Loading...
5. Consider Petition for Extensions of Sanitry Sewer and Watermain Along Grandview Road, Authorize Feasibility StudyCITY OF ' CHANHASSEN 690 COULTER DRIVE • P.O. BOX 147 • CHANHASSEN, MINNESOTA 55317 (612) 937 -1900 • FAX (612) 937 -5739 TO: Charles Folch, Director of Public Works FROM: Dave Hempel, Assistant City Engineer DATE: May 7, 1997 SUBJ: Consider Petition for Extension of Sanitary Scwer and Waternain along Grandview Road-, Authorize Feasibility Study - Project No. 97 -11 Staff has received a petition from three of the five property owners along Grandview Road requesting preparation of a feasibility study for the extension of municipal sewer and water services and upgrading Grandview Road (Attachment No. 1). One of the properties (8151 Grandview Road) who did not sign the petition is connected to municipal sanitary sewer from the Hidden Valley development east of Grandview Road. The remaining lots have septic systems and wells. Most of these lots are large enough to subdivide contingent upon the road being upgraded to urban standards and extension of municipal services. In conjunction with Villages on the Ponds municipal utilities are being extended to Grandview Road at two locations. One from the north and the other from the south. The utilities arc to be extended to the east property line of Villages on the Ponds by sometime in mid - July, 1997. The consulting firm of BRW, Inc. has submitted a proposal for preparing a feasibility study to address extension of municipal utility service and upgrading the road to urban standards (Attachment No. 2). The cost of preparing a feasibility study for just the extension of utilities is ($2,860 + $250) _ $3,110. To include upgrading of the road in the feasibility study would be an additional $720. Neighborhood input at the Council meeting on Monday, May 12, 1997 will naturally be an important factor in determining the scope of the feasibility study. Staff believes the cost to add the road to the feasibility study is justified and important information for residents and the Council to know at the public hearing in deciding whether or not to include the road in the project. Therefore, staff is recommending that the City Council authorize BRW, Inc. prepare a feasibility study in accordance with the proposal dated May 7, 1997 for the extension of municipal sanitary sewer, water service and the upgrade of Grandview Road, Public Improvement Project No. 97- 11 Attachments: 1. Petition dated April 3, 1997. 2. Letter from BRW. Inc. dated May 7, 1997. 3. Letter from Mary Bernier dated May 7, 1997 e , 4. Location map. c: Steven J. Kokesh, 8201 Grandview Road Albert & Jean Sinnen, 8150 Grandview Road ",t:w1^t4 lye. Richard & Linda Anderson, 8210 Grandview Road Y 10, %, t~tigtne r Mary Bernier, 8155 Grandview Road nY��+`t�d ( 5 7,97 01t / Gregory & Mary Larsen, 8151 Grandview Road "; �t� q rn>red by OY g:NengNpub1icN97- 11Veas.ecAm WD y�TCa>C�CC•w��u" � 1 April 3, 1997 To the City of Chanhassen: We, the majority of the homeowners on Grandview Road, do hereby petition the City of Chanhassen to extend municipal sewer and water service from the Villages on the Pond /St. Hubert's project to the homes on our road. Thank you very much. /J j - I 0 67 6�"\,C� F?�0, ro O-d CITY OF CHA MONORDY ANR 1 1 19P ENGINEERING DEPT. - l;,a "t i \ �`c -' • >� � '�k: � _�1�T � ��` E •`�' r "'- r C_'tr\ (A SC �.�ti� i' � Cl�� (l Sc' �� �- f J t-v ] q i a t 1 MAY -07 -1997 12:13 BRW 612 370 137e P.01iO4 T z I n-Kul May 7, 1997 OR w INC Mr. Dave Hempel Assistant City Engineer City of Chanhassen 690 Coulter Drive Chanhassen, Minnesota 55317 RE: Grand View Road Improvements Project Proposal for Feasibility Study Services SCOPE OF SERVICES BRW will prepare a feasibility report for the proposed Grand View Road Improvements Project. We have separated the proposed scope of work into two Dear Mr. Hempel: PlLniiwg The following proposal is offered for your consideration for feasibility study Transportation Tra services for the proposed Grand View Road Improvements Project_ It has been Urban Design prepared based upon our previous telephone conversations and information you provided on April 24, 1997. Thresher Square 7011 Third %Heel 5,. ' It is our understanding that the project includes the extension of sanitary sewer Minneapolis, and water main to five parcels located along Grand View Road east of the MN 55415 Villages on the Ponds Development which is currently under construction. 612/370 -0700 Approximately 900 feet of water main and 700 feet of sanitary sewer Fax 6l2/170 -137A improvements would, be included as a part of the project. The proposed utilities would be extended from existing stubs in the Villages on the Ponds Development. Denver M+Iw•ovkeo As a result of the utility construction, the existing roadway will need to be Minneapolis reconstructed. The existing roadway consists of an aggregate surfaced rural Ncwnrk section located within a 33 foot wide right of way. City staff is'currently Orlando evaluating whether they should reconstruct the roadway to City standards Vhkxmix including bituminous surl•'acing, curb and gutter and storm sewer. Portland San Diego Sealue Based upon our understanding of the project as detailed above, we have developed a proposed scope of work for the preparation of the feasibility study. The following is a summary of the scope. of work, along with an estimated cost for our services and a preliminary schedule for the project. SCOPE OF SERVICES BRW will prepare a feasibility report for the proposed Grand View Road Improvements Project. We have separated the proposed scope of work into two MAY -07 -1997 12:13 HRW 612 370 1378 P.02iO4 Mr. Dave Hempel May 7, 1997 Page 2 separate categories, Basic Services and Additional Services. The Basic Services include services necessary to prepare a feasibility study for the utility extensions and the reconstruction of the aggregate surfaced roadway_ The Additional Services include extra services associated with reconstructing the roadway to City standards as described above. The proposed scope of services is outlined below: Basic Services 1. Conduct kick -off meeting with City staff to discuss the project and gather background information. 