Loading...
Admin SectionADMINISTRATIVE SECTION Letter to Dan McKay, James Steele Construction dated August 1, 1997. Letter to Paul Pecora, Triax Midwest Associations dated August 4, 1997. Memo from Kate Garwood, Southwest Metro Transit dated July 29, 1997. Minutes of the South Metro Joint Public Safety Training Academy dated July 9, 1997. Memo from Phillip Elkin regarding No Wake Zones dated August 4, 1997. Memo from Paul Donna, Springsted dated July 30, 1997. Letter from Warren Porter, Hennepin County dated July 30, 1997. Letter to John Michael from Triax Cablevision dated July 25, 1997. Memo to Anita Benson, Project Engineer dated July 25, 1997. Letter from Bob Lindall, Southwest Corridor Transportation Coalition dated July 29, 1997. Chanhassen Library Quarterly Report dated July 1997. Memo from Scott Harr dated July 29, 1997. Memo from Scott Harr dated July 24, 1997. Letter to Malcolm MacAlpine dated July 28, 1997. Memo to Dale Gregory, Parks Superintendent dated July 29, 1997. Letter to Todd Hoffman dated July 29, 1997. Memo to Steve Torell, Asst. Building Official dated July 31, 1997. Letter from David Senjem, Minnesota Dept. of Public Safety, dated July 30, 1997. Budget and Revenue Reports as of June 30, 1997. CITY OF CHANHASSEN 690 COULTER DRIVE • P.O. BOX 147 • CHANHASSEN, MINNESOTA 55317 (612) 937 -1900 • FAX (612) 937 -5739 August 1, 1997 Mr. Dan McKay James Steele Construction 1410 Sylvan St. St. Paul, MN 55117 CERTIFIED Re: City 'water service at: USPS Carrier Annex 1775 Lake Drive West Chanhassen, MN 55317 Dear Mr. McKay: Thank you for providing the opportunity for an inspection of the water service at the USPS building by a City mechanical inspector. As I have stated, the purpose of that inspection was to verify that the City's water service is and will be properly protected from contamination through the use of approved backflow devices. The inspector observed a condition in the fire sprinkler room where it may be necessary to install a reduced pressure zone (RPZ) backflow preventer. It is desirable to avoid installation of RPZs whenever possible because of annual testing requirements, rebuilding requirements and reporting requirements. Rerouting some water piping in the fire sprinkler room may enable the use of a pressure type vacuum breaker as a backflow preventer. The City mechanical inspector discussed this with the plumber. Proper installation and maintenance of proper backflow preventors is the primary method of preventing accidental contamination of the City water supply. Accordingly, if an RPZ backflow preventer is installed at the USPS Carrier Annex, the USPS will be required to sign an agreement stating it understands, and will abide by, the requirements for testing, maintenance and reporting of RPZ backflow preventors as stated in the Minnesota State Building Code, Chapter 4715.2161. The agreement must be executed before the City provides permanent water service to the building. Mr. Dan McKay August 4, 1997 Page 2 The City mechanical inspectors noted on the 7/15/97 and 7/21/97 inspections that a final inspection will be required before permanent water service is provided. Please call me if you have any questions. Sincerely, Steve A. Kirchman Building Official PC: Don Ashworth, City Manager Scott Harr, Public Safety Director Charles Folch, City Engineer Roger Knutson, City Attornev Mark Littfin, Fire Marshal Randy Debner, Mechanical Inspector Sharmin Al -Jaff, Planner II Mr. Brian Marshall, USPS Mr. Greg Deeb, Mechanical Contractor City Council administrative packet Building file, 1775 Lake Drive West Planning; file, 95 -15 SPR G safaa'insp.bld -re,` scs3 LAW OFFICES MOSS & BARNETT A PROFESSIONAL ASSOCIATION 4800 NORwEST CENTER 90 SOUTH SEVENTH STREET ... MINNEAPOLIS, MINNESOTA 55402 -4129 BRIAN T. GROGAN TELEPHONE )612) 347 - 0300 (612) 347 -0340 E -MAIL: GroganB @moss - bamett.com FACSIMILE )612) 339 -6686 August 4, 1997 VIA FACSIMILE AND U.S. MAIL Mr. Paul R. Pecora Triax Midwest Associations, L.P. 1504 Second Street, S.E. Waseca, MN 56093 Re: City of Chanhassen, Minnesota Dear Mr. Pecora: As you are aware, the City of Chanhassen has experienced numerous customer service issues with your company over the past several weeks. The volume of telephone calls regarding cable television service received by the City Manager's office has significantly increased over this time period burdening City employees with matters which should be addressed by Triax and its employees. At a recent City Council meeting on July 28, 1997 each and every member of the Chanhassen City Council expressed serious concern over the level of customer service presently provided by Triax and its impact on the residents and cable television subscribers in the City. These customer service issues must be addressed immediately and a thorough and detailed report should be fnnx rded to the Ci explail: the ° Ci ,um�tnnno s r Y b rl" rc � �+••��:,gardli' i - ax ' s cus� vi;i�,t sii Jice failures and the steps which are being taken to ensure that similar issues do not arise in the future. In particular, the City is concerned that several provisions of the FCC Customer Service Obligations, found at 47 U.S.C. Section 76.309, have been violated. These include the following: 1) Trained company representatives have not been available to respond to customer telephone inquiries during normal business hours. G � MOSS & BARNETT A PROFESSIONAL ASSOCIATION Mr. Paul R. Pecora August 4, 1997 Page 2 It has been difficult if not impossible for subscribers to reach Triax representatives by telephone. 2) Under normal operating conditions telephone answering time by Triax customer service representatives, including wait time, is not to exceed thirty (30) seconds when the connection is made. If the call needs to be transferred, the transfer time is not to exceed thirty (30) seconds. These standards are to be met no less than ninety (90) percent of the time under normal operating conditions, measured on a quarterly basis. Based on the comments received from subscribers contacting the City office and Chanhassen's City Council members this standard has not been met. 3) Standard installations are to be performed within seven (7) business days after an order has been placed. "Standard" installations are those that are located up to 125 feet from the existing distribution system. 4) Excluding conditions beyond the control of Triax, Triax is to begin working on "service" interruptions "promptly" and in no event later than 24 hours after the interruption becomes known. Triax must begin actions to correct other service problems the next business day after notification of the service problem. 5) If a Triax representative is running late for an appointment with a customer and will not be able to keep the appointment as scheduled, the customer must be contacted. The appointment should then be rescheduled, as necessary, at a time which is convenient for the customer. 