Loading...
1a. 1) Final Plat ApprovalCITY OF CHANHASSEN 690 COULTER DRIVE • P.O. BOX 147 • CHANHASSEN, MINNESOTA 55317 (612) 937 -1900 • FAX (612) 937 -5739 MEMORANDUM TO: Don Ashworth, City Manager FROM: Bob Generous, Senior Planner i DATE: May 12, 1997 i SUBJ: Springfield Final Plat Approval, 93 -6 PUD, and Final Reading for Rezoning PROPOSAL SUMMARY The applicant is requesting final plat approval creating 26 lots and six outtots for Springfield First Addition. BACKGROUND On May 20, 1996, the City Council approved a one year extension until June 1, 1997 for preliminary plat (93 -6 PUD) to subdivide 80.8 acres into 135 single - family. 1. Submittal of street names to the Public Safety Department, Inspections Division for review and approval prior to final plat approval. 2. Revise grading and erosion control plan to indicate lowest floor level elevation and garage floor elevation before final plat approval. 3. Tree preservation/landscaping: a. Detailed plans for perimeter berming and landscaping. A landscaped buffer shall be provided along State Highway 101 and Lyman Boulevard. This buffer shall be sufficient to screen direct views of the homesite from the roadway. Additional landscaping shall be provided along Lake Riley Boulevard to provide a natural transition from Lake Riley Boulevard into the development. b. Tree planting to meet minimum size standards in City Code and to be selected from the official tree list. Springfield 1` Addition Final Plat May 7, 1997 Page 2 C. Landscaping to be covered by satisfactory financial guarantees to assure installation and survival. d. Existing trees listed in the tree survey to be preserved as part of the development. e. Development of an approved landscape budget prior to City approval of the final plat. The development must perform the appropriate calculations and comply with the requirements of the tree preservation ordinance (section 18 -61). 4. The applicant shall dedicate 5.3 acres of park land to the City in lieu of park fees. A trail easement to be dedicated in the southeast quadrant of the site to provide pedestrian and bicycle access to Lake Riley Boulevard. The trail segment shall be built by the developer as part of the phase of development including the abutting property. Full trail fees will be required as part of the development. 6. Demonstrate that each lot can accommodate at least a 60'x 40' homesite and a 12'x 12' deck and maintain all setbacks on the final plat. 7. A minimum fifty (50) foot building setback shall be maintained from Lyman Boulevard and State Highway 101. This setback shall be included on the final plat. Appropriate drainage and utility easements shall be conveyed with the final plat for all utilities located outside the public right -of -way. The minimum width shall be twenty (20) feet. 9. No lots shall have driveway access to State Highway 101, Lyman Boulevard, or Lake Riley Boulevard. 10. The developer shall construct all utility and street improvements in accordance with the City's latest edition of Standard Specifications and Detail Plates and prepare final construction plans and specifications for City staff review and formal City Council approval in conjunction with final plat approval. 11. As a condition of final plat approval, the applicant shall be required to enter into a PUD agreement and development contract with the City and provide the necessary financial security to guarantee compliance with the conditions of approval of final platting. Springfield I Addition Final Plat May 7, 1997 Page 3 12. The City of Chanhassen Wetland Ordinance should be employed to require a buffer strip and setback for the homes adjacent to the wetland in the northeast corner of the site, specifically Lots 6, 7 and 8, Block 5. 13. The grading plan should be revised to include existing ground contours. Street grades throughout the subdivision shall fall within the City's standard of 0.50% to 7.0% percent grades. 14. Storm sewers shall be designed and constructed to facilitate a 10 -year storm event. The ponding basins are required to meet NURP water quality standards and maintain the surface water discharge rate from the subdivision at the predeveloped runoff rate for a 100 -year, 24 -hour storm event. Detailed storm sewer and ponding calculations for the entire development will be required in conjunction with final platting of Phase 1. 15. The drainage basins along Lyman Boulevard shall be sized to accommodate the storm runoff for the future upgrade of Lyman Boulevard. The City may contribute towards the cost of any pond oversizing as a result of additional runoff generated from Lyman Boulevard. The City will credit the applicant by means of an assessment or SWMP fees reduction. 