone: 952.227.1130
Fax: 952.227.1110
Public Works
1591 Park Road
Phone: 952.227.1300
Fax: 952.227.1310
MEMORANDUM
TO: Mayor
City Council
FROM: Greg Sticha, Finance Director
DATE: December 13, 2010 01
SUBJ: Adoption of the Final 2011 Budget and CIP
PROPOSED MOTION
Staff recommends the City Council adopt the following motion:
"The City Council adopts a resolution establishing the 2011 final levy at
$10,267,390 and approves total general fund expenditures of $9,617,600. It
also approves the CIP for 2011 -2015 in the total amount of $72,665,531."
Approval of this item requires a simple majority vote of the City Council.
The City of Chanhassen has gone through an extensive process in evaluating its
budgets and capital improvement plans (CIP) for 2011 through 2015. This
process was finalized with the public budget meeting last Monday. Staff is
recommending that the 2011 Budget and the CIP be adopted as presented.
BACKGROUND
The final 2010 Budget being recommended for adoption is for a total levy of
$10,267,390, which is $54,200 or .53% more than the 2010 levy. The final levy
is also $54,000 less than the preliminary levy set in September.
After discussion at our last work session, staff was given direction to make
adjustments to the preliminary budget and tax levies as documented in the
attached adjustment spreadsheet. We will review that spreadsheet and those
adjustments at our meeting this evening.
CIP
Chanhassen is a Community for Life - Providing for Today and Planning for Tomorrow
The CIP funds larger construction projects such as a satellite fire station,
Senior Center
upgrades to Lyman Boulevard, and other infrastructure purchases such as
112
Pax::
streets, water lines and wells, storm water construction and upgrades, and
F
Fax: 955222.2277.1.1110 0
sanitary sewer lines.
Web Site
www.d.chanhassen.mn.us
Chanhassen is a Community for Life - Providing for Today and Planning for Tomorrow
Mayor & City Council
December 13, 2010
Page 2
In addition, the CIP funds our capital equipment replacement fund with an
annual levy of $750,000 to fund ongoing equipment replacements and
purchases. This amount has been lowered from $824,000 to $750,000.
This was done in part to reflect some of the actual spending each year in this
fund. As you can see on the attached spreadsheet, the capital equipment
purchases for each of the last four years has come in under budget by an average
of over $70,000. Staff has done a tremendous job of finding cost effective ways
to purchase our equipment needs. The plan going forward is not to push back
any purchases, however, continue to find creative ways and use good bidding
practices to only spend around $750,000 /year on the same capital equipment
purchases.
RECOMMENDATION
z
Staff recommends that the City Council adopt the 2011 Budget and CIP as
presented in the attached documents. Approval of the budget requires a simple
majority vote of those present.
ATTACHMENTS:
1. Proposed Resolution Adopting the 2011 Budget & CIP
2. PowerPoint Presentation: 2011 Budget
3. 2011 General Fund Budget
4. 2011 Special Revenue Funds Budget
5. 2011 -15 CIP
6. 2011 Final Levy Impact Spreadsheet
7. Budget Adjustment Spreadsheet
8. Capital Equipment Replacement Fund Spending History
9. Carver County Final Levy Certification Form
f: \gregs \budget\2011 budget\final budget and levy adoption memo l2- 13.docx
CITY OF CHANHASSEN
CARVER AND HENNEPIN COUNTIES, MINNESOTA
DATE: December 13, 2010 RESOLUTION NO: 2010-
MOTION BY:
SECONDED BY:
A RESOLUTION ADOPTING THE 2011 BUDGET AND CIP, AND
ESTABLISHING TAX LEVIES FOR 2010, COLLECTIBLE IN 2011
WHEREAS, the City Council has examined the budgetary and tax levy needs for
Chanhassen for the calendar year 2011 through detailed public budget meetings; and
WHEREAS, the Public Budget meeting was held on December 6` 2010, to receive public
input into the budget and tax levy for 2011;
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Chanhassen
that the 2011 Budget for the City of Chanhassen is adopted with revenue and expenditure amounts
for the General Fund of $9,617,600, Special Revenue Funds of $17,500, and $92,700 respectively
which are detailed in the 2011 Budget which is made part of this motion by reference; and
BE IT FURTHER RESOLVED that the City Council of the City of Chanhassen adopts a
total tax levy of $10,267,390 for 2011; and
BE IT FURTHER RESOLVED that the City Council of the City of Chanhassen adopts a
tax levy of $750,000 for the purpose of equipment upgrades and purchases for 2011; and
BE IT FURTHER RESOLVED that the City Council of the City of Chanhassen
determines that certain bonded indebtedness levies are hereby adopted to meet statutory
requirements and bond covenants and that the County Auditor is hereby authorized to spread the
adopted bonded debt levies as shown on the attached Tax Levy Certification document; and
BE IT FURTHER RESOLVED that the City Council adopts a Capital Improvement
Program for years 2011 -2015 in the total amount of $72,665,531.
BE IT FURTHER RESOLVED that the City of Chanhassen authorizes the County
Auditor to levy the amounts shown on the attached Tax Levy Certification document upon taxable
property in the City of Chanhassen in 2010 for collection in 2011, as set forth in the attached Tax
Levy Certification document.
Passed and adopted by the Chanhassen City Council this 13th day of December, 2010.
ATTEST:
Todd Gerhardt, City Manager
Thomas A. Furlong, Mayor
YES NO ABSENT
CITY OF CHANHASSEN
2011 BUDGET
Expenditures
GENERAL GOVERNMENT
1110
Legislative
1120
Administration
1130
Finance
1140
Legal
1150
Assessing
1160
MIS
1170
City Hall
1180
Elections
1190
Library Building
109,300
TOTAL
LAW ENFORCEMENT
1210
Law Enforcement
1220
Fire
1250
Building Inspection
1260
CSO
1550
TOTAL
PUBLIC WORKS
1310
Engineering
1320
Street Maintenance
1350
Street Lighting
1370
Vehicle Maintenance
1550
TOTAL
COMMUNITY DEVELOPMENT
1410 Planning Commission
1420 Planning Administration
1430 Senior Commission
* TOTAL
PARKS & RECREATION
1510
Park & Rec. Commission
1520
Park Administration
1530
Recreation Center
1540
Lake Ann
1550
Park Maintenance
1560
Senior Center
1600
Recreation Programs
1700
Self- Supporting Programs
1800
Recreation Sports
109,300
TOTAL
Total Operational Expenditures
Transfer for Roads
** TOTAL GENERAL FUND
Personal
Materials &
Contractual
Capital
2011
2010
%
Services
Supplies
Services
Outlay
Total
Total
Change
32,300
200
75,800
-
108,300
109,300
-0.91%
404,600
500
60,900
-
466,000
461,200
1.04%
233,100
200
48,100
200
281,600
277,300
1.55%
-
-
142,000
-
142,000
148,000
- 4.05%
-
-
112,100
-
112,100
110,000
1.91%
177,400
2,400
74,800
-
254,600
247,800
2.74%
71,500
42,900
294,000
-
408,400
419,500
- 2.65%
21,500
-
6,700
-
28,200
27,900
1.08%
-
3,000
124,300
-
127,300
137,200
-7.22%
940,400
49,200
938,700
200
1,928,500
1,938,200
-0.50%
79,900
-
1,575,000
-
1,654,900
1,631,200
1.45%
508,200
45,600
192,000
-
745,800
648,100
15.07%
586,300
5,100
16,900
-
608,300
606,000
0.38%
57,600
4,200
12,400
-
74,200
74,700
-0.67%
1,232,000
54,900
1,796,300
-
3,083,200
2,960,000
4.16%
541,100
1,300
30,600
-
573,000
563,200
1.74%
662,100
129,600
31,700
-
823,400
818,500
0.60%
-
5,000
340,400
-
345,400
348,400
-0.86%
2 65,000
145,700
86,800
5,500
503,000
527,200
- 4.59%
1,468,200
281,600
489,500
5,500
2,244,800
2,257,300
-0.55%
-
200
4,000
-
4,200
4,200
0.00%
405,100
700
12,600
-
418,400
408,900
2.32%
22,600
-
9,700
-
32,300
32,700
427,700
900
26,300
-
454,900
445,800
2.04%
-
200
2,000
-
2,200
2,200
0.00%
128,300
1,000
8,000
-
137,300
150,400
-8.71%
222,900
46,200
84,800
-
353,900
346,300
2.19%
8,700
7,500
45,900
-
62,100
68,300
- 9.08%
723,200
77,800
92,300
5,000
898,300
884,600
1.55%
44,500
3,500
21,000
-
69,000
69,100
172,800
19,100
90,100
-
282,000
283,500
-0.53%
30,400
8,600
43,000
-
82,000
83,300
- 1.56%
10,500
8,900
-
-
19,400
18,400
5.43%
1,341,300
172,800
387,100
5,000
1,906,200
1,906,100
0.01%
5,409,600
559,400
3,637,900
10,700
9,617,600
9,507,400
1.16%
-
50,000
9,617,600 1
9,557,400
0.63%
CITY OF CHANHASSEN
2011 BUDGET
REVENUE
101 General Fund
ACCOUNT
DESCRIPTION
2009
ACTUAL
2010
BUDGET
2010
PROJECTED
2011
BUDGET
Inc Over
PY Budget
GENERAL PROPERTY TAX
1,550
2,500
2,500
2,500
3404
3010
Current Property Tax
6,783,921
7,380,000
7,380,000
7,508,200
1.7%
3002
Allowance for Delinquent Taxes
-
(270,000)
(270,000)
(300,000)
122,501
3011
Delinquent Property Tax
149,403
100,000
100,000
130,000
3041
MVHC
_
_
_
_
45,000
3090
Other Property Taxes
119,628
160,000
160,000
130,000
3510
3500
Local Government Aid
-
_
_
_
TOTAL INTERGOVERNMENTAL REV
*
TOTAL GENERAL PROPERTY TAX
6,933,324
7,210,000
7,210,000
7,338,200
1.8%
LICENSES
3203
Dog Kennel
878
800
800
800
3205
Dog or Cat
10,452
6,000
6,000
-
3213
Solicitor
850
500
500
700
3226
Liquor On and Off Sale
89,622
84,000
84,000
90,000
3230
Rental Housing Licenses
34,900
30,000
30,000
34,000
3284
Rubbish
2,700
5,000
5,000
3,000
*
TOTAL LICENSES
139,402
126,300
126,300
128,500
1.7%
PERMITS
3301
Building
473,097
350,000
440,000
380,000
3302
Plan Check
227,918
175,000
220,000
180,000
3305
Heating & A/C
96,300
60,000
93,000
80,000
3306
Plumbing
64,541
50,000
60,000
65,000
3307
Trenching
24,558
15,000
38,000
25,000
3308
Gun
1,320
1,000
1,500
1,400
3309
Sprinkler
14,726
14,000
14,000
15,000
3311
Sign
5,750
7,500
7,500
7,500
3320
Stable
220
300
300
300
3330
Elec Permit App Forms
_
_
_
_
3331
Firework's Application Fee
200
-
_
_
3390
Misc. Permits
2,922
2,000
2,000
2,000
*
TOTAL PERMITS
911,552
674,800
876,300
756,200
12.1%
FINES & PENALTIES
3401
Traffic & Ordinance Violation
118,310
125,000
125,000
125,000
3402
Vehicle Lockouts
1,550
2,500
2,500
2,500
3404
Dog /Cat Impound
2,636
6,000
6,000
4,000
3405
Other Fines and Penalties
5
_
_
*
TOTAL FINES & PENALTIES
122,501
133,500
133,500
131,500 -1.5%
INTERGOVERNMENTAL REVENUE
3503
Reimbursement from School District
13,278
45,000
45,000
45,000
3509
Other Shared Taxes
119,628
160,000
160,000
130,000
3510
Grants -State
94,363
80,000
80,000
90,000
*
TOTAL INTERGOVERNMENTAL REV
227,268
285,000
285,000
265,000 -7.0%
CITY OF CHANHASSEN
2011 BUDGET
REVENUE
101 General Fund
1ACCOUNT
DESCRIPTION
2009
ACTUAL
2010
BUDGET
2010
PROJECTED
2011
BUDGET
Inc Over
PY Budget
CHARGES FOR CURRENT SERVICES
3601
Sale of Documents
1,860
1,000
1,000
1,000
3602
Use & Variance Permits
8,945
22,000
22,000
10,000
3603
Rezoning Fees
25
2,000
2,000
2,000
3604
Assessment Searches
345
500
500
500
3605
Plat Recording Fees
2,300
7,000
7,000
3,000
3607
Election Filing Fees
-
-
-
-
3613
Misc. - General Government
3,152
5,000
5,000
5,000
3614
Admin. Charge -2% Constr.
12,791
25,000
25,000
20,000
3615
Admin. Charge -5% Street Re- Constr.
18,976
24,000
24,000
30,000
3615
Admin. Charge -5% Utility Projects
75,144
84,000
84,000
20,000
3617
Engineering General
-
-
-
-
3619
Investment Management Fee
75,000
75,000
75,000
75,000
3629
Misc. - Public Safety
11,401
6,000
6,000
10,000
3630
Recreation Program Fees
32,220
40,000
40,000
40,000
3631
Recreation Center
235,372
221,000
221,000
230,000
3633
Park Equipment Rental
150
300
300
300
3634
Park Facility Usage Fee
13,684
14,000
14,000
14,000
3635
Watercraft Rental
4,229
4,500
4,500
4,500
3636
Self- Supporting Programs
70,831
98,000
98,000
97,000
3637
Senior Programs
29,038
28,000
28,000
30,000
3638
Food Concessions
10,562
12,000
12,000
12,000
3639
Misc. -Park & Rec.
1,051
1,000
1,000
1,200
3641
Youth Sport Donation
-
-
-
-
3642
Recreation Sports
12,301
31,000
31,000
31,000
3649
Misc. - Public Works
600
5,000
5,000
5,000
3651
Merchandise Sales
2,191
1,500
1,500
1,500
3670
Internment Fee
150
-
-
-
*
TOTAL CURRENT SERVICES
622,316
707,800
707,800
643,000
-9.2%
OTHER REVENUE
3801
Interest Earnings
53,522
200,000
80,000
100,000
3802
Equipment Rental & Sale
146,309
140,000
140,000
180,000
3803
Building Rental
5,960
4,000
4,000
5,000
3804
Land Sale
1,600
-
-
-
3807
Donations
26,365
20,500
20,500
25,200
3808
Ins. Recoveries & Reimburse
-
5,000
5,000
-
3816
SAC Retainer
3,402
5,000
5,000
5,000
3818
Sur -Tax Retainer
615
1,000
1,000
1,000
3820
Misc. Other Revenue
210
1,000
1,000
1,000
3829
Interest/Penalties -Other
-
500
500
-
3903
Refunds /Reimbursements
36,319
43,000
43,000
38,000
3910
Misc. Revenue
-
-
-
3980
Cash Short/Over
-
-
-
*
TOTAL OTHER REVENUE
274,301
420,000
300,000
355,200
-15.4%
**
TOTAL GENERAL FUND REVENUE
9,230,664
9,557,400
9,638,900
9,617,600
0.6%
TOTAL GENERAL FUND EXPENDITURES
9,617,600
NET LEVY REMAINING (Use of Gen Fund Reserves)
-
T Y.
CITY OF CHANHASSEN
2011 BUDGET
101 General Fund
1110 Legislative
2010 to
2009 2010 2011 2011
ACCOUNT DESCRIPTION ACTUAL BUDGET BUDGET % INC/(DEC)
4020
Salaries & Wages -Temp
29,700
30,000
30,000
0.0%
4030
Contributions- Retirement
2,109
2,200
2,200
0.0%
4050
Workers Compensation
-
100
100
0.0%
*
TOTAL PERSONAL SERVICES
31,809
32,300
32,300
0.0%
4210
Books & Periodicals
-
200
200
0.0%
*
TOTAL MATERIALS & SUPPLIES
-
200
200
0.0%
4300
Fees, Services
1,667
4,300
2,000
(53.5 %)
4330
Postage
6,633
3,500
6,800
94.3%
4340
Printing & Publishing
29,236
36,000
36,000
0.0%
4360
Subscriptions & Memberships
21,943
25,000
25,000
0.0%
4370
Travel & Training
3,762
5,000
5,000
0.0%
4375
Promotional Expense
494
3,000
1,000
(66.7 %)
4933
Sales Tax
4
-
-
0.0%
*
TOTAL CONTRACTUAL SERVICES
63,738
76,800
75,800
(1.3 %)
** TOTAL LEGISLATIVE 95,547 109,300 108,300 (0.9%
* r
CITY OF CHANHASSEN
2011 BUDGET
101 General Fund
1120 Administration
2010 to
2009 2010 2011 2011
ACCOUNT DESCRIPTION ACTUAL BUDGET BUDGET % INC/(DEC)
4010
Salaries & Wages -Reg
315,945
316,000
319,300
1.0%
4020
Salaries & Wages -Temp
110
1,000
1,000
0.0%
4030
Contributions - Retirement
43,755
46,300
47,800
3.2%
4040
Contributions- Insurance
31,808
31,700
35,800
12.9%
4050
Workers Compensation
438
700
700
0.0%
*
TOTAL PERSONAL SERVICES
392,055
395,700
404,600
2.2%
4120
Supplies- Equipment
112
200
200
0.0%
4130
Supplies- Program
-
100
100
0.0%
4210
Books & Periodicals
68
200
200
0.0%
*
TOTAL MATERIALS & SUPPLIES
180
500
500
0.0%
4300
Fees, Services
5,334
7,000
7,000
0.0%
4310
Telephone
3,825
2,900
4,000
37.9%
4330
Postage
15,510
16,000
16,000
0.0%
4340
Printing & Publishing
340
1,000
1,000
0.0%
4360
Subscriptions & Memberships
4,081
4,000
4,500
12.5%
4370
Travel & Training
4,544
8,000
8,000
0.0%
4380
Mileage
4,675
7,200
5,500
(23.6 %)
4410
Rental- Equipment
13,224
18,500
14,500
(21.6 %)
4530
Repair & Maintenance -Equip
-
300
300
0.0%
4807
Property Tax Expense
1,481
100
100
0.0%
*
TOTAL CONTRACTUAL SERVICES
53,013
65,000
60,900
(6.3 %)
4703
Office Equipment
-
-
-
0.0%
*
TOTAL CAPITAL OUTLAY
-
-
-
0.0%
** TOTAL ADMINISTRATION 445,249 461,200 466,000 1.0%
' A
CITY OF CHANHASSEN
2011 BUDGET
101 General Fund
1130 Finance
2010 to
2009 2010 2011 2011
ACCOUNT DESCRIPTION ACTUAL BUDGET BUDGET % INC/(DEC)
4010
Salaries & Wages -Reg
4011
Overtime
4030
Contributions - Retirement
4040
Contributions - Insurance
4050
Workers Compensation
4060
Unemployment
*
TOTAL PERSONAL SERVICES
4120 Supplies- Equipment
4210 Books & Periodicals
* TOTAL MATERIALS & SUPPLIES
178,200
1.0%
-
0.0%
26,600
2.7%
27,900
16.3%
400
0.0%
-
0.0%
233,100
2.8%
100 100
100 100
200 200
0.0%
0.0%
4300
Fees, Services
4,410
10,000
7,000
(30.0 %)
4301
Fees, Financial /Audit
30,495
30,000
32,000
6.7%
4310
Telephone and Communications
301
500
500
0.0%
4330
Postage
-
200
200
0.0%
4340
Printing & Publishing
1,503
1,800
1,800
0.0%
4360
Subscriptions & Memberships
460
400
400
0.0%
4370
Travel & Training
2,891
7,100
6,100
(14.1 %)
4530
Repair & Maintenance -Equip
-
100
100
0.0%
4901
Refunds /Reimbursements
(154)
-
-
0.0%
*
TOTAL CONTRACTUAL SERVICES
39,907
50,100
48,100
(4.0 %)
4703 Office Equipment _
* TOTAL CAPITAL OUTLAY -
** TOTAL FINANCE 268,538
177,722
176,500
25,033
25,900
22,510
24,000
248
400
3,118
-
228,631
226,800
200 200 0.0%
200 200 0.0%
277,300 281,600 1.6%
� r
CITY OF CHANHASSEN
2011 BUDGET
101 General Fund
1140 Legal
2010 to
2009 2010 2011 2011
ACCOUNT DESCRIPTION ACTUAL BUDGET BUDGET % INC/(DEC)
4302 Fees, Legal
135,725
148,000
142,000
(4.1 %)
* TOTAL CONTRACTUAL SERVICES
135,725
148,000
142,000
(4.1 %)
** TOTAL LEGAL
135,725
148,000
142,000
(4.1 1/6)
• L
CITY OF CHANHASSEN
2011 BUDGET
101 General Fund
1150 Property Assessment
2010 to
2009 2010 2011 2011
ACCOUNT DESCRIPTION ACTUAL BUDGET BUDGET % INC/(DEC)
4300 Fees, Services
104,314 109,900
112,000
1.9%
4340 Printing & Publishing
- 100
100
0.0%
* TOTAL CONTRACTUAL SERVICES
104,314 110,000
112,100
1.9%
** TOTAL PROPERTY ASSESSMENT
104,314 110,000
112,100
1.9%
A
CITY OF CHANHASSEN
2011 BUDGET
101 General Fund
1160 M.I.S.
2010 to
2009 2010 2011 2011
ACCOUNT DESCRIPTION ACTUAL BUDGET BUDGET % INC/(DEC)
