1c. TH 101-Pleasant View Road Intersection Imps: Approve Consultant AgmtO CITY OF CHANHASSEN 7700 Market Boulevard PO Box 147 Chanhassen, MN 55317 Administration Phone: 952.227.1100 Fax: 952.227.1110 Building Inspections Phone: 952227.1180 Fax: 952.227,1190 Engineering Phone: 952.227,1160 Fax: 952.227.1170 Finance Phone: 952.227.1140 Fax: 952.227.1110 Park & Recreation Phone: 952.227.1120 Fax: 952.227.1110 Recreation Center 2310 Coulter Boulevard Phone: 952.227.1400 Fax: 952.227.1404 Planning & Natural Resources Phone: 952.227.1130 Fax: 952.227.1110 Public Works 1591 Park Road Phone: 952.227.1300 Fax: 952.227.1310 Senior Center Phone: 952.227.1125 Fax: 952.227.1110 Web Site www.6chanhassen.m.us MEMORANDUM TO: Todd Gerhardt, City Manager t1 FROM: Paul Oehme, Director of Public Works /City Engineer` DATE: January 10, 2011 6�&_ , • SUBJECT: TH 10'1 & Pleasant View Road Intersection and Trail Improvements Project No. 11 -05: Approve Consultant Contract .PROPOSED MOTION "The City Council is recommended to approve a consultant contract in the amount of $92,000 with Kimley -Horn & Associates, Inc. for the TH 101 & Pleasant View Road Intersection and Trail Improvements, Project No. 11 -05. City Council approval requires a simple majority vote of the City Council present." BACKGOUND Staff has identified the need for improvements to the TH 101 and Pleasant View Road intersection based on a review of crash data, current and future traffic volumes, existing geometric conditions, and existing pedestrian and bicycle facilities in the area. Turn Lane Improvements The proposed turn lane improvements at the TH 101 and Pleasant View Road intersection will improve safety and mobility. The 45 mph speed limit on TH 101 creates an increased risk for serious crashes at this intersection particularly when considering that there are no left -turn lanes to Pleasant View Road from TH 101. Left turning vehicles from TH 101 under the existing geometric conditions result in significant speed differentials experienced for northbound and southbound traffic when compared to operations at a similar intersection where there are left -turn lanes on the non -stop controlled approach. Speed differential is a factor that often contributes to increased crash rates. In addition, considerable queuing and delay has been documented at this intersection during the morning and afternoon peak travel times, particularly on the eastbound Pleasant View approach to TH 101. The queuing and delays experienced on a stop controlled approach to an intersection have lead to aggressive behavior and ultimately an increase in the crash rate. A signal is not warranted at this intersection based on the MnDot criteria. Regional Trail Improvements Multi -use trails currently exist along the west side of TH 101 south of Pleasant View Road and north of West 62 Street. The proposed trail improvements will complete Chanhassen is a Community for Life - Providing for Today and Planning for Tomorrow TH 101 & Pleasant View Road Intersection and Trail Improvements January 10, 2011 Page 2 the current "gap" in trail construction where, currently, pedestrians and bicycle traffic must utilize the roadway and shoulder to travel between the two trails. The 45 mph speed limit in this area creates a very hazardous situation for pedestrians, bicyclists and motorists traveling between the two trails. In addition to the trail improvements on TH 10 1,. staff proposes to construct a trail along the north side of Pleasant View Road from TH 101 to approximately 1,200 feet west of TH 101 where there is an existing off -road trail head through the residential development. Completion of the trail along TH 101 from Pleasant View Road to _West 62 Street will provide multiple benefits by connecting the existing trails along TH 101 as well as the future trail connection west of TH 101 on Pleasant View Road. This trail segment is a missing link between Chanhassen and adjacent communities. PROPOSED IMPROVEMENTS/BENEFITS The project will provide the following benefits: • Construction of left -turn lanes on northbound and southbound TH 101 at Pleasant View Road will help reduce crashes and improve the traffic operations and safety at this intersection. • Construction of a right -turn lane from eastbound Pleasant View Road to southbound TH 101 will improve the traffic operations and safety on this approach to the