16. Storm sewer and ponding basins shall be designed in accordance to the City's Surface Water Management Plan. The applicant shall work with staff in relocating or adjusting the proposed NURP basins adjacent to Lyman Boulevard to be compatible with the future upgrade of Lyman Boulevard. The proposed development will also be subject to the appropriate water quality and quantity connection fees. 17. The applicant shall dedicate on the final plat additional road right -of -way along Lake Riley Boulevard to achieve a 60 -foot wide right -of -way. The street right -of -way throughout the subdivision shall be 60 feet wide. 18. During the construction of each phase, temporary turnarounds shall be provided on all dead end streets which are proposed to be extended. Barricades shall be placed at the end of the temporary turnarounds with a sign indicating that "this street shall be extended in the future." 19. The applicant/property owner of Outlot F shall enter into a driveway easement with the adjoining three property owners for the use of the existing driveway through Outlot F if one currently does not exist or eliminate the issue by relocating the driveway off of the property. Springfield I" Addition Final Plat May 7, 1997 Page 4 20. Preliminary and final plat approval shall be conditioned upon the Chanhassen City Council authorizing a public improvement project for the extension of trunk utility service to the area and the upgrade of Lyman Boulevard to urban standards. 21. Fire hydrants shall be spaced in accordance to the City's fire marshal recommendations. 22. The applicant shall provide a 6 -inch watermain stub to Lake Riley Boulevard between Lots 15 and 16, Block 5 shall be provided. 23. The existing home on Outlot F shall be required to connect to City sewer and water service within 12 months from the date the system becomes available or sooner if the well and septic system fails. 24. The applicant shall receive and comply with all pertinent agency permits, i.e. Watershed District, Health Department, MPCA, Williams Brothers Pipeline Company, MWCC. 25. All disturbed areas during site grading shall be immediately restored with seed and disc mulch or wood fiber blanket within two weeks after site grading or before October 31 each construction season accept in areas where utilities and street will be constructed yet that year. All disturbed areas resulting from construction activities shall be restored in accordance to the City's Best Management Practice Handbook for erosion and sediment control. 26. As a condition of final plat approval, the applicant will be required to enter into a development contract with the City and provide the necessary financial security to guarantee compliance with the conditions of approval and final platting. 27. The applicant shall be responsible for their fair share of the assessments for the extension of trunk utility improvements and the upgrade of Lyman Boulevard to urban standards. 28. Outlot F shall be platted as a lot within the subdivision since outlots cannot be built upon. Relocate the driveway for this lot so that it connects perpendicularly to the proposed street within the subdivision at a location acceptable to the Engineering Department. 29. Back -to -back cul -de -sacs shall be provided at the Kiowa Trail connection. The pavement for the northern cul -de -sac shall be installed to the project property line. A breakaway barricade shall be installed to prohibit through traffic on Kiowa Trail. The cul -de -sac shall be temporary until either area residents petition the City to open the connection or Highway 212 is constructed at which time traffic patterns will be changed. Springfield 1' Addition Final Plat May 7, 1997 Page 5 30. A declaration that the fields in Bandimere Community park will be lighted shall be included in the chain of title for lots within the subdivision. 31. Sidewalks or pedestrian trails shall be provided connecting Lake Riley Boulevard and Lyman Boulevard to Bandimere Park. This trail system shall include a trail segment built within the 92nd Street right -of -way from Kiowa Trail to Bandimere Park. 32. The City reserves the right to reevaluate the subdivision and require changes to the plat based on the city's approval of any ordinances that may be adopted during the preliminary plat time extension. 33. The applicant shall be responsible for acquiring the necessary right -of -entry required to complete the Lyman Boulevard upgrade until such time as the necessary right -of -way is platted with the development of the site. On May 22, 1995, the City Council granted a one year time extension for the preliminary plat for the Rogers /Dolejsi property ( #93 -6 PUD) until June 1, 1996. On January 9, 1995, the City Council approved a six month time extension for the preliminary plat for the Rogers/Dolejsi property ( #93 -6 PUD). On December 13, 1993, the City Council approved the preliminary plat for the Rogers /Dolejsi property ( #93 -6 PUD) for 135 lots on 80.8 acres located south of Lyman Boulevard and east of Highway 101. FINAL PLAT PROPOSAL SUMMARY At this time, the applicant is requesting final plat