Loading...
1h. Galpin Blvd/TH 5 Intersection Signal: Cooperative Construction Agreement.CITY OF 1 �' CHANHASSEN 690 COULTER DRIVE • P.O. BOX 147 • CHANHASSEN, MINNESOTA 55317 (612) 937 -1900 • FAX (612) 937 -5739 MEMORANDUM TO: Don Ashworth, City Manager FROM: Charles Folch, Director of Public Works DATE: April 8, 1997 SUBJ: Approve Supplemental Agreement No. 1 to Galpin Boulevard/Trunk Highway 5 Intersection Signal - Project No. 93 -26A -1 The installation of the traffic signal at the intersection of Trunk Highway 5 and Galpin Boulevard (County Road 19), in conjunction with the upgrade of Galpin Boulevard south of Trunk Highway 5, was a cooperative agreement project with the Minnesota Department of Transportation. Unfortunately, due to personnel changes with the electrical contractor and the inability of the City and General Contractor to reach consensus on final contract compensation, it has taken until now for this matter to finally be resolved. This supplemental agreement basically addresses two items for which additional work scope outside of the original contract was required. Part I involves an acceleration of the work effort in order to have the signal operational prior to the Bluff Creek Elementary School opening in September of 1995. In essence, the contractor was requested to accelerate his work schedule by working longer days which included overtime. The resulting additional cost involves the "half time" of the time- and -a -half labor costs incurred with the accelerated schedule since a given number of regular hours are required to complete such a project only the "half time" of the time - and -a -half overtime labor costs is justified. Since this is a cooperative agreement project, the City and MnDOT will split this cost 50150. Again, it is important to stress that it was imperative to accelerate the work in order to complete the project in time for the opening of Bluff Creek Elementary School. This situation arose through no fault of the contractor. Part H of the supplemental agreement involves additional traffic control for which the signal contractor incurred to complete the work. This signal project was a separate contract and general contractor from the overall Galpin Boulevard road improvement project; however, the signal project was codependent on the road project. While Electric Service Company, general contractor for the signal project, was to install the signal, the Galpin Boulevard general contractor was responsible for also constructing the turn lanes and acceleration lanes on Trunk Highway 5 at the Galpin Boulevard intersection. When the plans were designed it was assumed that both projects would occur simultaneously. Thus, it was planned that the traffic control between both Don Ashworth April 7, 1997 Page 2 contracts would only need to be dealt with by one contractor, i.e. the general contractor for the road. However, during the project, it was decided that it would be safer and more efficient for the road contractor to perform the turn lane construction work on Trunk Highway 5 and the associated traffic control during nighttime hours under lower traffic volumes. This meant that the same traffic control was not going to be implemented during the day when the signal contractor needed it. The result is that additional traffic control was performed by the signal contractor and appropriate compensation is due. The total amount of contract change for Supplemental Agreement No. 1 is $4,924.29. The State of Minnesota will be reimbursing the City of Chanhassen approximately $2,020 for their 50% share of Part I. The revised overall project cost will still be within project bonding/funding amounts. It is therefore recommended that the City Council