4010
Salaries & Wages -Reg
4030
Contributions - Retirement
4040
Contributions - Insurance
4050
Workers Compensation
*
TOTAL PERSONAL SERVICES
4150
Maintenance Materials
4210
Books & Periodicals
4220
Software Licenses
4260
Small Tools & Equipment
*
TOTAL MATERIALS & SUPPLIES
4300
Fees, Services
4310
Telephone
4320
Utilities
4370
Travel & Training
4530
Repair & Maintenance -Equip
4933
Sales Tax
*
TOTAL CONTRACTUAL SERVICES
4703
Office Equipment
*
TOTAL CAPITAL OUTLAY
** TOTAL M.I.S.
136,689
135,700
137,000
1.0%
19,208
20,000
20,500
2.5%
15,876
17,000
19,600
15.3%
189
300
300
0.0%
171,962
173,000
177,400
2.5%
812
1,300
1,300
0.0%
300
600
600
0.0%
-
-
-
0.0%
307
500
500
0.0%
1,420
2,400
2,400
0.0%
83,704
44,600
52,800
18.4%
1,355
1,500
1,900
26.7%
3,900
13,800
8,100
(41.3 %)
5,877
7,500
7,000
(6.7 %)
3,802
5,000
5,000
0.0%
237
-
-
0.0%
98,876
72,400
74,800
3.3%
0.0%
0.0%
272,257 247,800 254,600 2.7%
a �
CITY OF CHANHASSEN
2011 BUDGET
101 General Fund
1170 City Hall
2010 to
2009 2010 2011 2011
ACCOUNT DESCRIPTION ACTUAL BUDGET BUDGET % INC /(DEC)
4010
Salaries & Wages -Reg
50,539
50,800
51,300
1.0%
4011
Overtime -Reg
3,150
3,500
3,500
0.0%
4030
Contributions - Retirement
7,678
7,500
7,700
2.7%
4040
Contributions - Insurance
6,045
6,400
7,400
15.6%
4050
Workers Compensation
1,441
1,700
1,600
(5.9 %)
*
TOTAL PERSONAL SERVICES
68,853
69,900
71,500
2.3%
4110
Supplies -Office
33,958
43,000
37,000
(14.0 %)
4120
Supplies- Equipment
942
1,000
1,000
0.0%
4140
Supplies - Vehicles
31
1,000
500
(50.0 %)
4150
Maintenance Materials
4,064
3,000
4,000
33.3%
4260
Small Tools & Equipment
377
300
400
33.3%
*
TOTAL MATERIALS & SUPPLIES
39,372
48,300
42,900
(11.2 %)
4300
Fees, Services
7,209
7,000
9,000
28.6%
4310
Telephone
10,462
16,000
12,000
(25.0 %)
4320
Utilities
46,436
60,000
50,000
(16.7 %)
4350
Cleaning & Waste Removal
31,584
35,700
33,000
(7.6 %)
4370
Travel & Training
88
-
200
100.0%
4440
License & Registration
-
100
100
0.0%
4483
Insurance - General Liability
169,885
170,000
176,000
3.5%
4510
Repair & Maintenance - Building
4,971
10,000
10,000
0.0%
4520
Repair & Maintenance - Vehicles
167
400
400
0.0%
4530
Repair & Maintenance -Equip
2,763
2,000
3,000
50.0%
4933
Sales Tax
267
100
300
200.0%
*
TOTAL CONTRACTUAL SERVICES
273,832
301,300
294,000
(2.4 %)
**
TOTAL CITY HALL
382,058
419,500
408,400
(2.6 %)
CITY OF CHANHASSEN
2011 BUDGET
101 General Fund
1180 Elections
2010 to
2009 2010 2011 2011
ACCOUNT DESCRIPTION ACTUAL BUDGET BUDGET % INC/(DEC)
4020
Salaries & Wages -Temp
4030
Contributions - Retirement
4060
Unemployment
1,000
TOTAL PERSONAL SERVICES
4110
Office Supplies
4300
Fees, Services
4340
Printing & Publishing
4370
Travel & Training
-
TOTAL CONTRACTUAL SERVICES
** TOTAL ELECTIONS
10,118
20,500
20,500
0.0%
-
1,000
1,000
0.0%
220
-
-
0.0%
10,338
21,500
21,500
0.0%
-
200
200
0.0%
-
3,000
3,000
0.0%
4,395
2,000
2,300
15.0%
-
1,200
1,200
0.0%
4,395
6,400
6,700
4.7%
14,733 27,900 28,200 1.1%
CITY OF CHANHASSEN
2011 BUDGET
101 General Fund
1190 Library Building
2010 to
2009 2010 2011 2011
ACCOUNT DESCRIPTION ACTUAL BUDGET BUDGET % INC/(DEC)
4150
Maintenance Materials
2,629
3,000
3,000
0.0%
4260
Small Tools & Equipment
662
-
-
0.0%
*
TOTAL MATERIALS & SUPPLIES
3,291
3,000
3,000
0.0%
4300
Fees, Services
6,248
4,000
6,500
62.5%
4310
Telephone
1,766
2,200
1,800
(18.2 %)
4320
Utilities
60,061
80,000
70,000
(12.5 %)
4350
Cleaning & Waste Removal
32,028
34,000
34,000
0.0%
4510
Repair & Maintenance - Building
2,357
7,000
5,000
(28.6 %)
4530
Repair & Maintenance -Equip
8,178
7,000
7,000
0.0%
4933
Sales Tax
5
-
-
0.0%
*
TOTAL CONTRACTUAL SERVICES
110,643
134,200
124,300
(7.4 %)
** TOTAL LIBRARY 113,934 137,200 127,300 (7.2%
CITY OF CHANHASSEN
2011 BUDGET
101 General Fund
1210 Police Administration
2010 to
2009 2010 2011 2011
ACCOUNT DESCRIPTION ACTUAL BUDGET BUDGET % INC/(DEC)
4010
Salaries & Wages -Reg
4030
Contributions- Retirement
4040
Contributions - Insurance
4050
Workers Compensation
77,589
TOTAL PERSONAL SERVICES
62,307
62,100
8,987
9,100
6,106
6,500
190
500
77,589
78,200
62,700
1.0%
9,400
3.3%
7,500
15.4%
300
(40.0 %)
79,900
2.2%
4130
Program Supplies
4300
Fees, Services
4370
Travel & Training
4375
Promotional Expense
4933
Sales Tax
1,575,000
TOTAL CONTRACTUAL SERVICES
*" TOTAL POLICE ADMINISTRATION
4,639 5,000
1,483,759 1,543,000
- 500
4,659 4,500
315 -
1,493,372 1,553,000
5,000
0.0%
1,565,000
1.4%
500
0.0%
4,500
0.0%
-
0.0%
1,575,000
1.4%
1,570,961 1,631,200 1,654,900 1.5%
E
CITY OF CHANHASSEN
2011 BUDGET
101 General Fund
1220 Fire Prevention Administration
2010 to
2009 2010 2011 2011
ACCOUNT DESCRIPTION ACTUAL BUDGET BUDGET % INC /(DEC)
4010
Salaries & Wages -Reg
134,121
133,600
135,000
1.0%
4011
Overtime
256
1,000
1,000
0.0%
4020
Salaries & Wages -Temp
156,954
150,000
160,000
6.7%
4030
Contributions - Retirement
197,518
165,000
175,000
6.1%
4040
Contributions - Insurance
21,810
23,400
27,200
16.2%
4050
Workers Compensation
9,167
12,000
10,000
(16.7 %)
*
TOTAL PERSONAL SERVICES
519,825
485,000
508,200
4.8%
4120
Supplies- Equipment
11,845
11,000
11,000
0.0%
4130
Supplies- Program
2,393
2,000
2,500
25.0%
4140
Supplies - Vehicles
5,469
12,000
12,000
0.0%
4150
Maintenance Materials
516
500
500
0.0%
4170
Motor Fuels and Lubrication
268
-
-
0.0%
4210
Books & Periodicals
681
600
600
0.0%
4240
Uniforms & Clothing
7,455
10,000
9,000
(10.0 %)
4250
Merchandise for Resale
35
-
-
0.0%
4260
Small Tools & Equipment
3,478
6,000
5,000
(16.7 %)
4290
Misc. Materials & Supplies
5,904
5,000
5,000
0.0%
*
TOTAL MATERIALS & SUPPLIES
38,043
47,100
45,600
(3.2 %)
4300
Fees, Services
13,613
10,000
11,000
10.0%
4310
Telephone
3,571
6,000
5,000
(16.7 %)
4320
Utilities
22,037
28,500
25,000
(12.3 %)
4330
Postage
44
-
-
0.0%
4350
Cleaning & Waste Removal
4,768
6,000
5,000
(16.7 %)
4360
Subscriptions & Memberships
1,390
2,000
2,000
0.0%
4370
Travel & Training
-
10,000
10,000
0.0%
4375
Promotional Expense
7,034
9,000
9,000
0.0%
4483
Insurance - General Liability
-
1,000
1,000
0.0%
4510
Repair & Maintenance - Building
5,476
7,000
6,000
(14.3 %)
4520
Repair & Maintenance - Vehicles
4,550
8,000
8,000
0.0%
4530
Repair & Maintenance -Equip
18,689
11,000
15,000
36.4%
4531
Repair & Maintenance - Radios
1,993
5,000
5,000
0.0%
Contribution for Performance
-
12,500
90,000
620.0%
4901
Refund /Reimbursements
4
-
-
0.0%
4933
Sales Tax
611
-
-
0
*
TOTAL CONTRACTUAL SERVICES
83,782
116,000
192,000
65.5%
**
TOTAL FIRE PREVENTION ADMIN
641,650
648,100
745,800
15.1%
CITY OF CHANHASSEN
2011 BUDGET
101 General Fund
1250 Code Enforcement
2010 to
2009 2010 2011 2011
ACCOUNT DESCRIPTION ACTUAL BUDGET BUDGET % INC/(DEC)
4010
Salaries & Wages -Reg
511,773
442,600
448,400
1.3%
4011
Overtime -Reg
143
-
-
0.0%
4020
Salaries & Wages -Temp
-
-
-
0.0%
4021
Overtime -Temp
-
-
-
0.0%
4030
Contributions- Retirement
71,033
65,600
67,500
2.9%
4040
Contributions- Insurance
66,876
67,400
69,000
2.4%
4050
Workers Compensation
1,353
1,400
1,400
0.0%
*
TOTAL PERSONAL SERVICES
651,178
577,000
586,300
1.6%
4120
Supplies- Equipment
83
500
500
0.0%
4130
Supplies- Program
578
500
500
0.0%
4140
Supplies - Vehicles
2,090
1,700
1,700
0.0%
4210
Books & Periodicals
185
2,500
1,500
(40.0 %)
4240
Uniforms & Clothing
46
500
500
0.0%
4260
Small Tools & Equipment
32
400
400
0.0%
*
TOTAL MATERIALS & SUPPLIES
3,013
6,100
5,100
(16.4 %)
4300
Fees, Services
200
-
-
0.0%
4310
Telephone
3,526
4,000
4,000
0.0%
4340
Printing & Publishing
888
3,000
2,000
(33.3 %)
4360
Subscriptions & Memberships
450
1,000
1,000
0.0%
4370
Travel & Training
3,627
11,000
6,000
(45.5 %)
4375
Promotional Expense
-
200
200
0.0%
4440
License & Registration
479
200
200
0.0%
4520
Repair & Maintenance - Vehicles
103
500
500
0.0%
4530
Repair & Maintenance -Equip
1,553
2,000
2,000
0.0%
4901
Refunds /Reimbursements
510
1,000
1,000
0.0%
4933
Sales Tax
61
-
-
0.0%
*
TOTAL CONTRACTUAL SERVICES
11,397
22,900
16,900
(26.2 %)
** TOTAL CODE ENFORCEMENT 665,588 606,000 608,300 0.4%
M
CITY OF CHANHASSEN
2011 BUDGET
101 General Fund
1260 Community Service
2010 to
2009 2010 2011 2011
ACCOUNT DESCRIPTION ACTUAL BUDGET BUDGET % INC/(DEC)
4020
Salaries & Wages -Temp
43,282
47,000
48,000
2.1%
4021
Overtime -Temp
544
1,400
1,400
0.0%
4030
Contributions - Retirement
6,331
6,000
6,500
8.3%
4040
Contributions - Insurance
590
600
700
16.7%
4050
Workers Compensation
812
1,000
1,000
0.0%
*
TOTAL PERSONAL SERVICES
51,558
56,000
57,600
2.9%
4120
Supplies- Equipment
347
1,500
1,000
(33.3 %)
4130
Supplies- Program
1,046
700
1,000
42.9%
4140
Supplies - Vehicles
1,267
1,000
1,000
0.0%
4210
Books & Periodicals
-
200
200
0.0%
4240
Uniforms & Clothing
185
1,600
1,000
(37.5 %)
*
TOTAL MATERIALS & SUPPLIES
2,844
5,000
4,200
(16.0 %)
4300
Fees, Services
9,009
9,600
9,000
(6.3 %)
4310
Telephone
601
1,000
1,100
10.0%
4340
Printing & Publishing
162
500
300
(40.0 %)
4360
Subscriptions & Memberships
103
300
200
(33.3 %)
4370
Travel & Training
200
700
700
0.0%
4520
Repair & Maintenance - Vehicles
-
1,000
500
(50.0 %)
4530
Repair & Maintenance -Equip
368
300
300
0.0%
4531
Repair & Maintenance - Radios
16
300
300
0.0%
4933
Sales Tax
31
-
-
0.0%
*
TOTAL CONTRACTUAL SERVICES
10,490
13,700
12,400
(9.5 %)
** TOTAL COMMUNITY SERVICE 64,893 74,700 74,200 (0.7 9/6)
CITY OF CHANHASSEN
2011 BUDGET
101 General Fund
1310 Engineering
2010 to
2009 2010 2011 2011
ACCOUNT DESCRIPTION ACTUAL BUDGET BUDGET % INC/ DEC
4010
Salaries & Wages -Reg
402,783
409,800
413,000
0.8%
4011
Overtime -Reg
20
1,500
1,500
0.0%
4020
Salaries & Wages -Temp
5,593
15,000
15,000
0.0%
4030
Contributions - Retirement
57,622
60,000
61,700
2.8%
4040
Contributions - Insurance
39,949
42,600
48,400
13.6%
4050
Workers Compensation
1,114
1,500
1,500
0.0%
TOTAL PERSONAL SERVICES
507,081
530,400
541,100
2.0%
4120
Supplies- Equipment
1,117
400
500
25.0%
4140
Supplies - Vehicles
62
800
700
(12.5 %)
4150
Maintenance Materials
15
-
-
0.0%
4210
Books & Periodicals
320
100
100
0.0%
TOTAL MATERIALS & SUPPLIES
1,514
1,300
1,300
0.0%
4300
Fees, Services
17,653
18,000
18,000
0.0%
4310
Telephone
3,185
2,100
3,200
52.4%
4330
Postage
-
400
400
0.0%
4340
Printing & Publishing
430
600
600
0.0%
4360
Subscriptions & Memberships
814
1,500
1,400
(6.7 %)
4370
Travel & Training
1,693
4,200
3,000
(28.6 %)
4380
Mileage
43
500
500
0.0%
4440
License & Registration
-
300
-
(100.0 %)
4520
Repair & Maintenance - Vehicles
-
500
-
(100.0 %)
4530
Repair & Maintenance -Equip
3,722
3,000
3,500
16.7%
4531
Repair & Maintenance - Radios
-
100
-
(100.0 %)
4901
Refunds /Reimbursements
10
-
-
0.0%
4903
Bad Debt Expense
2,435
-
-
0.0%
4933
Sales Tax
66
-
-
0.0%
TOTAL CONTRACTUAL SERVICES
30,050
31,200
30,600
(1.9 %)
4705
Other Equipment
-
300
-
(100.0 %)
TOTAL CAPITAL OUTLAY
-
300
-
(100.0 %)
** TOTAL ENGINEERING 538,645 563,200 573,000 1.7%
r f
CITY OF CHANHASSEN
2011 BUDGET
101 General Fund
1320 Street Maintenance
2010 to
2009 2010 2011 2011
ACCOUNT DESCRIPTION ACTUAL BUDGET BUDGET % INC /(DEC)
4010
Salaries & Wages -Reg
4011
Overtime -Reg
4020
Salaries & Wages -Temp
4021
Overtime -Temp
4030
Contributions - Retirement
4040
Contributions - Insurance
4050
Workers Compensation
*
TOTAL PERSONAL SERVICES
4120
Supplies- Equipment
4140
Supplies - Vehicles
4150
Maintenance Materials
4210
Books & Periodicals
4240
Uniforms & Clothing
4260
Small Tools & Equipment
*
TOTAL MATERIALS & SUPPLIES
4300
Fees, Services
4310
Telephone
4330
Postage
4340
Printing & Publishing
4350
Cleaning & Waste Removal
4360
Subscriptions & Memberships
4370
Travel & Training
4410
Rental- Equipment
4440
License & Registration
4510
Repair & Maintenance - Building
4520
Repair & Maintenance - Vehicles
4530
Repair & Maintenance -Equip
4531
Repair & Maintenance - Radios
4540
Repair & Maintenance - Streets
4560
Repair & Maintenance -Signs
4933
Sales Tax
*
TOTAL CONTRACTUAL SERVICES
4703 Office Equipment
4705 Other Equipment
* TOTAL CAPITAL OUTLAY
** TOTAL STREET MAINTENANCE
459,600
457,800
462,400
1.0%
18,749
8,000
18,000
125.0%
9,582
10,000
10,000
0.0%
197
-
-
0.0%
68,964
67,100
70,000
4.3%
59,247
61,900
71,700
15.8%
27,818
36,400
30,000
(17.6 %)
644,158
641,200
662,100
3.3%
34,275
44,000
40,000
(9.1%)
16,872
25,000
18,000
(28.0 %)
70,990
65,000
65,000
0.0%
-
100
100
0.0%
4,224
4,800
4,800
0.0%
1,556
2,700
1,700
(37.0 %)
127,917
141,600
129,600
(8.5 %)
446
1,000
1,000
0.0%
3,252
3,800
3,800
0.0%
28
-
-
0.0%
-
300
300
0.0%
-
300
300
0.0%
1,085
1,200
1,200
0.0%
1,940
1,500
2,000
33.3%
323
1,500
1,500
0.0%
35
600
600
0.0%
-
500
500
0.0%
140
3,500
3,000
(14.3 %)
8,203
5,500
5,500
0.0%
-
500
-
0.0%
1,921
500
2,000
300.0%
8,081
13,700
10,000
(27.0 %)
1,511
-
-
0.0%
26,966
34,400
31,700
(7.8 %)
-
300
-
(100.0 %)
-
1,000
-
(100.0 %)
-
1,300
-
(100.0 %)
799,041
818,500
823,400
0.6%
A 1 }.
CITY OF CHANHASSEN
2011 BUDGET
101 General Fund
1350 Street Lighting & Signals
2010 to
2009 2010 2011 2011
ACCOUNT DESCRIPTION ACTUAL BUDGET BUDGET % INC/(DEC)
4120 Supplies- Equipment 1,331 5,000 5,000 0.0%
* TOTAL MATERIALS & SUPPLIES 1,331 5,000 5,000 0.0%
4300
Fees, Services
-
300
300
0.0%
4310
Telephone
575
600
600
0.0%
4320
Utilities
311,330
315,000
315,000
0.0%
4530
Repair & Maintenance -Equip
-
2,500
2,500
0.0%
4560
Repair & Maintenance -Signs
2,427
-
-
0.0%
4565
Repair & Maintenance - Lights &Signals
17,026
25,000
22,000
(12.0 %)
*
TOTAL CONTRACTUAL SERVICES
331,358
343,400
340,400
(0.9 %)
**
TOTAL STREET LIGHT & SIGNALS
332,688
348,400
345,400
(0.9 %)
A I i
CITY OF CHANHASSEN
2011 BUDGET
101 General Fund
1370 City Garage
2010 to
2009 2010 2011 2011
ACCOUNT DESCRIPTION ACTUAL BUDGET BUDGET % INC /(DEC)
4010
Salaries & Wages -Reg
187,697
185,700
187,600
1.0%
4011
Overtime -Reg
7,436
6,500
6,500
0.0%
4030
Contributions - Retirement
26,906
27,200
28,000
2.9%
4040
Contributions- Insurance
28,227
30,600
35,700
16.7%
4050
Workers Compensation
7,074
9,400
7,200
(23.4 %)
*
TOTAL PERSONAL SERVICES
257,340
259,400
265,000
2.2%
4120
Supplies- Equipment
1,159
3,300
2,000
(39.4 %)
4140
Supplies - Vehicles
96
500
500
0.0%
4150
Maintenance Materials
668
1,000
1,000
0.0%
4170
Motor Fuels & Lubricants
111,988
158,000
138,000
(12.7 %)
4240
Uniforms & Clothing
824
1,200
1,200
0.0%
4260
Small Tools & Equipment
2,597
4,400
3,000
(31.8 %)
*
TOTAL MATERIALS & SUPPLIES
117,332
168,400
145,700
(13.5 %)
4300
Fees, Services
1,635
1,300
1,300
0.0%
4310
Telephone
2,731
4,000
4,000
0.0%
4320
Utilities
23,624
70,000
60,000
(14.3 %)
4330
Postage
11
-
-
0.0%
4340
Printing & Publishing
-
100
100
0.0%
4350
Cleaning & Waste Removal
6,388
10,000
10,000
0.0%
4360
Subscriptions & Memberships
-
200
200
0.0%
4370
Travel & Training
323
1,500
800
(46.7 %)
4410
Rental- Equipment
-
500
500
0.0%
4440
License & Registration
30
500
500
0.0%
4510
Repair & Maintenance - Building
4,153
4,000
7,000
75.0%
4520
Repair & Maintenance - Vehicles
-
300
300
0.0%
4530
Repair & Maintenance -Equip
1,175
3,900
2,000
(48.7 %)
4531
Repair & Maintenance - Radios
-
100
100
0.0%
4933
Sales Tax
298
-
-
0.0%
*
TOTAL CONTRACTUAL SERVICES
40,368
96,400
86,800
(10.0 %)
4703
Office Equipment
-
500
500
0.0%
4705
Other Equipment
4,613
2,500
5,000
100.0%
*
TOTAL CAPITAL OUTLAY
4,613
3,000
5,500
83.3%
*'"
TOTAL CITY GARAGE
419,653
527,200
503,000
(4.6 %)
`w A A
CITY OF CHANHASSEN
2011 BUDGET
101 General Fund
1410 Planning Commission
2010 to
2009 2010 2011 2011
ACCOUNT DESCRIPTION ACTUAL BUDGET BUDGET % INC/(DEC)
4210 Books & Periodicals - 200 200 0.0%
* TOTAL MATERIALS & SUPPLIES - 200 200 0.0%
4340
Printing & Publishing
3,817
3,000
3,000
0.0%
4360
Subscriptions & Memberships
-
200
200
0.0%
4370
Travel & Training
249
800
800
0.0%
*
TOTAL CONTRACTUAL SERVICES
4,066
4,000
4,000
0.0%
**
TOTAL PLANNING COMMISSION
4,066
4,200
4,200
0.0%
r
CITY OF CHANHASSEN
2011 BUDGET
101 General Fund
1420 Planning Administration
2010 to
2009 2010 2011 2011
ACCOUNT DESCRIPTION ACTUAL BUDGET BUDGET % INC/(DEC)
4010
Salaries & Wages -Reg
303,521
304,900
307,500
0.9%
4030
Contributions - Retirement
41,711
44,700
45,900
2.7%
4040
Contributions- Insurance
40,068
43,900
51,100
16.4%
4050
Workers Compensation
421
600
600
0.0%
*
TOTAL PERSONAL SERVICES
385,722
394,100
405,100
2.8%
4120
Supplies- Equipment
75
4130
Supplies- Program
-
4140
Supplies - Vehicles
305
4210
Books & Periodicals
-
*
TOTAL MATERIALS & SUPPLIES
380
4300
Fees, Services
20
4310
Telephone
-
4340
Printing & Publishing
-
4360
Subscriptions & Memberships
1,126
4370
Travel & Training
4,988
4440
License & Registration
-
4520
Repair & Maintenance - Vehicles
-
*
TOTAL CONTRACTUAL SERVICES
6,134
300
300
100
100
100
100
200
200
700
700
0.0%
0.0%
0.0%
5,000
5,000
200
200
200
200
1,500
1,500
6,400
5,500
600
-
200
200
14,100
12,600
** TOTAL PLANNING ADMINISTRATION 392,237 408,900 418,400
0.0%
0.0%
0.0%
0.0%
0.0%
(14.1 %)
(100.0 %)
2.3%
CITY OF CHANHASSEN
2011 BUDGET
101 General Fund
1430 Senior Commission
2010 to
2009 2010 2011 2011
ACCOUNT DESCRIPTION ACTUAL BUDGET BUDGET % INC/(DEC)
4010
Salaries & Wages -Reg
17,931
17,700
17,900
1.1%
4030
Contributions- Retirement
2,538
2,600
2,700
3.8%
4040
Contributions - Insurance
1,538
1,600
1,900
18.8%
4050
Workers Compensation
25
100
100
0.0%
*
TOTAL PERSONAL SERVICES
22,031
22,000
22,600
2.7%
4300
Fees, Services
8,467
10,000
9,000
(10.0 %)
4370
Travel & Training
116
200
200
0.0%
4375
Promotional Expense
-
500
500
0.0%
*
TOTAL CONTRACTUAL SERVICES
8,583
10,700
9,700
(9.3 %)
** TOTAL SENIOR COMMISSION 30,614 32,700 32,300
A 1 4 . 4
CITY OF CHANHASSEN
2011 BUDGET
101 General Fund
1510 Park & Rec Commission
2010 to
2009 2010 2011 2011
ACCOUNT DESCRIPTION ACTUAL BUDGET BUDGET % INC/(DEC)
4130
Supplies- Program
4210
Books & Periodicals
*
TOTAL MATERIALS & SUPPLIES
4340
Printing & Publishing
4360
Subscriptions & Memberships
4370
Travel & Training
*
TOTAL CONTRACTUAL SERVICES
** TOTAL PARK & REC COMMISSION
-
100
100
0.0%
-
100
100
0.0%
-
200
200
0.0%
1,691
900
1,100
22.2%
550
700
600
(14.3 %)
337
400
300
(25.0 %)
2,578
2,000
2,000
0.0%
2,578 2,200 2,200 0.0%
* t
CITY OF CHANHASSEN
2011 BUDGET
101 General Fund
1520 Park & Rec Administration
2010 to
2009 2010 2011 2011
1CCOUNT DESCRIPTION ACTUAL BUDGET BUDGET % INC/(DEC
4010
Salaries & Wages -Reg
4030
Contributions - Retirement
4040
Contributions - Insurance
4050
Workers Compensation
*
TOTAL PERSONAL SERVICES
4120
Supplies- Equipment
4130
Supplies- Program
4210
Books & Periodicals
4240
Uniforms & Clothing
*
TOTAL MATERIALS & SUPPLIES
4300
Fees, Services
4310
Telephone
4330
Postage
4340
Printing & Publishing
4360
Subscriptions & Memberships
4370
Travel & Training
4380
Mileage
*
TOTAL CONTRACTUAL SERVICES
** TOTAL PARK & REC ADMINISTRATION
101,563
99,500
100,600
1.1%
14,015
14,500
15,200
4.8%
9,907
10,500
12,300
17.1%
140
200
200
0.0%
125,625
124,700
128,300
2.9%
333
500
500
0.0%
-
200
200
0.0%
-
100
100
0.0%
-
200
200
0.0%
333
1,000
1,000
0.0%
36
1,100
200
(81.8 %)
1,483
900
1,500
66.7%
-
2,000
-
(100.0 %)
-
14,000
-
(100.0 %)
1,343
1,600
1,600
0.0%
3,927
4,800
4,400
(8.3 %)
105
300
300
0.0%
6,894
24,700
8,000
(67.6 %)
132,852
150,400
137,300
(8.7 %)
R L4 ,
CITY OF CHANHASSEN
2011 BUDGET
101 General Fund
1530 Recreation Center
2010 to
2009 2010 2011 2011
1CCOUNT DESCRIPTION ACTUAL BUDGET BUDGET % INC /(DEC
4010
Salaries & Wages -Reg
4020
Salaries & Wages -Temp
4021
Overtime -Temp
4030
Contributions - Retirement
4040
Contributions - Insurance
4050
Workers Compensation
4060
Unemployment
*
TOTAL PERSONAL SERVICES
4120
Supplies- Equipment
4130
Supplies- Program
4150
Maintenance Materials
4240
Uniforms & Clothing
*
TOTAL MATERIALS & SUPPLIES
54,027
53,900
126,457
130,000
79
-
25,544
28,000
6,060
6,400
2,975
1,400
658
-
215,799
219,700
54,400
0.9%
130,000
0.0%
-
0.0%
28,500
1.8%
7,500
17.2%
2,500
78.6%
-
0.0%
222,900
1.5%
4300
Fees, Services
4310
Telephone
4320
Utilities
4360
Subscriptions & Memberships
4370
Travel & Training
4375
Promotional Expense
4510
Repair & Maintenance - Building
4530
Repair & Maintenance -Equip
4590
Misc. Contractual Services
4933
Sales Tax
*
TOTAL CONTRACTUAL SERVICES
** TOTAL RECREATION CENTER
1,464
4,000
3,000
(25.0 %)
36,769
42,000
42,000
0.0%
201
500
500
0.0%
23
800
700
(12.5 %)
38,457
47,300
46,200
(2.3 %)
45,692
32,000
40,000
25.0%
607
2,500
1,500
(40.0 %)
27,650
37,500
36,000
(4.0 %)
158
300
300
0.0%
8
400
400
0.0%
838
1,600
1,600
0.0%
1,895
3,000
3,000
0.0%
1,036
1,000
1,000
0.0%
841
1,000
1,000
0.0%
11
-
-
0.0%
78,737
79,300
84,800
6.9%
332,992
346,300
353,900
2.2%
i- [ F 0
CITY OF CHANHASSEN
2011 BUDGET
101 General Fund
1540 Lake Ann Park Operations
2010 to
2009 2010 2011 2011
ACCOUNT DESCRIPTION ACTUAL BUDGET BUDGET % INC/(DEC)
4020
Salaries & Wages -Temp
4021
Overtime -Temp
4030
Contributions- Retirement
4050
Workers Compensation
*
TOTAL PERSONAL SERVICES
4130 Supplies- Program
4240 Uniforms & Clothing
* TOTAL MATERIALS & SUPPLIES
5,237
12,200
8,000
(34.4 %)
-
400
-
(100.0 %)
401
600
500
(16.7 %)
85
200
200
0.0%
5,723
13,400
8,700
(35.1%)
6,124 9,000 7,000 (22.2 %)
- 500 500 0.0%
6,124 9,500 7,500 (21.1 %)
4300
Fees, Services
30,600
30,000
31,000
3.3%
4310
Telephone
1,208
2,000
1,500
(25.0 %)
4320
Utilities
12,013
13,000
13,000
0.0%
4340
Printing & Publishing
-
400
400
0.0%
*
TOTAL CONTRACTUAL SERVICES
43,822
45,400
45,900
1.1%
**
TOTAL LAKE ANN PARK OPERATIONS
55,668
68,300
62,100
(9.1 %)
CITY OF CHANHASSEN
2011 BUDGET
101 General Fund
1550 Park Maintenance
2010 to
2009 2010 2011 2011
ACCOUNT DESCRIPTION ACTUAL BUDGET BUDGET % INC/(DEC)
4010
Salaries & Wages -Reg
455,038
448,100
452,600
1.0%
4011
Overtime -Reg
11,884
15,000
15,000
0.0%
4020
Salaries & Wages -Temp
83,829
90,000
90,000
0.0%
4021
Overtime -Temp
3,755
4,000
4,000
0.0%
4030
Contributions - Retirement
71,602
69,000
72,000
4.3%
4040
Contributions - Insurance
62,835
67,400
78,400
16.3%
4050
Workers Compensation
8,773
11,200
11,200
0.0%
*
TOTAL PERSONAL SERVICES
697,716
704,700
723,200
2.6%
4120
Supplies- Equipment
30,997
38,000
34,000
(10.5 %)
4140
Supplies- Vehicles
2,656
8,000
5,000
(37.5 %)
4150
Maintenance Materials
31,704
27,000
31,000
14.8%
4151
Irrigation Materials
1,809
3,000
3,000
0.0%
4240
Uniforms & Clothing
2,077
2,800
2,800
0.0%
4260
Small Tools & Equipment
327
2,500
2,000
(20.0 %)
*
TOTAL MATERIALS & SUPPLIES
69,570
81,300
77,800
(4.3 %)
4300
Fees, Services
21,771
22,000
22,000
0.0%
4310
Telephone
2,596
2,700
2,700
0.0%
4320
Utilities
13,097
8,600
12,000
39.5%
4340
Printing & Publishing
370
200
400
100.0%
4350
Cleaning & Waste Removal
6,189
8,000
7,000
(12.5 %)
4360
Subscriptions & Memberships
-
400
400
0.0%
4370
Travel & Training
372
2,000
1,000
(50.0 %)
4400
Rental -Land & Buildings
32,745
31,500
32,500
3.2%
4410
Rental- Equipment
728
2,000
1,000
(50.0 %)
4440
License & Registration
108
700
700
0.0%
4510
Repair & Maintenance - Building
252
3,000
2,500
(16.7 %)
4520
Repair & Maintenance - Vehicles
113
2,500
2,000
(20.0 %)
4530
Repair & Maintenance -Equip
4,996
6,500
5,000
(23.1 %)
4531
Repair & Maintenance- Radios
-
500
100
(80.0 %)
4560
Repair & Maintenance -Signs
972
4,000
3,000
(25.0 %)
4933
Sales Tax
190
-
-
0.0%
*
TOTAL CONTRACTUAL SERVICES
84,498
94,600
92,300
(2.4 %)
4705
Other Equipment
-
4,000
5,000
25.0%
*
TOTAL CAPITAL OUTLAY
-
4,000
5,000
25.0%
** TOTAL PARK MAINTENANCE
851,785 884,600 898,300 1.5%
CITY OF CHANHASSEN
2011 BUDGET
101 General Fund
1560 Senior Citizens Center
2010 to
2009 2010 2011 2011
ACCOUNT DESCRIPTION ACTUAL BUDGET BUDGET % INC/(DEC)
4010
Salaries & Wages -Reg
4030
Contributions - Retirement
4040
Contributions - Insurance
4050
Workers Compensation
*
TOTAL PERSONAL SERVICES
4120 Supplies- Equipment
4130 Supplies- Program
* TOTAL MATERIALS & SUPPLIES
4300
Fees, Services
4340
Printing & Publishing
4350
Cleaning & Waste Removal
4360
Subscriptions & Memberships
4370
Travel & Training
4375
Promotional Expense
4380
Mileage
*
TOTAL CONTRACTUAL SERVICES
** TOTAL SENIOR CITIZENS CENTER
38,304
38,200
38,600
1.0%
5,512
5,600
5,800
3.6%
295
-
-
0.0%
54
200
100
(50.0 %)
44,164
44,000
44,500
1.1%
197
300
300
0.0%
3,150
4,200
3,200
(23.8 %)
3,347
4,500
3
(22.2 %)
20,283
19,600
20,000
2.0%
-
100
100
0.0%
160
200
200
0.0%
79
100
100
0.0%
241
300
300
0.0%
75
200
200
0.0%
90
100
100
0.0%
20,927
20,600
21,000
1.9%
68,439
69,100
69,000
(0.1 %)
1. 4
CITY OF CHANHASSEN
2011 BUDGET
101 General Fund
1600 Recreation Programs
2010 to
2009 2010 2011 2011
LCCOUNT DESCRIPTION ACTUAL BUDGET BUDGET % INC /(DEC
4010
Salaries & Wages -Reg
90,380
88,900
89,800
1.0%
4020
Salaries & Wages -Temp
46,753
55,500
54,500
(1.8 %)
4021
Overtime -Temp
393
1,100
1,100
0.0%
4030
Contributions- Retirement
16,454
17,000
17,500
2.9%
4040
Contributions - Insurance
7,533
7,100
8,900
25.4%
4050
Workers Compensation
888
200
1,000
400.0%
*
TOTAL PERSONAL SERVICES
162,401
169,800
172,800
1.8%
4120
Supplies- Equipment
1,450
2,000
2,000
0.0%
4130
Supplies- Program
10,996
15,600
15,600
0.0%
4240
Uniforms & Clothing
1,267
1,500
1,500
0.0%
*
TOTAL MATERIALS & SUPPLIES
13,712
19,100
19,100
0.0%
4300
Fees, Services
51,731
58,000
54,000
(6.9 %)
4310
Telephone
1,192
3,200
1,300
(59.4 %)
4320
Utilities
2,876
3,500
3,000
(14.3 %)
4330
Postage
-
200
200
0.0%
4340
Printing & Publishing
5,544
4,400
4,400
0.0%
4360
Subscriptions & Memberships
105
-
-
0.0%
4370
Travel & Training
666
400
600
50.0%
4380
Mileage
77
200
100
(50.0 %)
4400
Rental -Land & Buildings
20,365
6,500
6,500
0.0%
4410
Rental- Equipment
4,702
18,200
20,000
9.9%
4933
Sales Tax
73
-
-
0.0%
*
TOTAL CONTRACTUAL SERVICES
87,330
94,600
90,100
(4.8 %)
** TOTAL RECREATION PROGRAMS 263,444 283,500 282,000 (0.5 %)
M .+ '*
CITY OF CHANHASSEN
2011 BUDGET
101 General Fund
1700 Self- Supporting Programs
2010 to
2009 2010 2011 2011
ACCOUNT DESCRIPTION ACTUAL BUDGET BUDGET % INC/(DEC)
4010
Salaries & Wages -Reg
4020
Salaries & Wages -Temp
4030
Contributions- Retirement
4040
Contributions - Insurance
4050
Workers Compensation
*
TOTAL PERSONAL SERVICES
4120 Supplies- Equipment
4130 Supplies- Program
* TOTAL MATERIALS & SUPPLIES
4300 Fees, Services
4933 Sales Tax
* TOTAL CONTRACTUAL SERVICES
** TOTAL SELF - SUPPORTING PROGRAMS
22,595
22,300
23,500
5.4%
3,130
900
900
0.0%
3,478
3,400
3,700
8.8%
1,883
2,000
2,200
10.0%
74
100
100
0.0%
31,160
28,700
30,400
5.9%
- 600 600 0.0%
6,449 8,000 8,000 0.0%
6,449 8,600 8,600 0.0%
36,431 46,000 43,000 (6.5 %)
14 - - 0.0%
36,445 46,000 43,000 (6.5 %)
74,054 83,300 82,000 (1.6 %)
.4.