6) Triax's communications with its cable subscribers appear deficient in that Triax apparently has apparently not provided installation and service maintenance policies to its subscribers as required. As you know, Triax and the City of Chanhassen are scheduled to meet August 13, 1997 at 9:00 a.m. at the Chanhassen City Hall to discuss issues relating to the renewal of the cable television franchise. At this meeting the City also desires to address the customer service issues which have arisen over the past several weeks. It will still be necessary, however, for Triax to provide a detailed written explanation regarding matters addressed within this letter so that such letter can be distributed to City Council members at a regularly scheduled meeting. Based on my discussions with other Triax representatives I understand corrective measures are already being implemented in an effort to ensure that these customer service deficiencies do not resurface. This information must be communicated in writing by Triax to the City of Chanhassen to ensure MOSS &BARNETT A PROFESSIONAL ASSOCIATION Mr. Paul R. Pecora August 4, 1997 Page 3 that the City's elected officials are satisfied with Triax's response and compliance with applicable customer service obligations. If you should have any questions regarding this letter please feel free to contact me. Very truly yours, MOSS & BARNETT, A Professional Association /3/ 4/ ice. Brian T. Grogan BTG /slo 124156/2NSS01 !.DOC cc: Mr. Don Ashworth Mr. Todd Gerhardt Ms. Jane Bremer e - SOUTHWEST (METRO TRANSIT A �. MEMORANDUM TO: Commissioners, City Council Members, City Managers, Department Heads FROM: Kate Garwood, Policy & Administration Coordinator DATE: July 29, 1997 SUBJECT: UPDATE ON TRANSIT ISSUES PENDING THREAT OF STRIKE BY METRO TRANSIT DRIVER The contract for Metro Transit drivers and mechanics services between the Amalgamated Transit Union (ATU) and the Metropolitan Council expires on July 31, 1997. Recently, SMTC was notified by the General Manager of Metro Transit (formerly the MCTO) that the negotiations did not appear to be moving toward resolution and that a strike might occur soon. Staff concerns about this pending strike were reported to the Commission at its meeting on July 24th. This afternoon, SMTC was notified that mediators have been selected and that both sides have agreed to a one -month extension of the existing contract in order to continue working toward settlement on a new contract. Meanwhile, Metro Transit's General Manager has promised to keep SMTC informed and updated on the negotiations. SMTC's plans are very similar to last time in that SMTC WILL CONTINUE TO SERVE ITS CUSTOMERS in the event of a strike. Our main service provider, Laidlaw Transit Services, which is served by a different union, has agreed to continue driving in the event of a strike by the ATU. In addition, we will initiate the same communication system as before, which included: • Establishing key contacts with each city regarding emergency plans • Preparing drivers and dispatchers about what to expect • Developing an information plan for customers so they know what to expect and when • Developing media contacts to keep the general public informed Periodically, as events dictate, we will send out updates such as this to you. If you have any questions or concerns, please contact Len Simich, SMTC Executive Director, at 949 -8540, or me at 949 -8546. 07114 %97 15:28 FAX 92 7 1545 CITY OF EDINA South Metro Joint Public Safety Trailing Academy July 9 Minutes P" S,.:w ee .Th to the following members for attending. R oger Erickson, Todd Christopher fohn C'onlei-, Ken Rosland, Darrel Todd, Bill Barington, Ted Pru�fi�anz, Bernie Berighelrn and Patrick Alelvin. The primary purpose of this meeting was to allow the Business Plan Committee consisting of Itch Rosland. Mark Berrhiardson, Bob Lutz, Brad SveLur], Steve Devich, a finance officer from Richfield and Patrick Melvin to present their recommendatiol]. as to - which firm should prepare a business plan for fhe training academy. A material delivery issue detrimentally impacting the time line for construction was also presented by Roger for consideration by those rnenibers present. The Business Plan Conunittee interviewed four firms interested in preparing a business plan for the training academy. Tlii}se firms included Grant Thornton LLP, Deloitte & Touche LLP, Eide Helmelce. PLLP and Springsted. Grant Thornton, although putting together a well qualified project team and suggesting an additional source of funding for the planning stages of this project, proposed an exorbitant fee which quickly eliminated this firm as a possibility. Eide Hehneke although very thorough in outlining the aspects of a business plan, f ailed to provide the cominitteG with wi estimated c:vst fo preparation of a business plan instead providing an hourly fee range depending upon the scope of the project. Deloitte & Touche submitted a proposal that was very competitive from a cost standpoint- Yet another firm, Springsted Public finance Advisors, was judged to be the most qualified to prepare this business plan. Springsted Public Finance Advisors was the firnlr recommended and approved to prepare the business plan for the training academy. The primary f actor which compelled Springsted above Deloitte & Touche and the other firms was the qualifications of their project team. One of their project tew inembers, Don Peterson, is an individual with 33 years of lase enforcement experience with the Minnesota Bureau of Criminal Apprehension- The fee for their services is $27,300, the lowest of the four firms interviewed, and completion time is estimated to take approximately 12 weeks. The City of Edina will again pay Springsted and bill each city for reimbursement. Informal contracts are being prepared to confirm each city's commitment to reimburse the City of Edina for $5,460. A meeting is scheduled for 3:00, July 16 at the Edina Council Chiunbers to meet with project team members and more clearly outline the direction in w hich we want a business plan for this training academy to proceed. Anyone able to attend this ineeti.ng i.s welcome to come and provide input for the project team- Roger Erickson informed individuals of the latest complication in the construction schedule. The current con struction schedule anticipates construction to be initiated in May of 1998. However, orders for precast concrete are currently backlogged at least six months, requiring the construction schedule for the training academy to also be adjusted. If construction is to occur in lvl:ay of 1998, the design phase will have to be initiated in August of 1997 so that the precast r.� 07114:97 13:29 FAX 927 7545 CITY OF EDINa 0003 concrete will be here in time for construction_ A second benefit to initiating the design plans early is that conducting bids in January will attract more bidders, bidding lower prices because it is the start of the bidding process. As bidders get further into the bidding season prices typically increase as bidders get busier. Ken directed Roger and Todd to direct an updated letter regarding the precast concrete dilemma to his attention and hold off action until August. It is anticipated that the participating cornmunities will agree to proceed with the initial design phases which. are necessary to pen-nit construction in 1998. The cost for this initial design phase work will riot exceed 514,000. A proposal for the 1998 Governor's Bonding Bill has been submitted to the Department of Finance_ This copy reserves our place in the bonding bill and will be reviewed by personnel working in the Department of Finance and returned with further suggestions for improvement. Final submission of the revised proposal is due October 31. The Governor submits his 1998 Budget flan to the legislature in February of 1998 and legislative committees begin the process of fomially reviewing the agency requests. In May, the legislature adopts and the Governor approves the 1998 bonding bill_ The total being