1g. Springfield 1st Addition: Amended Grading, Drainage & Erosion Control PlanCITY OF 1 9 ., CHANHASSEN 690 COULTER DRIVE • P.O. BOX 147 • CHANHASSEN, MINNESOTA 55317 (612) 937 -1900 * FAX (612) 937 -5739 MEMORANDUM TO: Charles Folch, Director of Public Works Action by City Adminis"'Ir' Endorsed !- Mcdified Rejected Date -..---- 4 � Date Submitted to`Commissint, FROM: Anita Benson, Project Engineer Date s"t,Tit+.ed to cour:c4 DATE: July 8, 1997 SUBJ: Amend Grading, Drainage, and Erosion Control Plan; Springfield 1st Addition Project No. 97 -14 Staff has received a request from Lundgren Bros. Construction, Inc. to revise the grading, drainage, and erosion control plan for the above - referenced project. Lundgren Bros. has proposed to construct berms along Lyman Boulevard on Outlot E of Springfield 1 st Addition. These berms are shown on the approved preliminary grading plan for the Springfield development (formerly Fawn Hill development) and were originally intended to be constructed in a future phase of the development. However, the developer has encountered more material unsuitable for building construction than anticipated during the construction of Springfield 1 st Addition. Since the material is suitable for berm construction and staff has reviewed the proposed revised grading, drainage, and erosion control plan, approval is recommended. The approval shall be contingent upon the applicant obtaining subsequent approval from the Lake Riley Watershed District. jmS Attachment: 1. Letter dated June 30, 1997 from Bill Anner, Lundgren Bros. Construction 2. Berm Detail Grading Sheet dated July 8, 1997 prepared by Pioneer Engineering, P.A. \ �cfsl\ vol2leng \projects\springfield\plan revision.doc OFFICIAL ENGINEERING Copy Received Revision No. Approved y City Engineer Date — g 7 Approved by City Council we Lundgren BROS. 30 June, 1997 Mr. Dave Hempel City of Chanhassen P.O. Box 147 Chanhassen, MN 55317 -0147 Re: Springfield 1st Addition Dear Dave: As per our phone conversation of 6/27/97, during the construction of "Springfield 1st Addition," Lundgren Bros. Construction, Inc., has encountered more material which is not suitable for building construction then was anticipated. As can be seen from the attached drawing, in a later phase of the project a berm will be built along Lyman Blvd. This berm is a natural area to place the unsuitable building material. By way of this letter and the attached drawing we are seeking the City's approval for these Phone 612.473.1231 activities. Please feel free to contact me with any questions you may have. Fax 612.473.7401 935 East Wayzata Boulevard Wayzata, Minnesota 55391 Sincerely, Builder License No. 0001413 Bill Anner ITT or C A S E cc: Mike Pflaum 1199 - 1 E WEER UP F:\ USER\ SHARE\ LAND\ CHANHASS\ SPRGFLD\ CITYBERM.LET