CITY OF CHANHASSEN
2011 BUDGET
101 General Fund
1800 Recreation Sports
2010 to
2009 2010 2011 2011
ACCOUNT DESCRIPTION ACTUAL BUDGET BUDGET % INC/ DEC
4020
Salaries & Wages -Temp
2,896
8,400
10,000
19.0%
4030
Contributions - Retirement
221
1,000
400
(60.0 %)
4050
Workers Compensation
29
100
100
0.0%
*
TOTAL PERSONAL SERVICES
3,146
9,500
10,500
10.5%
4120
Supplies- Equipment
2,892
2,000
2,000
0.0%
4130
Supplies- Program
3,337
2,100
2,100
0.0%
4240
Uniforms & Clothing
-
4,800
3,800
(20.8 %)
4375
Promotional Exepnses
-
-
1,000
100.0%
*
TOTAL MATERIALS & SUPPLIES
6,229
8,900
8,900
0.0%
4300
Fees, Services
4,947
-
-
0.0%
*
TOTAL CONTRACTUAL SERVICES
4,947
-
_
0.0%
** TOTAL RECREATION SPORTS 14,322 18,400 19,400 5.4%
CITY OF CHANHASSEN
2011 BUDGET
SPECIAL REVENUE FUNDS
201 10% Fund
2010 to
2009 2010 2011 2011
ACCOUNT DESCRIPTION ACTUAL BUDGET BUDGET % INC/(DEC)
REVENUE
GENERAL PROPERTY TAX
3801 Interest Earnings
482
1,500
500
(66.7 %)
3807 Donations
20,841
12,000
15,000
25.0%
* TOTAL GENERAL PROPERTY TAX
21,323
13,500
15,500
14.8%
** TOTAL REVENUE
21,323
13,500
15,500
14.8%
EXPENDITURES
CONTRACTUAL SERVICES
4370 Travel & Training 14,491 17,500 17,500 0.0%
* TOTAL CONTRACTUAL SERVICES 14,491 17,500 17,500 0.0%
CAPITAL OUTLAY
4703 Office Equipment - - - 0.0%
* TOTAL CAPITAL OUTLAY - - - 0.0%
** TOTAL EXPENDITURES 14,491 17,500 17,500 0.0%
REVENUE OVER/(UNDER) EXPENDITURES 6,832 (4,000) (2,000)
CITY OF CHANHASSEN
2011 BUDGET
SPECIAL REVENUE FUNDS
210 Cable TV Fund
2010 to
2009 2010 2011 2011
ACCOUNT DESCRIPTION ACTUAL BUDGET BUDGET % INC/(DEC)
REVENUE
GENERAL PROPERTY TAX
3080 Franchise Fees
228,874
185,000
200,000
8.1%
* TOTAL GENERAL PROPERTY TAX
228,874
185,000
200,000
8.1%
OTHER REVENUE
10,136
10,100
10,400
3.0%
3801 Interest Earnings
8,185
15,000
8,000
(46.7 %)
* TOTAL OTHER REVENUE
8,185
15,000
8,000
(46.7 %)
** TOTAL REVENUE
237,059
200,000
208,000
4.0%
EXPENDITURES
PERSONAL SERVICES
4010 Salaries & Wages -Reg
71,612
70,000
70,000
0.0%
4011 Overtime
-
-
-
0.0%
4030 Contributions - Retirement
10,136
10,100
10,400
3.0%
4040 Contributions - Insurance
7,634
8,700
8,000
(8.0 %)
4050 Workers Compensation
98
300
200
(33.3 %)
* TOTAL PERSONAL SERVICES
89,481
89,100
88,600
(0.6 %)
MATERIALS & SUPPLIES
4120 Supplies- Equipment
-
500
500
0.0%
* TOTAL MATERIALS & SUPPLIES
-
500
500
0.0%
CONTRACTUAL SERVICES
4300 Fees, Services
1,314
2,000
1,500
(25.0 %)
4340 Printing & Publishing
-
500
500
0.0%
4370 Travel & Training
-
100
100
0.0%
4483 Liability Insurance
1,500
1,500
1,500
0.0%
* TOTAL CONTRACTUAL SERVICES
2,814
4,100
3,600
(12.2 %)
CAPITAL OUTLAY
4705 Other Equipment
1,167
-
-
0.0 %
* TOTAL CAPITAL OUTLAY
1,167
-
-
0.0%
** TOTAL EXPENDITURES
93,462
93,700
92,700
(1.1 %)
REVENUE OVER/(UNDER) EXPENDITURES
143,597
106,300
115,300
City of Chanhassen, MN
Capital Improvement Program
2011 flue 2015
DEPARTMENT SUMMARY
Department
2011
2012
2013
2014
201
Total
Major Equipment
983,465
733,795
1,640,300
1,195,855
1,498,116
6,051,531
Municipal Buildings
90,000
2,405,000
2,495,000
Park & Trail Improvements
1,080,000
1,350,000
635,000
590,000
210,000
3,865,000
Planning
75,000
75,000
Sanitary Sewer Improvements
290,000
425,000
2,040,000
415,000
115,000
3,285,000
Street Improvements
3,650,000
11,029,000
11,000,000
10,250,000
10,000,000
45,929,000
Surface Water Management
220,000
640,000
345,000
715,000
305,000
2,225,000
Water System Improvements
340,000
2,710,000
1,520,000
3,350,000
820,000
8,740,000
TOTAL 6,653,465 16,887,795 19,585,300 16,590,855 12,946,116 72,665,531
City of Chanhassen, MN
Capital Improvement Program
2011 thru 2015
PROJECTS BY DEPARTMENT
Department Project# Priority 2011 2012 2013 2014 2015 Total
Major Equipment
Fire Dept.: SCBA Equipment
EQ -004
n/a
5,000
5,000
5,000
5,000
7,000
27,000
PPE: Turnout/Helmets
EQ-010
n/a
15,000
20,000
20,000
20,000
75,000
Computer/Network Equipment Purchases/Upgrades
EQ -013
n/a
85,500
94,350
91,850
104,100
85,156
460,956
Telecommunication Purchases/Upgrades
EQ-014
n/a
10,500
5,500
5,500
5,500
5,500
32,500
Community Dev.: Light Duty Trucks
EQ -015
n/a
29,000
30,000
30,000
89,000
Dump /Plow Truck Replacements/Additions
EQ -016
n/a
399,800
120,000
206,000
209,000
216,000
1,150,800
Line Striper
EQ -025
n/a
9,000
9,000
Audio/Visual Equipment
EQ -026
n/a
10,000
10,000
10,000
10,000
10,000
50,000
Light Duty Trucks: Public Works
EQ -029
n/a
73,000
73,000
Utility Bobcat Snow Accessories
EQ -031
n/a
7,000
7,000
Software Purchases
EQ -048
n/a
78,690
80,695
77,700
79,205
80,210
396,500
Computerized Records Retention System
EQ -049
n/a
8,000
16,000
6,500
14,800
16,000
61,300
Fire Vehicles
EQ -054
n/a
40,000
40,000
170,000
195,000
445,000
Aerial Photography for City GIS Datasets
EQ -055
n/a
7,250
250
7,250
250
7,250
22,250
Light Duty Trucks: Utilities
EQ -062
n/a
85,000
55,000
58,000
34,000
232,000
Engineering Vehicles
EQ -065
n/a
25,000
25,000
Storage Area Network (SAN)
EQ -081
n/a
25,000
25,000
50,000
Office Furniture
EQ -084
n/a
5,000
5,000
5,000
5,000
5,000
25,000
Equipment for New Fire Station
EQ -086
n/a
1,000,000
1,000,000
Excavator
EQ -091
n/a
100,000
100,000
Fire Pager Replacement
EQ -092
n/a
12,000
12,000
Thermal Cameras
EQ -093
n/a
15,000
15,000
30,000
Portable Radios
EQ -094
n/a
8,000
8,000
16,000
Skid loader- Parks
EQ -095
n/a
43,000
43,000
Skid loader Tracks - Parks
EQ -096
n/a
7,500
7,500
Portable Generator - Utility Department
EQ -097
n/a
17,000
17,000
Loader Mounted Snow Blower
EQ -098
n/a
141,000
141,000
Sweeper - Parks
EQ -099
n/a
33,000
33,000
Light Duty Trucks - Parks
EQ -100
n/a
65,000
40,000
105,000
Skid loader - Utility Department
EQ -101
n/a
48,000
48,000
Light Weight Vehicle - Park
EQ -103
n/a
22,000
22,000
Mower Replacement- Park
EQ -104
n/a
90,000
95,000
64,000
249,000
Skid loader - Street Department
EQ -105
n/a
40,000
40,000
Tractor Replacement- Park
EQ -106
n/a
30,000
30,000
Springbrook Version 7 Software Upgrade
EQ -108
n/a
25,725
25,725
Bucket Truck Refurbish
EQ -109
n/a
30,000
30,000
Vactor /Sewer Jetting Truck
EQ -110
n/a
425,000
425,000
Paint Striper
EQ -111
n/a
19,000
19,000
Hydro Seeder
EQ -112
n/a
5,000
5,000
Refurbish Engine 12 (#212)
EQ -113
n/a
15,000
15,000
Refurbish Engine 11 (#211)
EQ -114
n/a
15,000
15,000
Brush Chipper
EQ -115
n/a
56,000
56,000
Watermain Break Supply Van
EQ -116
n/a
20,000
20,000
Berti Rear Mount Mower
EQ -117
n/a
10,000
10,000
Street Sweeper
EQ -118
n/a
281,000
281,000
Department
Project#
Priority
2011
2012
2013
2014
2015
Total
Elliptical Machine Replacement - Fire Station #1
EQ -119
n/a
5,000
5,000
Website Improvements
EQ -120
n/a
20,000
20,000
Major Equipment Total
983,465
733,795
1,640,300
1,195,855
1,498,116
6,051,531
Municipal Buildings
Fire Station 3
MB -009
n/a
2,000,000
2,000,000
City Hall Remodel
MB -010
n/a
125,000
125,000
City Hall North Parking Lot
MB -014
n/a
280,000
280,000
Engineering Copy Area Renovation
MB -015
n/a
10,000
10,000
City Hall Parking Lot Expansion
MB -016
n/a
70,000
70,000
Fire Station 1 Repainting and Carpeting
MB -017
n/a
10,000
10,000
Municipal Buildings Total
90,000
2,405,000
2,495,000
Park & Trail Improvements
Picnic Tables/Park Benches
PK &T -042
n/a
10,000
10,000
10,000
10,000
10,000
50,000
Trees
PK &T -043
n/a
25,000
25,000
25,000
25,000
25,000
125,000
Hwy 41 Pedestrian Underpass/Trail Grant Match
PK &T -069
n/a
400,000
400,000
Tennis Courts
PK &T -072
n/a
125,000
75,000
200,000
Pioneer Pass Park Acquisition
PK &T -078
n/a
290,000
290,000
Recreation Center Fitness Equipment
PK &T -079
n/a
10,000
10,000
20,000
Bluff Creek Drive Gap Trail
PK &T -083
n/a
390,000
390,000
Disc Golf Course Construction
PK &T -085
n/a
20,000
20,000
Skate Park Ramp Replacement & Asphalt Resurfacing
PK &T -093
n/a
110,000
110,000
Pedestrian Trail to Arboretum
PK &T -098
n/a
250,000
250,000
Chanhassen Native Preserve Trail, Final Phase
PK &T -099
n/a
90,000
90,000
Lyman Boulevard North Park Acquisition
PK &T -101
n/a
175,000
175,000
TH5 Pedestrian Underpass at Minnewashta
PK &T -108
n/a
1,000,000
1,000,000
Pioneer Pass Neighborhood Park Development
PK &T -109
n/a
350,000
350,000
Hwy 41 Trail Extension /Stairway
PK &T -110
n/a
250,000
250,000
City Hall Landscaping
PK &T -111
n/a
75,000
75,000
Bandimere Park Tree Replacement
PK &T -112
n/a
60,000
60,000
Herman Field Park Half Court Basketball
PK &T -113
n/a
10,000
10,000
Park & Trail Improvements Total
1,080,000
1,350,000
635,000
590,000
210,000
3,865,000
Planning
County Rd 61 (old 212) Corridor Study
PL -002
n/a
75,000
75,000
Planning Total
75,000
75,000
Sanitary Sewer Improvements
Inflow and Infiltration Abatement
SS -012
n/a
200,000
75,000
75,000
75,000
75,000
500,000
Sanitary Sewer Replacement
SS -014
n/a
300,000
300,000
600,000
Sanitary Lift Station Rehabilitation Program
SS -017
n/a
90,000
50,000
65,000
40,000
40,000
285,000
2010 MUSA Sanitary Lift Station
SS -020
n/a
1,900,000
1,900,000
Sanitary Sewer Improvements Total
290,000
425,000
2,040,000
415,000
115,000
3,285,000
Street Improvements
West 78th St Streetlights
ST -001
n/a
300,000
300,000
Lyman Boulevard Improvements
ST -003
n/a
8,850,000
8,400,000
17,250,000
Annual Street Improvement Program
ST -012
n/a
1,500,000
1,700,000
1,200,000
1,100,000
1,000,000
6,500,000
TH 101 Corridor Preservation Planning
ST -017
n/a
1,000,000
1,000,000
Department Project# Priority 2011 2012 2013 2014 2015 Total
Pavement Management
ST -018
n/a
300,000
300,000
300,000
300,000
300,000
1,500,000
TH5 Improvements - TH41 to Downtown Victoria
ST -025
n/a
9,029,000
9,029,000
TH 101 /Pleasant View Rd Intersection & Trail Imp
ST -027
n/a
765,000
765,000
TH 101 Improvements - Lyman Blvd to Pioneer Trail
ST -028
n/a
9,500,000
9,500,000
Repaint TH 5 Signals
ST -029
n/a
85,000
85,000
Street Improvements Total
3,650,000
11,029,000
11,000,000
10,250,000
10,000,000
45,929,000
Surface Water Management
Property Acquisition
SWMP -014
n/a
75,000
75,000
75,000
75,000
75,000
375,000
Street Improvement Projects - Storm Water Mgmt
SWMP -019
n/a
400,000
400,000
800,000
Ravine #2 Stabilization
SWMP -024
n/a
105,000
115,000
75,000
70,000
85,000
450,000
Lake Minnewashta Outlet
SWMP -026
n/a
30,000
30,000
Landings Court Storm Water Pond Imp
SWMP -029
n/a
70,000
70,000
Stormwater Pond Improvements
SWMP -032
n/a
25,000
35,000
25,000
35,000
40,000
160,000
LID Implementation Project
SWMP -035
n/a
15,000
15,000
15,000
15,000
15,000
75,000
Well 13 Parking Lot
SWMP -037
n/a
90,000
90,000
Cranes Vineyard Creek
SWMP -039
n/a
55,000
55,000
Bluff Creek Drive Drainage Improvement Project
SWMP -042
n/a
120,000
120,000
Surface Water Management Total
220,000
640,000
346,000
715,000
305,000
2,225,000
Water System Improvements
Repainting: West 76th St. Water Tower
W -015
n/a
110,000
110,000
Arboretum Water Main
W -020
n/a
220,000
220,000
Watermain Replacement
W -024
n/a
700,000
700,000
1,400,000
Pressure Reducing Station
W -027
n/a
65,000
65,000
75,000
205,000
Well Rehabilitation Program
W -032
n/a
45,000
45,000
45,000
50,000
50,000
235,000
Repaint Lake Lucy Water Stand Pipe
W -041
n/a
550,000
550,000
High Zone Elevated Storage Tank
W -042
n/a
1,900,000
1,900,000
Low Zone 1 million gallon Elevated Storage Tank
W -046
n/a
2,600,000
2,600,000
Well #15 Improvements
W -048
n/a
1,400,000
1,400,000
High Zone High Service Pump
W -050
n/a
120,000
120,000
Water System Improvements Total
340,000
2,710,000
1,620,000
3,350,000
820,000
8,740,000
GRAND TOTAL
6,653,465
16,887,795
19,585,300
16,590,855
12,948,116
72,665,531
City of Chanhassen, MN
Capital Improvement Program
2011 thm 2015
FUNDING SOURCE SUMMARY
Source 2011 2012 2013
2014 2015 Total
Arterial Collector Dvlpmnt Fee
Assessment/Revolving Assess Fund
Cable TV Fund
Capital Replacement Fund
GO Bonds
MSA
Other Agency Contribution
Park Dedication Fund
Sewer Utility Fund
Street Pavement Management
Surface Water Utility Fund
Tax Levy
Water Utility Fund
GRAND TOTAL 6,653,465 16,887,795 19,585,300 16,590,855 12,948,116 72,665,531
100,000
100,000
1,200,000
1,700,000
1,200,000
1,100,000
1,000,000
6,200,000
30,000
10,000
10,000
10,000
10,000
70,000
899,034
923,795
1,190,300
1,284,855
1,063,116
5,361,100
2,500,000
2,500,000
1,700,000
1,800,000
3,500,000
1,497,500
9,811,500
9,395,000
6,590,000
6,980,000
34,274,000
1,090,000
235,000
635,000
515,000
210,000
2,685,000
389,073
452,500
2,072,500
599,000
440,000
3,953,073
655,000
220,000
100,000
100,000
100,000
1,175,000
253,785
577,500
430,000
625,000
225,000
2,111,285
200,000
200,000
200,000
200,000
200,000
1,000,000
439,073
2,757,500
1,852,500
3,767,000
920,000
9,736,073
GRAND TOTAL 6,653,465 16,887,795 19,585,300 16,590,855 12,948,116 72,665,531
City of Chanhassen, MN
Capital Improvement Program
2011 du 2015
PROJECTS BY FUNDING SOURCE
Source Project# Priority 2011 2012 2013 2014 2015 Total
Arteria Collector Dvlpmnt Fee
Lyman Boulevard Improvements
ST -003
n/a
5,000
5,000
5,000
100,000
7,000
100,000
Arterial Collector Dvlpmnt Fee Total
EQ -010
n/a
15,000
20,000
100,000
20,000
100,000
Assessment/Revolving Assess Fund
EQ -013
n/a
85,500
94,350
91,850
104,100
85,156
460,956
Annual Street Improvement Program
ST -012
n/a
1,200,000
1,700,000
1,200,000
1,100,000
1,000,000
6,200,000
Assessment/Revolving Assess Fund Total
EQ -015
n/a
1,200,000
1,700,000
1,200,000
1,100,000
1,000,000
6,200,000
Cable TV Fund
EQ -016
n/a
399,800
120,000
206,000
209,000
216,000
1,150,800
Audio/Visual Equipment
EQ -026
n/a
10,000
10,000
10,000
10,000
10,000
50,000
Website Improvements
EQ -120
n/a
20,000
73,000
20,000
Cable TV Fund Total
EQ -048
n/a
30,000
10,000
10,000
10,000
10,000
70,000
Capital Replacement Fund
Fire Dept.: SCBA Equipment
EQ-004
n/a
5,000
5,000
5,000
5,000
7,000
27,000
PPE: Turnout/Helmets
EQ -010
n/a
15,000
20,000
20,000
20,000
75,000
Computer /Network Equipment Purchases/Upgrades
EQ -013
n/a
85,500
94,350
91,850
104,100
85,156
460,956
Telecommunication Purchases/Upgrades
EQ -014
n/a
10,500
5,500
5,500
5,500
5,500
32,500
Community Dev.: Light Duty Trucks
EQ -015
n/a
29,000
30,000
30,000
89,000
Dump /Plow Truck Replacements/Additions
EQ -016
n/a
399,800
120,000
206,000
209,000
216,000
1,150,800
Line Striper
EQ -025
n/a
9,000
9,000
Light Duty Trucks: Public Works
EQ -029
n/a
73,000
73,000
Software Purchases
EQ -048
n/a
78,690
80,695
77,700
79,205
80,210
396,500
Computerized Records Retention System
EQ -049
n/a
8,000
16,000
6,500
14,800
16,000
61,300
Fire Vehicles
EQ -054
n/a
40,000
40,000
170,000
195,000
445,000
Aerial Photography for City GIS Datasets
EQ -055
n/a
7,250
250
7,250
250
7,250
22,250
Engineering Vehicles
EQ -065
n/a
25,000
25,000
Storage Area Network (SAN)
EQ -081
n/a
25,000
25,000
50,000
Office Furniture
EQ -084
n/a
5,000
5,000
5,000
5,000
5,000
25,000
Equipment for New Fire Station
E"86
n/a
500,000
500,000
Excavator
EQ -091
n/a
10,000
10,000
Fire Pager Replacement
EQ -092
n/a
12,000
12,000
Thermal Cameras
EQ -093
n/a
15,000
15,000
30,000
Portable Radios
EQ -094
n/a
8,000
8,000
16,000
Skid loader- Parks
EQ -095
n/a
43,000
43,000
Skid loader Tracks - Parks
E"96
n/a
7,500
7,500
Loader Mounted Snow Blower
EQ -098
n/a
141,000
141,000
Sweeper - Parks
EQ -099
n/a
33,000
33,000
Light Duty Trucks - Parks
EQ -100
n/a
65,000
40,000
105,000
Light Weight Vehicle - Park
EQ -103
n/a
22,000
22,000
Source
Project#
Priority
2011
2012
2013
2014
2015
Total
Mower Replacement - Park
EQ -104
n/a
90,000
95,000
64,000
249,000
Skid loader - Street Department
EQ -105
n/a
40,000
40,000
Tractor Replacement - Park
EQ -106
n/a
30,000
30,000
Springbrook Version 7 Software Upgrade
EQ -108
n/a
19,294
19,294
Bucket Truck Refurbish
EQ -109
n/a
30,000
30,000
Paint Striper
EQ -111
n/a
19,000
19,000
Hydro Seeder
EQ -112
n/a
5,000
5,000
Refurbish Engine 12 (#212)
EQ -113
n/a
15,000
15,000
Refurbish Engine 11 (#211)
EQ -114
n/a
15,000
15,000
Brush Chipper
EQ -115
n/a
56,000
56,000
Berti Rear Mount Mower
EQ -117
n/a
10,000
10,000
Street Sweeper
EQ -118
n/a
281,000
281,000
Elliptical Machine Replacement - Fire Station #1
EQ -119
n/a
5,000
5,000
City Hall Remodel
MB -010
n/a
125,000
125,000
Engineering Copy Area Renovation
MB -015
n/a
10,000
10,000
City Hall Parking Lot Expansion
MB -016
n/a
70,000
70,000
Fire Station 1 Repainting and Carpeting
MB -017
n/a
10,000
10,000
Tennis Courts
PK &T -072
n/a
125,000
75,000
200,000
Recreation Center Fitness Equipment
PK &T -079
n/a
10,000
10,000
20,000
Skate Park Ramp Replacement & Asphalt Resurfacing
PK &T -093
n/a
110,000
110,000
City Hall Landscaping
PK &T -111
n/a
75,000
75,000
Bandimere Park Tree Replacement
PK &T -112
n/a
30,000
30,000
County Rd 61 (old 212) Corridor Study
PL -002
n/a
75,000
75,000
Capital Replacement Fund Total
899,034
923,795
1,190,300
1,284,855
1,063,116
5,361,100
GO Bonds
Equipment for New Fire Station
EQ -086
n/a
500,000
500,000
Fire Station 3
MB -009
n/a
2,000,000
2,000,000
GO Bonds Total
2,500,000
2,500,000
MSA
West 78th St Streetlights
ST -001
n/a
300,000
300,000
Lyman Boulevard Improvements
ST -003
n/a
1,700,000
1,500,000
3,200,000
MSA Total
1,700,000
1,800,000
3,500,000
Other Agency Contribution
City Hall North Parking Lot
MB -014
n/a
140,000
140,000
TH5 Pedestrian Underpass at Minnewashta
PK &T -108
n/a
920,000
920,000
Lyman Boulevard Improvements
ST -003
n/a
6,500,000
6,900,000
13,400,000
TH 101 Corridor Preservation Planning
ST -017
n/a
920,000
920,000
TH5 Improvements - TH41 to Downtown Victoria
ST -025
n/a
8,829,000
8,829,000
TH 101 /Pleasant View Rd Intersection & Trail Imp
ST -027
n/a
560,000
560,000
TH 101 Improvements - Lyman Blvd to Pioneer Trail
ST -028
n/a
9,200,000
9,200,000
Ravine #2 Stabilization
SWMP -024
n/a
12,500
47,500
30,000
35,000
45,000
170,000
Stormwater Pond Improvements
SWMP -032
n/a
10,000
10,000
20,000
LID Implementation Project
SWMP -035
n/a
5,000
5,000
5,000
5,000
5,000
25,000
Well 13 Parking Lot
SWMP -037
n/a
30,000
30,000
Cranes Vineyard Creek
SWMP -039
n/a
20,000
20,000
Bluff Creek Drive Drainage Improvement Project
SWMP -042
n/a
40,000
40,000
Source Project# Priority
2011
2012
2013
2014
2015
Total
10,000
50,000
Trees
PK &T -043
n/a
25,000
25,000
Other Agency Contribution Total
25,000
25,000
125,000
Hwy 41 Pedestrian Underpass/Trail Grant Match
PK &T -069
n/a
1,497,500
9,811,500
9,395,000
6,590,000
6,980,000
34,274,000
Park Dedication Fund
Picnic Tables/Park Benches
PK &T -042
n/a
10,000
10,000
10,000
10,000
10,000
50,000
Trees
PK &T -043
n/a
25,000
25,000
25,000
25,000
25,000
125,000
Hwy 41 Pedestrian Underpass/Trail Grant Match
PK &T -069
n/a
400,000
400,000
Pioneer Pass Park Acquisition
PK &T -078
n/a
290,000
290,000
Bluff Creek Drive Gap Trail
PK &T -083
n/a
390,000
390,000
Disc Golf Course Construction
PK &T -085
n/a
20,000
20,000
Pedestrian Trail to Arboretum
PK &T -098
n/a
250,000
250,000
Chanhassen Native Preserve Trail, Final Phase
PK &T -099
n/a
90,000
90,000
Lyman Boulevard North Park Acquisition
PK &T -101
n/a
175,000
175,000
TH5 Pedestrian Underpass at Minnewashta
PK &T -108
n/a
80,000
80,000
Pioneer Pass Neighborhood Park Development
PK &T -109
n/a
350,000
350,000
Hwy 41 Trail Extension/Stairway
PK &T -110
n/a
250,000
250,000
Bandimere Park Tree Replacement
PK &T -112
n/a
30,000
30,000
Herman Field Park Half Court Basketball
PK &T -113
n/a
10,000
10,000
TH5 Improvements - TH41 to Downtown Victoria
ST -025
n/a
80,000
80,000