sought through the Governor's Bonding Bill is 2.5 million dollars. Thanks to Jim Prosser for his willingness to be the contact person on this proposal. A copy of the proposal will be distributed to each department. CITY OF CHANHASSEN 690 COULTER DRIVE • P.O. BOX 147 • CHANHASSEN, MINNESOTA 55317 (612) 937 -1900 • FAX (612) 937 -5739 MEMORANDUM TO: Don Ashworth, City Manager FROM: Phillip Elkin, Water Resources Coordinator DATE: August 4, 1997 SUBJ: No Wake Update Here is summary of our meeting on no wake ordinances and an update on the issue. • The City can pass an ordinance to restrict boating activities that cause wakes • Any Lake that the City restricts will have to be completely within the City boundary or will require an identical ordinance from the adjoining City. (i.e. Lake Riley will require additional approval from the City of Eden Prairie.) • Recreational lakes entirely within Chanhassen, which.this ordinance would effect are Lotus, Minnewashta, Susan, Lucy and Ann. • The DNR will have to review any ordinances to make sure they meet state regulations • Public Safety has posted No Wake signs on all Lakes which have public access in Chanhassen, however are technically not legal. • Carver County and DNR water patrol will enforce No Wake ordinances once they're in place. • At this time I would recommend that any ordinance be proposed for Lotus Lake, Lake Riley and Lake Minnewashta. Lake Ann already has a restriction on motors, and Lake Lucy has no public access therefore there is nowhere for signs or no way of enforcing the rules. The Lake Minnetonka Conservation District has had such an ordinance in place since July 1993. That ordinance requires the water levels to exceed the ordinary high water mark (OHW 929.4) by 0.4 feet (929.8) for five consecutive days or reach a level of 930.0. All elevations are measured above sea level. In the past few years water has risen above the mark and gone down the next day, thus the five day requirement. 08/04/97 Here is my proposal on how the City should proceed with issue for the remainder of the boating season: Enact a temporary No Wake ordinance on the following Lakes at the respective elevations: Recreational NWL OHW 100yr. WL Proposed Distance from Lakes No Wake El. Shore Lotus 895.4 896.3 896.8 896.6 Lake Wide Minnewashta 942.2 944.5 945.3 944.9 600 ft Christmas N/A 932.77 N/A N/A Susan 881.4 881.8 884 882.2 Lake Wide Riley 864 865.3 865.5 865.5 600 ft Ann 955.2 955.5 956.3 N/A Lucy 955.3 956.1 956.6 956.4 Lake Wide *NWL - Normal water Level *OHW - Ordinary high water level * l 00yr. WL - 100 year floodplain level Once a ordinance is drafted send a copy to Eden Prairie for their ratification. If this action is agreed upon, I will contact Roger K. and have the elevations written into an ordinance. If the ordinance process is to be pursued I recommend the following actions: • Meet with watershed districts, DNR and determine an elevation for enactment of the ordinance. Determination should be made at specific water level that triggers a ban and a proposed ordinance drafted. • Determine which lakes need no wake protection and eliminate any lakes that can withstand temporary rising water. • A public hearing should be held with all Lakeshore residents notified as well as notification in the local newspaper • Benchmark elevations put at public access points of each of the lakes to identify the restrictive water elevations • No wake signs should be made that can be posted and removed • No wake signs would have a diagram of the lake, and restricted areas highlighted. 85 E. SE%ENTH PLACE SUITE 100 SAINT PAUL, MN 55101 -2143 612 - 223 -3000 FAX: 612-223-3002 SPRINGSTED Publu Finance Advisers MEMORANDUM TO: Distribution List FROM: Paul R. Donna DATE: July 30, 1997 SUBJECT: City of Chanhassen, MN - Capital Financing Requirements Attached is a proposed calendar of events for the City's upcoming bond issue(s). It is imperative that the projects become defined and the sources of revenue outlined within the next couple of weeks in order to meet your schedule. If you have any questions or would like to amend the calendar, please contact me. cjb Attachment SAINT PAUL, MN • MINNEAPOLIS, MN • BROOKFIELD, WI • OVERLAND PARK, KS • WASHLtiGTON, DC • IOWA CITY, to Page 2 Preliminary Bond Sale Calendar City of Chanhassen, Minnesota 1997 Bond Issue(s) Date Action Item Participants August 6, 1997 Projects defined and revenue City Staff sources outlined Springsted August 15, 1997 Official Statement information sent City Staff to Springsted August 21, 1997 Finance plan recommendations and Springsted resolutions delivered to City for Kennedy & Graven Council packet August 25, 1997 City Council meeting to consider City Council /Staff resolution setting sale date Springsted Kennedy & Graven August 29, 1997 Draft Official Statement sent to Springsted participants to review September 4, 1997 Comments on draft Official City Staff Statement complete Kennedy & Graven Springsted September 8, 1997 Official Statement printed and Springsted distributed Application to Standard and Poor's for credit rating September 15 -19, 1997 Credit rating review and assigned City Staff Springsted September 22, 1997 Bids taken and tabulated Springsted September 22, 1997 City Council consideration of award City Council/Staff Springsted Kennedy & Graven Late October 1997 Settlement of bonds; transfer Springsted of funds to City Kennedy & Graven Page 3 City of Chanhassen, Minnesota 1997 Bond Issue(s) Distribution List ISSUER: Mr. Don Ashworth, Manager Ms. Pam Snell, Finance Director Mr. Charles Folch, City Engineer City of Chanhassen P.O. Box 147 690 Coulter Drive Chanhassen, MN 55317 Phone: (612) 937 -1900 Fax: (612) 937 -5739 FINANCIAL ADVISORS: Mr. David MacGillivray Mr. Paul Donna Ms. Catherine Polta Springsted Incorporated 85 East 7th Place, Suite 100 St. Paul, MN 55101 Phone: (612) 223 -3068 - Dave (612) 223 -3066 - Paul (612) 223 -3064 - Catherine Fax: (612) 223 -3002 LEGAL: Mr. Dave Kennedy Kennedy & Graven 470 Pillsbury Center Minneapolis, MN 55402 Phone: (612) 337 -9232 Fax: (612) 337 -9310 s July 30, 1997 ennepin - An Equal Opportunity Employer Cr a DfD►'f MILD -"U" C 1 1997 Mr. Charles Folch City Engineer City of Chanhassen 690 Coulter Drive Chanhassen, MN 55317 RE: Application for ISTEA Funds for CSAH 101 Dear Mr. Folch: ENGINEERING DEPT, s y Enclosed for your files is a copy of the application we recently submitted for ISTEA funding for project 101/9626 in Chanhassen and Eden Prairie. We appreciate and thank you for the June 17, 1997 letter of support from Mr. Ashworth. We will let you know the results of the application process as soon as we hear the award announcement. Sincerely, Warren K. Porter, P.E. Senior Professional Engineer WKP:jrh Enclosure cc: Tom Johnson ounty Department of Public Works 320 Washington Avenue South Recycled Paper Hopkins, Minnesota 55343 -8496 (612)930 -2500 FAX:(612)930 -2513 TDD:(612)930 -2696 (f. 6. 