approve Supplemental Agreement No. 1 for the traffic signal system at Trunk Highway 5 and Galpin Boulevard, City Project No. 93- 26A -1, S.P. 1002 -60 in the amount of $4,924.29, yielding a revised contract amount of $76,555.29. With the approval of this supplemental agreement the final payment on the contract can be made and the project contract documents can be finaled out. ktm Attachment: Supplemental Agreement No. 1 \Ncfsl \vol2'eng\public\93 -26a- ]\approve supp agmt.doc Roden Owner: City of Chanhassen, 690 Coulter Dr., Chanhassen, MN 55317 Date March 4, 1997 Anderlik A Contractor: Electric Service Co., 1609 Chicago Avenue. S, Minneapolis, MN 55404 rs i Ard* Bond Co. SUPPLEMENTAL AGREEMENT NO. 1 TRAFFIC SIGNAL SYSTEM @ T.H. 5 AND GALPIN BLVD. S.P. 1002 -60 CITY PROJECT 96 -26A1 File No. 39329 -A Description of Work This Supplemental Agreement is for accelerated work necessary to insure that the signal system is fully operable before the opening of the Bluff Creek Elementary School for the '95 -'96 school year. The agreement covers the "half" time of time and a half labor costs incurred. Also included in this agreement is additional traffic control costs for items added to this contract. Contract Unit Total No. Item Unit Quantity Price Amount Part 1- Accelerated Work Total Accelerated Work Including Benefits $4,041.55 Part 2 - Traffic Control Total Additional Traffic Control TOTAL CHANGE ORDER NO.1 39329-A/co.wbl CITY Of CHANHASSEN MHONN MAR 111997 ENGINEER DEPT. A $882.74 $4,924.29 Original Contract Amount Previous Change Orders This Change Order Revised Contract Amount (including this change order) Recommended for Approval by: BONESTROO, ROSENE, ANDERLIK & ASSOCIATES, INC. to, ILW date: Approved by Contractor: ELECTRIC SERVICE CO 3I b cc: Owner Contractor Bonding Company Bonestroo & Assoc. $71,631.00 $4,924.29 $76,555.29 Approved by Owner: CITY OF CHANHASSEN x 39329-A/co.wbi SM 1609 CHICAGO AVE. M FAPMIS, MINN. M404 OVERTIME HOURS FOR DRWSSEN TRAFFIC SIGNALS TOTAL COST 1- I 1 3 : - 7 D, 7/21 7/28 8184 13% Wla • 'I 8/11 8/18 8/25 9/1 6W TOTAL ELECTRICIAN RATE HOURS EXT HOURS EXT HOURS EXT HOURS EXT HOURS EXT HOURS EXT HOURS EXT 1OIZ EZT 0.00 `foTAL 0.00 0.00 6.00 ' - -- 0.80 &W 8. N OCONNOR OT 36.38 2.00 72.76 8.00 291.04 6.00 218.28 0.88 0.80 lb SgaJ(R OCONNOR OT 36.38 2.00 72.76 0.00 ZN 72.76 SCHILLER, JR OT 2134 0.00 1.00 23.34 2.00 46.68 8.00 0.00 -70. a LL,B OT 29.81 2.00 59.62 9.00 268.29 18.80 298.18 0.88 0.00 �I (� %- U I WORK OT 34.13 1 N 102.39 8.00 273.04 10.00 341.30 0.80 0.06 21.0 716.73 W ORK ORK OT 34.13 2.80 68.26 0.00 2. N 68.26 DENESY OT 34.13 1 N 182.39 4.00 136.52 4.80 136.52 8.80 0.08 11. N ' 313.43 STIDGER,D OT 12.75 1.88 12.75 1.58 19.13 0.08 0.00 8.08 251. 31.88 JACOUES OT 34.13 8.88 10.00 341.30 15.08 511.95 8.80 8,88 2S. N 853.25 JAMS OT 34.13 2.00 68.26 0.00 am 68 26 I)UNDERI OT 34.13 6.80 284.78 11.58 392.50 8.80 8.88 17.51 597.28 OUNDERI OT 34.13 SHAW OT 20.48 4.00 81.92 9.00 184.32 2.08 40.96 8.00 11N 317.20 FISHER OT 13.65 1.00 13.65 8.88 0.08 8.00 1.M 1365 MATRON OT 34.13 2.00 68.26 0.00 8.00 a 68.26 POOLE OT 13.65 4.06 54.60 8.08 0.06 4.W 5f. U KROGFOSS OT 29.81 IN 89.43 8.88 8.00. 3M 89.43 SIMONSON OT 34.13 2.88 68.26 8,88 8.80 2.N 6326 SAUNDERS OT 34.13 12.08 409.56 8.80 0.00 12.N 409.56 SAUNDERS OT 34.13 0.08 2.00 68.26 0.00 -P N 68.26 TOTAL HOURS 1.08 23.34 6.00 198.57 11.80 349.91 52.56 1,653-01 96.50 2,811.76 10.00 318.50 ^ 2.88 68.26 173.80 I , I g- 3 - �� •�� AVERAGE RATE 23.34 33.10 31.81 31.49 31.16 31.85 34.13 31.41 55 TOTAL COST 1- I 1 3 : - 7 D, VACATIONMOLIDAY 13% Wla • 'I 50 STATE BLUE BOOK 62% i HOC___. (R 3 HEALTH /WELFARE 3 10.38% 3515 f0 3 PENSION 4 1 13% Hra 1R .), OTHER 5.45% 170. R ( . 5 P ark I 49M- '�9 `foTAL