TH 101 /Pleasant View Rd Intersection & Trail Imp
ST -027
n/a
95,000
95,000
Park Dedication Fund Total
1,090,000
235,000
635,000
515,000
210,000
2,685,000
Sewer Utility Fund
Utility Bobcat Snow Accessories
EQ -031
n/a
3,500
3,500
Light Duty Trucks: Utilities
EQ -062
n/a
42,500
27,500
29,000
17,000
116,000
Excavator
EQ -091
n/a
30,000
30,000
Portable Generator - Utility Department
EQ -097
n/a
17,000
17,000
Skid loader - Utility Department
EQ -101
n/a
24,000
24,000
Springbrook Version 7 Software Upgrade
EQ -108
n/a
2,573
2,573
Vactor /Sewer Jetting Truck
EQ -110
n/a
325,000
325,000
Inflow and Infiltration Abatement
SS -012
n/a
200,000
75,000
75,000
75,000
75,000
500,000
Sanitary Sewer Replacement
SS -014
n/a
300,000
300,000
600,000
Sanitary Lift Station Rehabilitation Program
SS -017
n/a
90,000
50,000
65,000
40,000
40,000
285,000
2010 MUSA Sanitary Lift Station
SS -020
n/a
1,900,000
1,900,000
Lyman Boulevard Improvements
ST -003
n/a
150,000
150,000
Sewer Utility Fund Total
389,073
452,500
2,072,500
599,000
440,000
3,953,073
Street Pavement Management
Annual Street Improvement Program
ST -012
n/a
300,000
300,000
TH 101 Corridor Preservation Planning
ST -017
n/a
80,000
80,000
Pavement Management
ST -018
n/a
100,000
100,000
100,000
100,000
100,000
500,000
TH5 Improvements - TH41 to Downtown Victoria
ST -025
n/a
120,000
120,000
TH 101 /Pleasant View Rd Intersection & Trail Imp
ST -027
n/a
90,000
90,000
Repaint TH 5 Signals
ST -029
n/a
85,000
85,000
Street Pavement Management Total
655,000
220,000
100,000
100,000
100,000
1,175,000
Surface Water Utility Fund
Excavator
EQ -091
n/a
30,000
30,000
Springbrook Version 7 Software Upgrade
EQ -108
n/a
1,285
1,285
City Hall North Parking Lot
MB -014
n/a
140,000
140,000
Source Project# Priority 2011 2012 2013 2014 2 015 Total
TH 101 /Pleasant View Rd Intersection & Trail Imp
ST -027
Property Acquisition
SWMP -014
Street Improvement Projects - Storm Water Mgmt
SWMP -019
Ravine #2 Stabilization
SWMP -024
Lake Minnewashta Outlet
SWMP -026
Landings Court Storm Water Pond Imp
SWMP -029
Stormwater Pond Improvements
SWMP -032
LID Implementation Project
SWMP -035
Well 13 Parking Lot
SWMP -037
Cranes Vineyard Creek
SWMP -039
Bluff Creek Drive Drainage Improvement Project
SWMP -042
Surface Water Utility Fund Total
67,500
45,000
35,000
Tax Levy
Pavement Management
ST -018
Tax Levy Total
30,000
Water Utility Fund
Utility Bobcat Snow Accessories
EQ -031
Light Duty Trucks: Utilities
EQ -062
Excavator
EQ -091
Skid loader - Utility Department
EQ -101
Springbrook Version 7 Software Upgrade
EQ -108
Vactor /Sewer Jetting Truck
EQ -110
Watermain Break Supply Van
EQ -116
Lyman Boulevard Improvements
ST -003
TH 101 Improvements - Lyman Blvd to Pioneer Trail
ST -028
Repainting: West 76th St. Water Tower
W -015
Arboretum Water Main
W -020
Watermain Replacement
W -024
Pressure Reducing Station
W -027
Well Rehabilitation Program
W -032
Repaint Lake Lucy Water Stand Pipe
W -041
High Zone Elevated Storage Tank
W -042
Low Zone 1 million gallon Elevated Storage Tank
W -046
Well #15 Improvements
W -048
High Zone High Service Pump
W -050
Water Utility Fund Total
n/a
20,000
3,500
20,000
n/a
75,000
75,000
75,000
75,000
75,000
375,000
n/a
30,000
400,000
400,000
800,000
n/a
92,500
67,500
45,000
35,000
40,000
280,000
n/a
2,573
30,000
30,000
n/a
70,000
100,000
70,000
n/a
25,000
25,000
25,000
25,000
40,000
140,000
n/a
10,000
10,000
10,000
10,000
10,000
50,000
n/a
300,000
60,000
60,000
n/a
110,000
35,000
35,000
n/a
80,000
220,000
80,000
n/a
253,785
577,500
430,000
625,000
225,000
2,111,285
n/a
200,000
200,000
200,000
200,000
200,000
1,000,000
n/a
200,000
200,000
200,000
200,000
200,000
1,000,000
n/a
3,500
3,500
n/a
42,500
27,500
29,000
17,000
116,000
n/a
30,000
30,000
n/a
24,000
24,000
n/a
2,573
2,573
n/a
100,000
100,000
n/a
20,000
20,000
n/a
400,000
400,000
n/a
300,000
300,000
n/a
110,000
110,000
n/a
220,000
220,000
n/a
700,000
700,000
1,400,000
n/a
65,000
65,000
75,000
205,000
n/a
45,000
45,000
45,000
50,000
50,000
235,000
n/a
550,000
550,000
n/a
1,900,000
1,900,000
n/a
2,600,000
2,600,000
n/a
1,400,000
1,400,000
n/a
120,000
120,000
439,073
2,757,500
1,852,500
3,767,000
920,000
9,736,073
GRAND TOTAL 6,653,465 16,887,795 19,585,300 16,590,855 12,948,116 72,665,531
Capital Improvement Program 2011 thru 2015
City of Chanhassen, MN
Project # EQ -004
Project Name Fire Dept.: SCBA Equipment
Account #1 40041154705
Account #2
Account #3
Account #4
Department Major Equipment
Contact Richard Rice
Type
Equipment
Useful Life
20 years
Category
Fire
Priority
n/a
Total Project Cost: $117,000
program is to provide additional and/or replacement SCBA air bottles, SCBA face masks, and upgrades to SCBA air packs as needed.
Justification
refighting is a very rigorous and demanding activity that is performed in an environment of extremes. The high temperatures and other hostile
vironmental conditions can quickly shorten the service life of SCBA equipment. The periodic replacement and/or additions to SCBA equipment
required to maintain current quantities through replacement of damaged or destroyed equipment and to equip new firefighters.
Prior Expenditures 2011 2012 2013 2014 2015 Total
90 Equipment 5,000 5,000 5,000 5,000 7,000 27,000
Total Total 5,000 5,000 5,000 5,000 7,000 27,000
Prior
so,55
Total
Funding Sources 2011 2012 2013 2014 2015 Total
Capital Replacement Fund 5,000 5,000 5,000 5,000 7,000 27,000
Total 5,000 5,000 5,000 5,000 7,000 27,000
Budget Impact/Other
Fhere should be no operational impact from this purchase. The current maintenance budget will accommodate for this addition.
Capital Improvement Program 2011 thru 2015
City of Chanhassen, MN
Project # EQ -010
Project Name PP E: Turnout/Helmets
Account #1 4004105 -4705
Account #2
T otal
Department Major Equipment
Contact Richard Rice
Type Equipment
Useful Life 5 -7 years
Category Fire
Priority n/a
Description Total Project Cost: $135,000
teplacement of 3 -5 sets of turnout gear per year as a result of damage received from firefighting activities. The City will also provide new
nembers with new turnout gear after they complete their probationary period. Funding for turnout gear in 2013 will be funded out of the Station 3
:quiUment fund.
Justification
Turnout gear lasts approximately 5 -7 years on average.
Prior Expenditures
60,000 Maintenance
Total
Total 15,000 20,000 20,000 20,000 75,000
Prior Funding Sources
2011
2012 2013
2014
2015
Total
60,000 Capital Replacement Fund
15,000
20,000
20,000
20,000
75,000
Total Total
15,000
20,000
20,000
20,000
75,000
Account #3
Account #4
2011 2012 2013
15,000 20,000
2014 2015
20,000 20,000
75,000
Budget Impact/Other
there should be no operational impact from this purchase. The current maintenance budget will accommodate for this addition.
Capital Improvement Program 2011 thru 2015
City of Chanhassen, MN
Project # EQ -013
Project Name Computer/Network Equipment Purchases/Upgrades
Account #1 400 - 4126 -4703
Account #2
Account #3
Account #4
Department Major Equipment
Contact Richard Rice
Type Equipment
Useful Life 3 -8 years
Category Administration
Priority n/a
Description I Total Project Cost: $765,206
?unds the purchase of replacement user and network computer, printer, peripherals, and networking hardware. The replacement schedule was
tdopted in 1999 and is subject to modification by the MIS Coordinator with the approval of the City Manager and department heads.
Justification
sting and purchasing computer equipment through this project allows the City greater flexibility to direct equipment to where it is needed the
rather than in individual budgets. The replacement schedule was developed by the MIS Coordinator in 1999 and approved by the 1999
it appointed IT task force. Expenditures in the 2011 budget requests are for the replacement of one domain controller, 2 network switches, 2
rk servers, 4 workstations, 11 desktop PC's and 4 notebook PC's. Some equipment will be traded in. Other replaced equipment will be
ed if possible for use by other users or will be sold on the public surplus auction site.
Prior Expenditures
2011
2012
2013
2014
2015
Total
— 304, - 250 - 1 Office Equipment
85,500
94,350
91,850
104,100
85,156
460,956
Total
Total 85,500
94,350
91,850
104,100
85,156
460,956
Prior Funding Sources
2011
2012
2013
2014
2015
Total
304,250 D Capital Replacement Fund
Total Total
85,500
85,500
94,350
94,350
91,850
91,850
104,100
104,100
85,156
85,156
460,956
460,956
Budget Impact/Other
lost items purchased for this account come with a 3 year warranty. Repairs to items are done by MIS staff after the warranty period expires. Spare
)arts or outside repairs are funded out of 101- 1160 -4530 (Repair & Maintenance- Equipment) or 101 - 1160 -4300 (Consulting).
Capital Improvement Program 2011 thru 2015
City of Chanhassen, MN
Project # EQ -014
Project name Telecommunication Purchases/Upgrades
Account #1 400 - 4101 -4703
Account #2
Account #3
Account #4
Department Major Equipment
Contact Richard Rice
Type Equipment
Useful Life 10 years
Category Administration
Priority n/a
Total Project Cost: $88,700
s project funds the expansion and upgrades to the City telephone systems, excluding cellular equipment and services which remains an
ividual department budget item. The current City telephone system is an Intertel Axxess PBX which provides phone service for City Hall,
)lic Works, the Recreation Center, Fire Station 1, and the Water Treatment Plant. This system is being replaced in 2011.
Justification
k central PBX system simplifies the management of phone services and allows for the integration of phone services with other City applications
;uch as unified messaging and fax services. The current system was installed in 1999 and upgraded in 2006. The majority of the handsets are from
he original order. The system has an estimated service life of 10 years and was scheduled to be replaced in 2010, but was delayed due to budget
ssues. The system will be replaced in 2011 with 2010 funds. The system will utilize the majority of the existing handsets. Some older non
:ompatible IP handsets will be replaced when the system is replaced. Additional IP handsets will be ordered as replacements for existing digital
)hones in City Hall in years 2 - 4. New IP phone in year 5 will be for projected Fire Station 3.
Prior Expenditures
2011
2012
2013
2014
2015
Total
F -- 5 - 6 — ,20 - 0 1 Office Equipment
10,500
5,500
5,500
5,500
5,500
32,500
Total
Total 10,500
5,500
5,500
5,500
5,500
32,500
Prior
56,200
Total
Funding Sources 2011 2012 2013 2014 2015 Total
Capital Replacement Fund 10,500 5,500 5,500 5,500 5,500 32,500
Total 10,500 5,500 5,500 5,500 5,500 32,500
Budget Impact/Other
new maintenance agreement was established with Integra Telecom following the expiration of the 5 year warranty from Intertel. The MIS
, erating budget includes annual maintenance charges for this service. A new system will have some warranty period.
Capital Improvement Program 2011 thru 2015
City of Chanhassen, MN
Project # EQ -015
Project Name Community Dev.: Light Duty Trucks
Account #1 400 - 4107 -4704
Account #2
Account #3
Account #4
Department Major Equipment
Contact Kate Aanenson
Type Vehicles
Useful Life Unassigned
Category Community Development
Priority n/a
Total Project Cost: $173,000
purchases are consistent with the Vehicle Replacement Schedule. Replacement units are generally purchased early in the year to
modate the time frames established by Hennepin County and the State of Minnesota Cooperative Purchasing Program.
2012 - #609 1999 Ford Ranger Pickup
2013 - #603 2001 Ford Ranger Pickup
2014 - #604 2002 Ford Ranger Pickup
Justification
I These vehicles are used to provide building inspection services throughout the community. The average replacement age is over 10 years.
Prior Expenditures 2011 2012 2013 2014 2015 Total
84,000 Vehicles 29,000 30,000 30,000 89,000
Total Total 29,000 30,000 30,000 89,000
Prior Funding Sources 2011
2012
2013
2014 2015
Total
F -- 84 — ,000 - 1 Capital Replacement Fund
29,000
30,000
30,000
89,000
Total Total
29,000
30,000
30,000
89,000
Budget Impact/Other
These purchases will include a limited warranty and will reduce the annual maintenance and repair costs as compared to the vehicles replaced.
Capital Improvement Program 2011 thru 2015
City of Chanhassen, MN
Project # EQ -016
Project Name Dump/Plow Truck Replacements /Additions
Account #1 400 - 4108 -4704
Account #2
Account #3
Account #4
Department Major Equipment
Contact Paul Oehme
Type Vehicles
Useful Life Unassigned
Category Street Equipment
Priority n/a
Total Project Cost: $1,150,800
ese purchases are required to maintain a reliable truck fleet. Costs include truck chassis, dump box, hydraulic system, snow wing, snow plow
1 sander. Truck chassis costs are higher due to new federal mandated anti -lock braking requirements effective since 2000. These vehicles are
- chased using either the Hennepin County or State of MN cooperative bid systems. Orders for truck chassis are typically required to be placed
to one year in advance of delivery.
zeplacement schedule is as follows:
?011 - #117 1994 Ford L8000 Dump/Plow Truck
?011 - #118 1994 Ford L8000 Dump/Plow Truck
?012 - #115 1991 Ford F800 Dump/Plow Truck (would also replace truck #302)
?013 - #120 1995 Ford LS8000 Dump/Plow Truck
?014 - #121 1995 Ford LS8000 Dump/Plow Truck
1015 - #122 1996 Ford LS8000 Dump/Plow Truck
Justification
Mese vehicles are used to provide a variety of maintenance services throughout the community including winter response for plowing and hauling
;now. The average replacement age is 18.5 years. Winter emergency service necessitates these vehicles be reliable and dependable. Growth in the
; ommunity creates additional work for these trucks. These vehicle purchases are consistent with the Vehicle Replacement Schedule and are
>urchased through MnDot State contracts..
Expenditures 2011 2012 2013 2014 2015 Total
Vehicles 399,800 120,000 206,000 209,000 216,000 1,150,800
Total 399,800 120,000 206,000 209,000 216,000 1,150,800
Funding Sources 2011
2012
2013
2014
2015
Total
Capital Replacement Fund 399,800
120,000
206,000
209,000
216,000
1,150,800
Total 399,800
120,000
206,000
209,000
216,000
1,150,800
purchases will include a limited warranty and will reduce the annual maintenance and repair costs as compared to the vehicles replaced.
Capital Improvement Program 2011 thru 2015
City of Chanhassen, MN
Project # EQ -025
Project Name Line Striper
Account #1 400 - 00004705 Account #3
Account #2 Account #4
for the replacement of an existing line - striping machine.
12 - 1994 Graco GM5000 Line Striper 5 hp
Department Major Equipment
Contact Paul Oehme
Type Equipment
Useful Life Unassigned
Category Street Equipment
Priority n/a
Total Project Cost: $9,000
Justification
This machine is used to paint pavement markings and stripe lanes on roads. This purchase will ensure timely and reliable pavement marking
operations. The purchase is consistent with the Equipment Replacement Schedule.
Expenditures
2011 201 2013 2014 2015 Total
Equipment 9,000 9,000
Total 9,000 9,000
Funding Sources 2011 2012 2013 2014 2015 Total
Capital Replacement Fund 9,000 9,000
Total 9,000 9,000
purchase will include a limited warranty.
Capital Improvement Program 2011 thru 2015
City of Chanhassen, MN
Project # EQ -026
Project Name AudioNisual Equipment
Account #1 210- 00004705
Account #2
Description
'rovides for the systematic maintenance and upgrading of audio /visual equipment.
Account #3
Account #4
Department Major Equipment
Contact Laurie Hokkanen
Type Equipment
Useful Life Unassigned
Category Administration
Priority n/a
Total Project Cost: $80,000
Justification
The original AN equipment was purchased in 1989, with the upgrades in 1994 and 2008.
Prior Expenditures 2011 2012 2013 2014 2015 Total
30,000 Maintenance 10,000 10,000 10,000 10,000 10,000 50,000
Total Total 10,000 10,000 10,000 10,000 10,000 50,000
Prior Funding Sources 2011 2012 2013 2014 2015 Total
F - 7 - 0 — ,00 - 01 Cable N Fund 10,000 10,000 10,000 10,000 10,000 50,000
Total Total 10,000 10,000 10,000 10,000 10,000 50,000
B udget Impact/Other
this purchase will include a limited warranty. In 2008, a major remodeling including cameras, display screens, AN control systems, and Ch 8
nanagement was undertaken. Future upgrades include expanding access to programming to those without access to cable, and continued
enhancement of the live and broadcast experience.
Capital Improvement Program 2011 Mru 2015
City of Chanhassen, MN
Project # EQ -029
Project Name Light Duty Trucks: Public Works
Account #1 400 - 4120 -4704
Account #2
Account #3
Account #4
Department Major Equipment
Contact Paul Oehme
Type Vehicles
Useful Life Unassigned
Category Street Equipment
Priority n/a
Description Total Project Cost: $106,000
'rovides for scheduled replacement of light duty trucks in the street and garage departments. Replacement units are generally purchased early in
he year in order to accommodate the time frames established by Hennepin County and the State of MN Cooperative Purchasing Program.
13 - #110 1996 Chevrolet 3/4 ton 4x4 ($35,000)
13 - #125 1999 Dodge 3/4 ton 4x4 with plow ($38,000)
Justification
These vehicles are used for a variety of services throughout the community. The average replacement age is 13 years. These purchases are
consistent with the Vehicle Replacement Program.
Prior
33,000
Total
Total 73,000 73,000
Prior Funding Sources 2011 2012 2013 2014 2015 Total
33,0001 Capital Replacement Fund -- 73,000 73,000
Total Total 73,000 73,000
Expenditures 2011 2012 2013 2014 2015 Total
Vehicles 73,000 73,000
Budget Impact/Other
These purchases will include a limited warranty and will reduce annual maintenance and repair costs as compared to the vehicles replaced.
Capital Improvement Program 2011 thru 2015
City of Chanhassen, MN
Project # EQ -031
Project Name Utility Bobcat Snow Accessories
Account #1 700 - 7025 -4705
Account #2 701 - 7025 -4705
Account #3
Account #4
Department Major Equipment
Contact PaulOehme
Type
Improvement
Useful Life
10 -15 years
Category
Utilities
Priority
n/a
Total Project Cost: $7,000
snow blower attachment is nearing its useful life and needs replacement.
13 - 2007 Loftness Snow Blower
Justification
This equipment is necessary for cleaning snow from water and sewer locations.
Expenditures
2011 2 012 2013 2014 2015 Total
Equipment 7,000 7,000
Total 7,000 7,000
Funding Sources 2011 2012 2013 2014 2015 Total
Sewer Utility Fund 3,500 3,500
Water Utility Fund 3,500 3,500
Total 7,000 7,000
Capital Improvement Program 2011 Mru 2015
City of Chanhassen, MN
Project # EQ -048
Project Name Software Purchases
Account #1 400 -4117 -4703 Account #3
Account #2 Account #4
Department Major Equipment
Contact Richard Rice
Type Equipment
Useful Life 3 -6 years
Category Administration
Priority n/a
Description I Total Project Cost: $535,900
[his project funds the purchase of software for all City departments that is not associated with a specific, individual project. Most annual software
support and license renewal fees are funded out of account 101 - 1160 -4300. Some reoccurring software costs have been moved to this account in
>.010.