'led- s TRWoC 1504 2nd St. S.E., I.O. Box 110, Waseca, M N 56093 Sales and Billing: 1.800- 332 -0245 Repair: 1- 800 -422 -1473 July 25, 1917 Mr. John W. Michael 431 Trap Line Lane Chanhassen, MN 55317 -9103 Dear Mr. Michael: First, I would like to thank you for your letter, dated July 17, 1997, regarding the quality of service you have recently received from Triax Cablevision. Over the last several weeks, we have had several service interruptions affecting our customers in your area, and most recently, interruptions caused by severe thunderstorm activity. We understand this is very frustrating, and at tines, it has been very difficult to contact a representative in our office because our telephone lines have been very busy. Not only have service interruptions created a dramatic increase in our telephone activity, recent programming enhancements and our cost competitive monthly service have also contributed to above - normal activity. The r�sti It of this activity is the providing of service far below what we us a C ompany, Laid Yo« as a valued customer, expect. We recognize that quality customer service is the core of our business. As a result, over the next 30 -60 days, we will make several upgrades and improvements to our telephone system which will enable us to answer your questions more efficiently. We are also taking aggressive action in other areas. In addition to making several staffing changes, implementing new training programs, and renewing our commitment to service quality, we are making plans to completely upgrade our system. While this project will take some time to finalize and complete, it is part of our continued efforts to bring a new level of service quality to the community. Mr. Michael, i appreciate you taking the time to write, and t thank you for your patience with us while we make several. changes to improve the quality of our service to you. If we can be of assistance in the future, please feel free to contact one of our Customer Service Specialist at 1- 800- 332 -0245. Sincerely, i'd 4zo r Paul R. Pecora Regional Manager / �` ' - ___Z4J CITY OF CHANHASSEN 690 COULTER DRIVE • P.O. BOX 147 • CHANHASSEN, MINNESOTA 55317 (612) 937 -1900 • FAX (612) 937 -5739 MEMORANDUM TO: Anita Benson, Project Engineer FROM: Charles Folch, Director of Public Works DATE: July 25, 1997 SUBJ: Professional Engineers Exam I want to extend a well deserved congratulations to you on your recent successful passing of the Professional Engineers Exam for civil engineers. This is undoubtedly one of the most major milestones to attain in your engineering career and I'm sure it is one that you are happy to have under your belt. Again, please accept my congratulations on your achievement j c: Don Ashworth, City Manager Todd Gerhardt, Assistant City Manager Personnel File \'cfs 1 \vo 12\englcharles\znemos\anita.doc SOUTHWEST CORRIDOR TRANSPORTATION COALITION 470 Pillsbury Center Minneapolis, MN 55402 (612) 337 -9300 L July 29, 1997 Dave Pokorney City Administrator City of Chaska One City Hall Plaza Chaska, MN 55318 RE: T.H. 41 Our File No. LN400 -51 Dear Dave: At its July 16, 1997 meeting, the Southwest Transportation Coalition adopted a resolution of support for the joint application being submitted by MnDOT and the City of Chaska for federal funds to assist in the upgrade of Highway 41. We understand that your application is specifically for the section of Highway 41 from Highway 212 northerly to Engler Boulevard and that the application which you are submitting is for surface transportation program funds. Highway 41 carries in excess of 20,200 cars per day, well in excess of its design capacity. The City is to be commended for offering to contribute One Million Dollars toward the upgrading of this section of Highway 41, and for its efforts to acquire right -of -way for the project. This is a much needed improvement. The City of Chaska has been at a great disadvantage for many years due to the heavy traffic through the City. I am unaware of any other city of its size which has level of congestion "F" on two highways intersecting at a major downtown corner. In addition, the "reliever road" also serving the community, T.H.5, is also at level of congestion F. Truly, the area's highways are in miserable condition and badly in need of improvement. You ver tru , Robert J. ndall, President RJL /cm cc: Coalition Members Gene Ranieri Fred Corrigan Chuck Siggerud Natilio Diaz RJL126632 LN400 -51 CHANHASSEN LIBRARY QUARTERLY REPORT July 1997 April Circulation up 19% Reference questions were up 47 Library users 5,849 up 6% May Circulation up 26% Reference Questions up 42% Library users 4,979 up 41% June Circulation up 20% Reference questions up 31% Library users 5,005 up 7% Year to date: Circulation up 15% Reference questions up 36% Library users up 9% Notes: Our summer programs are going well. Over 450 children have signed up for the summer reading program. 200 -300 have been attending the summer performances on Tuesdays. we have added another staff person who will be working Tuesday nights, enabling us to have two people on duty all day Tuesday, our busiest day. Current staff: Kathy Perschmann, Branch Librarian; Rowena Lauterbach, Librarian 1; Karla Businaro and Mary Diane Bass, Aides. We received a donation of 760$ from the Jaycees and another of $250 from the Friends of the Chanhassen Library, which were used to purchase reference books, which will be very useful. jr t i CHANHASSEN LIBRARY QUARTERLY REPORT July 1997 April Circulation up 19% Reference questions were up 47 Library users 5,849 up 6% May Circulation up 26% Reference Questions up 42% Library users 4,979 up 41% June Circulation up 20% Reference questions up 31% Library users 5,005 up 7% Year to date: Circulation up 15% Reference questions up 36% Library users up 9% Notes: Our summer programs are going well. Over 450 children have signed up for the summer reading program. 200 -300 have been attending the summer performances on Tuesdays. we have added another staff person who will be working Tuesday nights, enabling us to have two people on duty all day Tuesday, our busiest day. Current staff: Kathy Perschmann, Branch Librarian; Rowena Lauterbach, Librarian 1; Karla Businaro and Mary Diane Bass, Aides. We received a donation of 760$ from the Jaycees and another of $250 from the Friends of the Chanhassen Library, which were used to purchase reference books, which will be very useful. CITY OF CHANHASOrmyoll 690 COULTER DRIVE • P.O. BOX 147 * CHANHASSEN, MINNESOTA 55317 (612) 937 -1900 • FAX (612) 937 -5739 TO: Mayor City Council City Manager FROM: Scott Harr, Public Safety Director -46� DATE: July 29, 1997 SUBJECT: Outdoor warning sirens I would like to take this opportunity to briefly express my intention of again requesting outdoor warning sirens to be funded as a part of the 1998 budget process. Because I believe the public hearing (of which verbatim minutes are available at your request) last year clearly supported this effort, I don't plan to hold another public hearing, unless you might like one. However, I have received additional calls this year because of the severe weather that we have experienced. As the Public Safety Director for the City of Chanhassen, I feel very strongly about the necessity of providing this component of our warning coverage, and would please ask that you contact me with any questions or thoughts so that I might have the opportunity to address these as we enter into the budget process. I did hold a meeting with neighboring jurisdictions regarding the possibility of sharing costs on the borders, and expect an updated quote from one siren company shortly. I'm sure we're looking at something in the realm of $125,000.00 to purchase 10 - 12 battery backup radio activated units to cover all of the city. Thank you. c _:afetvSh\sirens8 MEMORANDUM 1 CITY OF C-e "°� CHANHASSEN 690 COULTER DRIVE • P.O. BOX 147 • CHANHASSEN, MINNESOTA 55317 (612) 937 -1900 • FAX (612) 937 -5739 MEMORANDUM TO: City Staff FROM: Scott Harr, Public Safety Director