approval to create 26 lots and six outlots and associated right -of -way for Springfield 1 y ` Addition and the second reading of the rezoning of the property from Agricultural Estate, A2, to Planned Unit Development Residential, PUD -R. Staff is recommending approval of the final plat of the Springfield I" Addition subject to the conditions of this staff report. PARKS & RECREATION The applicant is proposing the dedication of approximately 5.3 acres to the City for park land. This is adjacent to lands currently owned by the City for Bandimere Heights Community Park. The Park and Recreation Commission reviewed this development at their meeting of September 28, 1993. The Commission recommended that the City require the dedication of 5.3 acres of park land as shown on the applicant's concept plan dated August 20, 1993, in lieu of park fees. The applicant will also be required to provide a park trail connection from the southeast quadrant Springfield 1" Addition Final Plat May 7, 1997 Page 6 of the development to Lake Riley Boulevard. This trail will provide pedestrian and bicycle access to Bandimere Park. The comprehensive plan shows trail systems on State Highway 101 and Lyman Boulevard. These trails will be included in the future upgrade of these roadways. Full trail fees shall be required as a part of this development As an added amenity, sidewalk or trail connections should be made from Lyman Boulevard and Lake Riley Boulevard through the development to Bandimere Park. LANDSCAPING There are a total of twenty -two (22) trees locating on the subject property. While only two of the trees are on the City's list of desired trees, all existing trees can be preserved as part of the development of the site. The rows of tree that have been planted on the site have been excluded from the tree survey, but will be used by the developer. The applicant has prepared a master landscape plan for the project as well as a final plan for the first phase of the development. This plan has incorporated tree preservation requirements as well as buffer yard requirements. The plan contains a total of 498 deciduous trees and 131 conifers. Detailed plans for landscaping and berming all exterior roadways were required as part of the preliminary plat. These features must be significant enough to buffer direct views of abutting home sites from Lyman Boulevard and State Highway 101 and provide a natural transition from Lake Riley Boulevard into the development. The proposed plan will need to be revised to enhance the screening along Highway 101 and the western portion of Lyman Boulevard to screen direct views of the home sites. COMPLIANCE TABLE Description Area (Sq. Ft.) Frontage (Ft.) Depth (Ft.) Code minimum 11,000 90 100 average 15,000 Block 1, Lot 1 18,179 80.81 * 209 Block 1, Lot 2 18,465 88.26 * 230 Block 1, Lot 3 25,552 104.81 333 Block 1, Lot 4 22,985 95.34 316 Block 1, Lot 5 17,139 55.64 * 200 Block 1, Lot 6 36,119 55.64 * 239 Block 1, Lot 7 34,703 53.53 * 279 Block 1, Lot 8 21,827 79.09 * 203 Block 1, Lot 9 16,869 116.25 152 Block 2, Lot 1 13,068 111.96 141 Springfield 1 St Addition Final Plat May 7, 1997 Page 7 Block 2, Lot 2 13,054 Block 2, Lot 3 12,890 Block 2, Lot 4 14,818 Block 2, Lot 5 13,495 Block 2, Lot 6 16,578 Block 2, Lot 7 16,491 Block 2, Lot 8 16,939 Block 2, Lot 9 17,780 Block 2, Lot 10 18,454 Block 2, Lot 11 19,100 Block 2, Lot 12 13,720 Block 2, Lot 13 11,897 Block 3, Lot 1 40,208 Block 4, Lot 1 17,196 Block 4, Lot 2 14,522 Block 5, Lot 1 53,911 Outlot A 39,922.7 Outlot B 7,644.8 Outlot C 538,257.8 Outlot D 30,587.8 Outlot E 1,883,194.6 Outlot F 41,338.4 Total 517,780 Average Lot Area 19,351 • Meets minimum width at building setback line. 111.96 111.96 192.66 137.46 128.24 65.83 * 55.64 * 55.64 60.35 128.4 79.51 * 86.08 * 200.42 90.12 90.13 association park storm pond entry area future development future development future development park dedication 141 139 154 141 134 128 146 149 166 148 140 124.5 216 192 198 Minimum setbacks: PUD exterior: thirty (30) feet Front yard: thirty (30) feet Rear yard: thirty (30) feet Side yard: ten (10) feet Adjacent to arterial or collector roads, a fifty (50) foot setback shall be maintained. DRAINAGE Storm water runoff from the site will be conveyed via a storm sewer drainage system to on -site storm water quality ponds for treatment prior to discharging into the wetlands. Two ponds along Lyman Boulevard and an interim storm water pond on Outlot C will be constructed with this phase. The interim storm water pond is intended to address a current drainage problem in the Springfield 1" Addition Final Plat May 7, 1997 Page 8 Sunnyslope Addition. A future phase of development will construct a permanent storm water quality pond in this same location. Drain tiles are proposed behind the curbs and backyards to address sump pump discharge from the homes. SURFACE WATER MANAGEMENT PLAN (SWMP) The City has adopted a Surface Water