intersection. • Trail construction along the west side of TH 101 from Pleasant View Road to West 62 Street will complete a missing segment of a regional trail system along TH 101 in this area, resulting in improved mobility and safety for pedestrians. CONSULTANT CONTRACT Kimley -Horn and Associates assisted the City with the grant application and are most familiar with the project. The scope of the consultant services includes meetings with the City Council, Park Commission, neighborhood meetings and staff meetings. Their scope also includes preliminary design and final design and bidding services. A large component of the services includes coordination with MnDot since the project will need to go through a special state review process before the project can be bid. Kimley -Horn will also draft legal descriptions and prepare exhibits for necessary easement acquisitions. Staff has reviewed the proposal and finds it acceptable for the amount of time and resources needed to complete the identified tasks. The grant application includes a $44,000 consultant fee match to help pay for some of the consultant work. Due to the amount of work needed to keep the work on the tight schedule, staff feels Kimley -Horn would provide the best opportunity for a successful project. The contract would be a time and materials based work not -to- exceed amount. As with all engineering contracts, the consultant must submit periodic invoices that staff will review before processing. The consultant will be required to submit timesheets verifying the hours worked on the project and expense sheets. Staff will review the invoices and expense sheets for accuracy and conformance to the contract. gAeng \public \_2011 projects \11 -05 th 101 and pvr improvements \approve consultant contract 011011.docx TH 101 & Pleasant View Road Intersection and Trail Improvements January 10, 2011 Page 3 SCHEDULE If this project moves forward, staff anticipates the following project schedule: Award Consultant Contract Level 2 Layout Submittal to MnDot for review City Council Receives Feasibility Report; Authorizes Preparation of Plans and Specifications Neighborhood Meeting Final Plans and Specifications Submittal to MnDot for Review Final Plans and Specifications Approved by MnDot City Council Approves Plans and Specifications; Authorizes Ad for Bids MnDot Agreement Executed Authorizing Advertisement of Project Bid Opening Award Contract Start Construction Construction Substantially Complete Final Restoration Construction Complete FUNDING January 10, 2011 February 18, 2011 March 14, 2011 February/March, 2011 April 22, 2011 June 17, 2011 June 27, 2011 July 8, 2011 August 12, 2011 August 22, 2011 September 6, 2011 November, 2011 June, 2012 The total estimated cost for these improvements is $765,000. The City has been awarded a $594,000 MnDot grant for improvements to the intersection. The project costs are proposed to be funded through City funds and MnDot Municipal Agreement funds as shown in the Capital Improvements Project plan. Attachments: Letter from MnDot dated December 13, 2010 CIP Page Project Area Map gAeng \public \_2011 projects \11 -05 th 101 and pvr improvements \approve consultant contract 011011.docx t o ,,;-. 94t � OF J Minnesota DepartmiL, of Transportation Metro District Office of State Aid 1500 West County Road B2 Roseville, MN 55113 -3174 December 13, 2010 Mr. Paul Oehme City Engineer City of Chanhassen 7700 Market Blvd. Chanhassen, MN 55317 RE: Request for FY 2012 Municipal Agreement Program Funding TH 101 at Pleasant View Road City of Chanhassen Dear Mr. Oehme: DEC I > 2010 I am writing to inform you of a new decision which has been reached concerning the request for Fiscal Year (FY) 2012 Municipal Agreement Program funds for the proposed intersection improvement project. After reviewing the initial request in more detail and soliciting additional input from various Metro Functional Areas it has been decided to offer a maximum contribution by Mn/DOT of $594,000 (this includes $44,000 for Construction Engineering and Inspection). The award is for channelization of TH 101 at the intersection with Pleasant View Road. The proposal was categorized as Safety Improvement. The referenced funding amount is the maximum amount of Mn/DOT Metro Municipal Agreement funding available for this project. Municipal Agreement funds can only be used for construction