DATE: July 24, 1997 SUBJ: New CSO I would like to have you join me in formally welcoming Henry Price, better known. as "Pepper ". Pepper has been here a while now, but I have been negligent in introducing him via memo. Pepper attended high school in British Columbia, moving to Edina to attend police school at Normandale College. Pepper's parents have traveled throughout the world as missionaries, so you might ask him about the fascinating places he's lived. Pepper's interest include beach volleyball, hand gliding and bowling. Please join me in welcoming Pepper to the CSO team! SH:cd gAsafety \sh \newcso Adi1 S" . C. C LARKIN, I DALY & LINDGREN, LTD. ATTORNEYS AT LAW Jane E. Bremer DIR. DIAL (612) 896 -3297 July 28, 1997 Mr. Malcolm MacAlpine 7187 Frontier Trail Chanhassen, MN 55319 Dear Mr. MacAlpine: 1500 NORWEST FINANCIAL CENTER 7900 XERXES AVENUE SOUTH BLOOMINGTON, MINNESOTA 55431 -1194 TELEPHONE (612) 835 -3800 FAX (612) 896 -3333 s�. :. As you know, I serve as counsel to Triax Midwest Associates, L. P. and appreciate your call of 1'lnu•sday, July 17, regarding the customer service problems you experienced with Triax's cable system in Cllanllassen. It is illy understanding that you previously sent a letter to Triax regarding these customer service issues and were given lily name by the City of Chanhassen when you received no response. Please be advised that I have forwarded your name and the specifics of your concern to the Triax's Regional Manager for Minnesota, Paul Pecora, and it is illy understanding he has contacted you at this point. lfthis incorrect, please contact me immediately. On behalf of "Triax, I am very sorry your experience with us has been less than either of us would hope or expect. Triax is sincerely interested in providing the best possible service to its customers and welcomes comments and suggestions from its customers and regulators. Going forward, if you have any problems or concerns or experience difficulty contacting Triax, please feel free to call me, Amy Nawrocki of illy office or Paul Pecora at 1 -800- 332 -0245. Sincerely, O _ ne E. Bremer, for LARKIN, HOFFMAN, DALY & LINDGREN, Ltd. cc: vfodd Gerhardt Ric Hanson Paul Pecora 0317424.01 CITY OF CHANHASSEN 690 COULTER DRIVE • P.O. BOX 147 • CHANHASSEN, MINNESOTA 55317 (612) 937 -1900 • FAX (612) 937 -5739 MEMORANDUM TO: Dale Gregory, Parks Superintendent FROM: Todd Hoffman, Director of Parks and Recreation DATE: July 29, 1997 SUBJ: Sidewalk Repair On July 29, 1997, I discussed your inquiry regarding sidewalk repair with City Manager Don Ashworth and other department heads. Upon conclusion of our discussion, Don directed the engineering department to discuss this issue with the city council at budget time. His proposal is to include this item as an annual component of the City's street repair program. Sidewalk repair would then become a budgeted line item of this program to be administered by the City Engineer/Director of Public Works. PC: City Council Park and Recreation Commission Charles Folch, City Engineer /Director of Public Works Mike Wegler, Street Superintendent gApark \th \S idewal k RepairMemo r� 1001 Lake Lucy Road Chanhassen, MN 55317 -8678 Telephone: 612- 470 -9883 Facsimile: 612- 470 -8067 July 22,1997 Mr. Todd Hoffman Park & Recreation Director City of Chanhassen PO Box 147 Chanhassen, MN 55317 Dear Mr. Hoffman: UT 4 Thank you to you personally and the City of Chanhassen for the Playground Equipment that was provided to Minnetonka Middle School West. It is good to see some involvement of the City with Minnetonka Schools and this particular item is much needed and appreciated. As a resident of Chanhassen and a member of the Minnetonka School Board, I have often felt that those of us on the Minnetonka Schools side of the District were not fully part of the City of Chanhassen. Perhaps you are not aware, but three of the eight n Members of the Minnetonka Board are residents of Chanhassen. That is out of the 10 communities we serve. Congratulations on the successful Park referendum. The decision to include upgrades to the existing parks was a big factor in changing my view on the referendum. Again, that part affects those of us in the northern part of the City. When the City has issues needing support in the future, I hope it will consider the Minnetonka Public Schools as a possible partner. Thanks again. Sincerely, Uradley U. Johnson �✓iG/'� /G' s // CITY OF CHANHASSEN 690 COULTER DRIVE • P.O. BOX 147 • CHANHASSEN, MINNESOTA 55317 (612) 937 -1900 0 FAX (612) 937 -5739 MEMORANDUM TO: Steve Torell, Assistant Building Official FROM: Steve A. Kirchman, Building Official a�IC DATE: July 31, 1997 SUBJECT: Commendation - flood relief Just a short note to commend you on your recent week -long trip to East Grand Forks to assist that city in their efforts to inspect and issue permits for the more than 2400 flood damaged structures. I understand that about one third of these structures will be required to be moved or demolished. Imposing such drastic measures on an already distressed citizenry has to be very stressful to code enforcement officials. Your experiences in East Grand Forks should prove very helpful to Chanhassen as we continue to develop and refine our emergency management plans. PC: Scott Harr, Public Safety Director Council admin packet Personnel file g:\safetN.\sak\mcmos\psd\st-coin DIVISION OF EMERGENCY MANAGEMENT EMERGENCY RESPONSE COMMISSION B -5 State Capitol 75 Constitution Avenue St. Paul, Minnesota 55155 -1612 TTY (612) 282 -6555 FAX (612) 296 -0459 Telephone: (612) 296 -2233 July 30, 1997 Don Ashworth, City Manager City of Chanhassen 690 Coulter Drive Chanhassen, Minnesota 55317 Dear Mr. Ashworth: STATE OF MINNESOTA DEPARTMENT OF PUBLIC SAFETY Aj MINNESOTA P.H. Safety �w EMENGENC MpNAGEMENr A/- j C a �✓ �: K �Q� Su 1 The Minnesota Emergency Response Commission (ERC) would like to recognize two significant contributions to the public safety of our state. The first contribution is that of your employee, Scott Harr, as a member of the Regional Review Committee. As a member of this committee, Mr. Harr participates in local planning for emergency response to hazardous materials incidents. The support of the regional review process is critical to emergency planning in the state and the ERC would like to formally recognize the work of Mr. Harr as a representative of business and industry. The second contribution is that made by your business or agency. The ERC is grateful that you have made public safety a priority and that you have provided a representative in the planning process. The Regional Review Committee's across the state are an effective example of a business /government partnership. Your continued participation and representation are welcomed and are absolutely necessary for success. The ERC thanks City of Chanhassen for supporting the emergency planning process through the time and work of Scott Harr. Our state's system of planning for emergencies is evolving. Increased emphasis is being placed on local involvement from all sectors. The continued input from all the involved parties will be needed. We hope you will continue to participate in this public safety partnership. Sincerely, David H. Senjem Chair AN EQUAL OPPORTUNITY EMPLOYER Income Statement 06130/97 Actual v. Budget 50% Remaining Page 1 06/97 YTD Actual 06197 Budget 06/97 Variance 06/97 % Variance 06/96 YTD Actual 06/96 Budget 06/96 Variance 06/96 % Variance 12/96 YTD Actual 12/96 Budget 12/96 