Loading...
1d-1. Approve Design Services Contract with Barton-Aschman to inlcude City Utility Infrastructure in the TH 5 Project CITYOF � .A 690 COULTER DRIVE • P.O. BOX 147 • CHANHASSEN, MINNESOTA 55317 (612) 937 -1900 • FAX (612) 937 -5739 athoe by City // Administrator Endorsad A MEMORANDUM aaod f�; d ;;ejected Date_..._.!. B:S_7 TO: Don Ashworth, City Manager Date Submitted to Comiiissio FROM: Charles Folch, Director of Public Works Date Submitted to Council DATE: February 18, 1997 SUBJ: Approve Design Services Contract with Barton - Aschman to include City Utility Infrastructure in the Trunk Highway 5 (Powers Boulevard west to Trunk Highway 41) Improvement Project No. 97 -6 Based on the latest information from MnDOT, it is apparent that the proposed Trunk Highway 5 Improvement project from Powers Boulevard (CSAH 17) to Trunk Highway 41 is scheduled for a contract letting in November of 1998 with a construction start of 1999. MnDOT has entered into a design service agreement with the consulting engineering firm of Barton - Aschman to complete the design work for this improvement project. As a part of this overall improvement project, it is important to plan ahead with long -term City utility infrastructure crossing the reconstructed trunk highway so that these improvements can be constructed at the same time as the Highway 5 project. This will eliminate the need to disrupt the new roadway with planned crossings in the future. Accordingly, Barton - Aschman has prepared a proposal to incorporate the design of these utility infrastructure crossings of Highway 5 and utility installations to be constructed as a part of the Arboretum Boulevard (north frontage road). The City is responsible for the design and engineering costs associated with local utility infrastructure installations. In addition, the City will also be responsible for the actual cost of constructing these improvements as a part of the overall Trunk Highway 5 improvement project. Barton - Aschman's proposal fee of $30,724 to perform this design service is a not -to- exceed amount based on the utility infrastructure as outlined in Section 2.2. Barton - Aschman has also estimated a preliminary cost for the installation of the local utility infrastructure which amounts to approximately $620,000. Once the design plans are completed, the construction estimate will again be reviewed. Costs associated with these installations will need to be programmed with the City's Utility Expansion Fund in the years 1999 and 2000. Don Ashworth February 18, 1997 Page 2 It is therefore recommended that the City Council approve the design services proposal with Barton - Aschman dated February 18, 1997 for the sewer and water extensions associated with the Trunk Highway 5 Improvement Project No. 97 -6. ktm Attachment: Proposal from Barton - Aschman dated February 18, 1997. Update: Attached please find a copy of the notice to proceed on the design contract from MnDOT to Barton - Aschman. This is consistent with the contract letting date of November, 1998 for Trunk Highway 5 (Powers Boulevard to Trunk Highway 41). Carver County Engineer Roger Gustafson has confirmed that his concerns for future programmed improvements to Trunk Highway 5 are west of Trunk Highway 41 and not the currently programmed project from Powers Boulevard to Trunk Highway 41. g:\eng'charles`cc\ h5 design contract.doc PARSONS Barton - Aschman Associates, Inc. • A Unit of Parsons Transportation Group Inc. - 1-c A r.,e °cute. Su to 3E0 • "(. °neacolls. M nnescta 55401 USA • (612) 332 -042 • ==_x .612) 332 -6180 February 18, 1997 Mr. Charles Folch, P.E. City Engineer/Director of Public Works City of Chanhassen 690 Coulter Drive P.O. Box 147 Chanhassen, MN 55317 Re: Proposal to prepare final plans for Sewer and Water extensions for inclusion in Mn/DOT, TH 5 /Arboretum Boulevard project from TH 41 to CSAH 17 (Powers Boulevard) Dear Mr. Folch: Barton - Aschman is under contract with Mn/DOT for final design of TH 5 including Arboretum Boulevard from TH 41 to CSAH 17. It would be prudent for the city to include proposed sewer and water trunk lines in that construction work. Enclosed is a proposed Scope of Work (Attachment A) and an estimated cost (Attachment