Justification
The major portion of funds requested for this project are for Microsoft software purchases. In 2007, the City joined the Microsoft Office
Enterprise Agreement for the State of Minnesota. Microsoft Office is the standard desktop software application for all City users. Participating in
the state agreement allows the City to spread the cost of the product over a period of six years in which there are no additional fees for product
upgrades. Additional Microsoft Server licenses are proposed to update existing Windows Server 2000 and 2003 licenses. Some reoccurring
software costs have been moved to this account in 2010. The City is anticipating purchasing mapping software under an ESRI enterprise software
agreement with Carver County, which allows for use of all vendor mapping software applications. It is anticipated that all cities in Carver County
will participate in the agreement.
Prior Expenditures 2011 2012 2013 2014 2 015 Total
139,400
Total
Prior
139,400
Total
Office Equipment
Funding Sources
78,690 80,695 77,700 79,205 80,210 396,500
Total 78,690 80,695 77,700 79,205 80,210 396,500
2011 2012 2013 2014 2015 Total
Capital Replacement Fund 78,690 80,695 77,700 79,205 80,210 396,500
Total 78,690 80,695 77,700 79,205 80,210 396,500
Budget Impact/Other
Capital Improvement Program 2011 thru 2015
City of Chanhassen, MN
Project # EQ -049
Project Name Computerized Records Retention System
Account #1 400 - 4124 -4703
Account #2
Account #3
Account #4
Department Major Equipment
Contact Richard Rice
Type Equipment
Useful Life 3 -5 Years
Category Administration
Priority n/a
Total Project Cost: $107,800
pis project originally funded the purchase of an electronic records retention system in 2002. Laserfiche was the vendor chosen for the project.
is project is now used to fund its expansion and the replacement costs for associated scanning equipment, which have an useful life expectancy
3 to 5 years. Additional software modules are proposed for later years to allow for managing retention policy compliance.
Justification
This system allows for quick and simultaneous retrieval of documents from any computer on the City network. Both physical document storage
space and the occurrence of lost or misfiled documents will be significantly reduced. In addition, documents specified for public access can be
easily made available to residents and constituents from any internet capable computer. Small workgroup scanners in the fire and public works
departments will be replaced in the 2011 budget cycle. An additional bar code license is being added for scanning building and finance documents
utilizing bar codes for identification.
Prior Expenditures
2011
2012
2013
2014
2015
Total
46,500 Office Equipment
8,000
16,000
6,500
14,800
16,000
61,300
Total
Total 8,000
16,000
6,500
14,800
16,000
61,300
Prior
46,500
Total
Funding Sources 2011 2012 2013 2014 2015 Total
Capital Replacement F und 8,000 16,000 6,500 14,800 16,000 61,300
Total 8,000 16,000 6,500 14,800 16,000 61,300
Impact/Other
Capital Improvement Program 2011 Mru 2015
City of Chanhassen, MN
Project # EQ -054
Project Name F Vehicles
Account #1 400 - 4135 -4704
Account #2
Account #3
Account #4
Department Major Equipment
Contact Richard Rice
Type Vehicles
Useful Life 10 -15 years
Category Fire
Priority n/a
icription I Total Project Cost: $638,000
item allows for the replacement of existing equipment. Vehicles are purchased off either the Hennepin County or State of Minnesota
erative bid. Orders are typically required to be placed up to one (1) year in advance of delivery.
Justification
I As vehicles age they become less reliable and require more costly maintenance. Vehicles proposed for replacement in this budget are:
2011 - 1995 Chevrolet Astro Van (207)
2012 - 1988 Chevrolet Third Chiefs vehicle (203)
2014 - 2004 Dodge Durango (201)
2014 - 1999 Ford F350 Rescue (218)
2015 - 2004 Dodge Durango (202)
2015 - 1990 Chevrolet Heaw Rescue (216)
Prior Expenditures 2011
2012 2013 2014 2015 Total
1937000 Vehicles 40,000 40,000 170,000 195,000 445,000
Total. Total 40,000 40,000 170,000 195,000 445,000
Prior Funding Sources 2011 2012 2013 2014 2015 Total
193,000 Capital Replacement Fund 40,000 40,000 170,000 195,000 445,000
Total Total 40,000 40,000 170,000 195,000 445,000
;et Impact/Other
purchases will include a limited warranty and will reduce the annual maintenance and repair costs.
Capital Improvement Program 2011 thru 2015
City of Chanhassen, MN
Project # EQ -055
Project Name Aerial Photography for City GIS Datasets
Account #1 400 - 00004752
Account #2
Account #3
Account #4
Department Major Equipment
Contact Richard Rice
Type Improvement
Useful Life 2 -3 years
Category Administration
Priority n/a
Total Project Cost: $79,250
This project funds the aerial photography for the integration with the City's existing GIS datasets. This project is heavily dependent upon the
cooperation of the Carver County GIS department. An initial joint aerial flyover for high resolution orthographic imagery data was conducted in
April 2005 and was scheduled to be re -flown every two years. Due to budgetary issues, Carver County is not scheduled to do another flyover until
April 2011 and will return to a two year schedule if their budget allows.
Justification
'ity Planners, Engineers and Utility staff use this data in conjunction with other GIS datasets to help resolve geographical issues with residents and
:ontractors without repeated site visits. It is used in nearly every scheduled staff meeting and has proven useful to the Sheriffs Office and fire
lepartment when conducting area searches. In 2008, Carver County chose a new vendor ( Pictometry), which added a three dimensional view to
napping data. The Pictometry solution provides the ability for staff to view each side of buildings and includes a toolset which allows for accurate
neasurement of areas and lines. The vendor data however was not able to be used for updating the Planometric data currently used by City
lepartments. A separate flyover, delayed by Carver County in 2010, is proposed for 2011 to collect data for this purpose.
Prior
Expenditures
2011
2012
2013
2014
2015
Total
F --- 57,00 - 0 1
Maintenance
7,250
250
7,250
250
7,250
22,250
Total
Total
7,250
250
7,250
250
7,250
22,250
Prior
Funding Sources
2011
2012
2013
2014
2015
Total
F - 77,0001
Capital Replacement Fund
7,250
250
7,250
250
7,250
22,250
Total
Total
7,250
250
7,250
250
7,250
22,250
fidget Imp
operational impact is expected.
Capital Improvement Program
City of Chanhassen, MN
2011 thru 2015
Department Major Equipment
Contact Paul Oehme
Project # EQ -062
Type Vehicles
Useful Life Unassigned
Project Name Light Duty Trucks: Utilities Category Utilities
Account #1 700 - 7025 -4704 Account #3 Priority n/a
Account #2 701- 7025 -4704 Account #4
Description Total Project Cost: $296,000
This allows for replacement of existing vehicles in the Water and Sewer department.
2011 - #302 1999 Ford F -450 3/4 ton pickup
2012 - #317 1997 Chevrolet 3/4 ton pickup
2013 - #320 2003 Chevrolet 3/4 ton pickup
2013 - #316 1997 Chevrolet 3/4 ton pickup
2014 - #3012002 Chevrolet 3/4 ton picku
Justification
This replaces pickups in accordance with the vehicle replacement plan.
Prior Expenditures
64,000 Vehicles
Total
Prior Funding Sources
7000 Sewer Utility Fund
Total Water Utility Fund
2011 2012 2013 2014 2015 Total
2011 2012 20 13 2014 2015 Tot
42,500 27,500 29,000 17,000
42,500 27,500 29,000 17,000
116,000
116,000
85,000 55,000 56,000 34,000 232,000
Total 85,000 55,000 58,000 34,000 232,000
Total 85,000 55,000 58,000 34,000 232,000
Capital Improvement Program 2011 thru 2015 Department Major Equipment
City of Chanhassen, MN Contact Paul Oehme
Project # EQ -065
Type Vehicles
Project Name Useful Life Unassigned
Engineering Vehicles Category Street Equipment
Account #1 400 - 0000 -4704 Account #3 Priority n/a
Account #2 Account #4
Description Total Project Cost: $60,000
The Crown Victoria was purchased in 1993 and is used for general transportation for City Hall employees and site inspections.
Justification
This replacement is in accordance with the vehicle replacement plan.
Budget Impact/Other
Prior
Expenditures 2011
2012 2013
2014 2015 Total
F -7 35,00 - 0 1
Vehicles
25,000
25,000
Total
Total
25,000
25,000
Prior
Funding Sources 2011
2012 2013
2014 2015 Total
35,000
Capit Replacement Fund
25,000
25,000
Total
Total
25,000
25,000
Budget Impact/Other
Capital Improvement Program 2011 Mru 2015
City of Chanhassen, MN
Project # EQ -081
Project Name Storage Area Network (SAN)
Account #1 400 - 4126 -4703 Account #3
Account #2 Account #4
Description
Department Major Equipment
Contact Richard Rice
Type Improvement
Useful Life 5 -7 years
Category Administration
Priority n/a
Total Project Cost: $136,600
project funds the purchase of a storage area network (SAN), which will gradually replace all internal disk drives in existing network servers.
storage area network is a central storage device made up of individual storage modules, and managed from a single console. The SAN allows
storage to be modified as storage needs change, without any downtime for users. New network servers will not be ordered with internal
age. Existing network servers are being migrated to a virtualized environment which will utilize the SAN for all data storage needs.
Justification
The need for digital storage space for City documentation and applications is growing at a rate of approximately 50OGB per year. Existing storage
space became difficult to manage on individual network servers. Internal storage utilization is inefficient, and requires system downtime to
reconfigure. SAN storage allows for real time reconfiguration as well as the ability to make real time copies for redundancy and for daytime
backup processes. The initial SAN array was purchased in 2008, a second unit in 2009, and a replication SAN in 2010. Currently all units reside
in City Hall, however the third replication SAN will be moved to the public works building after it receives fiber connectivity. An additional SAN
array is projected for 2012 to accommodate growth. The initial SAN is projected to reach the end of its serviceable life in 2014 and is scheduled to
be replaced. As each unit is added, the overall performance of the SAN as a whole is greatly increased.
Prior Expenditures 2011
2012 2013
2014 2015
Total
7 - 86 - , - 60 5- 0 1 Equipment
25,000
25,000
50,000
Total Total
25,000
25,000
50,000
Prior Funding Sources 2011 2012 2013 2014 2015 Total
86,600 Capital Replacement Fund 2 5,000 25,000 50,000
Total Total 25,000 25,000 50,000
Budget Impact/Other
Software support is included for the first year. Software support for the following years would be funded out of 101 - 1160 -4300. The hardware
proposed is covered under a three year, next day warranty. Hardware repairs would be done by MIS staff using a spare kit and replenished by the
warranty. Spare parts required after the warranty expiration would be funded out of 101- 1160 -4530.
Capital Improvement Program
City of Chanhassen, MN
2011 thru 2015
Department Major Equipment
Contact Laurie Hokkanen
Project # EQ -084
Project Name Office Furniture
Account #1 400 - 0000 -4703 Account #3
Account #2 Account #4
Description
'rovide for office furniture and chair replacements.
Type Unassigned
Useful Life
Category Administration
Priority n/a
Total Project Cost: $40,000
Justification
This item will allow items to be replaced as they wear out or needs change.
Budget Impact/Other
Prior
Expenditures
2011
2012
2013
2014
2015
Total
15,000
Office Equipment
5,000
5,000
5,000
5,000
5,000
25,000
Total
Total
5,000
5,000
5,000
5,000
5,000
25,000
Prior
Funding Sources
2011
2012
2013
2014
2015
Total
15,000
Capital Replacement Fund
5,000
5,000
5,000
5,000
5,000
25,000
Total
Total
5,000
5,000
5,000
5,000
5,000
25,000
Budget Impact/Other
Capital Improvement Program 2011 thru 2015 Department Major Equipment
City of Chanhassen, MN Contact Richard Rice
1,000,000
Account #1 Account #3 Priority n/a
Account #2 Account #4
Description Total Project Cost: $1,000,000
This project funds new equipment for a new satellite fire station scheduled to be constructed in 2013.
Justification
Response times from the other two fire stations will be unacceptable for the new commercial and residential development that will surround the
212 corridor.
Expenditures 2011 2012 2013 2014 2015 Total
Equipment 1,000,000 1,000,000
Total
Type Equipment
Useful Life 20 years
Category Fire
1,000,000
Funding Sources 2011 2012 2013 2014 2015 Total
Capital Replacement Fund 500,000 500,000
GO Bonds 500,000 500,000
Total 1,000,000 1,000,000
Budget Impact/Other I
Chese purchases will include a limited warranty and will reduce the annual maintenance and repair costs.
Capital Improvement Program 2011 thru 2015
City of Chanhassen, MN
Project # EQ -091
Project Name Excavator
Account #1 400 - 0000 -4705
Account #2 700 - 7025 -4705
Account #3 701- 7025 -4705
Account #4 720 - 7025 -4705
Department Major Equipment
Contact Paul Oehme
Type Equipment
Useful Life
Category Public Works
Priority n/a
Total Project Cost: $100,000
is for the replacement of the City's rubber tire backhoe with a used track excavator. The City's backhoe is a 1989 model that is 21 years old.
Justification
Currently the City is renting an excavator or hiring a contractor to complete excavation projects. These projects include watermain breaks, sewer
pipe repairs and storm sewer pipe improvements. The City's backhoe is not large enough and does not have the necessary features to complete
these tasks. The pay back for purchasing an excavator is estimated at 2 years.
Expenditures 2011 2012 2013 2014 2015 Total
Equipment 100,000 100,000
Total 100,000 100,000
Funding Sources 2011 2012 2013 2014 2015 Total
Capital Replacement Fund 10,000 10,000
Sewer Utility Fund 30,000 30,000
Surface Water Utility Fund 30,000 30,000
Water Utility Fund 30,000 30,000
Total 100,000 100,000
Capital Improvement Program 2011 thru 2015 Department Major Equipment
City of Chanhassen, MN Contact Richard Rice
Project # EQ -092 Type Equipment
Useful Life 7 -10 years
Project name Fire Pager Replacement Category Fire
Account #1 400 - 4127 -4705 Account #3 Priority n/a
Account #2 Account #4
Description Total Project Cost: $12,000
In 2013, the FCC will be making changes to the fire paging frequencies. A consequence of these changes is that older model pagers will become
inoperable. The fire department expects that approximately 30 fire pagers will have to be replaced in 2013.
Justification
Each member of the fire department must have a pager in order to respond to calls.
Expenditures 201 2012 2013 2014 2 015 Total
Equipment 12,000 12,000
Total
12,000
12,000
Funding Sources 2011 20 2013 2014 20 15 Total
Capital Replacement Fund 12,000 12,000
Total 12,000 12,000
Budget Impact/Other
there should be no operational impact from this purchase. The current maintenance budget will accommodate for this addition.
Capital Improvement Program 2011 thru 2015 Department Major Equipment
City of Chanhassen, MN Contact Richard Rice
Project # EQ -093 Type Equipment
Useful Lite 7 -10 years
Project Name Thermal Cameras Category Fire
Account #1 400 - 4127 -4705 Account #3 Priority n/a
Account #2 Account #4
Description Total Project Cost: $30,000
Thermal cameras are critical tools necessary for rescue operations at fire scenes. They are also a vital part of firefighter safety during interior fire
suppression actions.
Justification
Two thermal cameras are 7 -10 years old and should be replaced. These cameras have outdated technology, require frequent repairs and are
becoming unreliable.
Expenditures 2011 2012 2613 2014 2015 Total
Equipment 15,000 15,000 30,000
Total 15,000 15,000 30,000
Funding Sources 2011 2012 2013 2014 2015 Total
Capital Replacement Fund 15,000 15,000 30,000
Total 15,000 15,000 30,000
Budget Impact/Other
There should be no operational impact from this purchase. The current maintenance budget will accommodate for this addition.
Capital Improvement Program 2011 Mru 2015
Department Major Equipment
City of Chanhassen, MN Contact Richard Rice
ject # EQ -094 Type Equipment
Useful Life 7 -10 years
ject name portable Radios Category Fire
Account #1 400 - 4122 -4705 Account #3 Priority n/a
Account #2 Account 94
icription Total Project Cost: $16,000
fire department utilizes 800 MHz radios to communicate at fire and rescue scenes. The radios also allow for communication with other
)unding departments, Carver County Sheriff deputies and various other agencies at the local, state and federal levels.
Justification
To achieve optimum firefighter safety there must be one radio for each firefighter on first due engines. Currently, there are two front line engines
that only have 2 radios which must be shared by 4 firefighters. We need to add two radios each to E11 and E21
should be no operational impact from this purchase. The current maintenance budget will accommodate for this addition.
Expenditures 2011
2012 2013
2014 2015
Total
Equipment
8,000
8,000
16,000
Total
Funding Sources 2011
8,000
2012 2013
8,000
2014 2015
16,000
Total
Capital Replacement Fund
8,000
8,000
16,000
Total
8,000
8,000
16,000
should be no operational impact from this purchase. The current maintenance budget will accommodate for this addition.
Capital Improvement Program
City of Chanhassen, MN
2011 thru 2015
Department Major Equipment
Contact Todd Hoffman
Project # EQ -095
Project Name Skid loader - Parks
Account #1 400 - 4119 -4705
Account #2
Description
1 1002 753H Bobcat ( #413)
Type Equipment
Useful Life
Category Park
Account #3 Priority n/a
Account #4
Total Project Cost: $43,000
Justification
This piece of equipment is used extensively by the park department for construction projects.
Expenditures 2011 2012 2013
2014 2015
Total
Equipment
43,000
43,000
Total
Funding Sources 2011 2012 2013
43,000
2014 2015
43,000
Total
Capital Replacement Fund
43,000
43,000
Total
43,000
43,000
Capital Improvement Program 2011 rhru 2015
City of Chanhassen, MN
Project # EQ -096
Project Name Skid loader Tracks - Parks
Account #1 400 - 4119 -4705 Account #3
Account #2 Account #4
D esc rip tion
teWacement of rubber tracks for skid loader.
Justification
every three years these tracks have to be replaced because of wear.
Department Major Equipment
Contact Todd Hoffman
Type Equipment
Useful Life
Category Park
Priority n/a
Total Project Cost: $15,000
Prior Expenditures 2011 2012 2013 2014 2015 Total
7,500 Equipment 7,500 7,500
Total Total 7,500 7,500
Prior Funding Sources 2011 2012 2013 2014 2015 Total
F --- 7,5 - 0 - 0 - 1 Capital Replacement Fund 7,500 7,500
Total Total 7,500 7,500
bWact/Other
Capital Improvement Program
City of Chanhassen, MN
2011 thru 2015 Department Major Equipment
Contact Paul Oehme
Project # EQ -097
Project name Portable Generator - Utility Department
Account #1 701 - 7025 -4705
Account #2
Descrip
1984 7.5 khw Generator ( #310)
Type Equipment
Useful Life
Category Utilities
Account #3 Priority n/a
Account #4
Total Project Cost: $17,000
Justification
This generator is used for generation of power for lift stations when power is interrupted. The City maintains 31 lift stations and most of the lift
stations do not have onsite standby generation. Generators for lift stations need to be in good working order when needed.
hWact/Other
Expenditures 2011
2012 2013 2014 2015
Total
Equipment
17,000
17,000
Total
Funding Sources 2011
17,000
2012 2013 2014 2015
17,000
Total
Sewer Utility Fund
17,000
17,000
Total
17,000
17,000
hWact/Other
Capital Improvement Program 2011 thru 2015
City of Chanhassen, MN
Project # EQ -098
Project Name Loader Mounted Snow Blower
Account #1 400 - 0000 -4705 Account #3
Account #2 Account #4
Department Major Equipment
Contact Paul Oehme
Type Equipment
Useful Life
Category Public Works
Priority n/a
Total Project Cost: $141,000
1989 Loader Mounted Snow Blower
Justification
This snow blower is used by the street and park departments for removal of snow primarily in the downtown and library parking lot. For large
snow events or when snow piles up, snow needs to be removed from the downtown because of lack of storage space.
Expenditures
2011 2012 2013 2014 2015 Total
Equipment 141,000 141,000
Total 141,000 141,000
Funding Sources 2011 2012 2013 2014 2015 Total
Capital Replacement Fund 141,000 141,000
Total 141,000 141,000
Capital Improvement Program 2011 rhru 2015
City of Chanhassen, MN
Project # EQ -099
Project Name Sweeper - Parks
Account #1 400 - 0000 -4705
Account #2
1999 Tenant Sweeper ( #470)
Department Major Equipment
Contact Todd Hoffman
Type Equipment
Useful Life
Category Park
Account #3 Priority n/a
Account #4
Total Project Cost: $33,000
Justification
This piece of equipment is used by the park department to sweep downtown sidewalks, trails, tennis courts and play areas. The sweeper is used in
areas where the larger sweeper can not be used.
Expenditures 2011 2012 2013 2014 2015 Total
Equipment 33,000 33,000
Total 33,000 33,000
Funding Sources 2011 2012 2013 2014 2015 Total
Capital Replacement Fund 33,000 33,000
Total 33,000 33,000
Capital Improvement Program
City of Chanhassen, MN
2011 thru 2015
Department Major Equipment
Contact Todd Hoffman
Project # EQ -100
Project name Light Duty Trucks - Parks
Type Vehicles
Useful Life
Category Park
Account #1 400 - 4120 -4704
Account #2
Description
Account #3
Account #4
Priority
Total Project Cost:
n/a
$105,000
1995 Chevrolet 3/4 ton pickup with plow ( #414)
1995 Chevrolet 3/4 ton pickup with plow ( #415)
2002 Chevrolet 3/4 ton pickup with plow (#422)
Justification
Expenditures
2011 2012 2013
2014 2015
Total
Vehicles
65,000
40,000
105,000
Total
Funding Sources
65,000
2011 2012 2013
40,000
2014 2015
105,000
Total
Capital Replacement Fund
65,000
40,000
105,000
Total
65,000
40,000
105,000
bWact/Other
Capital Improvement Program
City of Chanhassen, MN
2011 thru 2015
Department Major Equipment
Contact Paul Oehme
Project # EQ -101
Project Name Skid loader -Utility Department
Account #1 700 - 7025 -4705
Account #2 701 - 7025 -4705
Description
1997 863H Bobcat Skid loader ( #318)
Type Equipment
Useful Life
Category Utilities
Account #3 Priority n/a
Account #4
Total Project Cost: $48,000
Justification
Ibis piece of equipment is used by the utility department for water main breaks and other utility construction projects. It will be 14 years old when
t is replaced.
Expenditures 2011 2012 2013 2014 201 Total
Equipment 48,000 48,000
Total 48,000
Funding Sources 2011 2012 201 2014 2015 Total
48,000
Sewer Utility Fund 24,000 24,000
Water Utility Fund 24,000 24,000
Total 48,000 48,000
Capital Improvement Program
City of Chanhassen, MN
2011 thru 2015
Department Major Equipment
Contact Todd Hoffman
Project # EQ -103
Project Name Light Weight Vehicle - Park
Account #1 400 - 0000 -4704
Account #2
Description
1997 Toro 3300 Workman ( #475)
Type Vehicles
Useful Life
Category Park
Account #3 Priority n/a
Account #4
Total Project Cost: $22,000
Justification
(This vehicle is used for ballfield maintenance and park projects. It will be 17 years old when it is replaced.
Expenditure 2011
2012 2013 2014 2015
Total
Vehicles
22,000
22,000
Total
Funding Sources 2011
22,000
2012 2013 2014 2015
22,000
Total
Capital Replacement Fund
22,000
22,000
Total
22,000
22,000
Impact/Other
Capital Improvement Program 2011 Mru 2015
City of Chanhassen, MN
Project # EQ -104
Project Name Mower Replacement - Park
Department
Major Equipment
Contact
Todd Hoffman
Type
Equipment
Useful Life
Category
Park
Account #1 400 - 00004705 Account #3 Priority n/a
Account #2 Account #4
escription Total Project Cost: $249,000
12 - 1998 Toro 560D ( #452)
14 - 2000 Toro 580D ( #453)
15 - 1996 Toro 325D ( #465)
15 - 1998 Toro 325D (#466)
Justification
The City currently has 4 high - production grounds mowers. Each machine is used daily during the growing season and needs to be in good
workin¢ condition.
Expenditures 2011 2012 2013 2014 2015 Total
Equipment 90,000 95,000 64,000 249,000
Total 90,000 95,000 64,000 249,000
Funding Sources 2011 2012 2013 2014 2015 Total
Capital Replacement Fund 90,000 95,000 64,000 249,000
Total 90,000 95,000 64,000 249,000
Capital Improvement Program 2011 thru 2015
City of Chanhassen, MN
Project # EQ -105
Project Name Skid loader - Street Department
Account #1 400 - 0000 -4705 Account #3
Account #2 Account #4
Description
1000 863H Bobcat ( #149)
Department Major Equipment
Contact Paul Oehme
Type Equipment
Useful Life
Category Street Equipment
Priority n/a
Total Project Cost: $40,000
Justification I
This piece of equipment is used extensively by the street department for construction projects.
Expen d i tures 2011 2012 2013 2014 2015 Total
Equipment 40,000 40,000
Total 40,000 40,000
Funding Sources 2011 2012 2013 2014 2015 Total
Capital Replacement Fund 40,000 40,000
Total 40,000 40,000
Capital Improvement Program
City of Chanhassen, MN
2011 thru 2015 Department Major Equipment
Contact Todd Hoffman
Project # EQ -106
Projeet name Tractor Replacement - Park
Account #1 400 - 0000 -4705 Account #3
Account #2 Account #4
Description
Chese tractors are used for field maintenance at park facilities
>,014 - 1997 John Deere 455 ( #468)
>.014 - 1999 John Deere 455 ( #469)
Type Equipment
Useful Life
Category Park
Priority n/a
Total Project Cost: $30,000
Justification
These tractors are used for maintenance and upkeep of baseball fields. The tractors will be 15 and 17 years old before they are replaced.
Expenditures 2011 2012 2013 2014 2015 Total
Equipment 30,000 30,000
Total 30,000 30,000
Funding Sources 2011 2012 2013 2014 2015 Total
Capital Replacement Fund 30,000 30,000
Total 30,000 30,000
Budget Impact/Other
Capital Improvement Program 2011 thru 2015 Department Major Equipment
City of Chanhassen, MN Contact Greg Sticha
Project # EQ -108 Type Equipment
Useful Life
Project Name Springbrook Version 7 Software Upgrade Category Finance
Account #1 400 - 0000 -4707 Account #3 701 - 7025 -4707 Priority n/a
Account #2 700 - 7025 -4707 Account #4 720 - 7025 -4707
Description Total Project Cost: $25,725
In order to provide enhanced customer and employee services, we are requesting an upgrade to our financial, payroll, human resources and utility
billing software to the newest version.
Justification
This upgrade will allow for a more customer friendly on -line utility billing interface, as well as an upgrade to the payroll and human resources
module that will allow for online time entry and employee human resource services.
