1f. Lyman Blvd/Lake Riley Area Trunk Utilities: Change Order No. 3CITY OF I 4 CHANHASSEN 690 COULTER DRIVE • P.O. BOX 147 • CHANHASSEN, MINNESOTA 55317 (612) 937 -1900 • FAX (612) 937 -5739 MEMORANDUM TO: FROM: DATE: SUBJ: Charles Folch, Director of Public Works Anita Benson, Project Engineer kv August 6, 1997 ptft By City JWfit �7 DO Submitt6d to CommissIM DW s ubmit4Qd to WutKil F //- 9 I Approve Change Order No. 3 to Lyman Boulevard Reconstruction and Lake Riley Area Trunk Utility Improvement Project No. 93 -32B The attached Change Order No. 3 for the above - referenced project consists of four primary elements as outlined in Change Order No. 3 dated July 9, 1997. The first and fourth items were changes needed to complete the east surcharge area which was started under a separate contract. However, this soil consolidation process was ongoing when the plans for this project were finalized. After the Lyman Boulevard contract was let, it was determined that additional surcharge material was needed to complete the consolidation required. Since the previous contractor had demobilized his equipment from the site, it was decided to have this additional surcharge work performed under this contract. Item No. 2 was required to adequately maintain traffic through the project area and access to residences during and after rain events. The third item is a cooperative effort change with the Springfield development (formerly Fawn Hill) and the City. Initially, it was planned to have the private development construct the joint storm ponds, for which they would have received an oversizing credit. However, the private development schedule was delayed and, as a result, it became necessary to construct the storm ponds under this improvement contract to provide adequate storm drainage for the Lyman Boulevard project prior to the development of the Springfield Addition. The developer's share of the pond excavation will be determined based on the capacity requirements of the Springfield development and will be included in the special assessment for the property. The total of Change Order No. 3 amounts to a total revised contract increase of $109,489.39. The previous bonding for this improvement project will adequately cover the cost increase associated with Change Order No. 3 since previous change orders resulted in a net reduction of the original contract amount by $155,600. Charles Folch August 6, 1997 Page 2 It is therefore recommended that the City Council approve Change Order No. 3 in the amount of $109,489.39 yielding a revised contract amount of $2,607,875.77 for the Lyman Boulevard Reconstruction and Lake Riley Area Trunk Utility Improvement Project No. 93 -32B. Attachment: Change Order No. 3 c: Dave Mitchell, OSM Rueben Mausolf, Richard Knutson, Inc. r\t Director of Public Works Comment vX As stated above, the previously approved Change Order Nos. 1 and 2 amounted to a $155,600 deduct on the original contract. This change order adds back approximately $109,000. However, the revised contract amount is still substantially under the original contract amount and within bonding amounts previously made. Staff recommends approval. g: \eng \pub1i&93- 32bkhange order no. 3 memo.dor OEFOAl. ENGINEERING CORY Received Revision No. Approved by City Engineer Date Approved by City Councll Date 1 1997 CHANGE ORDER Change Order No: 3 UIRE RING DEPT, City Project No. 93 -32B Project: Lake Riley Area Trunk Utilities, Improvements Phase IIB OSM Project No. 5183.04 Owner: City of Chanhassen Date of Issuance: July 9, 1997 P. O. Box 147 Chanhassen, MN 55317 Contractor: Richard Knutson, Inc. Engineer: Orr - Schelen - Mayeron 12585 Rhode Island Avenue South and Associates, Inc. Savage, MN 55378 You are directed to make the following changes in the Contract Documents: Add $109,489.39 to the contract. Description: 1) Furnish 7,100 cubic yards of additional material on east surcharge area. Negotiated and paid at the unit price of $6.54 per cubic yard. Quantity was not included in original bid quantity. $46,452.00 2) Placement of 1 -1/2" foundation rock to maintain access for residents. Material was used on rain days and to provide temporary roads during the project. Contractor furnished and placed 2,308.16 ton at a unit price of $5.93 per ton. $13,687.39 3) Excavation of ponding areas associated with storm sewer improvements. Ponding areas were to be graded by the developer prior to the City's project. Developer did not grade when anticipated. Contractor removed 7,000 cubic yards at common excavation unit price of $3.50 per cubic yard. $24,500.00 4) Removal of 7,100 cubic yards of surcharge material at common excavation unit price of $3.50 per cubic yard. Quantity was not included in original bid quantity. $24 TOTAL AMOUNT OF CHANGE ORDER $109,489.39 Purpose of Change Order: To provide for additional encumbrance of funds for additions to the project after it was bid. Attachments (documents supporting change): CHANGE IN CONTRACT PRICE CHANGE IN CONTRACT TIME Original Contract Price: $2,763,482.53 Original Contract Time: July 15, 1997 Previous Change Orders No.1 to No. 1: (- )$265,096.15 Change from Previous Change Orders: N/A Contract Price Prior to this Change Order: Contract Time Prior to this Change Order: $2,498,386.38 July 15, 1997 Net Increase (Decrease) of this Change Order: $109,489.39 Net Increase (decrease) of Change Order: N/A Contract Price with all Approved Change Orders: Contract Time with Approved Change Orders: $2,607,875.77 J y 15, 1997 Recomm nded By: � v App ov David D. Mitchell, P.E. ichar Kn tson, Inc. Approved By: Approved By: Date of Council Action: (City Engineer) (City Manager) '3.00\C N I L \PHASE I I\CO.3