2. Review as- builts and existing conditions information. 3. Determine the scope of the proposed, utility improvements. 4. Determine the estimated costs for the proposed utility improvements. 5. Determine a proposed method of financing. 6. Determine the proposed schedule for the improvements. 7. Prepare a feasibility report, presenting the results of the tasks described above. 8. Attend one neighborhood meeting and one public hearing as necessary to present the results of the feasibility report. Additional Service_ 1. Determine the scope of the proposed roadway improvements. 2. Determine the estimated costs for the proposed roadway improvements. 3. Determine a proposed method of financing for the roadway improvements. Based upon our conversations, it is assumed that the feasibility report can be a brief document prepared in letter format. It is also assumed that we will not be required to prepare any detailed presentation graphics foi• the report or the neighborhood meeting or public hearing. It is assumed that the feasibility report will consider one design plan for the proposed improvements and that we will not be required to investigate or determine estimated costs for alternative designs. ESTIMATED COSTS We propose that all work for this project be completed on an hourly basis. Our estimate of the fees required for the project is as follows: MAY -07 -1997 12:14 BRW Mr. Dave Hempel May 7, 1997 Page 3 BAilr' Services 612 370 1378 P.03iO4 P so e . Ho lv ate Hours Amount Project Manager $95.00 8.0 $ 760.00 Project Engineer $65.00 24.0 $1,560.00 Technician $50.00 8.0 $ 400.00 Clerical $35.00 4.0.. $ 140.00 Total Cost $2,860.00 Additional Services Personnel Hourlv Rate Hours Amount Project Engineer $65.00 8:0 $ 520.00 Technician $50.00 4.0 $ 200.00 Total Cost $ 720.00 Expenses Expenses incurred during the preparation of the feasibility study will be billed directly to the City with no BRW rharkup. Expenses may include items such as reproduction costs, mileage, etc. We estimate that expenses will be approximately $250.00. S ummary Basic Services (Hourly Not -to- Exceed) $2,860.00 Additional Services (Hourly Not -to- Exceed) $ 720.00 Expenses (Estimated) $ 250.00 Total Cost* $3,830.00 *All work will, therefore, be completed for the total not -to- exceed amount of $3,110.00 for the Basic Services only and $3,830.00 if the City elects to include the Additional Services for the roadway upgrade. Services will be performed on an hourly basis based upon the individual employee rates times a multiplier of 2.90. Expenses will be billed directly to the City with no BRW markup.. BRW would be happy to provide any other additional services for this project, as requested by City staff. Additional services may include the. preparation of presentation graphics for public meetings, the investigation of additional alternatives and attendance of any additional meetings. All additional services could be performed on an hourly basis. MAY -07 -1997 12:14 BRW Mr. Dave Hempel . May 7; 1997 Page 4 SCHEDULE 612 370 1378 P.04iO4 The following is a preliminary schedule for the project: The schedule assumes that a notice to proceed will be given by May 14, 1997. Neighborhood Meeting May 29, 1997 Feasibility Study Received by City Council June 9, 1997 Public Hearing June 23, 1997 The schedule for the preparation of the final plans and specifications, advertising, bidding and construction will be determined as a part of the preparation of the Feasibility Study. Thank you for the opportunity to provide this proposal. Nit is acceptable, please execute below and return the attached copy to us for our records. This original is provided for your file. Feel free to call us if you have any questions or need additional information. Sincerely, BRW, INC. ' Al J B om, PE Grego rown, PE eni r Associate Senior sultant Approved by: Signature Name Title Date TOTAL P.04 make, �k, --&-z, ' Til _ ze -� CITY OF CHANHASSEN OUR MAY 0 7 1997 ENNEERING OEPTC ✓ �`� e G�/� -cam " �- i J ��ti/tC l�Ye, !LC p "Ito- C� , k'-� XVV . e Qp i 6 .� BB 104, P 459 N O \ 1 r O � \� 3 Ar HIDDEN VALLEY 4 5 I � 6 2ND ADDITION 8 7 26 LAKE 10 �� 27 OUTLOT B a 12 II OQ� 36 t o 28 1 �,\ ?� 29 35 ;9 2 q 3' 1 . �� 30 �t N_ 39 38 34 OUTLOT C 3 40 33 31 / h 41 32 +� OUTLOT E ? i 4 42 43 44 5 45 Lft 15 -"'OUTLOT A CL{!Kti D o CO 6 9 `, - 46 `V OUTLOT G 7 e 10 47L . VIEW II .. – w0— s5 -- 160— 14 Q 48 I z S I 15 13 12 49 in I I m °D t w 16 SINNEN %A r% = �� so l a 1 17 21 so 51 LoeAwdD�v 11 o p 01 1 + _ Is 19 20 Z. r yn • 0 Q� ^ �o p YN P4 23 22 a a 6 1 26 25 m 30 54 -� c 1601 33 — i60-±- 27 P� � � 30 31 32 33 28 29 I ✓ � \ 0uj�OS //gk v \Z" Q � p C H r OUTLOT F