Expen ditures 2011 2012 2013 2014 2015 Total
Equipment 25,725 25,725
Total 25,725
Funding Sources
Capital Replacement Fund
Sewer Utility Fund
Surface Water Utility Fund
Water Utility Fund
Total
25,725
2011 2012 2013 2014 2015 Total
19,294 19,294
2,573 2,573
1,285 1,285
2,573 2,573
25,725 25,725
Budget hnpact/Other
Capital Improvement Program 2011 thru 2015 Department Major Equipment
City of Chanhassen, MN Contact Paul Oehme
Project # EQ -109 Type Equipment
Useful Life
Project Name Bucket Truck Refurbish Category Street Equipment
Account #1 Account #3 Priority n/a
Account #2 Account #4
Description Total Project Cost: $30,000
tefurbish the bucket truck subframe under the bed of the truck. This frame supports the pedestal for the broom. This truck was purchased in 1996
and is not scheduled to be replaced for another 10 years.
Justification
The subframe under the bed of the truck is rusted and will not pass the annual safety inspection.
Expenditures 2011 2012 2013 2014 2015 Total
Equipment 30,000 30,000
Total 30,000 30,000
Funding Sources 2011 2012 2013 2014 2015 Total
Capital Replacement Fund 30,000 30,000
Total 30,000 30,000
Capital Improvement Program 2011 thru 2015
City of Chanhassen, NW
Project # EQ -110
Project Name Vactor /Sewer Jetting Truck
Account #1 701 - 7025 -4704
Account #2 700 - 7025 -4704
Expenditures 2011 2012 2013 2014 2015 Total
Equipment 425,000 425,000
Department Major Equipment
Contact Paul Oehme
Type Equipment
Useful Life
Category Utilities
Priority n/a
Description Total Project Cost: $425,000
['his truck was purchased by the City in 2000 and will be 15 years old when it will be replaced. This truck is used mainly by the utility department
or sewer jetting, emergency sewer back -ups, watermain breaks and delicate excavations around utilities. This truck has to be reliable and in good
vorking condition because of the projects and emergency calls it is used for.
Justification
To have the truck as reliable as possible with minimal downtime.
Account #3
Account #4
Total 425,000 425,000
Funding Sources 2011 2012 2013 2014 2015 Total
Sewer Utility Fund 325,000 325,000
Water Utility Fund 100,000 100,000
Total 425,000 425,000
Budget Impact/Other
Capital Improvement Program
City of Chanhassen, MN
2011 thru 2015
Department Major Equipment
Contact Todd Hoffman
Project # EQ -111
Project Name Paint Striper
Type Equipment
Useful Life
Category Park
Account #1 Account #3 Priority n/a
Account #2 Account #4
Description Total Project Cost: $19,000
Zeplace existing riding paint striper used for painting athletic fields.
Justification
The City stripes 15 ballfields and 20 soccer fields, going through 50 fifty gallons of paint a week.
Expenditures 2011
2012 2013
2014 2015 Total
Equipment
19,000
19,000
Total
Funding Sources 2011
19,000
2012 2013
19,000
2014 2015 Total
Capital Replacement Fund
19,000
19,000
Total
19,000
19,000
bWact/Other
Capital Improvement Program 2011 thru 2015
City of Chanhassen, MN
Project # EQ -112
Project ]name Hydro Seeder
Department Major Equipment
Contact Todd Hoffman
Type Equipment
Useful Life
Category Park
Account #1 Account #3 Priority n/a
Account #2 Account #4
Description Total Project Cost: $5,000
the hydro seeder is used for smaller areas of reseeding and mulching all in one operation.
Justification
Will be used by all departments on smaller lawn restoration projects. It speeds up grass growth and helps stop erosion problems.
Expenditures 2011 2012 2013 2014 2015 Total
Equipment 5,000 5,000
Total 5,000 5,000
Funding Sources 2011 2012 2013 2014 2015 Total
Capital Replacement Fund 5,000 5,000
Total 5,000 5,000
Budget Impact/Other
Capital Improvement Program
City of Chanhassen, MN
2011 thru 2015
Department Major Equipment
Contact Richard Rice
Project # EQ -113
Project Name Refurbish Engine 12 ( #212)
Type Equipment
Useful Life
Category Fire
Account #1 Account #3 Priority n/a
Account #2 Account #4
Description Total Project Cost: $15,000
'aint, repair and replace deteriorated body panels and interior components of engine 12.
Justification
Firetruck refurbishment will extend the service life of the unit and delay the need to replace the truck.
Impact/Other
Expenditures 2011
2012 2013 2014 2015
Total
Maintenance
15,000
15,000
Total
Funding Sources 2011
15,000
2012 2013 2014 2015
15,000
Total
Capital Replacement Fund
15,000
15,000
Total
15,000
15,000
Impact/Other
Capital Improvement Program 2011 thru 2015
City of Chanhassen, MN
Project # EQ -114
Project Name Refurbish Engine 11 ( #211)
Account #1
Account #2
Account #3
Account #4
Department Major Equipment
Contact Richard Rice
Type Maintenance
Useful Life
Category Fire
Priority n/a
Total Project Cost: $15,000
repair and replace deteriorated body panels and interior components of engine 11.
I Justification
Firetruck refurbishment will extend the service life of the unit and delay the need to replace the truck.
Expenditures
2011 2012 2013 2014 2015 Total
Maintenance 15,000 15,000
Total 15,000 15,000
Funding Sources 2011 2012 2013 2014 2015 Total
Capital Replacem Fund 15,000 15,000
Total 15,000 15,000
Capital Improvement Program 2011 Mru 2015
City of Chanhassen, MN
Project # EQ -115
Project Name B rush Chipper
Account #1 400 - 00004705
Account #2
Expenditures 2011 2012 2013 2014 2015 Total
Equipment 56,000 56,000
Department Major Equipment
Contact Paul Oehme
Type Equipment
Useful Life
Category Street Equipment
Priority n/a
Description I Total Project Cost: $56,000
Phis item is to replace the brush and tree limb chipper. This unit will be 16 years old when it is replaced. This unit is used heavily year round by
ill the public works departments and needs to be in good working condition.
Justification
I To keep equipment in good repair. This purchase is consistent with the vehicle replacement program.
Account #3
Account #4
Total 56,000 56,000
Funding Sources 2011 2012 2013 2014 2015 Total
Capital Replacement Fund 56,000 56,000
Total 56,000 56,000
Budget Impact/Other
Capital Improvement Program 2011 thru 2015 Department Major Equipment
City of Chanhassen, NW Contact Paul Oehme
Project # EQ -116 Type Vehicles
Useful Life
Project Name Watermain Break Supply Van Category utilities
Account #1 700 - 7025 -4704 Account #3 Priority n/a
Account #2 Account #4
Description I Total Project Cost: $20,000
This item is to replace the 1973 watermain break supply van. This van is used to transport parts, generator and temporary utility lights to the job
site. The van is starting to show signs of needing major repairs and it is advisable to replace the van before major repairs are needed. The
replacement for this van will be a used van.
Justification
To avoid costly maintenance and repairs and to keep equipment in good repair.
Expenditures 2011 2012 2013 2014 2015 Total
Vehicles 20,000 20,000
Total 20,000 20,000
Funding Sources 2011 2012 2013 2014 2015 Total
Water Utility Fund 20,000 20,000
Total 20,000 20,000
Capital Improvement Program 2011 thru 2015
City of Chanhassen, MN
Project # EQ -117
Project Name B erti Rear Mount Mower
Account #1 400 - 0000 -4705
Account #2
Description
[his purchase is required to maintain a reliable piece of equipment of mowing.
Account #3
Account #4
Department Major Equipment
Contact Todd Hoffman
Type Equipment
Useful Life
Category Park
Priority n/a
Total Project Cost: $10,000
Justification
This tractor mounted attachment was purchased in 2006 and is used to mow the 500 acre park system, which features 5 community parks, 22
neighborhood parks and 55 miles of trails and sidewalks. Mowing is done in the parks and along the trails and sidewalks which is hard on
equipment. Growth in the park system creates additional work for this mower. This equipment purchase is consistent with the equipment
replacement schedule.
Expenditures 2011 2012 2013 2014 2015 Total
Equipment 10,000 10,000
Total 10,000 10,000
Funding Sources 2011 2012 2013 2014 2015 Total
Capital Replacement Fund 10,000 10,000
Total 10,000 10,000
Budget Impact/Other
Capital Improvement Program 2011 Mru 2015
City of Chanhassen, MN
Project # EQ -118
Project Name Street Sweeper
Account #1 400 - 0000 -4705
Account #2
Account #3
Account #4
Description
Chis purchase is required to maintain a reliable piece of equipment for street sweeping.
136 Elgin Eagle Street Sweeper
Department Major Equipment
Contact Paul Oehme
Type Equipment
Useful Life
Category Street Equipment
Priority n/a
Total Project Cost: $281,000
Justification
Mis piece of equipment was purchased in 2003 and provides street sweeping for the 108 miles of local streets within the City of Chanhassen. The
,treet department sweeps all the streets at least once a year starting as soon as weather permits in the spring. This piece of equipment is also used
pring through fall to maintain safe streets void of debris that accumulates from storms, construction and general use. Street sweeping is also part
)f the City's MS4 permit requirement. This equipment purchase is consistent with the equipment replacement schedule.
Total 281,000 281,000
Funding Sources 2011 2012 2013 2014 2015 Total
Expenditures 2011 2012 2013 2014 2015 Total
Equipment 281,000 281,000
Capital Replacement Fund 281,000 281,000
Total 281,000 281,000
Capital Improvement Program 2011 rhru 2015
City of Chanhassen, MN
Project # EQ -119
Project name Elliptical Machine Replacement - Fire Station #1
Account #1 400 - 4127 -4705
Account #2
Account #3
Account #4
Description I
[ he current elliptical machine has reached the end of it's useful life.
Department Major Equipment
Contact Laurie Hokkanen
Type Equipment
Useful Life
Category Fire
Priority n/a
Total Project Cost: $5,000
Justification I
IThe City will pay 50% and the Fire Relief will pay 50 %.
Expenditures 2011 2012
2013 2014 2015 Total
Equipment 5,000 5,000
Total 6A00 5,000
Funding Sources 2011 2012 2013 2014 2015 Total
Capital Replacement Fund 5,000 5,000
Total 5,000 5,000
o operational impact from this purchase.
Capital Improvement Program 2011 thru 2015 Department Major Equipment
City of Chanhassen, MN Contact Laurie Hokkanen
Project # EQ -120
Type Improvement
Useful Life
Project Name Website Improvements
Category Administration
Account #1 210 - 0000 -4706 Account #3 Priority n/a
Account #2 Account #4
Description Total Project Cost: $20,000
The City website was last updated in 2002. The site receives over 3 million hits per year. City staff recommends improvements to make it more
user friendly and add additional information.
Justification
The website is used extensively by citizens, businesses and staff.
Expenditures 2011 2012 2013 2014 2015 Total
Planning /Design 20,000 20,000
Total 20,000 20,000
Funding Sources 2011 2012 2013 2014 2015 Total
Cable TV Fund 20,000 20,000
Total 20,000 20,000
Budget Impact/Other
Capital Improvement Program 2011 Mru 2015 Department Municipal Buildings
City of Chanhassen, NW Contact Richard Rice
jest # MB -009
Type Improvement
Useful Life 30 Years
ject Name Fire Station 3
Category Fire
Account #1 Account #3 Priority n/a
Account #2 Account #4
scription Total Project Cost: $2,000,000
is for the proposed third fire station to be built in the southern area of the city which is currently being developed.
Justification
(Response time from the other two stations will be unacceptable for the new commercial and residential development that will surround the 212
,et Impact/Other
will need to be additional hiring for firefighters to staff the third station.
Expenditures 2011
2012 2013 2014
2015 Total
Construction
2,000,000
2,000,000
Total
Funding Sources 2011
2,000,000
2012 2013 2014
2,000,000
2015 Total
GO Bonds
2,000,000
2,000,000
Total
2,000,000
2,000,000
,et Impact/Other
will need to be additional hiring for firefighters to staff the third station.
Capital Improvement Program
City of Chanhassen, MN
2011 thru 2015 Department Municipal Buildings
Contact Laurie Hokkanen
Project # MB -010
Type Improvement
Useful Life
Project Name City Hall Remodel
Category Administration
Account #1 400 -4142- Account #3 Priority n/a
Account #2 Account #4
Descrip Total Project Cost: $125,000
Remodel and refurbish areas of City Hall that need paint, carpet or storage areas added.
Justification I
I Certain areas of City Hall will be in need of some small repair and maintenance needs in 2013.
Expenditures 2011
2012 2013 2014
2015 Total
Maintenance
125,000
125,000
Total
Funding Sources 2011
125,000
2012 2013 2014
125,000
2015 Total
Capital Replacement Fund
125,000
125,000
Total
125,000
125,000
Capital Improvement Program 2011 Mru 2015
City of Chanhassen, MN
Project # MB -014
Project Name City Hall North Parking Lot
Account #1
Account #2
Account #3
Account #4
Department Municipal Buildings
Contact Paul Oehme
Type Improvement
Useful Life
Category Streets/Highways
Priority n/a
)n Total Project Cost: $280,000
of a 70 stall permeable blacktop parking lot on the north side of City Hall. The Other Agency Contribution will be from the Watershed
Justification
Needed to relieve parking congestion at City Hall.
Expenditures 2011 2012 2013 2014 2015 Total
Construction 280,000 280,000
Total 280,000 280,000
Funding Sources 2011 2012 2013 2014 2015 Total
Other Agency Contribution 140,000 140,000
Surface Water Utility Fund 140,000 140,000
Total 280,000 280,000
Capital Improvement Program 2011 thru 2015
City of Chanhassen, MN
Project # MB -015
Project dame Engineering Copy Area Renovation
Department
Municipal Buildings
Contact
Paul Oehme
Type
Improvement
Useful Life
10,000
2011 2012
Category
Engineering
Account #1 Account #3 Priority n/a
Account #2 Account #4
Description Total Project Cost: $10,000
[be copy area in the engineering department is used by all the departments at City Hall for making copies and plotting large prints or displays.
Ibis area used to have work stations for summer help, but is now used by the printers. The summer help have to use the engineering conference
oom as a work station. This is not as productive and makes the engineering conference room unavailable for meetings. The improvements
)]armed are to remove the bathrooms in the engineering office area and convert them into a copy and printer room. This area would also be
)tilized for storage of hanging files such as plans and plats.
Justification
(Will allow for a more efficient work space.
Expenditures
2011 2012
2013 2014 2015 Total
Construction
10,000
10,000
Total
Funding Sources
10,000
2011 2012
10,000
2013 2014 2015 Total
Capital Replacement Fund
10,000
10,000
Total
10,000
10,000
Budget Impact/Other
Capital Improvement Program 2011 Mru 2015
City of Chanhassen, MN
Project # MB -016
Project Name City Hall Parking Lot Expansion
Account #1 Account #3
Account #2 Account #4
Descripti
,xpansion of the lower east parking lot at City Hall adding ten new spaces.
Department
Municipal Buildings
Contact
Paul Oehme
Type
Improvement
Useful Life
Category
Engineering
Priority
n/a
Total Project Cost: $70,000
Justification
(Additional parking capacity is needed for City Hall, senior center, library and park.
Expenditures
2011 2012 2013 2014 2015 T otal
Construction 70,000 70,000
Total 70,000 70,000
Funding Sources 2011 2012 2013 2014 2015 Total
Capital Replacement Fund 70,000 70,000
Total 70,000 70,000
Capital Improvement Program
City of Chanhassen, MN
2011 thru 2015 Department Municipal Buildings
Contact Richard Rice
Project # MB -017
Project Name Fire Station 1 Repainting and Carpeting
Account #1 Account #3
Account #2 Account #4
Description
tepaint the interior and replace the carpeting in Fire Station 1.
Type Improvement
Useful Life
Category Fire
Priority n/a
Total Project Cost: $10,000
Justification
The paint and carpet are approximately 8 - 10 years old and are very worn and deteriorated. The building is open to the public and is used as a
polling place. The appearance of the worn carpet and paint presents a poor image to the public.
Budget Impact/Other
Expenditures
2011 2012
2013 2014 2015 Total
Maintenance
10,000
10,000
Total
Funding Sources
10,000
2011 2012
10,000
2013 2014 2015 Total
Capital Replac Fund
10,000
10,000
Total
10,000
10,000
Budget Impact/Other
Capital Improvement Program 2011 thru 2015
City of Chanhassen, MN
Project # PK &T -042
Project Name P icnic Tables/Park Benches
Account #1 410 - 000 -4705 Account #3
Account #2 Account #4
Description I
'urchase of picnic tables and park benches.
Department Park & Trail Improvements
Contact Todd Hoffman
Type Improvement
Useful Life 30 Years
Category Park
Priority n/a
Total Project Cost: $76,000
I Justification I
New tables and benches are needed annually to replace old stock and meet new needs.
Prior Expenditures 2011 2012 2013 2014 2015 Total
F - 2 - 6,70 - 0 1 Equipment 10,000 10,000 10,000 10,000 10,000 50,000
Total Total 10,000 10,000 10,000 10,000 10,000 50,000
Prior Funding Sources
26,000 Park Dedication Fund
Total
2011 2012 2013 2014 2015 Total
10,000 10,000 10,000 10, 10,000 50,000
Total 10,000 10,000 10,000 10,000 10,000 50,000
Budget bWact/Other
Capital Improvement Program 2011 thru 2015
City of Chanhassen, MN
Project # PK &T -043
Project Name Trees
Account #1 410- 0000 -4701
Account #2
Account #3
Account #4
Department Park & Trail Improvements
Contact Todd Hoffman
Type Improvement
Useful Life 50 Years
Category Park
Priority n/a
Description I Total Project Cost: $175,000
annual tree planting program. This program is proposed to be accelerated to mitigate the affects of Emerald Ash Borer.
Justification
(Parklands and other City properties experience tree loss annually, due to storm damage, disease, stress, etc.
Prior Expenditures
2011
2012
2013
2014
2015
Total
Future
F -7 4 - 0 — ,00 - 0 1 Land Improvement
25,000
25,000
25,000
25,000
25,000
125,000
10,000
Total
Total 25,000
25,000
25,000
25,000
25,000
125,000
Total
Prior Funding Sources
40,000 Park Dedication Fund
Total
2 011 2012 2013 2014 2015 Total Future
25,000 25,000 25,000 25,000 25,000 125,000 1Q000
Total 25,000 25,000 25,000 25,000 25,000 125,000 Total.
Capital Improvement Program 2011 Mru 2015
City of Chanhassen, MN
Project # PK &T -069
Project Name Hwy 41 Pedestrian Underpass /Trail Grant Match
Department
Park & Trail Improvements
Contact
Todd Hoffman
Type
Improvement
Useful Life
50 Years
Category
Park
Account #1 410 - 0000 -4706 Account #3 Priority n/a
Account #2 Account #4
Description Total Project Cost: $400,000
�arver County has applied for a federal grant to provide these improvements. The City originally supported the application by pledging a
6125,000 matching contribution. However, project engineering and increased project costs have resulted in the City share of the budget to be re-
,stimated at $400,000.
Justification
k pedestrian underpass to Minnewashta Regional Park is a highly sought after improvement. The project also completes a one mile section of trail
idjacent to State Highway 41 identified in the City's Comprehensive Plan.
Expenditures
2011 2012
2013 2014 2015 Total
Construction
400,000
400,000
Total
Funding Sources
400,000
2011 2012
400,000
2013 2014 2015 Total
Park Dedication Fund
400,000
400,000
Total
400,000
400,000
Budget Impact/Other
Maintenance and operations costs. Will need to be included in the pavement management program.
Capital Improvement Program 2011 thru 2015
City of Chanhassen, MN
Project # PK &T -072
Project Name Tennis Courts
Account #1 400 - 0000 -4706
Account #2
Account #3
Account #4
Department Park & Trail Improvements
Contact Todd Hoffman
Type Improvement
Useful Life 25 years
Category Park
Priority n/a
Description Total Project Cost: $200,000
to -build two courts at the Chanhassen Recreation Center, patch and resurface remainder of courts.
Justification
We have deliberately limited the number of courts constructed within our system to lower overall maintenance costs associated with tennis courts.
The courts we do offer are kept in playable condition through patching and resurfacing on a six to ten year cycle.
Expenditures
2011 2012 2013 2014 2015 Total
Maintenance 125,000 75,000 200,000
Total 125,000 75,000 200,000
Funding Sources 2011 2012 2013 2014 2015 Total
Capital Replacement Fund 125,000 75,000 200,000
Total 125,000 75,000 200,000
Budge Impact/O
maintenance and operations costs.
Capital Improvement Program
City of Chanhassen, MN
2011 thru 2015 Department Park & Trail Improvements
Contact Todd Hoffman
Project # PK &T -078
Project Name Pioneer Pass Park Acquisition
Account #1 Account #3
Account #2 Account #4
Description
kcquisition of a neighborhood park in the 2005 MUSA area.
Type Improvement
Useful Life 50 Years
Category Park
Priority n/a
Total Project Cost: $290,000
Justification
This acquisition satisfies a significant void in the City's comprehensive park plan. It will serve neighborhood park needs for over 500 homes
located within %: mile of its' location.
and operations costs.
Expenditures
2011 2012
2013 2014 2015 Total
Land Acquisition
290,000
290,000
Total
Funding Sources
290,000
2011 2012
290,000
2013 2014 2015 Total
Park Dedication Fund
290,000
290,000
Total
290,000
290,000
and operations costs.
Capital Improvement Program 2011 Mru 2015
City of Chanhassen, MN
Project # PK &T -079
Project name Recreation Center Fitness Equipment
Account #1 400 - 4145 -4705 Account #3
Account #2 Account #4
Description
'urchase of new fitness room equipment for the Recreation Center over a five year period.
Department
Park & Trail Improvements
Contact
Todd Hoffman
Type
Equipment
Useful Life
20,000
Category
Park
Priority
n/a
Total Project Cost: $50,000
Justification
The fitness room equipment has not been replaced since the opening of the Recreation Center in 1995. The equipment is now 14 years old with
many pieces nearing or past their useful life expectancy.
Prior Expenditures
30,000 Equipment
Total
Total 10,000 10,000 20,000
Prior Funding Sources
2011
2012 2013
2014 2015 Total
E -7 3 - 0,00 - 0 1 Capital Replacement Fund
10,000
10,000
20,000
Total Total
10,000
10,000
20,000
T otal
2011 2012 2013 2014 2015
10,000 10,000
20,000
Budget Impact/Other
Maintenance costs will be reduced.
Cap ital Imp rovement Pro 2011 Mru 2015
p p b� Department Park &Trail Improvements
City of Chanhassen, MN Contact Todd Hoffman
Project # PK &T -083 Type Improvement
Useful Life 30 Years
Project Name Bluff Creek Drive Gap Trail Category Park
g rJ'
Account #1 410 - 0000 -4710 Account #3 Priority n/a
Account #2 Account #4
Description Total Project Cost: $390,000
Construction of a 10 foot wide pedestrian trail along the east side of Bluff Creek Drive from south of Pioneer Trail to the Minnesota Valley LRT
trail head.
Justification
The Highway 212 improvement project included a pedestrian trail along the first 2,000 feet of Bluff Creek Drive. The resulting trail "gap"
represents a missing link in the City's trail system. Bluff Creek Drive is a difficult stretch of road to negotiate as a pedestrian in the absence of a
trail.
and operations costs. Will need to be included in the pavement management program.
Expenditures 2011
2012 2013 2014 2015
Total
Construction
390,000
390,000
Total
Funding Sources 2011
390,000
2012 2013 2014 2015
390,000
Total
Park Dedication Fund
390,000
390,000
Total
390,000
390,000
and operations costs. Will need to be included in the pavement management program.
Capital Improvement Program
City of Chanhassen, MN
2011 thru 2015 Department Park & Trail Improvements
Contact Todd Hoffman
Project # PK &T -085
Project Name Disc Golf Course Construction
Account #1 410 - 0000 -4705 Account #3
Account #2 Account #4
Description
- onstruction of a nine hole disc golf course in Bandimere Park.
Type Equipment
Useful Life 30 Years
Category Park
Priority n/a
Total Project Cost: $20,000
Justification
Disc golf is a very popular activity with many teenage and adult participants.
Expenditures 2011 2012 2013 2014 2015 Total
Equipment 20,000 20,000
Total 20,000 20,000
Funding Sources 2011 2012 2013 2014 2015 Total
Park Dedication Fund 20,000 20,000
Total 20,000 20,000
Budget Impact/Other
Annual maintenance costs of $50041,000.
Capital Improvement Program 2011 thru 2015 Department Park & Trail Improvements
City of Chanhassen, MN Contact Todd Hoffman
Project # PK &T -093 T y pe Equipment
Useful Life 10 -15 years
Project Name Skate Park Ramp Replacement & Asphalt Resurfacing Category Park
Account #1 400 - 0000 -4705 Account #3 Priority n/a
Account #2 Account #4
Description
Total Project Cost: $110,000
Zeplacement of the original skate park equipment with new equipment. The original equipment at the park was purchased in 1999, 2000 and
1003. The asphalt surface in both the skate park and hockey rink is in need of repair.
Justification
The skate park is one of the most highly visited recreation areas in the City. The existing equipment has deteriorated to a level that makes repairs
Budget Impact/Other
Expenditures 2011
2012 2013
2014 2015 Total
Maintenance
Equipment
55,000
55,000
55,000
55,000
Total
Funding Sources 2011
110,000
2012 2013
110,000
2014 2015 Total
Capital Replacement Fund
110,000
110,000
Total
110,000
110,000
Budget Impact/Other
Capital Improvement Program 2011 Mru 2015
City of Chanhassen, MN
Project # PK &T -098
Project name P edestrian Trail to Arboretum
Account #1 410 - 0000 -4710
Account #2
Account #3
Account #4
Department Park & Trail Improvements
Contact Todd Hoffman
Type Improvement
Useful Life
Category Park
Priority n/a
Description I Total Project Cost: $250,000
ten foot wide bituminous pedestrian trail located on the south side of State Highway 5, from Century Boulevard to the Minnesota Landscape
krboretum entry road. The total project cost will exceed $250,000, requiring additional funding partners /sources to be identified for the project.
Justification
Completing a pedestrianibicycle trail route to the Arboretum has been a long range goal for the City. The Arboretum will continue the trail from
their entrance into the property.
Expenditures 2011 2012 2013 2014 2015 Total
Construction 250,000 250,000
Total 250,000 250,000
Funding Sources 2011 2012 2013 2014 2015 Total
Park Dedication Fund 250,000 250,000
Total 250,000 250,000
Budget Impact/Other
Capital Improvement Program 2011 thru 2015 Department Park & Trail Improvements
City of Chanhassen, MN Contact Todd Hoffman
Project # PK &T -099 Type Improvement
Useful Life
Project Name Chanhassen Native Preserve Trail, Final Phase
Category Park
Account #1 410- 0000 -4710 Account #3 Priority n/a
Account #2 Account #4
Description Total Project Cost: $90,000
A 900 foot section of eight foot wide bituminous trail, located at the perimeter of Lot 2, Block 1 Arboretum Business Park 7th Addition.