Variance 12/96 % Variance General Government 111 Legislative 70,049.68 149,575 79,525.32 53.17% 70,390.59 146,742 76,351.41 52.03% 130,064.06 146,742 16,677.94 11.37% 112 Administration 96,480.94 239,124 142,643.06 59.65% 100,083.92 223,124 123,040.08 55.14% 192,372.71 223,124 30,751.29 13.78% 113 Finance 65,023.54 142,804 77,780.46 54.47% 87,253.83 183,362 96,108.17 52.41% 168,635.41 183,362 14,726.59 8.03% 114 Legal 41,031.23 83,000 41,968.77 50.56% 47,332.73 80,000 32,667.27 40.83% 98,099.07 80,000 (18,099.07) - 22.62% 115 Property Assessment 1,709.26 74,050 72,340.74 97.69% 1,125.64 72,600 71,474.36 98.45% 48,913.16 72,600 23,686.84 32.63% 116 M.I.S. 0.00 26,800 26,800.00 100.00% 0.00 0 0.00 0.00% 0.00 0 0.00 0.00% 117 City Hall 136,653.32 196,350 59,696.68 30.40% 129,940.95 176,850 46,909.05 26.52% 197,888.00 176,850 (21,038.00) - 11.90% 118 Elections 315.95 7,750 7,434.05 95.92% 8,944.63 32,000 23,055.37 72.05% 41,968.41 32,000 (9,968.41) - 31.15% Total General Government 411,263.92 919,453 508,189.08 55.27% 445,072.29 914,678 469,605.71 51.34% 877,940.82 914,678 36,737.18 4.02% Page 1 City of Chanhassen Income Statement 06/30/97 Actual v. Budget 50% Remaining Page 2 06/97 YTD Actual 06/97 Budget 06/97 Variance 06/97 % Variance 06/96 YTD Actual 06/96 Budget 06/96 Variance 06/96 % Variance 12/96 YTD Actual 12/96 Budget 12/96 Variance 12/96 % Variance Public Safety 121 Police Administration 339,465.13 694,474 355,008.87 51.12% 357,045.02 682,793 325,747.98 47.71% 673,857.92 682,793 8,935.08 1.31% 122 Fire Prevention 103,356.85 279,435 176,078.15 63.01% 115,061.84 267,807 152,745.16 57.04% 250,791.48 267,807 17,015.52 6.35% 123 Public Safety Commission 297.04 2,375 2,077.96 87.49% 853.24 2,325 1,471.76 63.30% 2,314.65 2,325 10.35 0.45% 125 Code Enforcement 261,876.58 675,850 413,973.42 61.25% 263,919.01 586,200 322,280.99 54.98% 548,886.58 586,200 37,313.42 6.37% 126 Animal Control 46,456.11 123,550 77,093.89 62.40% 51,922.33 116,000 64,077.67 55.24% 102,570.99 116,000 13,429.01 11.58% Total Public Safety 751,451.71 1,775,684 1,024,232.29 57.68% 788,801.44 1,655,125 866,323.56 52.34% 1,578,421.62 1,655,125 76,703.38 4.63% Page 2 Income Statement 06/30/97 Actual v. Budget 50% Remaining Page 3 06/97 06/97 06/97 06/97 06/96 06/96 06/96 06/96 12/96 12/96 12196 12/96 YTD Actual Budget Variance % Variance YTD Actual Budget Variance % Variance YTD Actual Budget Variance % Variance Public Works 131 Engineering 60,674.99 128,300 67,625.01 52.71% 53,644.47 126,560 72,915.53 57.61% 114,195.41 126,560 12,364.59 9.77% 132 Street Maintenance 239,266.65 702,370 463,103.35 65.93% 240,629.08 627,790 387,160.92 61.67% 583,805.51 627,790 43,984.49 7.01% 135 Street Lighting & Signals 82,074.47 171,440 89,365.53 52.13% 66,175.84 151,280 85,104.16 56.26% 148,822.93 151,280 2,457.07 1.62% 137 City Garage 94,527.02 237,850 143,322.98 60.26% 104,714.18 222,250 117,535.82 52.88% 211,910.22 222,250 10,339.78 4.65% Total Public Works 476,543.13 1,239,960 763,416.87 61.57% 465,163.57 1,127,880 662,716.43 58.76%11,058,734.07 1,127,880 69,145.93 6.13% Page 3 City of Chanhassen Income Statement 06/30/97 Actual v. Budget 50% Remaining Pa ^e 4 06/97 YTD Actual 06/97 Budget 06/97 Variance 06/97 % Variance 06/96 YTD Actual 06/96 Budget 06/96 Variance 06/96 % Variance 12/96 YTD Actual 12/96 Budget 12/96 Variance 12196 % Variance Parks & Recreation 141 Park & Rec Commission 983.45 2,075 1,091.55 52.60% 783.56 2,125 1,341.44 63.13% 1,028.12 2,125 1,096.88 51.62% 142 Park & Rec Administration 27,571.82 72,050 44,478.18 61.73% 31,449.69 68,113 36,663.31 53.83% 63,333.55 68,113 4,779.45 7.02% 143 Recreation Center 114,112.06 257,500 143,387.94 55.68% 110,912.77 250,495 139,582.23 55.72% 259,586.08 250,495 (9,091.08) - 3.63% 144 Senior Center Operation 11,668.05 37,300 25,631.95 68.72% 16,031.66 33,885 17,853.34 52.69% 30,919.04 33,885 2,965.96 8.75% 145 Recreation Programs 69,901.06 168,480 98,578.94 58.51% 69,566.62 145,236 75,669.38 52.10% 131,015.94 145,236 14,220.06 9.79% 146 Self- Supporting Programs 23,192.64 56,410 33,217.36 58.89% 17,558.46 52,877 35,318.54 66.79% 48,877.03 52,877 3,999.97 7.56% 147 Lake Ann Park Operations 9,453.34 70,805 61,351.66 86.65% 11,765.61 59,303 47,537.39 80.16% 49,331.58 59,303 9,971.42 16.81% 148 Park Maintenance 159,610.93 407,750 248,139.07 60.86% 178,955.99 384,750 205,794.01 53.49% 383,835.87 384,750 914.13 0.24% Total Parks & Recreation 416,493.35 1,072,370 655,876.65 61.16% 437,024.36 996,784 559,759.64 56.16% 967,927.21 996,784 28,856.79 2.89% Pa ^e 4 city or cnannassen Income Statement 06/30/97 Actual v. Budget 50% Remaining Page 5 06/97 06/97 06/97 06/97 06/96 06/96 06/96 06/96 12/96 12/96 12/96 12/96 YTD Actual Budget Variance % Variance YTD Actual Budget Variance % Variance YTD Actual Budget Variance % Variance Community Development 151 Planning Commission 2,696.94 5,750 3,053.06 53.10% 2,355.66 5,400 3,044.34 56.38% 5,439.09 5,400 (39.09) -0.72% 152 Planning Administration 44,108.91 183,200 139,091.09 75.92% 48,373.66 134,480 86,106.34 64.03% 100,894.26 134,480 33,585.74 24.97% 153 Senior Facility Commission 5,701.20 22,250 16,548.80 74.38% 130.95 3,250 3,119.05 95.97% 1,815.52 3,250 1,434.48 44.14% Total Community Development 52,507.05 211,200 158,692.95 75.14% 50,860.27 143,130 92,269.73 64.47% 108,148.87 143,130 34,981.13 24.44% Page 5 City of Chanhassen Income Statement 06/30/97 Actual v. Budget 50% Remaining Page 6 06/97 YTD Actual 06/97 Budget 06/97 Variance 06/97 % Variance 06/96 YTD Actual 06/96 Budget 06/96 Variance 06/96 % Variance 12/96 YTD Actual 12/96 Budget 12/96 Variance 12/96 % Variance Total General Fund Revenue 2,270,284.08 5,218,756 2,948,471.92 56.50% 1,766,166.29 4,846,646 3,080,479.71 63.56% 4,913,370.56 4,846,646 (66,724.56) -1.38% Total General Fund Expense 2,108,259.16 5,218,667 3,110,407.84 59.60% 2,186,921.93 4,837,597 2,650,675.07 54.79% 4,591,172.59 4,837,597 246,424.41 5.09% Revenue Over /Under Expenditures 162,024.92 89 (161,935.92) (420,755.64) 9,049 429,804.64 322,197.97 9,049 (313,148.97) Page 6 Income Statement 06/30197 Actual v. Budget 50% Remaining * 06/97 expenses include major capital equipment purchases that were made in the first half of 97 to update electronics in the City Council Chambers. Page 7 06/97 06/97 06/97 06/97 06/96 06/96 06/96 06/96 12/96 12/96 12/96 12/96 YTD Actual Budget Variance % Variance YTD Actual Budget Variance % Variance YTD Actual Budget Variance % Variance 210 CATV Fund Revenue 0.00 57,800 57,800.00 100.00% 0.00 53,800 53,800.00 100.00% 69,178.24 53,800 (15,378.24) - 28.58% 210 CATV Fund Expense 55,154.22 64,500 9,345.78 14.49% 17,787.48 50,200 32,412.52 64.57 62,112.75 50,200 (11,912.75) - 23.73% Revenue Over /Under Expenditures (55,154.22) (6,700) 48,454.22 (17,787.48) 3,600 21,387.48 7,065.49 3,600 (3,465.49) * 06/97 expenses include major capital equipment purchases that were made in the first half of 97 to update electronics in the City Council Chambers. Page 7 City of Chanhassen Income Statement 06/30/97 Actual v. Budget 50% Remaining 06/97 06/97 06/97 06/97 06196 06/96 06/96 06/96 12196 12/96 12/96 12/96 YTD Actual Budget Variance % Variance YTD Actual Budget Variance % Variance YTD Actual Budget Variance % Variai 211 Environmental Protection Revenue 42,146.11 118,000 75,853.89 64.28% 49,419.34 134,500 85,080.66 63.26% 155,822.32 134,500 (21,322.32) -1 231 Recycling 12,310.40 44,150 31,839.60 72.12% 21,350.88 44,350 22,999.12 51.86% 63.76% 45,953.85 22,396.24 44,350 35,000 (1,603.85) ; 