items that can be justified in accordance with the Mn/DOT Cost Participation Policy. If the cost of eligible items falls below this maximum amount, the funds awarded will be reduced to match the cost of the eligible items. A copy of the Mn/DOT Cost Participation Policy can be viewed at: http: / /www. dot. state. mn. us /stateaid/ProjDeliv /agreements /information/dsl l pdf If this funding is accepted by your agency you will be expected to provide project plans and specifications to my office that conform to a Mn/DOT format. They will be reviewed and commented on by Mn/DOT functional groups. Please contact the Metro functional groups directly for specific questions relating to their area and copy the State Aid Project Manager on correspondence. We will provide the Municipal Agreement Program process information upon request. All Right -of -Way costs and acquisition, Utility Relocation as applicable and Preliminary Engineering are the responsibility of the local agency. An agreement will be written by Mn/DOT's Office of Technical Support and must be fully executed prior to award of the Office Tel: 651 - 234 -7770 Office Fax: 651 - 234 -7765 mike. kowski @dot.state. mn. us An equal opportunity employer Mr. Paul Oehme Page 2 December 13, 2010 project. To receive the funds, this project must be let by June 30, 2012. After that date the money becomes unavailable to our office. Please reply in writing by December 17, 2010 if Chanhassen would like to accept this funding. The written confirmation should include acceptance of the conditions of Right -of -Way, Utility Relocation and Design along with the funding level proposed. If funding is accepted by the city a State Aid Project Manager will be assigned and we will contact you to set up a project kickoff meeting. If you have any questions about the selection process or funding situation please feel free to contact me. EMiael tKowski, P. . Acting Cooperative Agreement Engineer cc: Greg Coughlin, Mn/DOT -Metro State Aid * ✓ V Lynn Clarkowski, Mn/DOT -South Area Manager Nicole Pederson, Mn/DOT -South Area Engineer * `� Lars Impola, Mn/DOT -Metro Traffic File * Electronic Copy Only Capital Improvement Program 2011 Mru 2015 City of Chanhassen, MN Project # ST -027 Project Name TH 101/1leasant View Rd Intersection & Trail Imp Account #1 Account #2 Account #3 Account #4 Department Street Improvements Contact Paul Oehme Type Improvement Useful Life Category Streets/Highways Priority n/a Description I Total Project Cost: $765,000 The City has applied for state funds to make improvements to the intersection of TH 101 and Pleasant View Road. These improvements include urn lanes, shoulder, drainage and-trail improvements. The project would widen the intersection so left turn lanes can be constructed and curb and ;utter on TH 101 would be constructed where necessary. A 10' wide bituminous trail would be constructed on the west side of TH 101 from Neasant View Road to Town Line Drive. A trail would also be constructed on the north side of Pleasant View Road to connect to an existing trail ;tossing_ Justification `To improve safety, access and mobility to the project area. Expenditures 2011 2012 2013 2014 2015 Total Construction 765,000 765,000 Total 765,000 765,000 Funding Sources 2011 2012 2013 2014 2015 Total Other Agency Contribution 560,000 Park Dedication Fund 95,000 560,000 Street Pavement Management 90,000 95,000 Surface Water Utility Fund 20,000 90 000 20,000 Total 765,000 _„_ _„_ B udget impact/ot ruture maintenance of trail. 111 Y ! } FOX DRIVE r J g0 X_ 0w Au LL D R1 TH 101 — - -B424 CURB ND GUTTER T.50_, T APER -" TH 101 'ARRINGTON DRIVE 1.. _ 71 % ■ -V- ell E 4P r.i LEGEND Y PROPOSED BITUMINOUS TRAIL PROPOSED ROADWAY WIDENING FULL RECONSTRUCTION PROPOSED SHOULDER V .. TH 101 i.ft MATCH EXISTING EXISTING ROADWAY Yl CURB AND CUTTER CONCRETE N RETE AND GUTTER PROPOSED DRIVEWAY ENTRANCE PROPOSED RETAINING WALL �, PROPOSED STORM SEWER y _ � • PROPOSED DRAINAGE STRUCTURE !. � 0 30 60 120 +Ms�.1 - ° r,� ,, EXISTING TRAIL s SCALE IN FEET � ,� 2 ❑ ❑ Kimley -Horn � TH 101 AND PLEASANT VIEW ROAD MN/DOT METRO MUNICIPAL AGREEMENT PROGRAM � and Associates v ' Inc. INTERSECTION AND TRAIL IMPROVEMENTS MN/DOT FISCAL YEAR 2012 Qp 2550 UNIVERSITY AVE WEST. SUITE 345N TEL. NO. (651) 645 -4192 � OF OF Twa ST. PAUL. MINNESOTA 55114 FAX NO. (651) 645 -5116 L,I11111I7)m REVISED NOVEMBER 11, 2010