Justification
I This section of trail is the final phase of a two mile trail loop around the Chanhassen Native Preserve. The trail project was initiated in 1995.
Budget Impact/Other I
Maintenance and operation costs. Will need to be included in the pavement management program.
Expenditures 2011
2012 2013 2014 2015
Total
Construction
90,000
90,000
Total
Funding Sources 2011
90,000
2012 2013 2014 2015
90,000
Total
Park Dedication Fund
90,000
90,000
Total
90,000
90,000
Budget Impact/Other I
Maintenance and operation costs. Will need to be included in the pavement management program.
Capital Improvement Program 2011 thru 2015 Department Park & Trail Improvements
City of Chanhassen, MN Contact Todd Hoffman
Project # PK &T -101 Type Improvement
Useful Life
Project Name Lyman Boulevard North Park Acquisition
Category Park
Account #1 Account #3 Priority n/a
Account #2 Account #4
Description Total Project Cost: $175,000
Acquisition and initial development of a neighborhood park in the area north of Lyman Boulevard, south of Highway 212, east of Quinn Road and
west of the Chanhassen/Eden Prairie border.
Justification
This acquisition satisfies a void in the City's Comprehensive Park Plan. This park will serve approximately 400 homes located within a 1/2 mile
neighborhood park service area.
hWact/Other
Expenditures 2011
2012 2013 2014 2015
Total
Construction
175,000
175,000
Total
Funding Sources 2011
175,000
2012 2013 2014 2015
175,000
Total
Park Dedication Fund
175,000
175,000
Total
175,000
175,000
hWact/Other
Capital Improvement Program 2011 thru 2015 Department Park & Trail Improvements
City of Chanhassen, MN Contact Todd Hoffman
Project # PK &T -108 Type Improvement
Useful Life
Project Name TH5 Pedestrian Underpass at Minnewashta Category Park
g
Account #1 410 - 0000 -4706 Account #3 Priority n/a
Account #2 Account #4
Description Total Project Cost: $1,000,000
f the City is successful in securing federal funds, this project will be included in MNDOT's resurfacing project for TH5 scheduled for 2012. The
>roject includes the installation of a box culvert under TH5 from Minnewashta Parkway to the Landscape Arboretum. This project is consistent
vith the Landscape Arboretum's comprehensive plan and the City's trail master plan.
Justification
To increase safety to pedestrians wanting to access the Landscape Arboretum.
Expenditures 2011 2012 2013 2014 2015 Total
Construction 1,000,000 1,000,000
Total 1,000,000 1,000,000
Funding Sources 2011 2012 2013 2014 2015 Total
Other Agency Contribution 920,000 920,000
Park Dedication Fund 80,000 80,000
Total 1,000,000 1,000,000
Budg I
vlaintenance and operation costs.
Capital Improvement Program 2011 Mru 2015
City of Chanhassen, MN
Project # PK &T -109
Project name Pioneer Pass Neighborhood Park Development
Account #1
Account #2
Account #3
Account #4
Department Park & Trail Improvements
Contact Todd Hoffman
Type Improvement
Useful Life
Category Park
Priority n/a
ascription Total Project Cost: $350,000
istruction of an 8.7 acre neighborhood park in southern Chanhassen. This property is being acquired through a combination of dedication and
purchase as a component of the Pioneer Pass housing development.
Justification
This new park is being acquired and developed to fulfill the neighborhood park needs of a large portion of the 2005 MUSA area. This is the first
new neighborhood park acquisition in the past 15 years.
Expenditures 2011 2012
2013 2014 2015 Total
Construction 350,000 350,000
Total 350,000 350,000
Funding Sources 2011 2012 2013 2014 2015 Total
Park Dedication Fund 350,000 350,000
Total 350,000 350,000
B udget Imp act / Other I
knnual operation and maintenance costs.
Capital Improvement Program 2011 thru 2015 Department Park & Trail Improvements
City of Chanh lv
assen, Contact Todd Hoffman
Project # PK &T -1
Type Improvement
Useful Life
Project Name H wy 41 Trail Extension/Stairway Category Park
Account #1 Account #3 Priority n/a
Account #2 Account #4
Description Total Project Cost: $250,000
?xtension of the Highway 41 trail from Minnetonka Middle School West to the intersection of Highway 7 and Highway 41 and construction of a
)edestrian stairway connecting to Highover Drive.
Justification
The current trail project being undertaken by Carver County in cooperation with the City terminates at Minnetonka Middle School West.
Extending the trail to Highway 7 will allow for a signalized at grade pedestrian crossing.
Expenditures 2011 2012 2013 2014 2015 Total
Construction 250,000 250,000
Total 250,000 250,000
Funding Sources 2011 2012 2013 2014 2015 Total
Park Dedication Fund 250,000 250,000
Total 250,000 250,000
need to be included in the pavement management program.
Capital Improvement Program 2011 thru 2015
Department Park &Trail Improvements
City of Chanhassen, MN Contact Todd Hoffman
)ject # PK &T -111 Type Improvement
Useful Life
)ject Name City Hall Landscaping Category Park
Account #1 400 - 0000 -4706 Account #3 Priority n/a
Account #2 Account #4
ascription Total Project Cost: $75,000
lating the landscaping around the perimeter of City Hall to blend with City Center Park and the library. Addition of exterior furniture to match
iiture in City Center Park.
Justification I
I The landscaping around City Hall is 30 years old and in need of updating.
Expenditures 2011 2012 2013 2014 2015 T otal
Maintenance 75,000 75,000
Total 75,000
Funding Sources 2011 2012 201 2014 2015 Total
75,000
Capital Replacement Fund 75,000 75,000
Total 75,000 75,000
Capital Improvement Program 2011 thru 2015 Department Park & Trail Improvements
City of Chanhassen, MN Contact Todd Hoffman
Project # PK &T -112 Type Improvement
Useful Life
Project Name Bandimere Park Tree Replacement Category Park
Account #1 Account #3 Priority n/a
Account #2 Account #4
Description Total Project Cost: $60,000
Bandimere park was opened in 2000. Dozens of the trees originally planted have perished due to stress or disease. Also, half of the planting
originally scheduled was not completed.
Justification
The presence of healthy shade trees in community parks ensures that visitors can seek relief from the sun.
Impact/Other
nce and trimming.
Expenditures 2011
2012 2013
2014 2015 Total
Maintenance
60,000
60,000
Total
Funding Sources 2011
60,000
2012 2013
60,000
2014 2015 Total
Capital Replacement Fund
Park Dedication Fund
30,000
30,000
30,000
30,000
Total
60,000
60,000
Impact/Other
nce and trimming.
Capital Improvement Program
City of Chanhassen, MN
2011 thru 2015 Department Park & Trail Improvements
Contact Todd Hoffman
Project # PK &T -113
Project Name Herman Field Park Half Court Basketball
Type Improvement
Useful Life
Category Park
Account #1 Account #3 Priority n/a
Account #2 Account #4
Description Total Project Cost: $10,000
' onstruction of a 50' by 50' asphalt half court basketball area with single hoop.
Justification
The park currently lacks amenities for teenagers.
Budget Impact/Other
Expenditures 2011
2012 2013
2014 2015 Total
Construction
10,000
10,000
Total
Funding Sources 2011
10,000
2012 2013
10,000
2014 2015 Total
Park Dedication Fund
10,000
10,000
Total
10,000
10,000
Budget Impact/Other
Capital Improvement Program
City of Chanhassen, MN
2011 thru 2015
Department Planning
Contact Kate Aanenson
Project # PL -002
Project Name County Rd 61 (old 212) Corridor Study
Type Improvement
Useful Life 10 -15 years
Category Planning
Account #1 Account #3 Priority n/a
Account #2 Account #4
cription Total Project Cost: $75,000
dor design along new County Road 61 and old State Highway 212.
Justification
The specific corridor study is an extension of the comprehensive plan identifying necessary improvements and developing configurements for
parcels along the right of way.
Expenditures 2011 2012 2013 2014 2015 Total
Planning /Design 75,000 75,000
Total 75,000 75,000
Funding Sources 2011 2012 2013 2014 2015 Total
Capital Replacement Fund 75,000 75,000
Total 75,000 75,000
B udget Impact/Other
the corridor study will identify development potential and specific infrastructure improvements needed for development.
Capital Improvement Program 2011 Mru 2015
City of Chanhassen, MN
Project # SS -012
Project ]name Inflow and Infiltration Abatement
Account #1 701- 7024 -4751
Account #2
Account #3
Account #4
Department Sanitary Sewer Improvements
Contact Paul Oehme
Type
Improvement
Useful Life
Unassigned
Category
Utilities
Priority
n/a
Description Total Project Cost: $900,000
this annual project includes televising, repairs and rehabilitation of existing sanitary sewer. The program also detects and eliminates points of
entry of ground water and surface water into the City sanitary sewer system. Projects have been identified from the 2006 Inflow and Infiltration
teport. The projects were reviewed by Metropolitan Council and approved in lieu of surcharge fees.
Justification
City staff has identified numerous older sewer lines that are in need of repair. The City of Chanhassen pays the Metropolitan Council for sewage
treatment. Those payments are based on the amount of flow generated by the City of Chanhassen. Surface water and ground water that makes its
way into the system either through breaks, displaced joints, manhole covers, or private connections to the system increase the amount charged to
the City for sewage disposal and increasing the load on the City's lift stations. Also, MCES would place a surcharge on the annual charge if the
City was not actively trying to reduce the inflow and infiltration problem.
Prior
Expenditures
2011
2012
2013
2014
2015
Total
400,000
Maintenance
200,000
75,000
75,000
75,000
75,000
500,000
Total
Total 200,000
75,000
75,000
75,000
75,000
500,000
Prior
Funding Sources
2011
2012
2013
2014
2015
Total
400,000
Sewer Utility Fund
200,000
75,000
75,000
75,000
75,000
500,000
Total
Total 200,000
75,000
75,000
75,000
75,000
500,000
B udget Impact/Other
[be efforts may decrease operational costs, MCES fees and emergency call outs. It is also the City's intent to use connection charges to help fund
or those costs. It is the City's belief that as new customers come on line those connection fees should help fund future infiltration problems.
Capital Improvement Program 2011 thru 2015 Department Sanitary Sewer Improvements
City of Chanhassen, MN Contact Paul Oehme
Project # SS -014 Type Improvement
Project Name Useful Life Unassigned
Sanitary Sewer Replacement Category Utilities
Account #1 701- 70254751 Account #3 Priority n/a
Account #2 Account #4
Description Total Project Cost: $850,000
Replacement or rehabilitation of existing sanitary sewer lines in conjunction with the reconstruction of the City street.
Justification
The City considers the condition of the existing utilities in the process to select streets for rehabilitation in an effort to realize cost savings by
consolidating these projects.
project will decrease maintenance costs.
Prior
Expenditures 2011
2012 2013
2014 2015
Total
F - 250 - , - 00 - 0 1
Construction
300,000
300,000
600,000
Total
Total
300,000
300,000
600,000
Prior
Funding Sources 2011
2012 2013
2014 2015
Total
7 - 25 - 5,75 - 51
Sewer Utility Fund
300,000
300,000
600,000
Total
Total
300,000
300,000
600,000
project will decrease maintenance costs.
Capital Improvement Program 2011 Mru 2015 Department Sanitary Sewer Improvements
City of Chanhassen, NW Contact Paul Oehme
Project # SS -017 Type Improvement
Useful Life Unassigned
Project Name Sanitary Lift Station Rehabilitation Program Category Utilities
Account #1 701 - 7025 -4751 Account #3 Priority n/a
Account #2 Account #4
Description Total Project Cost: $585,000
The sanitary lift station rehabilitation program is designed to minimize sewer backups and emergency calls due to failed lift station equipment. The
City currently maintains 31 lift stations. Many of these lift stations are high service pumps and need frequent servicing. The program will service
or replace pumps, pipe gallery, and electrical components as needed. The proposed lift stations scheduled for improvements over the next 5 years
are as follows:
2011 - #10 and #11
2012 - #16 and #21
2013 - #1, #22 and #25
2014 - #23
2015 - #17
Justification
Reduce emergency calls and potential sewer backups
I
Prior
Expenditures
2011
2012
2013
2014
2015
Total
300,000
Maintenance
90,000
50,000
65,000
40,000-
40,000
285,000
Total.
Total 90,000
50,000
65,000
40,000
40,000
285,000
Prior
Funding Sources
2011
2012
2013
2014
2015
Total
300,000
Sewer Utility Fund
90,000
50,000
65,000
40,000
40,000
285,000
Total
Total 90,000
50,000
65,000
40,000
40,000
285,000
Capital Improvement Program 2011 that 2015
P P Program Sanitary Sewer Improvements
City of Chanhassen, MN Contact Paul Oehme
Project # SS -020
Type Improvement
Useful Life
Project Name 2010 MUSA Sanitary Lift Station Category Utilities
Account #1 701 - 7025 -4702 Account #3 Priority n/a
Account #2 Account #4
Description Total Project Cost: $1,900,000
This lift station will be located on Powers Boulevard south of TH 212 to service the future 2010 MUSA and will also be used by future MUSAs
The project needs to be constructed before this area starts to develop and is contingent on when that happens.
Justification
tequired for future development of the 2010 MUSA. The cost for this improvement will be assessed to future MUSA areas using connection fees.
Budget Impact/Other
Expenditures 2011
2012 2013 2014
2015 Total
Construction
1,900,000
1,900,000
Total
Funding Sources 2011
1,900,000
2012 2013 2014
1,900,000
2015 Total
Sewer Utility Fund
1,900,000
1,900,000
Total
1,900,000
1,900,000
Budget Impact/Other
Capital Improvement Program 2011 Mru 2015 Department Street Improvements
City of Chanhassen, MN Contact Paul Oehme
Project # ST -001 Type Improvement
Project Name Useful Life Unassigned
West 78th St Streetlights
Category Streets /Highways
Account #1 Account #3 Priority n/a
Account #2 Account #4
Description Total Project Cost: $300,000
Install street lights on West 78th Street from the western edge of Lake Ann Park to Century Blvd. Street lights already exist on the section of West
78th Street east of this section of road.
Justification
Visibility will be improved with the installation of street lights.
Expenditures 2011 2012 2013 2014 2015 Total
Equipment 300,000 300,000
Total 300,000 300,000
Funding Sources 2011 2012 2013 2014 2015 Total
MSA 300,000 300,000
Total 300,000 300,000
[get Impact/Other
project will increase maintenance and electrical usage costs.
Capital Improvement Program 2011 Mru 2015
City of Chanhassen, MN
Project # ST -003
Project name Lyman Boulevard Improvements
Account #1
Account #2
Account #3
Account #4
Department Street Improvements
Contact Paul Oehme
Type Improvement
Useful Life Unassigned
Category Streets/Highways
Priority n/a
Description I Total Project Cost: $17,250,000
[be City will need to participate in the reconstruction of Lyman Boulevard between Powers Boulevard and TH 41 based on the master funding
agreement plan for the corridor. The corridor is proposed to be widened and urbanized to accommodate increased traffic volume from TH 212,
iew developments in the area and the new Chanhassen High School. Improvements include roadway widening, storm sewer, trail, sanitary sewer
utd trunk watermain improvements.
Phase II - 2014 - Improvements are from Audubon south to Powers Blvd
Phase III - 2015 - Improvements are from Galpin Blvd to TH 41
Justification
To improve safety and mobility along the corridor.
Expenditures 2011 2012 2013 2014 2015 Total
Construction 8,850,000 8,400,000 17,250,000
Total 8,850,000 8,400,000 17,250,000
Funding Sources 2011
2012 2013 2014
2015
Total
Arterial Collector Dvlpmnt Fee
100,000
100,000
MSA
1,700,000
1,500,000
3,200,000
Other Agency Contribution
6,500,000
6,900,000
13,400,000
Sewer Utility Fund
150,000
150,000
Water Utility Fund
400,000
400,000
Total
8,850,000
8,400,000
17,250,000
project will increase maintenance costs in relation to the increase in City utilities and trails constructed with the project.
Capital Improvement Program 2011 thru 2015
City of Chanhassen, MN
Project # ST -012
Project Name Annual Street Improvement Program
Account #1 601 -xxxx -4751
Account #2
Account #3
Account #4
Department Street Improvements
Contact Paul Oehme
Type Improvement
Useful Life Unassigned
Category Streets/Highways
Priority n/a
Description I Total Project Cost: $9,700,000
Annual project to rehabilitate and reconstruct streets in the City. Current 5 -year plan shows the following neighborhood areas:
tesidential 2011 - Timberwood Drive neighborhood, Saratoga, Santa Vera, Chippewa, Picha and Kerber (S of W 78th), Target lane and W 78th
Street (Powers Blvd to Market Blvd)
2012 - Greenbriar, Fir Tree, Elm Tree, Dogwood, Shore Drive and Maplewood Circle (Reconstruction)
2013 - Greenwood Shores and West 78th Street (Powers to Market)
2014 - Dartmouth Drive and Cypress Drive
2015 - Carver Beach area (south and west of Carver Beach Road)
Justification
Che City uses a Pavement Management System to monitor the condition of the City streets. While proper preventative maintenance extends the
ife of the street and is cost effective, a street will eventually deteriorate to a point that further maintenance is no longer cost effective.
tehabilitation projects extend the life of the street. In cases with utility or poor sub grade needs to be replaced or where streets have deteriorated
o a point where rehabilitation will no longer be practical reconstruction of the street is necessary. A feasibility study is written to consider the
nerits of the project and scope of work.
Prior
F - 3 — ,2 - 00 — ,O - O - 0 1
Expenditures
Construction
2011
1,500,000
2012
1,700,000
2013
1,200,000
2014
1,100,000
2015
1,000,000
Total
6,500,000
Total
Total
1,500,000
1,700,000
1,200,000
1,100,000
1,000,000
6,500,000
Prior
Funding Sources
2011
2012
2013
2014
2015
Total
3,200,000
Assessment/Revolving Assess
1,200,000
1,700,000
1,200,000
1,100,000
1,000,000
6,200,000
Total
Street Pavement Management
300,000
300,000
Total
1,500,000
1,700,000
1,200,000
1,100,000
1,000,000
6,500,000
Budget Impact/Other
Fhis project may decrease maintenance costs.
Capital Improvement Program 2011 thru 2015
City of Chanhassen, MN
Project # ST -017
Project Name TH 101 Corridor Preservation Planning
Account #1
Account #2
Account #3
Account #4
Department Street Improvements
Contact Paul Oehme
Type
Improvement
Useful Life
Unassigned
Category
Streets/Highways
Priority
n/a
Total Project Cost: $1,180,000
preliminary design, environmental scoping study was completed in 2007. A study to complete the environmental assessment review and
eliminary design from Pioneer Trail to Scott county is proposed for 2011 if other funds become available. No construction funding for
nrovements have been identified at this time.
Justification
To improve safety and mobility along the corridor and plan for future growth.
Prior Expenditures 2011 2012 2013 2014 2015 Total
180,000 Planning /Design 1,000,000 1,000,000
Total Total 1,000,000 1,000,000
Prior
Funding Sources
2011 2012
2013 2014 2015 Total
F - 780,0001
Other Agency Contribution
920,000
920,000
Total
Street Pavement Management
80,000
80,000
Total
1,000,000
1,000,000
Capital Improvement Program 2011 thru 2015
City of Chanhassen, MN
Project # ST -018
Project name P avement Management
Account #1 420 - 0000 -4751
Account #2
Account #3
Account #4
Department Street Improvements
Contact Paul Oehme
Type Maintenance
Useful Life 7 -10 years
Category Streets /Highways
Priority n/a
Description Total Project Cost: $2,165,000
rhis project will provide maintenance such as crack sealing, seal - coating and pothole patching for City streets. The projects will be determined
tnnually based on the pavement condition index as generated by the pavement management program.
I Justification
This will provide a centralized funding mechanism that will help reduce the effect on General Fund operating expenditures.
Prior Expenditures 2011 2012 2013 2014 2015 Total
F - 6 - 65, - 00 - 0 1 Maintenance 300,000 300,000 300,000 300,000 300,000 1,500,000
Total Total 300,000 300,000 300,000 300,000 300,000 1,500,000
Prior
Funding Sources
2011
2012
2013
2014
2015
Total
665,000
Street Pavement Management
100,000
100,000
100,000
100,000
100,000
500,000
Total
Tax Levy
200,000
200,000
200,000
200,000
200,000
1,000,000
Total
300,000
300,000
300,000
300,000
300,000
1,500,000
Budget Impact/Other
These improvements will cost effectively prolong the life of the street so major improvements such as reconstruction projects can be delayed.
Capital Improvement Program 2011 Mru 2015
City of Chanhassen, MN
Project # ST -025
Project Name TH5 Improvements - TH41 to Downtown Victoria
Account #1
Account #2
Account #3
Account #4
Department Street Improvements
Contact Paul Oehme
Type Improvement
Useful Life
Category Streets /Highways
Priority n/a
Description I Total Project Cost: $9,029,000
VINDOT is planning to resurface and make improvements to TH5 west of TH41 in 2011. These improvements include resurfacing, shoulder
mprovements, turn lane improvements and intersection improvements at Minnewashta Parkway. The City will be responsible for a small portion
)f the project as it relates to local access and trail and underpass improvements. The City applied for federal funding for trail and underpass
mprovements along with safety improvements at Minnewashta Parkway. The trail underpass local share is estimated at $275,000. It is anticipated
he Landscape Arboretum, City of Victoria and Carver County Parks will help pay for the local share.
Justification
To improve safety and mobility along the corridor.
Expenditures 2011 2012 2013 2014 2015 Total
Construction 9,029,000 9,029,000
Total 9,029,000 9,029,000
Funding Sources 2011 2012 2013 2014 2015 Total
Other Agency Contribution 8,829,000
8,829,000
Park Dedication Fund 80,000
80,000
Street Pavement Management 120,000
120,000
Total 9,029,000
9,029,000
Impact/Other
Capital Improvement Program 2011 Mru 2015
City of Chanhassen, MN
Project # ST -027
Project Name TH 101/Pleasant View Rd Intersection & Trail Imp
Department
Street Improvements
Contact
Paul Oehme
Type
Improvement
Useful Life
90,000
Category
Streets /Highways
Account #1 Account #3 Priority n/a
Account #2 Account #4
Description Total Project Cost: $765,000
The City has applied for state funds to make improvements to the intersection of TH 101 and Pleasant View Road. These improvements include
urn lanes, shoulder, drainage and trail improvements. The project would widen the intersection so left turn lanes can be constructed and curb and
;utter on TH 101 would be constructed where necessary. A 10' wide bituminous trail would be constructed on the west side of TH 101 from
'leasant View Road to Town Line Drive. A trail would also be constructed on the north side of Pleasant View Road to connect to an existing trail
Justification
To improve safety, access and mobility in the project area.
Expenditures 2011 2012 2013 2014 2015 Total
Construc 765,000 765,000
Total 765,000 765,000
Other Agency Contribution
560,000
560,000
Park Dedication Fund
95,000
95,000
Street Pavement Management
90,000
90,000
Surface Water Utility Fund
20,000
20,000
Total
765,000
765,000
Funding Sources 2011 2012 2013 2014 2015 Total
Budget lmpact/O
?uture maintenance of trail.
Capital Improvement Program 2011 thru 2015
City of Chanhassen, MN
Project # ST -028
Project name TH 101 Improvements - Lyman Blvd to Pioneer Trail
Account #1 700-7025 -
Account #2
Account #3
Account #4
Department Street Improvements
Contact Paul Oehme
Type Improvement
Useful Life
Category Streets/Highways
Priority n/a
Description I Total Project Cost: $9,500,000
rhis project is proposed to make improvements on TH 101 from Lyman Blvd to Pioneer Trail. The improvements are proposed to improve safety
tnd mobility along the corridor. The project is consistent with the 2007 101 corridor scoping study. Federal funds are proposed to be used to pay
or most of the improvements and other state funds are anticipated to pay for the remaining construction costs. The City will need to pay for
intension of watermain consistent with the 2030 comprehensive plan.
Justification
To improve safety and mobility on TH 101. The project also plans for growth of the community south of Lyman Blvd.
Expenditures 2011 2012 2013 2014 2015 Total
Construction 9,500,000 9,500,000
Total 9,500,000 9,500,000
Funding Sources 2011 2012 2013 2014 2015 Total
Other Agency Contribution 9,200,000 9,200,000
Water Utility Fund 300,000 300,000
Total 9,500,000 9,500,000
Capital Improvement Program 2011 thru 2015
City of Chanhassen, MN
Project # ST -029
Project Name Repaint TH 5 Signals
Department Street Improvements
Contact Paul Oehme
Type Maintenance
Useful Life
Category Streets /Highways
Account #1 Account #3 Priority n/a
Account #2 Account #4
Description Total Project Cost: $85,000
This project would repaint the signals along TH 5 which are severely rusted. The maintenance agreement the City has with MNDOT and Carver
County states the City is responsible for the minor maintenance of the signals, which includes painting. If these signals are left to rust much
further, replacement may be warranted which would cost the City more. Seven signals are planned to be repainted on TH 5 from Century Blvd to
Dakota Ave.
Justification
To avoid total replacement due to lack of maintenance and for aesthetic appeal.
Expenditures
2011
2012 2013 2014 2015 Total
Maintenance 85,000 85,000
Total 85,000 85,000
Funding Sources 2011 2012 2013 2014 2015 Total
Street Pavement Management 85,000 85, 000
Total 85,000 85,000
Capital Improvement Program 2011 thru 2015 Department Surface Water Management
City of Chanhassen, MN Contact Paul Oehme
E ect # SWMP -014 Type Improvement
Useful Life Unassigned
ect Name property Acquisition Category SWMP
Account #1 720 - 7025 -4701 Account #3 Priority n/a
Account #2 Account #4
Descrip Total Project Cost: $650,000
The City will acquire property in accordance with its Comprehensive and Surface Water Management Plans.
I Justification
Properties within the City must be acquired in order to achieve the goals set forth in the Comprehensive and Surface Water Management Plans.
Budget Impact/C
"itywide. No map.
Prior
Expenditur
2011
2012
2013
2014
2015
Total
275,000
Land Acquisition
75,000
75,000
75,000
75,000
75,000
375,000
Total
Total
75,000
75,000
75,000
75,000
75,000
375,000
Prior
Funding Sources
2011
2012
2013
2014
2015
Total
F -- 275,00 - 0 - 1
Surface Water Utility Fund
75,000
75,000
75,000
75,000
75,000
375,000
Total
Total
75,000
75,000
75,000
75,000
75,000
375,000
Budget Impact/C
"itywide. No map.