Management Plan (SWMP) that serves as a tool to protect, preserve and enhance water resources. The plan identifies, from a regional perspective, the storm water quantity and quality improvements necessary to allow future development to take place and minimize its impact to downstream water bodies. In general, the water quantity portion of the plan uses a 100 -year design storm interval for ponding and a 10 -year design storm interval for storm sewer piping. The water quality portion of the plan uses William Walker, Jr.'s Pondnet model for predicting phosphorus concentrations in shallow water bodies. An ultimate conditions model has been developed at each drainage area based on the projected future land use, and therefore, different sets of improvements under full development were analyzed to determine the optimum phosphorus reduction in priority water bodies. The development will be required to be constructed in accordance with the City's Surface Water Management Plan. In conjunction with final platting and the construction plan review process, staff will require the applicant to supply drainage plans providing the pre - developed and post - developed drainage areas along with runoff calculations for pre - development and post - development conditions for 10 -year and 100 -year 24 -hour storm events. The grading plan shall also reflect the normal and high water elevations in the wetlands and storm water ponds for both pre- developed and post - developed conditions. Water quality ponds shall be designed and constructed in accordance with the Walker Pondnet model which essentially uses a 2 %z -inch rainfall. In addition, detailed drainage plans and calculations indicating drainage to individual catch basins will also be required. Storm Water Ouality Fees The SWMP has established a water quality connection charge for each new subdivision based on land use. Dedication shall be equal to the cost of land and pond volume needed for treatment of the phosphorus load leaving the site. The requirement for cash in lieu of land and pond construction shall be based upon a schedule in accordance with the prescribed land use zoning. Values are calculated using market values of land in the City of Chanhassen plus a value of $2.50 to $4.00 per cubic yard for excavation of the pond. The water quality charge has been established at $800 /acre for single - family residential development. This proposed development of 22.44 acres would be charged a water quality fee of $17,952. Springfield 1" Addition Final Plat May 7, 1997 Page 9 Stone Water Ouantitv Fees The SWMP has established a connection charge for the different land uses based on an average city -wide rate for the installation of water quantity systems. This cost includes land acquisition, proposed SWMP culverts, open channels and storm water ponding areas for runoff storage. Single family residential developments will have a connection charge of $1,980 per developable acre. Estimated water quantity fees for this plan are based on assessments of 22.4 acres at $1,980 or $44,431. SWMP Credits The applicant will be credited water quality fees where they provide NURP basins to treat runoff from this site. This will be determined upon review of the ponding and storm sewer calculations. Credits in this development are also being given for the applicants participation in paying for overseeing trunk storm sewer lines servicing this property. At this time these credits are estimated at $3,233.81. This figure may change as the final quantities from the contractor have not been finalized. These fees will be due payable to the City at time of final plat recording. The applicant will be charged SWMP fees for lots that are presented for final platting. Future phases of the development will be assessed charges when they are submitted for final platting. GRADING Grading will be limited to Phase I of the development with the exception of an interim storm water pond on Outlot C (adjacent to the Sunnyslope Addition) which will also be constructed at this time. UTILITIES Detailed construction plans and specifications were submitted for staff review and City Council approval. Staff has reviewed the plans and specifications and found them to be in general conformance with City standards. STREETS Detailed street construction plans and specifications have been submitted for staff review and City Council approval. Staff has reviewed the plans and specifications and finds them to be in general conformance with City Standards. A 5 -foot wide concrete sidewalk will be constructed on Springfield Drive and Sunnyvale Drive. Springfield I` Addition Final Plat May 7, 1997 Page 10 Decorative street lights will be installed throughout the development by Minnesota Valley Electric Company after the streets are constructed. Due to the restricted turning movements caused by the landscaped median island in the center of the cul -de -sacs, it is recommended