1d. Approval of Additional Fund Closings and Transfers.CITY OF 1 ° 4 CHANHASSEN 690 COULTER DRIVE 0 P.O. BOX 147 • CHANHASSEN, MINNESOTA 55317 (612) 937 -1900 • FAX (612) 937 -5739 MEMORANDUM TO: FROM: DATE: SUBJ: Mayor and City Council Don Ashworth, City Manager June 10, 1997 7� � a Update on Additional Year End Fund Closings and Transfers Report This item was tabled from the May 27` agenda with questions regarding the large deficit that exists in the Chanhassen Estates public improvement project. In researching 1993 records, the bottom line is primarily the same as had been previously reported, but the rationale of how we get to the bottom line was incorrect. It was previously reported that the project costs were estimated at $900,000 +, but the amount bonded was $700,000 +. We also found that the total amount bonded in that year hit the magical $10 million mark. All of the above statements are true and the conclusion that we previously reached that the $200,000 in additional bonding, whether paid for by today's dollars or debt levies, needed to occur. All of those facts and figures come from the project records in the engineering department. In reviewing the bonding documents, those records indicate that the amount to be paid from sewer and water expansion was set at $)(not the $1 0 00_previously estimated by Charles) with the net proceeds then being approximately $750,000. The approximate $135,000 differential between estimated project costs and actual total costs can be accounted for by three factors, i.e: • Bonding /Storm Water Costs ($ ): By the time the project had been awarded, the Storm Water Management Plan had been received. That document indicated that a holding pond should be built on the north side of Highway 5 with the downstream drainage going through the Chanhassen Estates neighborhood. Individual drainage problems for property owners in the Chanhassen Estates neighborhood prompted staff to recommend that the contract be amended to include the pond and drainage items. The city council approved that contract amendment and the funding was, again, to have occurred through the Storm Water Management fund, although the actual expenses were being recorded within the Chanhassen Estates project fund (same contractor, engineer, etc.); and Mayor and City Council June 10, 1997 Page 2 • Engineering Services: The original project included the entire Chanhassen Estates neighborhood. The feasibility study, hearings, plans and specifications, and even bid documents were for this much larger $2 million project. Virtually on the same date that the city council was to have awarded the bids for the project, several of the neighbors from the western half of Chanhassen Estates petitioned the city council asking that the project be cut in half and that solely the easterly half be awarded. The two neighborhoods had become quite polarized with the westerly half backing the position of not carrying out the improvements and the easterly half strongly supporting them. Caught in this dilemma, the city council acted to revise the project to the $920,000 level and to delete the improvements in the westerly half. However, the engineering costs for preparing the feasibility study, plans and specifications, and bidding were $120,000, and by eliminating the western half of the project, a $60,000 bill was left on the table which reasonably could not be assessed or bonded for. The dilemma we are faced with is exactly the same problem that exists with costs associated with Nez Perce; and • Interest Costs: The length of time from the start of this project until its final closing had produced a deficit for the past 2 -3 years. Accordingly, approximately $30,000 of the total deficit in this fund is attributable to negative interest earnings. As stated at the beginning of this memorandum, the bottom line of actions that need to be taken to eliminate the deficit associated with the Chanhassen Estates project is almost identical to that previously recommended. Approval of the attached (amended) transfers and fund closings is recommended. [Note: At this point in time, the funds listed cannot be officially closed for audit year 1996. However, I would rather have the management report show that the city has taken positive steps in regards to the deficits in each of these funds rather than having that document potentially criticize the city for not taking positive steps.] gAmg6fundclosings 1 Fund Closings 648 Minnewashta Parkway to 415 Minnesota State Aid (MSA) (456,208.05) 663 Highway 5 Corridor to 460 H.R.A. (58,700.95) 665 Hwy 101 S. Re- alignment to 460 H.R.A. (79,305.05) 666 92 -6 Nez Perce Extension to 458 City Hall Expansion (109,811.22) 671 93 -10 Chanhassen Estates S/W & Strrr to 720 Stormwater Expansion (40,692.56) 671 93 -10 Chanhassen Estates S/W & Strrrto 710 Sewer & Water Expansion (170,000.00) 671 93 -10 Chanhassen Estates S/W & Strrr to 458 City Hall Expansion (94,276.78) Project Complete -funds received into MSA to fund Project Complete Project Complete Project Complete Project Complete - Stormwater costs to be funded by fund 720 Project Complete -Water main portion to be funded by fund 710 Project Complete