12,603.76 235 Lake Management 0.00 35,000 44,000 35,000.00 100.00% 30,086.02 68.38% 12,682.87 14,312.85 35,000 32,000 22,317.13 17,687.15 55.27% 26,942.61 32,000 5,057.39 1 236 Reforestation 13,913.98 Revenue Over /Under Expenditures 15,921.73 (5,150) (21,071.73) 1,072.74 23,150 22,077.26 60,529.62 23,150 (37,379.62) Page 8 Income Statement 06/30197 Actual v. Budget 50% Remaining Page 9 06/97 06/97 06/97 06/97 06/96 06/96 06/96 06/96 12/96 12/96 12/96 12/96 YTD Actual Budget Variance % Variance YTD Actual Budget Variance % Variance YTD Actual Budget Variance % Variance 400 Capital Project Admin Revenue 106,263.38 385,000 278,736.62 72.40% 41,973.21 405,000 363,026.79 89.64% 542,692.42 405,000 (137,692.42) - 34.00% 400 Capital Project Admin Expense 171,656.42 325,100 153,443.58 47.20% 232,744.59 405,000 172,255.41 42.53% 583,573.26 565,000 (18,573.26) -3.29% Revenue Over /Under Expenditures (65,393.04) 59,900 125,293.04 (190,771.38) 0 190,771.38 (40,880.84 160,000 ( ) (119,119.16) Page 9 City of Chanhassen Income Statement 06/30/97 Actual v. Budget 50% Remaining Page 10 06/97 06/97 06/97 06/97 06/96 06/96 06/96 06/96 12/96 12/96 12/96 12/96 YTD Actual Budget Variance % Variance YTD Actual Budget Variance % Variance YTD Actual Budget Variance % Variance 410 Park Trailways Acq & Dev Revenue 153,173.33 319,000 165,826.67 51.98% 187,877.60 449,000 261,122.40 58.16% 506,382.92 449,000 (57,382.92) - 12.78% 410 Park Trailways Acq & Dev Expense 183,177.48 391,000 207,822.52 53.15% 125,456.25 273,600 148,143.75 54.15% 431,969.25 273,600 (158,369.25) - 57.88% Revenue Over /Under Expenditures (30,004.15) (72,000) (41,995.85) 62,421.35 175,400 112,978.65 74,413.67 175,400 100,986.33 Page 10 Income Statement 06/30197 Actual v. Budget 50% Remaining '1996 budgeted expenditures did not take into account several new special assessment payments made to new businesses. Page 11 06/97 06/97 06/97 06/97 06/96 06/96 06/96 06/96 12/96 12/96 12/96 12/96 YTD Actual Budget Variance % Variance YTD Actual Budget Variance % Variance YTD Actual Budget Variance % Variance 460 Tax Increment District #1 Revenue 2,909,841.03 6,060,000 3,150,158.97 51.98% 2,751,632.54 5,798,000 3,046,367.46 52.54% 5,788,003.97 5,798,000 9,996.03 0.17% 460 Tax Increment District #1 Expense 549 1,627,544 1,077,774.06 66.22% 1,375,774.60 1,915,975 540,200.40 28.19% 2,478,575.42 1,915,975 (562,600.42) - 29.36% Revenue Over /Under Expenditures 2,360,071.09 4,432,456 2,072,384.91 1,375,857.94 3,882,025 2,506,167.06 3,309,428.55 3,882,025 572,596.45 '1996 budgeted expenditures did not take into account several new special assessment payments made to new businesses. Page 11 City of Chanhassen Income Statement 06/30/97 Actual v. Budget 50% Remaining 1996 & 1997 expenditures include special assessment payments for the Recreation Center /School Project as per agreement between the City of Chanhassen and ISD 112. Page 12 06/97 06/97 06/97 06/97 06/96 06/96 06/96 06/96 12/96 12/96 12/96 12/96 YTD Actual Budget Variance % Variance YTD Actual Budget Variance % Variance YTD Actual Budget Variance % Variance 468 Economic Dev. District #2 Revenue 340,134.98 730,000 389,865.02 53.41% 306,089.70 720,000 413,910.30 57.49% 650,706.01 720,000 69,293.99 9.62% 468 Economic Dev. District #2 Expense 119,964.20 60,300 (59,664.20) - 98.95% 117,029.31 65,500 (51,529.31) - 78.67% 369,382.19 65,500 (303,882.19) - 463.94% Revenue Over /Under Expenditures 220,170.78 669,700 449,529.22 189,060.39 654,500 465,439.61 281,323.82 654,500 373,176.18 1996 & 1997 expenditures include special assessment payments for the Recreation Center /School Project as per agreement between the City of Chanhassen and ISD 112. Page 12 Income Statement 06/30/97 Actual v. Budget 50% Remaining Page 13 06/97 YTD Actual 06/97 Budget 06/97 Variance 06/97 % Variance 06/96 YTD Actual 06/96 Budget 06/96 Variance 06/96 % Variance 12/96 YTD Actual 12/96 Budget 12/96 Variance 12/96 % Variance 700 S & W Utility Revenue 932,701.55 2,122,100 1,189,398.45 56.05% 793,391.79 1,959,100 1,165,708.21 59.50% 2,307,955.56 1,959,100 (348,855.56) - 17.81% 701 Utility Administration 31,615.63 121,500 89,884.37 73.98% 56,217.44 133,000 76,782.56 57.73% 127,805.36 133,000 5,194.64 3.91% 702 S & W Operations 771,917.14 1,973,900 1,201,982.86 60.89% 908,112.20 1,772,500 864,387.80 48.77% 1,784,851.45 1,772,500 (12,351.45) -0.70% Revenue Over /Under Expenditures 129,168.78 26,700 (102,468.78) (170,937.85) 53,600 224,537.85 395,298.75 53,600 (341,698.75) Page 13 City of Chanhassen Income Statement 06/30/97 Actual v. Budget 50% Remaining Page 14 06/97 06/97 06/97 06/97 06/96 06/96 06/96 06/96 12/96 12/96 12/96 12/96 YTD Actual Budget Variance % Variance YTD Actual Budget Variance % Variance YTD Actual Budget Variance % Variance 710 Sanitary S & W Expansion Revenue 239,421.72 350,000 110,578.28 31.59% 143,172.60 350,000 206,827.40 59.09% 1,058,794.78 350,000 (708,794.78) - 202.51% 710 Sanitary S & W Expansion Expense 292,021.82 863,750 571,728.18 66.19% 272 859,385 587,253.87 68.33% 391,286.23 859,385 468,098.77 54.47% Revenue Over /Under Expenditures (52,600.10) (513,750) (461,149.90) (128,958.53) (509,385) (380,426.47) 667,508.55 (509,385) (1,176,893.55) Page 14 QI Of c O d 2 OI m C N « y yacc E c o C O O M i0 O r N cu CL 0 \ 0 \ C r M l0 N t0 0 r N r � 0 O t0 l0 N 01 n 01 0 r- co cli co to l0 r 01 P a > i1 r CIA O C. O O rn 0 am uS � w -e r Cl) o O o r as r Q F LO N M N N V 0 C l0 01 M Cl) r G t0 ? 0 n r a y n N C q Lq M O l0 LO co N r M r O O O 81 O O � t(1 (O r Lq N N 01 R a rn It O Q N r r N � V C M M v 00 co c u1 w > 0 N r N n t0 t0 et C M M � f0 O CD Op O N M co l N M r O O O d O N N N co co O M . 7 f0,, Cl) V 01 (V ce) n co Q w r � r co 0 0 CL d cc x W N E E a 01 CD W y d d � 'O f0 t0 C Q o 7 N 7 N d N N C n n j m OC r N cu CL d QI y C � N � m � d � s 10 M !0 v H v m o � � 0 V C co N o 0 U N Cl) Cl) CV 0 N r � 0 C r r- O LO Of N CO U C4 O to O O C O Cl) r r r W r (a r v O O r O O O d O O 'p n N T m co a a m a Cl) rn �Q o rn r ao a a m o 0 U CO L tr0 cli CO O > 0 N Ui CO r U O N M T 07 CO 'i O t Cl) CCs 00 r > r N r O O p C n N O m co -e et i0 Cl) M r .�. Q ion C4 n O F r n T N U o 0 C co O d' O MO O M cli O C; 00 0 O N n A a C C Cp 0 > R M r O d l0 0 0 00 CD to m O Cn r Q N . Cl) 0 O D Cl) r 3 N N d m W d L i i 7 O O C Q. > i i W d Ll C CL a � � d O O 0 N N y _ = C O O O O N 4) co CO d m CD 0 CL 4/ M W C m M N � d yQ OC o e o N C O a N co M 0 y O r 0 M A � co a C O o O O � ° a 'a r L T � m °) Q n rn a� F- to n N } v e c C °o c ° o 0 0 d) C O p C W O co o lC r O N O "M co Ln N O O O O O O � m In O In O T O T m Q O O O D r e* F- r } o 0 c A LO N v N 0 N LO O LO Q O � lC i 47 CO M p r Z In co O O O O O O 00 to N O � m 3 O O O 0 T O co r O O O O oo N !O F } 7 y N i d > m a 'o OC w (1) CL w ¢ OC d a � i C � d � L Z y > i L d C co coo a>i CD cu a ._� §EEc s § k §�) « \§k §2� � _ £ im to ) i4 9 m -> % � to @ to § # > C-4 \ 8 8 A aƒ o o q 2 S s ± 2 m \ § \ N \ \ e § s § � k aM S § $ q q wk to k 0) Cl) > / a 8 / o C C § \ ° a G a� LO $ \ m ° � 0 k k m � 1 % P\ k k CD 2 $ \ \ \ � C a § cm C w \ > It m Cl) § § $ %$ a M / a a ■ - Lq / Cl) k § f i \ � 2 C U. U k c 2 A 7 2 w CL CL & 7 w f e ; / o k ° > § § § x _ £ Up from City Hall- -July 30- August 6, 1997 Public Safety Department Planning Department Administration • Scott hosted a brainstorming meeting his week on how to make Highway 5 safer. Will see if we can create some innovative ideas. • We had a great meeting regarding "no ,vake" zones attended by the