that parking be prohibited. In the future, the existing street name on Kiowa Trail shall be changed to Springfield Drive if a connection is made to maintain continuity of street names. A landscaped median island is proposed in Springfield Drive at the access point to the development off of Lyman Boulevard. This median island shall be maintained by the homeowners association through the declaration of covenants. Should the median not be well maintained or become a public safety hazard, the City reserves the right to remove the landscaping and/or the entire median. The City shall not be liable for damage to the landscaping or irrigation system as a result of snow plowing operations. REVIEW OF CONDITIONS OF APPROVAL Staff has reviewed the conditions of approval and made a determination of the compliance with the conditions. Submittal of street names to the Public Safety Department, Inspections Division for review and approval prior to final plat approval. * This condition shall be modified as follows: Rename the street currently proposed as "Parkview Court." 2. Revise grading and erosion control plan to indicate lowest floor level elevation and garage floor elevation before final plat approval. * This condition has been met. 3. Tree preservation/landscaping: a. Detailed plans for perimeter berming and landscaping. A landscaped buffer shall be provided along State Highway 101 and Lyman Boulevard. This buffer shall be sufficient to screen direct views of the homesite from the roadway. Additional landscaping shall be provided along Lake Riley Boulevard to provide a natural transition from Lake Riley Boulevard into the development. * This condition has been met for the first phase. However, landscaping along Highway 101 and the west half of Lyman Boulevard will need to be enhanced to meet the intent of this condition. Springfield 1" Addition Final Plat May 7, 1997 Page I 1 b. Tree planting to meet minimum size standards in City Code and to be selected from the official tree list. * This condition has been met. C. Landscaping to be covered by satisfactory financial guarantees to assure installation and survival. * This condition is being met as part of the development contract. d. Existing trees listed in the tree survey to be preserved as part of the development. * This condition has been met. e. Development of an approved landscape budget prior to City approval of the final plat. * This condition has been met for the first phase. f The development must perform the appropriate calculations and comply with the requirements of the tree preservation ordinance (section 18 -61). * This condition has been met. 4. The applicant shall dedicate 5.3 acres of park land to the City in lieu of park fees. * The applicant is dedicating a proportionate share of the park, Outlot F, consisting of 0.949 acres as part of the first phase. An additional 4.351 acres will be required with future phases. 5. A trail easement to be dedicated in the southeast quadrant of the site to provide pedestrian and bicycle access to Lake Riley Boulevard. The trail segment shall be built by the developer as part of the phase of development including the abutting property. Full trail fees will be required as part of the development. * The first half of this condition does not apply with this phase. However, full trail fees will be required as part of the development. 6. Demonstrate that each lot can accommodate at least a 60' x 40' homesite and a 12' x 12' deck and maintain all setbacks on the final plat. Springfield 1 51 Addition Final Plat May 7, 1997 Page 12 * This condition has been met. 7. A minimum fifty (50) foot building setback shall be maintained from Lyman Boulevard and State Highway 101. * This condition still applies. 8. Appropriate drainage and utility easements shall be conveyed with the final plat for all utilities located outside the public right -of -way. The minimum width shall be twenty (20) feet. * This condition has been met. 9. No lots shall have driveway access to State Highway 101, Lyman Boulevard, or Lake Riley Boulevard. * This condition still applies. 10. The developer shall construct all utility and street improvements in accordance with the City's latest edition of Standard Specifications and Detail Plates and prepare final construction plans and specifications for City staff review and formal City Council approval in conjunction with final plat approval. * This condition has been met. 11. As a condition of final plat approval, the applicant shall be required to enter into a PUD agreement and development contract with the City and provide the necessary financial security to guarantee compliance with the conditions of approval of final platting. *This condition still applies. 