B) for services to include City of Chanhassen sewer and water trunk line extensions in the plans for TH 5 and Arboretum Boulevard as may be appropriate. Also provided is a preliminary estimate of the cost for the sewer and water main extensions to assist the city in program budgeting (Attachment C). Briefly, the project will extend the 12" water main located on the south side of TH 5 east of Audubon Road to the north side of TH 5 and westerly on the new Arboretum Boulevard about 2,600 feet. An 8" stub will be placed under TH 5 to the south at that point. An 18" water main will be placed north of TH 5 from TH 41 to a connection with the 20" water main in Galpin Boulevard. A new 20" water main will cross TH 5 east of TH 41. A section of 15" and 18" sanitary sewer trunk line will be placed on each side of Galpin Boulevard, parallel to new Arboretum Boulevard. Although developers may be submitting plat/plan proposals, this proposal does not include integration of developer plans into the system. The proposed fee of $30,724 is a not to exceed cost based on direct salary, overhead and profit rates as negotiated with Mn/DOT for the TH 5 project. Charles Folch February 18, 1997 Page 2 Barton- Aschman appreciates the opportunity to provide the City of Chanhassen with engineering services on this project. If this proposal is satisfactory, please sign both copies and return one for our files. If you have any questions or would like to discuss this proposal, please call me. Sincerely, BARTON -ASC 1 • ASSOCIATES, INC. ACCEPTED AND APPROVED BY: 9 1/1(1A , 7,, James C. Knutson, P.E. Senior ociate (Signature) `i '/%JJ /��� (Typed Name) David B. W./la, P.E. Vice Presid•nt and Its Contracting Engineer Authorized to Execute Agreement for: City of Chanhassen (Date) 146S7.iCK ATTACHMENT A Barton - Aschman Scope of Services City water and sewer extensions to be added to TH 5 - Arboretum Boulevard Plans 1. SCOPE OF THE PROJECT The project includes reconstruction of TH 5 and construction of Arboretum Boulevard from TH 41 to CSAH 17 (Powers Boulevard). Portions of the City's sewer trunk lines and watermains which will be located on the project will be designed. Construction plans and special provisions will be added to the TH 5 and Arboretum Boulevard plans being prepared for MnDOT 2. BASIC SERVICES Barton - Aschman's services shall consist of design services as described below. Attachment B lists the estimated costs associated with the design phase services. 2.1 Review proposed sewer and water systems with the City staff, collect data on the existing utilities to be connected or modified, input new system information in the CADD files for the TH 5 project. 2.2 Develop schematic layout for new watermains and sanitary sewer with approximate locations for hydrants, valves, stubouts and manholes for City review. Anticipated locations are listed below. 2.2.1 Watermain 12" - 350 lineal feet crossing TH 5 at Audubon Road to the north side of TH5 to Arboretum Boulevard including a casing pipe under TH 5 12" - 2600 lineal feet west of Audubon Road on the north side of TH 5 to a new development (Highlands) 8" - 350 lineal feet south across TH 5 including a casing pipe under TH 5 to provide a stub to the south side of TH 5 18" - 3800 lineal feet west of Galpin, connected to 20" main in Galpin. 12" - 1000 lineal feet between TH 41 and proposed West City Street along proposed Arboretum Boulevard. 20" - 800 lineal feet crossing TH 5 east of TH41 to include a casing pipe under TH 5 similar to the crossing at Galpin Boulevard 2.2.2 Sanitary Sewer 15" sewer from 400' west of Galpin Blvd. to about 600' east of Galpin Blvd. along proposed Arboretum Boulevard and an 18" sewer connection to a new 18" sewer crossing TH5 in the vicinity of Bluff Creek. This route will involve coordination with a trail and underpasses for the trail at TH 5 and at Arboretum Boulevard. The City shall provide information on expected design flow and required invert locations at manhole connections or stubouts along the proposed trunk sewer extension. 2.3 Coordinate utility crossings with MnDOT plan for TH 5 / Arboretum Boulevard. 2.4 Plans, profiles and details for sanitary sewers and watermains. 