DNR, Carver County Water Patrol, Hennepin �ounty Water Patrol; Chanhassen Public Safety and Planning Departments; the �ity Manager and Mayor. Immediate to long range ideas were generated. • More severe weather has generated nore calls wanting sirens. Finance Department Water sales continue to be at record evels. A usage report is attached. The first lease payments were received his week for cellular phone leases on our vater towers. This new revenue source ; hould guarantee that total general fund •evenues will be greater than budgeted. All departments have received an ,lectronic form of their 1998 budgetary )ages. The fall bonding schedule has been set 'included in admin section). Representa- ives of Standard & Poor are anticipated :o be in Chanhassen on September 16 or 17. I had hoped that the bond sale would >ccur in the summer, leaving lots of time o complete the RFP process during the .all. The park referendum shot down the ,artier plans. The council may see 2 or 3 additional )ayments to Hartley and Associates as we .inalize work efforts with that firm. Most )f the costs will be associated with ,omputer equipment necessary to ensure :hat the GIs system continues to be isable, i.e. graphics computer, plotter, etc. • Residents of the Hidden Valley neighbor- hood contacted Channel 5 news regarding their concerns over the proposed car dealership. Channel 5 contacted the Mayor, Mark Senn, and Kate regarding comments. It aired on Monday night's news. • We received an application from Famous Dave's BBQ and a retail building to be located in the northeast corner of the Villages on the Ponds. • No wake signs remain on Chanhassen lakes. Roger has elevation information and is working on a revised ordinance that will be on the August 25th Council agenda. • The Lake Minnewashta Preservation Association has asked to reschedule the boat tour of the lake. Call Phillip (937- 1900 e 105) if you would like to attend. Engineering/Public Works Dept. • The city will be installing a pressure reducing value in the Lake Riley water service area due to high pressure levels. • Notice to Proceed to be issued this week - Walnut Grove utility & street improvement • West 76th Street water tower drained for emergency repairs. Park & Recreation Dept. • Our MIS Coordinator, Rick Rice started work on Monday. His timing was great as the network computer at the Recreation Center crashed that same day. That network computer is used by Recreation Center staff and some staff members at city hall. Approximately 6 computers were down and the alternative would have been an outside consulting service at $105 per hour. The Rec Center's demise has taken from Rick's first task -- establishment of short and long range goals. I will submit those to the city council during the upcom- ing weeks. • I received confirmation today of my registration for the NLC conference. Lodging was confirmed at the Holiday Inn Select Hotel (first choice for all of us). None of the registrations included spouse information. Remind me to poll council members Monday evening. Typically the city has advanced the $40 fee with each council member then deducting $40 from your final expense form. Don't forget to look at the Northwest promotions included in this packet. The current companion fare is $30 less than when I booked my reservation 3 weeks ago. I have since made a reservation for Mark Senn and would be happy to make a reservation for any other council member. If you leave a message, make sure that you leave your credit card type, number, and expiration date, frequent flyer number, and which flights you've picked. If your spouse is going with, I need a first name and frequent flyer number. • The low bidder for the retaining wall at city hall has gone bankrupt. Todd Christopherson believes that the 2nd low bid ($100 higher) will accept the job, but construction could be delayed to late fall. • Cable TV complaints continue to soar (see letter sent to Triax in the Admin Section). Nancy and I will be meeting with Triax representatives next Wednesday at 9 a.m. Since Councilman Senn has received the most complaints, I am using this document to invite him to this meeting. • Music on Hold: To solve the continued problems with reception for the radio that's been hooked up to our telephone system, and since that form of providing music on hold is illegal, a CD player was purchased and hooked up to the telephone system. While they were in, we finished wiring several of the jacks that had been roughed - in in the new portion of the building. WATER USAGE 31 -May 1996 1997 DIFFERENCE SINGLE FAMILY 22,677,000 25,623,000 2,946,000 APT/ MULTI FAMILY 32,000 43,000 11,000 COMMERCIAL 640,000 611,000 (29,000) INDUSTRIAL - - CHURCH/SCHOOL 579,000 555,000 (24,000) TOTAL USAGE 23,928,000 26,832,000 2,904,000 1996 1997 DIFFERENCE 30-Jun SINGLE FAMILY 37,767,000 64,770,000 27,003,000 APT / MULTI FAMILY 4,006,000 3,954,000 (52,000) COMMERCIAL 11,242,000 15,094,000 3,852,000 INDUSTRIAL 7,262,000 11,121,000 3,859,000 CHURCH / SCHOOL 632,000 641,000 9,000 TOTAL USAGE 60,909,000 95,580,000 34,671,000 31 -Jul 1996 1997 DIFFERENCE SINGLE FAMILY 47,639,000 59,147,000 11,508,000 APT/ MULTI FAMILY 383,000 396,000 13,000 COMMERCIAL 1,433,000 1,602,000 169,000 INDUSTRIAL 23,709,000 30,352,000 6,643,000 CHURCH / SCHOOL . 588,000 1,001,000 413,000 TOTAL USAGE 73,752,000 92,498,000 18,746,000 pis New Member Information mailbox: /C %7C/ Program% 20Fil es /Netscape / ... 1502.PAA0301 I @mxl.expedia.com &number -48 Subject: Reservations New Member Information Date: Wed, 6 Aug 1997 15:02:24 GMT From: nwressupp @worldspan.com To: chmgr @ci.chanhassen.mn.us Welcome to Northwest Airlines Reservations! Below is your new membership information. Please keep this confirmation mail as a record of your Member ID. Your Member ID is: dashworth The Reservations Internet address is: http: / /www.flvnwa.com/ Reservations is a free service. To use the Reservations, you will have to type your Member ID and Password on the Sign In page. Whether for business or pleasure, Northwest Airlines Reservations makes it easy for you to plan and purchase travel arrangements that best meet your budget and personal preferences. Reservations is on the job 24 hours a day, 7 days a week. With a click of your mouse, you can: • Reserve and purchase airline tickets • Reserve hotel rooms • Reserve rental cars • Research over 300 destinations in the World Guide • Chart your course with over 200 city maps We look forward to fulfilling all of your travel needs. Northwest Airlines Reservations Start your travel here. http: / /www.flvnwa.com/ 8/6/97 2:56 PM CITY OF CHANHASSEN 690 COULTER DRIVE • P.O. BOX 147 • CHANHASSEN, MINNESOTA 55317 August 5, 1997 Denise Becker 675 Lake Susan Hills Drive Chanhassen, MN 55317 (612) 937 - 1900 • FAX (612) 937 - 5739 The City Council met at a work session on Monday, August 4 to discuss the tree issue at Lake Susan Hills 9 Addition. I am writing to inform you of their decision. After a thorough discussion, the Council concluded that any action taken to remove or replace the trees on your lot is a civil matter between yourself, your neighbors and Joe Miller Homes. It was the intent of the City to preserve the wooded character within the development, however, the survival of the trees was not guaranteed by the City. If you have any questions or comments, please feel free to contact the Mayor, Council members, or myself. Si erely, ��G acs J 1 inclair Environmental Resources Specialist