12. The City of Chanhassen Wetland Ordinance should be employed to require a buffer strip and setback for the homes adjacent to the wetland in the northeast corner of the site, specifically Lots 6, 7 and 8, Block 5. * This condition has been met. 13. The grading plan should be revised to include existing ground contours. Street grades throughout the subdivision shall fall within the City's standard of 0.50% to 7.0% percent grades. Springfield 1 51 Addition Final Plat May 7, 1997 Page 13 * This condition has been met. It should be noted that the minimum standard is now 0.75%. 14. Storm sewers shall be designed and constructed to facilitate a 10 -year storm event. The ponding basins are required to meet NURP water quality standards and maintain the surface water discharge rate from the subdivision at the predeveloped runoff rate for a 100 -year, 24 -hour storm event. Detailed storm sewer and ponding calculations for the entire development will be required in conjunction with final platting of Phase I. * This condition has been met. 15. The drainage basins along Lyman Boulevard shall be sized to accommodate the storm runoff for the future upgrade of Lyman Boulevard. The City may contribute towards the cost of any pond oversizing as a result of additional runoff generated from Lyman Boulevard. The City will credit the applicant by means of an assessment or SWMP fees reduction. * This condition has been met. 16. Storm sewer and ponding basins shall be designed in accordance to the City's Surface Water Management Plan. The applicant shall work with staff in relocating or adjusting the proposed NURP basins adjacent to Lyman Boulevard to be compatible with the future upgrade of Lyman Boulevard. The proposed development will also be subject to the appropriate water quality and quantity connection fees. * This condition still applies. 17. The applicant shall dedicate on the final plat additional road right -of -way along Lake Riley Boulevard to achieve a 60 -foot wide right -of -way. The street right -of -way throughout the subdivision shall be 60 feet wide. * This condition has been met. On streets without sidewalks, the city is permitting 50 foot right -of -ways. 18. During the construction of each phase, temporary turnarounds shall be provided on all dead end streets which are proposed to be extended. Barricades shall be placed at the end of the temporary turnarounds with a sign indicating that "this street shall be extended in the future." * This condition still applies. Springfield 1" Addition Final Plat May 7, 1997 Page 14 19. The applicant /property owner of Outlot F shall enter into a driveway easement with the adjoining three property owners for the use of the existing driveway through Outlot F if one currently does not exist or eliminate the issue by relocating the driveway off of the property. * This condition shall be modified as follows: The applicant/property owner of Lot 1, Block 3 and Outlot D, shall enter into a driveway easement agreement with the adjoining three property owners for the use of the existing driveway through of Lot 1, Block 3 and Outlot D. 20. Preliminary and final plat approval shall be conditioned upon the Chanhassen City Council authorizing a public improvement project for the extension of trunk utility service to the area and the upgrade of Lyman Boulevard to urban standards. * This condition has been met. 21. Fire hydrants shall be spaced in accordance to the City's fire marshal recommendations. * This condition has been met. 22. The applicant shall provide a 6 -inch watermain stub to Lake Riley Boulevard between Lots 15 and 16, Block 5 shall be provided. * This condition is not applicable with this phase. 23. The existing home on Outlot F shall be required to connect to City sewer and water service within 12 months from the date the system becomes available or sooner if the well and septic system fails. * This condition shall be modified as follows: The existing home on Lot 1, Block 3 shall be required to connect to City sewer and water service within 30 days from the date the sanitary sewer system is accepted by the city or sooner if the well and septic system fails. 24. The applicant shall receive and comply with all pertinent agency permits, i.e. Watershed District, Health Department, MPCA, Williams Brothers Pipeline Company, MWCC. * This condition still applies. 25. All disturbed areas during site grading shall be immediately restored with seed and disc mulch or wood fiber blanket within two weeks after site grading or before October 31 Springfield I" Addition Final Plat May 7, 1997 Page 15 each construction season accept in areas where utilities and street will be constructed yet that year. All disturbed areas resulting from construction activities shall be restored in accordance to the City's Best Management Practice Handbook for erosion and sediment control. * This condition still applies. 26. As a condition of final plat approval, the applicant will be required to enter into a development contract with the City and provide the necessary financial security to guarantee compliance with the conditions of approval and final platting. * This condition is a duplicate and can be deleted. 