1g. Springfield 1st Addition: Amended Grading, Drainage & Erosion Control PlanCITY OF 1 9
.,
CHANHASSEN
690 COULTER DRIVE • P.O. BOX 147 • CHANHASSEN, MINNESOTA 55317
(612) 937 -1900 * FAX (612) 937 -5739
MEMORANDUM
TO: Charles Folch, Director of Public Works
Action by City Adminis"'Ir'
Endorsed !-
Mcdified
Rejected
Date -..---- 4 �
Date Submitted to`Commissint,
FROM: Anita Benson, Project Engineer Date s"t,Tit+.ed to cour:c4
DATE: July 8, 1997
SUBJ: Amend Grading, Drainage, and Erosion Control Plan; Springfield 1st Addition
Project No. 97 -14
Staff has received a request from Lundgren Bros. Construction, Inc. to revise the grading,
drainage, and erosion control plan for the above - referenced project. Lundgren Bros. has
proposed to construct berms along Lyman Boulevard on Outlot E of Springfield 1 st Addition.
These berms are shown on the approved preliminary grading plan for the Springfield development
(formerly Fawn Hill development) and were originally intended to be constructed in a future phase
of the development. However, the developer has encountered more material unsuitable for
building construction than anticipated during the construction of Springfield 1 st Addition. Since
the material is suitable for berm construction and staff has reviewed the proposed revised grading,
drainage, and erosion control plan, approval is recommended. The approval shall be contingent
upon the applicant obtaining subsequent approval from the Lake Riley Watershed District.
jmS
Attachment: 1. Letter dated June 30, 1997 from Bill Anner, Lundgren Bros. Construction
2. Berm Detail Grading Sheet dated July 8, 1997 prepared by Pioneer
Engineering, P.A.
\ �cfsl\ vol2leng \projects\springfield\plan revision.doc
OFFICIAL ENGINEERING Copy
Received
Revision No.
Approved y City Engineer
Date — g 7
Approved by City Council
we
Lundgren
BROS.
30 June, 1997
Mr. Dave Hempel
City of Chanhassen
P.O. Box 147
Chanhassen, MN 55317 -0147
Re: Springfield 1st Addition
Dear Dave:
As per our phone conversation of 6/27/97, during the construction of
"Springfield 1st Addition," Lundgren Bros. Construction, Inc., has
encountered more material which is not suitable for building construction
then was anticipated. As can be seen from the attached drawing, in a later
phase of the project a berm will be built along Lyman Blvd. This berm is a
natural area to place the unsuitable building material. By way of this letter
and the attached drawing we are seeking the City's approval for these
Phone 612.473.1231 activities. Please feel free to contact me with any questions you may have.
Fax 612.473.7401
935 East Wayzata Boulevard
Wayzata, Minnesota 55391
Sincerely,
Builder License No. 0001413
Bill Anner ITT or C A S E
cc: Mike Pflaum
1199 - 1
E WEER UP
F:\ USER\ SHARE\ LAND\ CHANHASS\ SPRGFLD\ CITYBERM.LET