Capital Improvement Program 2011 thru 2015
City of Chanhassen, MN
Project # SWMP -019
Project Name Street Improvement Projects - Storm Water Mgmt
Account #1 720 - 7025 -4751
Account #2
Account #3
Account #4
Department Surface Water Management
Contact Paul Oehme
Type
Improvement
Useful Life
Unassigned
Category
SWMP
Priority
n/a
Description Total Project Cost: $1,250,000
kn annual amount set aside for storm water management infrastructure construction or expansion associated with street improvement projects
mdertaken by the engineering and public works departments.
Justification
Street improvement projects frequently require construction or expansion of storm water management infrastructure in order to comply with
federal, state and local regulations, as well as protecting existing and proposed development adjacent to the projects.
Prior Expenditures
2011 2012 2013
2014 2015
Total
F - IR, - 00 - 0 1 Construction
400,000
400,000
800,000
Total
Total 400,000
400,000
800,000
Prior
450,000
Total
Funding Sources 2011 2012 2013 2014 2015 Total
Surface Water Utility Fu 400,000 400,000 800,000
Total 400,000 400,000 800,000
Budget Impact/Other
nventory, inspection and maintenance of new infrastructure will be required. Citywide. No map
Capital Improvement Program 2011 thru 2015
City of Chanhassen, MN
Project # SWMP -024
Project Name Ravine #2 Stabilization
Account #1 720 - 7025 -4751
Account #2
Account #3
Account #4
Department Surface Water Management
Contact Paul Oehme
Type
Improvement
Useful Life
Unassigned
Category
SWMP
Priority
n/a
Total Project Cost: $750,000
The Bluff Creek Natural Resources Management Plan identified 25 gullies tributary to Bluff Creek south of Pioneer Trail. Of these, 19 were
considered moderate to severe with only two (2) considered stable. In addition there are three (3) severely eroded escarpments in lower Bluff
Creek. This project will involve the stabilization of severely incised gully using in situ trees, silvicultural practices, grading and the establishment
of understory vegetation; stabilization of escarpments using similar natural revetment techniques; source control of surface water volume; and
wetland restoration.
Justification
2011 - Ravine #2 Stabilization Project - $105,000
2012 - Source Volume Reduction and Rate Control - $25,000
2012 - Wetland Restoration; Pioneer Pass, Outlot D - $90,000
2013 - Source Volume Reduction and Rate Control - $75,000
2014 - Ravine #21 Stabilization Project - $70,000
2015 - Escarpment #20 Stabilization Project - $85,000
Prior Expenditures
2011
2012
2013
2014
2015
Total
300,000 Construction
105,000
115,000
75,000
70,000
85,000
450,000
Total
Total 105,000
115,000
75,000
70,000
85,000
450,000
Prior
Funding Sources
2011
2012
2013
2014
2015
Total
300,000
Other Agency Contribution
12,500
47,500
30,000
35,000
45,000
170,000
Total
Surface Water Utility Fund
92,500
67,500
45,000
35,000
40,000
280,000
Total
105,000
115,000
75,000
70,000
85,000
450,000
dget Impact/Other
stabilization areas will require maintenance for 2 to 3 years. Given the proximity to Bluff Creek, most of these projects will require
aordinary measures to ensure that Bluff Creek is protected from sediment deposition. The wetland project may be eligible to be placed into the
mesota Wetland Bank to be drawn against for future City projects.
Capital Improvement Program 2011 thru 2015
City of Chanhassen, MN
Project # SWMP -026
Project Name Lake Minnewashta Outlet
Account #1 720 - 7025 -4751
Account #2
Account #3
Account #4
Description
nstall a permanent outlet structure at the outlet for Lake Minnewashta.
Department Surface Water Management
Contact Paul Oehme
Type Improvement
Useful Life
Category SWMP
Priority n/a
Total Project Cost: $30,000
Justification
The current outlet is sand and is therefore easily altered. Alterations to the outlet can cause the entire lake to drain down to the outlet elevation.
Expenditures 2011 2012 2013 2014 2015 Total
Construction 30,000 30,000
Total 30,000 30,000
Funding Sources 2011 2012 2013 2014 2015 Total
Surface Water Utility Fund 30,000 30,000
Total 30,000 30,000
Capital Improvement Program 2011 thru 2015
Department Surface Water Management
City of Chanhassen, MN Contact Paul Oehme
Project # SWMP -029
Type Improvement
Useful Life
Project name Landings Court Storm Water Pond Imp Category SWMP
Account #1 720 - 7025 -4751 Account #3 Priority n/a
Account #2 Account #4
Description Total Project Cost: $70,000
This project addresses storm water quantity issues entering Lake Minnewashta. This project was discussed with the City Council during the
Boulder Cove development application. The improvements include ponding and additional storm water piping to the lake.
Justification
ITo help address erosion and reduce storm water discharge rates into Lake Minnewashta.
Impact/Other
Expenditures 2011
2012 2013 2014
2015 Total
Construction
70,000
70,000
Total
Funding Sources 2011
70,000
2012 2013 2014
70,000
2015 Total
Surface Water Utility Fund
70,000
70,000
Total
70,000
70,000
Impact/Other
Capital Improvement Program 2011 rhru 2015
City of Chanhassen, MN
Project # SWMP -032
Project Name Stormwater Pond Improvements
Account #1 720 - 7025 -4751
Account #2
Account #3
Account #4
Department Surface Water Management
Contact Paul Oehme
Type Improvement
Useful Life
Category SWMP
Priority n/a
Description I Total Project Cost: $245,000
this project will provide inspection and cleaning if required of all City stormwater ponds on a rotating four (4) year schedule, to identify any
nanagement needs and perform needed repairs and improvements. This may include sediment removal, placement of blanket, rip -rap or other
,rosion control BMP's, vegetation management and assessment, repair and replacement of inlet and outlet structures.
Justification
are over 170 stormwater ponds in the City of Chanhassen, all requiring regular maintenance to assure they function to National Urban
f Program recommendations. This measure has also been identified in Chanhassen's National Pollution Discharge Elimination Municipal
tte Storm Sewer System permit.
Prior Expenditures 2011 2012 2013 2014 2015 Total
85,000 Construction 25,000 35,000 25,000 35,000 40,000 160,000
Total Total 25,000 35,000 25,000 35,000 40,000 160,000
Prior
Funding Sources 2011
2012 2013
2014
2015 Total
85,000
Other Agency Contribution
10,000
10,000
20,000
Total
Surface Water Utility Fund 25,000
25,000 25,000
25,000
40,000 140,000
Total 25,000
35,000 25,000
35,000
40,000 160,000
lg et Im
will require an input of other public works staff hours.
Capital Improvement Program 2011 Mru 2015
City of Chanhassen, MN
Project # SWMP -035
Project name LID Implementation Project
Account #1 720 - 7025 -4751
Account #2
Account #3
Account #4
Department Surface Water Management
Contact Paul Oehme
Type Improvement
Useful Life
Category SWMP
Priority n/a
Description I Total Project Cost: $107,500
This project will work with residents within the City of Chanhassen who are willing to construct alternative stormwater best management practices
on their property and assist them with the design and construction of these features.
Justification
Water Resources staff have been approached by several Chanhassen residents and neighborhood groups interested in incorporating these features
into their landscaping plans and looking for guidance and assistance with the design and construction. By identifying and assisting residents with
the design and implementation of alternative stormwater treatment features, the City will be able to address water quality and quantity issues in
fully developed areas where regional ponding is not a practical option. This project will also meet requirements of the City's NPDES permit and
nondegradation plan as well as meeting issues identified in the Second Generation Surface Water Management Plan.
Prior Expenditures 2011 2012 2013 2014 2015 Total
32,500 Construction 15,000 15,000 15,000 15,000 15,000 75,000
Total Total 15,000 15,000 15,000 15,000 15,000 75,000
Prior Funding Sources
2011
2012
2013
2014
2015
Total
32,500 Other Agency Contribution
5,000
5,000
5,000
5,000
5,000
25,000
Total Surface Water Utility Fund
10,000
10,000
10,000
10,000
10,000
50,000
Total
15,000
15,000
15,000
15,000
15,000
75,000
B udget Impact/Other
day require additional notices, mailings and web page communications.
Capital Improvement Program 2011 thru 2015
City of Chanhassen, MN
Project # SWMP -037
Project Name W ell 13 Parking Lot
Account #1 720 - 7025 -4751
Account #2
Account #3
Account #4
Department Surface Water Management
Contact Paul Oehme
Type Improvement
Useful Life
Category SWMP
Priority n/a
Description Total Project Cost: $90,000
Ibis project would install a pervious pavement parking lot at Well 13 in Chanhassen Estates Park. Other low impact development features may be
ncorporated into the design as well depending upon feasibility of the features.
Justification
Parks and Recreation has noted that there is no available parking within the park nor are there sidewalks to allow for pedestrian access to the park.
This project will meet the requirements of the National Pollution Discharge Elimination System permit, the nondegradation plan and serve as a
demonstration for the practicality of pervious pavement in a parking lot application.
Expenditures 2011 2012 2013 2014 2015 Total
Construction 90,000 90,000
Total 90,000 90,000
Funding Sources 2011 2012 2013 2014 2015 Total
Other Agency Contribution
30,000
30,000
Surface Water Utility Fund
60,000
60,000
Total
90,000
90,000
Budget Impact/Other
Ibis project may require different deicing techniques in the winter months and will need biannual sweepings.
Capital Improvement Program 2011 Mru 2015
City of Chanhassen, MN
Project # SWMP -039
Project Name Cranes Vineyard Creek
Department Surface Water Management
Contact Paul Oehme
Type Improvement
Useful Life
Category SWMP
Account #1 720 - 7025 -4751 Account #3 Priority n/a
Account #2 Account #4
Description Total Project Cost: $55,000
Fhis project will stabilize the remaining 750 feet of Cranes Vineyard Creek (aka Curry Farm Creek) and stabilize the delta that has formed at the
)utlet into Christmas Lake.
Justification
Previously a large portion of the Creek was stabilized with utility repair work. The final 750 feet was not addressed at that time due to conflicts
with area landowners. City staff has been in dialogue with the landowners and it appears a compromise may be attainable. This project is
identified in the Second Generation Surface Water Management Plan and will meet the mitigation requirements of the Nondegradation Plan.
Expenditures 2011 2012 2013 2014 2015 Total
Construction 55,000 55,000
Total 55,000 55,000
Other Agency Contribution 20,000 20,000
Surface Water Utility Fund 35,000 35,000
Total 55,000 55,000
Funding Sources 2011 2012 2013 2014 2015 Total
Impact/Other
Capital Improvement Program 2011 thru 2015
City of Chanhassen, MN
Project # SWMP -042
Project Name Bluff Creek Drive Drainage Improvement Project
Account #1 720 - 7025 -4300
Account #2 720 - 7025 -4706
Account #3
Account #4
Department Surface Water Management
Contact Paul Oehme
Type Improvement
Useful Life
Category SWMP
Priority n/a
Description Total Project Cost: $140,000
[his project proposes to work cooperatively with the Parks Department to identify possible stormwater treatment best management practices and
ncorporate them into the design and construction of the trail. This is likely to include ponding within the right -of -way ditches, the installation of
additional storm sewer pipe and structures and possibly the utilization of pervious pavement sections in part of the trial.
Justification
Bluff Creek Drive is a steep road with minimal storm sewer infrastructure and no stormwater treatment. As a result of these conditions, numerous
gullies have developed on private property which are threatening these properties as well as Seminary Fen. Five of the six watershed areas
tributary to Bluff Creek Drive are identified in the Surface Water Management Plan as needing additional ponding and treatment.
Prior Expenditures 2011 2012 2013 2014 2015 Total
20,000 Construction 120,000 120,000
Total Total 120,000 120,000
Prior
Funding Sources 2011
2012 2013 2014 2015
Total
F - 70,_00 - 01
Other Agency Contribution
40,000
40,000
Total
Surface Water Utility Fund
80,000
80,000
Total
120,000
120,000
Budget Impact/Other
[be BMP's constructed will need long -term maintenance. The cost of the trail may be distributed among two separate funding mechanisms.
Capital Improvement Program 2011 thru 2015
City of Chanhassen, MN
Project # W -015
Project name Repainting: West 76th St. Water Tower
Department
Water System Improvements
Contact
Paul Oehme
Type
Improvement
Useful Life
Unassigned
Category
Utilities
Account #1 700 - 7025 -4751 Account #3 Priority n/a
Account #2 Account #4
Description Total Project Cost: $110,000
'rovides for the recoating of the exterior surfaces of the W. 76th St. Water Tower. The water tower is currently not used for water storage because
)f the hydraulic changes that were made when the Lake Lucy Road/Powers Boulevard tower was built. The tower is only used as a cell tower. A
basibility study should be drafted evaluating if it is more cost effective to paint the tower or remove the tower. If the tower is removed, a cell
ower would be needed at the same location or in close proximity.
Justification
This type of infrastructure requires periodic repainting to protect the metal structure so more costly repairs can be avoided. The tower was last
painted approximately 20 years ago.
Expenditures
2011 2012
2013 2014 2015 Total
Construction
110,000
110,000
Funding Sources
Total 110,000
2011 2012
110,000
2013 2014 2015 Total
Water Utility Fund
110,000
110,000
Total 110,000
110,000
project does not increase operational costs.
Capital Improvement Program 2011 Mru 2015 Department Water System Improvements
City of Chanhassen, MN Contact Paul Oehme
Project # W -020 Type Improvement
Project N ame Arboretum Wa
Useful Life Unassigned
ter Main
Category Utilities
Account #1 700 - 7025 -4751 Account #3 Priority n/a
Account #2 Account #4
Description Total Project Cost: $220,000
Installation of a missing piece of water main to provide better looping and system reliability between the Arboretum Water Tower and W 78th
Justification
Completing this section of water main will complete a missing loop in the system providing improved water quality and pressure as well as
increasing operational reliability. This project was identified in the 2003 Master Water Study.
[get Impact/Other
project will increase maintenance costs.
Expenditures 2011
2012 2013 2014 2015
Total
Construction
220,000
220,000
Total
Funding Sources 2011
220,000
2012 2013 2014 2015
220,000
Total
Water Utility Fund
220,000
220,000
Total
220,000
220,000
[get Impact/Other
project will increase maintenance costs.
Capital Improvement Program 2011 thru 2015
City of Chanhassen, MN
Project # W -024
Project Name W atermain Replacement
Account #1 700 - 7025 -4751 Account #3
Account #2 Account #4
of existing water main lines in coordination with the reconstruction of the City street.
Department Water System Improvements
Contact Paul Oehme
Type
Improvement
Useful Life
Unassigned
Category
Utilities
Priority
n/a
Total Project Cost: $2,200,000
Justification
The City considers the condition of the existing utilities in the process to select streets for rehabilitation in an effort to realize cost savings by
consolidating these projects and also to avoid potential cuts in recently improved streets. If significant repairs are necessary to the existing water
main, replacement may be the most cost effective option. Given the highly corrosive soils in the City, water main replacement is an ongoing
project in the City.
Prior
800,000
Total
Expenditures 2011 2012 2013 2014 2015 Total
Construction 700,000 700,000 1,400,000
Total 700,000 700,000 1,400,000
Prior Funding Sources 2011
2012 2013
2014 2015
Total
800,000 Water Utility Fund
700,000
700,000
1,400,000
Total Total
700,000
700,000
1,400,000
projects will decrease maintenance costs.
Capital Improvement Program 2011 thru 2015 Department Water System Improvements
City of Chanhassen, MN Contact Paul Oehme
Project # W -027 Type Improvement
Useful Life Unassigned
Project Name Pressure Reducing Station Category Utilities
Account #1 700 - 70254751 Account #3 Priority n/a
Account #2 Account #4
Description I Total Project Cost: $205,000
Construction of a pressure reducing valve station in the 2005 MUSA area by Pioneer Trail is programmed for 2011 if the development along
Pioneer Trail is constructed. Two pressure reducing stations are programmed for the 2010 MUSA area in 2012 and 2013 if the area is developed
Justification
(Identified in the 2010 Comprehensive Water Supply Plan. Needed to control watermain pressure due to elevation changes for future development
project will increase maintenance costs.
Expenditures
2011
2012
2013 2014
2015 Total
Construction
65,000
65,000
75,000
205,000
Funding Sources
Total 65,000
2011
65,000
2012
75,000
2013 2014
205,000
2015 Total
Water Utility Fund
65,000
65,000
75,000
205,000
Total 65,000
65,000
75,000
205,000
project will increase maintenance costs.
Capital Improvement Program 2011 thru 2015
City of Chanhassen, MN
Project # W -032
Project Name W ell Rehabilitation Program
Account #1 700 - 7025 -4530
Account #2
Description I Total Project Cost: $325,000
This program annually inspects and performs regular maintenance of the City's wells. Well pumps are recommended to be serviced every 8 years.
It is recommended that the following pumps and motors be pulled and inspected for wear:
2011 - Well #9
2012 - Well #5 (Abandon)
2013 - Well #10
2014 - Well #11
2015 - Well #12
Justification
Performing regular maintenance will extend the life of well components, reduce emergency calls and have a more reliable water supply system
Prior Expenditures
90,000 Maintenance
Total
Total 45,000 45,000 45,000 50,000 50,000 235,000
Prior Funding Sources
2011
2012
2013
2014
2015
Total
F Water Utility Fund
45,000
45,000
45,000
50,000
50,000
235,000
Total
Total 45,000
45,000
45,000
50,000
50,000
235,000
Account #3
Account #4
2011 2012
45,000 45,000
2013 2014
45,000 50,000
Department Water System Improvements
Contact Paul Oehme
Type
Improvement
Useful Life
Unassigned
Category
Utilities
Priority
n/a
2015 Total
50,000 235,000
Budget Impact/Other
Capital Improvement Program 2011 thru 2015
City of Chanhassen, MN
Project # W -041
Project Name Repaint Lake Lucy Water Stand Pipe
Account #1 700 - 7025 -4751
Account #2
Description
rhis project will repaint the interior and exterior surfaces of the Lake Lucy stand pipe.
Account #3
Account #4
Department Water System Improvements
Contact Paul Oehme
Type Improvement
Useful Life
Category Utilities
Priority 'n /a
Total Project Cost: $550,000
Justification
Steel tanks require recoating to protect the metal to prevent more costly repairs. An inspection report will be drafted prior to construction
justifying the work.
Expenditures 2011 2012 2013 2014 2015 Total
Construction 550,000 550,000
Total 550,000 550,000
Funding Sources 2011 2012 2013 2014 2015 Total
Water Utility Fund 550,000 550,000
Total 550,000 550,000
Budget Impact/Other
Capital Improvement Program 2011 thru 2015
City of Chanhassen, MN
Project # W -042
Project Name H igh Zone Elevated Storage Tank
Account #1 700 - 7025 -4751
Account #2
Department Water System Improvements
Contact Paul Oehme
Type Improvement
Useful Life
Category Utilities
Priority n/a
Description I Total Project Cost: $1,900,000
3ased on current and projected system demands, the high zone should have additional storage capacity. The 2008 water comprehensive plan
•ecommends a total of 750,000 gallons for storage. Currently, the high zone only has 200,000 gallons of storage. The location of the tank has not
/et been determined, but a few locations were identified in the 2008 comprehensive plan. A tank siting study should be completed to identify the
)est location.
Jus
Co meet current and future water
Account #3
Account #4
for the high zone area and to meet recommended fire flow storage requirements.
Expenditures 2011 2012 2013 2014 2015 Total
Construction 1,900,000 1,900,000
Total 1,900,000 1,900,000
Funding Sources 2011 2012 2013 2014 2015 Total
Water Utility Fund 1,900,000 1,900,000
Total 1,900,000 1,900,000
Capital Improvement Program 2011 thru 2015 Department Water System Improvements
City of Chanhassen, NM Contact Paul Oehme
roject # W -046 Type Improvement
Useful Life
roject dame Low Zone 1 million gallon Elevated Storage Tank Category Utilities
Account #1 700 - 7025 -4751 Account #3 Priority n/a
Account #2 Account #4
lescription I Total Project Cost: $2,600,000
its tank is needed to meet the peak day irrigation demand and potential emergency demand for the growth of the community. It is needed in the
N zone pressure area to service the growth area south of Lyman Boulevard. The location for the tank has not been determined, but a few
rations are feasible or identified in the 2008 water comprehensive plan. This tank is dependent on development. Staff plans to evaluate the need
this tank annually and adjust the construction date accordingly.
Justification
To meet peak irrigation demand and emergency water demand for the growing community as identified in the 2008 water comprehensive plan.
Expenditures 2011
2012 2013 2014 2015
Total
Construction
2,600,000
2,600,000
Total
Funding Sources 2011
2,600,000
2012 2013 2014 2015
2,600,000
Total
Water Utility Fund
2,600,000
2,600,000
Total
2,600,000
2,600,000
Capital Improvement Program 2011 thru 2015
City of Chanhassen, MN
Project # W -048
Project Name W ell #15 Improvements
Account #1 700 - 7025 -4751
Account #2
Description
[his well is proposed to meet the water needs of the growing community.
Account #3
Account #4
Department Water System Improvements
Contact Paul Oehme
Type Improvement
Useful Life
Category Utilities
Priority n/a
Total Project Cost: $1,400,000
Justification
I To meet the growing water needs of the City planned for in the 2008 water comprehensive plan.
Expenditures 2011 2012 2013 2014 2015 Total
Construction 1,400,000 1,400,000
Total 1,400,000 1,400,000
Funding Sources 2011 2012 2013 2014 2015 Total
Water Utility Fund 1,400,000 1,400,000
Total 1,400,000 1,400,000
bMact/Other
Capital Improvement Program 2011 thru 2015
City of Chanhassen, MN
Project # W -050
Project Name H igh Zone High Service Pump
Account #1 700 - 7025 -4751
Account #2
Account #3
Account #4
Department Water System Improvements
Contact Paul Oehme
Type Improvement
Useful Life
Category Utilities
Priority n/a
Description Total Project Cost: $120,000
[his project would allow water in the low zone pressure area to be pumped up to the high zone water pressure area.
Justification
this project is proposed due to the development growth in the high zone water pressure area. The west water treatment plant will be designed to
flow water to be pumped to either the high or low zone area. However, construction of the west water treatment plant is not planned until 2016 at
he earliest. The high service pump will allow treated water into the high zone during the winter months, so potentially 100% of the City could
Lave treated water a portion of the year.
Expenditures 2011 2012 2013 2014 2015 Total
Construction 120,000 120,000
Total 120,000 120,000
Funding Sources 2011 2012 2013 2014 2015 Total
Water Utility Fund 120,000 120,000
Total 120,000 120,000
CITY OF CHANHASSEN (DECEMBER)
TAX LEVY
2011 Budget
TAX CAPACITY BASED TAX LEVY
General Fund
Capital Replacement Fund (for equipment)
Pavement Mgmt Fund (Sealcoating)
General Obligation Debt (212 Bonds)
Audubon
Public Works Facility
Debt of Other Agencies (EDA)
TOTAL TAX CAPACITY BASED TAX LEVIES
MARKET VALUE TAX LEVY
Library Referendum
TOTAL MARKET VALUE TAX LEVY
Use of cash reserves to buy down debt levies
TOTAL TAX LEVY
Dollar Increase
Taxes applied to
Tax Generation Capacity
General Fund
Capital Replacement
Pavement Mgmt
Total Levy subject to levy limits
Bond Funds
Audubon
Reduction in DS Levy
Total
Prior Year
New Construction
Exsiting MV Inc
TIF Dist 1
Eden Trace TIF
Gateway TIF
Total Capacity
Estimated Effect on avg Taxpayer
2010
2011
Percent
Levy
Levy
Increase
$7,380,000
$7,508,200
1.74%
824,000
750,000
-8.98%
200,000
200,000
0.00%
337,500
336,800
-0.21%
253,795
256,570
1.09%
599,300
594,000
-0.88%
122,195
126,420
3.46%
$9,716,790
9,771,990
0.57%
496,400 495,400 -0.20%
$496,400 $495,400 -0.20%
$0 $0
$10,213,190 $10,267,390 0.53%
Scenario 1
$7,508,200
750,000
200,000
$54,200
$8,458,200
1,552,620
256,570
0
$10,267,390
$10,213,190
$108,200
$0
$0
$0
$0
$10,321,390
- 0.52%
$128,200
Estimated Dollar Effect on avg Taxpayer $ (4.40)
2011 Potential Budget Adjustments
Adjustment
Impact
Eliminate Animal Licensing
$ (10,000)
Eliminate Revolving Assessment Const Fund Transfer
50,000
Increase in Fire Relief Pension Contribution
(70,000)
Decrease in Interest Earning Projection
(30,000)
Reduction in Capital Replacement Equipment Fund Levy
74,000
Reduction in Overall Compensation from 2% down to 1 %*
40,000
Total
54,000
* This will result in a reduction in net pay for most employees.
History of Capital Replacement Fund
Levy
$ 824,000.00
824,000.00
824,000.00
800,000.00
$ 3,272,000.00
Average Spent per Year
Over/ (Under)
$ (220,627.00)
(143,363.00)
185,680.00
(105,498.00)
$ (283,808.00)
747,048.00
Expenditures
2009
$ 603,373.00
2008
680,637.00
2007
1,009,680.00
2006
694,502.00
Tota 1
$ 2,988,192.00
Levy
$ 824,000.00
824,000.00
824,000.00
800,000.00
$ 3,272,000.00
Average Spent per Year
Over/ (Under)
$ (220,627.00)
(143,363.00)
185,680.00
(105,498.00)
$ (283,808.00)
747,048.00
d 0
J
f0
C Cl
~ E N
C
W
aj
m
M �= o
_ t N
= V �
o i M
75 IL
C
V �-
zc
M �
Cl
O
N
O
O
O
C
-$
v
Q
O
r-I
N
N
N
al
^O
. I
O
N
CO
V
O
O
V-
Ln
O
Q
CG
l0
t0
O
O
LA
l0
V'
M
n
N
N
Ln
j p
Lr
-I
V�
II
o U �
N
U
�6r
469•
iF�-
iA-
-b�
ifs
{{}
^>
a �
J p n
0 X
a
Q
Q
Q
Q
Q
Q
Q
Q
T U U
Z
Z
Z
Z
Z
Z
Z
Z
v
J v
.�i
C
O
_
:g
C �
N v
i
a
w
0
o
V
M
= z
O
m L
O
Z
>-
Z
Z
O !�
=z
LL p
Z
�-
Z
Z
v
0
U
� N
v)
E ED
a mfn
o r
M `
• L
M �
c
m
C14
>
asi
w
^^ll
W
m
n
/1
S
u
w
V)
E
3
2
w
c
C
-$
v
Q
L
0
v
a
r-I
N
N
N
al
CD
O
. I
O
O
O
O
O
O
O
I
i
44
JZ
O'
H�
C
N 4
N 41
N m
C IZ
O
E y
t O
c
c -a
U f0
E
fp
E
W c
N 92
L U
c v
.
.
m
L
3
.c
CL
v
m
H
E
3
O
V
m
C
m
A H
V
m
m
w � wj
^W C
i =
R O
s m
d
++ s
�a
a L
'10
Mm
N
a
C
.�
Q