27. The applicant shall be responsible for their fair share of the assessments for the extension of trunk utility improvements and the upgrade of Lyman Boulevard to urban standards. * This condition still applies. 28. Outlot F shall be platted as a lot within the subdivision since outlots cannot be built upon. Relocate the driveway for this lot so that it connects perpendicularly to the proposed street within the subdivision at a location acceptable to the Engineering Department. * This condition has been partially met and needs to be modified as follows: Within 90 days of acceptance of the street improvements by the city, the driveway for Lot 1, Block 3 shall be relocated to connect perpendicularly to the proposed Springfield Drive when it is constructed within the subdivision, at a location acceptable to the Engineering Department. 29. Back -to -back cul -de -sacs shall be provided at the Kiowa Trail connection. The pavement for the northern cul -de -sac shall be installed to the project property line. A breakaway barricade shall be installed to prohibit through traffic on Kiowa Trail. The cul -de -sac shall be temporary until either area residents petition the City to open the connection or Highway 212 is constructed at which time traffic patterns will be changed. * This condition does not apply to this phase. 30. A declaration that the fields in Bandimere Community park will be lighted shall be included in the chain of title for lots within the subdivision. * This condition still applies. Springfield I" Addition Final Plat May 7, 1997 Page 16 31. Sidewalks or pedestrian trails shall be provided connecting Lake Riley Boulevard and Lyman Boulevard to Bandimere Park. This trail system shall include a trail segment built within the 92nd Street right -of -way from Kiowa Trail to Bandimere Park. * This condition is partially being met. The connection to Lake Riley Boulevard and on 92 Street will occur in future phases. 32. The City reserves the right to reevaluate the subdivision and require changes to the plat based on the city's approval of any ordinances that may be adopted during the preliminary plat time extension. * This condition no longer applies. The only ordinance that has been amended since the original approval of the plat is the tree preservation ordinance which is being incorporated in the landscaping plan. 33. The applicant shall be responsible for acquiring the necessary right -of -entry required to complete the Lyman Boulevard upgrade until such time as the necessary right -of -way is platted with the development of the site. * This condition has been met. After review of the developer's construction plan and plat, staff is recommending that the following conditions be added: • A separate sign permit will be required for each sign proposed for the development. • Water quality fees will be based in accordance with the City's SWMP. The requirement for cash in lieu of land and pond construction shall be based upon a schedule in accordance with the prescribed land use zoning. • Water quantity fees will be based in accordance with the City's SWMP. Storm sewer trunk fees will be evaluated based on the applicant's contribution to the SWMP design requirements. • "No Parking" signs shall be posted around the island and outside curb line of the cul -de -sacs and that portion of Springfield Drive lying north of Sunnyvale Drive in order to keep a lane open for turning movements. The City Council shall adopt a resolution for a "No Parking" zone in this area. • The landscape median island proposed in Springfield Drive shall be maintained by the homeowners association through the declaration of covenants. Should the median not be well maintained or become a public safety hazard, the City reserves the right to remove the Springfield 1 St Addition Final Plat May 7, 1997 Page 17 landscaping and/or the entire median. The City shall not be liable for damage to the landscaping or irrigation system as a result of snow plowing operations. RECOMMENDATION Staff recommends that the City Council adopt the following motions: "The City Council approves final reading of rezoning PUD #95 -1 rezoning 80.8 acres from Agricultural Estate, A2, to Planned Unit Development Residential, PUD -R." "The City Council approves PUD #95 -1 granting Final Plat approval for Springfield l Addition creating 26 lots and six outlots (plans prepared by Pioneer Engineering, dated stamped received May 6, 1997) subject to the following conditions: Rename the street currently proposed as "Parkview Court." 2. Full trail fees will be required as part of the development. 3. A minimum fifty (50) foot building setback shall be maintained from Lyman Boulevard and State Highway 101. 4. No lots shall have driveway access to State Highway 101, Lyman Boulevard, or Lake Riley Boulevard. 