2.5 Quantities, special provisions and cost estimate. 2.6 Exhibits for Minnesota Department of Health Permit and for permit to cross public waters if necessary. Exhibits for MPCA sewer extension permit. 3. CHANGE IN SCOPE Developers may have or will submit plat/plans for properties in this corridor. Development plans are unknown and thus integration and connection of future plats are not included in this scope. These additional areas can be added to this work if the City desires with supplements to the defined scope. ATTACHMENT B Chanhassen Utilities on TH 5 and Arboretum Boulevard TH 41 to CSAH 17 (Powers Blvd) Barton - Aschman Associates, Inc. February 17, 1997 TASK PA SA Al T Total, Review sewer and water system with 1 6 2 9 City staff Place "as built" information in CADD 1 9 13 23 Develop watermain schematic tees & 6 16 12 34 hydrants for City review Develop san sewer schematic and 5 10 5 20 i and manholes for City review Location /routing for new 20" watermain zing 3 41 4 11 , east of TH 41 near West City Street 1 , Assist City to determine routing of 1 8 2' 2 13 west end of 18" watermain Coordinate sewer and water xing 1 j 12' 10 2 25 TH 5 with MnDOT Plan/profile watermains: 18" X 3800' 6 16 62 84 20" X 800', 12" X 4600' (7 sheets) Plan/profile san sewer (1900') 41 8 20 32 (3 sheets) 1 1 Sewer Details j 6 , 4 24 34 Watermain details 2 : 4 12 ! 18 Coordination with roadway plans ' 31 141 81 16 j 41 Special provisions 4 26 i ! 6 36 Quantities and Cost Estimate 61 8' 81 22 Wetland /Creek crossing permit coord 3'1 12' 24 61 45 Department of Health Permits 11 81 20 81 37 Total Hours 141 125 143 i 202! 484 Rate 842.001 $28.00 $22.001$18.00 i Direct Labor $5881 $3,500 $3.146' $3.6361 $10,870 Overhead 155.70% $16,925 Subtotal $27,795 Profit $2,779 Expenses: Mileage, reproductions $150 TOTAL $30,724 ATTACHMENT C Barton - Aschman Associates, Inc. February 17, 1997 Estimated construction cost for Sewer and Water for TH 5 - Arboretum Blvd project WATER Units Quantity Unit Cos Cos' 6" DIP LF 150 $20.00 $3,000 8" DIP LF 400 $25.00 $10,000 12" DIP LF 5000 $30.00 $150,000 18" Watermain ;LF 3800 $45.00 $171,000! 20" Watermain ELF 800 $50.00 $40,000 Hydrants Each 8 $1,500.00 $12,000; 6" Valve Each 1 8 $500.00 $4,0001 , 8" Valve Each ' 8 $700.00 $5,600 12" Valve Each ! 4 $1,000.00 $4,0001 18" Valve Each 1 6 i $2,000.00 , $12,000 20" Valve Each 1 2 $2,200.001 $4,400 Jacked 16" Casing ILF I 125 $60.001 $7,500 Add'I 16" Casing ;LF 1501 $45.001 $6,750 Jacked 20" Casing ; LF ! 1251 $80.00' $10,000, Add'I 20" Casing LF 150 $55.001 $8,250 '' Jacked 30" Casing ILF 125 1 $120.001 $15,000 Add'I 30" Casing 1 LF 150 $90.00 $13,500 1 Total estimated watermain cost $477,000 Sanitary Sewer Units Quantity Unit Cost Cost 8" San Sewer stubs 1 LF 300' $15.00' $4,500 15" San Sewer LF 1000 $20.00 , $20,000 18" San Sewer LF 1200 $25.00 $30,000 San Manholes LF 70 $200.00 $14,000 Castings Each 3 $300.001 $900 Jacked 24" Casing LF 0' $100.001 $0 Add'I 24' Casing LF 0 $75.00 $0 Total estimated sanitary sewer cost $69,400 $546,400 Contingency 15% 76,150 Estimated Cost $622,550 02/19/97 14:38 FAX 612 332 6180 BARTON - ASCHMAN 002 /002 , ta. Minnesota Department of Transportation (T1 Transportation Building ? 1 — 395 John Ireland Boulevard fiD Saint Paul, Minnesota 55155.1899 t I 1 t JAN - 8 1997 ,II BARTON MC January 6, 1997 David Warzala, P.E. Barton- Aschman Associates, Inc. 111 Third Ave. #300, Minneapolis, MN 55401 RE: Agreement No. 74881, TH 5 in Chanhassen Dear Mr. Warzala: Enclosed is your executed copy of the above referenced agreement. This is your notice to proceed with the work in the Agreement assigned to your company. However, work assigned to SUBCONSULTANTS must riot commence until this office receives and approves a copy of your agreements with these subconsultants_ • For question regarding invoicing and other administrative matters, contact me. I have been assigned as the agreement administrator for this project. For questions regarding technical matters, contact Michael Spielmann. He has been assigned as the Project Manager for this project. . Sincerely, Alex Chernyaev, P.E. CC Michael Spielmann Assistant Consultant Agreement Engineer Ron Gipp Sandra Born File th \Ocosub An equal opportunity. employer