Loading...
1h. Well No. 7: Change Order 2.CITY OF CHANHASSEN 690 COULTER DRIVE • P.O. BOX 147 • CHANHASSEN, MINNESOTA 55317 (612) 937 -1900 • FAX (612) 937 -5739 MEMORANDUM TO: Don Ashworth, City Manager FROM: Charles Folch, Director of Public Works DATE: June 18, 1997 SUBJ: Approve Change Order No. 2 to Well 7 - Project No. 94 -3 The attached change order involves some additional work, outside of the original scope of the contract, associated with the manual supervisory control valve and automatic flow valve switch for the fire sprinkling system and connect them to the City's telemetry system so that if sprinkling system should activate the telemetry system will page the appropriate utility personnel. The other work task addition involves providing for an external building alarm system which would also activate should the fire protection system in the building be activated. These revisions were requested by the Fire Marshal from review of the submitted shop drawings. The total amount of Change Order No. 2 is $2,664.15. The original contract amount was $384,829. With the approval of Change Order No. 2 the revised contract will be $387,493.15. It should also be noted that Change Order No. 1 did not involve a cost increase or decrease to the contract, but only an extension of time to the project completion schedule due to coordination with the water system improvements. It is therefore recommended that Change Order No. 2 in the amount of $2,664.15 to Well No. 7 contract, Project No. 94 -3, be approved. Attachment: Change Order No. 2 c: Jerry Boucher, Utility Superintendent Daryl Kirschenman, Bonestroo g:\eng1charleslcc\,coldoc Description of Work This change order provides for the connection of the Fire Sprinkler Alarms at Pump Facility No.7 to the cities computer system as requested by the Fire Marshall. Work tasks consist of the following: Contract Unit Total No. Item Unit Quantity Price Amount 1 Connect the manual shut off valve supervisory switch, ball control valve supervisory switch and the flow switch in parallel. 2 Provide a relay in the Supervisory Control Panel. Wire the CITY OF CHANHASSE above devices to energize this relay upon activation of either D) 1-01 �111r1iS Ifin{�/��� lU( valve's supervisory switch or the flow switch. J 16 1997 3 Wire one set of relay contacts to an input on the Supervisory ENGINEERING DEPT, Control Panel's telemetry system. Configure this input as a Fire Protection System - Common Alarm in the Owner's SCADA system. This alarm shall also activate the alarm dialer. 4 Wire a second set of relay contacts to control the exterior alarm light and horn furnished with the Fire Protection System. Total Change Order No. 2 - 2664.15 70294/co.wbl CHANGE ORDER NO.2 WELL NO.7 PUMPING FACILITY File 39323 Original Contract Amount Previous Change Orders This Change Order Revised Contract Amount (including this change order) $384,829.00 $0.00 $2,664.15 $387,493.15 Recommended for Approval by: BONESTROO, ROSENE, ANDERLIK & ASSOCIATES, INC. Approved by Contractor. Richmar Construction date: Approved by Owner: City of Chanhassen cc: Owner Contractor Bonding Company Bonestroo & Assoc. 7o2Wco.wbt