5. As a condition of final plat approval, the applicant shall be required to enter into a PUD agreement and development contract with the City and provide the necessary financial security to guarantee compliance with the conditions of approval of final platting. 6. Storm sewer and ponding basins shall be designed in accordance to the City's Surface Water Management Plan. The applicant shall work with staff in relocating or adjusting the proposed NURP basins adjacent to Lyman Boulevard to be compatible with the future upgrade of Lyman Boulevard. The proposed development will also be subject to the appropriate water quality and quantity connection fees. 7. During the construction of each phase, temporary turnarounds shall be provided on all dead end streets which are proposed to be extended. Barricades shall be placed at the end of the temporary turnarounds with a sign indicating that "this street shall be extended in the future." Springfield I" Addition Final Plat May 7, 1997 Page 18 8. The applicant/property owner of Lot 1, Block 3 and Outlot D, shall enter into a driveway easement agreement with the adjoining three property owners for the use of the existing driveway through of Lot 1, Block 3 and Outlot D. 9. The existing home on Lot 1, Block 3 shall be required to connect to City sewer and water service within 30 days from the date the sanitary sewer system is accepted by the city or sooner if the well and septic system fails. 10. The applicant shall receive and comply with all pertinent agency permits, i.e. Watershed District, Health Department, MPCA, Williams Brothers Pipeline Company, MWCC. 11. All disturbed areas during site grading shall be immediately restored with seed and disc mulch or wood fiber blanket within two weeks after site grading or before October 31 each construction season accept in areas where utilities and street will be constructed yet that year. All disturbed areas resulting from construction activities shall be restored in accordance to the City's Best Management Practice Handbook for erosion and sediment control. 12. The applicant shall be responsible for their fair share of the assessments for the extension of trunk utility improvements and the upgrade of Lyman Boulevard to urban standards. 13. Within 90 days of acceptance of the street improvements by the city, the driveway for Lot 1, Block 3 shall be relocated to connect perpendicularly to the proposed Springfield Drive when it is constructed within the subdivision, at a location acceptable to the Engineering Department. 14. A declaration that the fields in Bandimere Community park will be lighted shall be included in the chain of title for lots within the subdivision. 15. A separate sign permit will be required for each sign proposed for the development. 16. Water quality fees will be based in accordance with the City's SWMP. The requirement for cash in lieu of land and pond construction shall be based upon a schedule in accordance with the prescribed land use zoning ($17,952). 17. Water quantity fees will be based in accordance with the City's SWMP. Storm sewer trunk fees will be evaluated based on the applicant's contribution to the SWMP design requirements ($44,431). 18. "No Parking" signs shall be posted around the island and outside curb line of the cul -de- sacs and that portion of Springfield Drive lying north of Sunnyvale Drive in order to keep Springfield 1 St Addition Final Plat May 7, 1997 Page 19 a lane open for turning movements. The City Council shall adopt a resolution for a "No Parking" zone in this area. 19. The landscape median island proposed in Springfield Drive shall be maintained by the homeowners association through the declaration of covenants. Should the median not be well maintained or become a public safety hazard, the City reserves the right to remove the landscaping and/or the entire median. The City shall not be liable for damage to the landscaping or irrigation system as a result of snow plowing operations." ATTACHMENTS 1. Location Map 2. Preliminary Plat 3. Reduced Final Plat 4. Final plat, area sketch, landscape plan, and entry monument plan 1= i W1 i ill . •' 6 TH paw +�= lC _ a 7 -F 0 LL LL r T H • 212 �OSEQ LAKE R ILEY AIL I J1 1 o r~ j 14 ., A I rf O t 247 Si hk Sig at 1 Its —� .\. 4 ft7.94 1 r NARY to revision notice. �y a I +s Y �• S6f E � g b 9 Y - n i �Q N•4 850.02 " ;,m i d ry IOvx o I r I L �naoE x$ IF y i I 1I veor $ f a i OC ^ �r s a P ^3 I i a t= m °III �a o Aq oc 3 s ae 40 4a4' ° 9 A SOOR5'00'E N•4 850.02 Yom; „`1` •E IOvx � I 8 I L �naoE x$ 3ei y i I 1I veor $ f w l i s � •' I i a I a I I S d� I 'Y.a ccro \1no O 4 • p •u KV - t y J im � u _ a _ x E r x N•4 It N07_•3'54-E Yom; „`1` •E ° I 9a � • 3ei y i I 1I o M r1 :sso a i OC ^ I P ^3 c I H w l i s � •' I i a I a I I S d� I 'Y.a ccro \1no O 4 • p •u KV - t y J im � u _ a _ x E r x .� It N07_•3'54-E ° I M r1 / � I a t= m °III o. : C) ys oh � / A\ 41 cA .� It N07_•3'54-E x n � A � o O 0 0 . � m Z 0 0 0