September 4, 2002
Public Hearing - Approve Feasibility Study for Extension of
Utilities in Ashling Meadows 2nd Addition, Project No. 02-07A
REOUESTED ACTION
Building Inspections
Phone. 952.227. i 180
Fax: 952.227.1190
Engineering
?h~ne: 952.227.1160
Fa:,:: 952.227. i 170
Finance
Phc, ne: 952.227. i !-,"0
F~:: 952.227.ii10
Park & Recreation
F:-s:.¢: 952.227.i i20
Fax. 952.227.!1'~0
~,'n:-952.227.!400
~,~.,~,.
Fax: 95Z227.!404
Hold the Public Hearing, Approve the Feasibility Study, and Authorize
Preparation of Plans and Specifications.
DISCUSSION
The developer of Lake Lucy Ridge petitioned the City for sanitary sewer and
watermain connections. These utilities would be provided with the development
of Ashling Meadows 2nd, however, the Lake Lucy Ridge developer desires to
develop sooner than they would be available.
To address the petitioner's request for sanitary sewer and watermain service, staff
is recommending extending sanitary sewer, watermain and a temporary gravel
road on Ruby Lane and ending with Emerald Lane, approximately 550 feet west
of the existing terminus.
Planning &
Natural Resources
Ph,cne: 952.227.ti30
Fa',:: 952.227.ii ]C
The estimated total project cost is $73,863 and is proposed to be assessed 100% to
the benefiting property owners of the Ashling Meadows 2nd Addition and Lake
Lucy Ridge developments.
Public Works
i59! Park Road
Phone: 952.227.1300
Fzx: 952.227.13i0
Senior Center
Phone: 952.227.1 i25
Fax: 952.227. i 1i0
Web Site
,',Y,r. Ci.ghan hasse,,.-i.m n.us
Failure to accept the Feasibility Study and Order the Preparation of Plans and
Specifications will delay development of Lake Lucy Ridge.
RECOMMENDED MOTION
Move to approve the feasibility study and authorize preparation of plans and
specifications for extension of sanitary sewer and watermain utilities through the
Ashling Meadows 2nd Addition development.
Attachments: 1. Feasibility Report.
2. Petition from property owner.
C:
Matt Saam, Project Engineer
Randy Noecker, Noecker Development
David Hinners, Lundgren Bros. Development
G:kENG\PUBLIC\02-07Akstaff repolx 9-9-02 revised.doc
the City of Chanhassen · A o~rov,,ing community v.,,ith clean lakes, quality schools, a cha.mning downtown, lhriving businesses, w riding trails, and beaulilul parks. A gear place to live. work. and play.
FEASIBILITY REPORT FOR
Ashling Meadows 2~a Addition
Utility Extension Improvements
City Project 02-07A
Chanhassen, Minnesota
August 20, 2002
Prepared by Matm~oud Sweidan, Engineer
I hereby certify that this plan, specification, or report
was prepared by me or under my direct supervision and
that I am a duly Registered Professional Engineer under
the laws of the State of Minnesota.
' Te'resa Burge~s, P~. -
Date: 9--~'iz--z-lco'z.- Reg. No. 25315
Table of Contents
Table of Contents
............. "'" .... "'"' ........... '"'"' ....... .. ........ · ........... · ................. . .................. 1
VI.
I. Introduction/Summary ................................................................................................. 2
Figure 1 .- Location Map ....................................................................................... 3
II. Proposed Improvements ............................................................................................... 4
III. Cost Analysis/Financing .................. i ......................................................................... 5
Table 1 - Project Costs
Table 2 - Proposed Assessment Rates ................................................................. 5
Table 3 - Funding Summary ................................................................................ 6
IV. Project Schedule ........................................................................................................... 7
V. Easements and Permits
Summary and Recommendations ................................................................................ 9
Appendix A - Preliminary Cost Estimate
Appendix B - Preliminary Assessment Roll
Appendix C - Map of Assessment Area
I. Introduction/Summary
This report presents infom-~ation concerning extension of utilities in Ashling Meadows 2nd
Addition. Streets included in the study are Ruby Lane and Emerald Lane. This project is part of
the second phase of the Ashling Meadows development.
Municipal improvements proposed herein include sanitary sewer and watem-min.
was petitioned for by the developer of the adjacent Lake Lucy Ridge development.
This project
The costs of the proposed improvements are detailed in Appendix A. Cost allocation and a cost
summary are presented in the Cost Analysis section. Financing for the project will come from
assessments to adjacent properties or to the developers of Ashling Meadows and Lake Lucy
Ridge.
The report examines the feasibility of completing municipal improvements consisting of sanitary
sewer and watermain in the project area.
Assessments proposed in this report are consistent with past projects and Council direction
concerning assessment methodology. The proposed project assessment area consists of the
developer's parcels and is shown in Appendix C. The proposed assessments are based on the
preliminary cost estimates and may be revised at the time of the final assessment hearing.
Fec~sibiliO~, Report for Project 02-07A Page 2
,Figure I - Location Plan
~ilit' Re
II. Proposed Improvements
SanitarX Sewer
An 8-inch sanitary sewer was stubbed east at the intersection of Ruby and Sapphire Lanes as part
of the Ashling Meadows Project (Phase I). The improvements proposed herein consist of
extending the sewer 550 feet eastward through Emerald Lane. The extension will include six
manholes and approximately five sewer wyes. The sewer will be installed at minimum ~ade.
The sewer will be installed so that it can be extended further south along Ruby Lane,
Watermain
Watermain proposed herein consists of extending and 8-inch diameter main approximately 550
feet east front the existing 8-inch diameter stub, Construction will include fire hydrants near the
and the middle of the extension to provide fire coverage and a means of flushing the line.
Street
Street improvements will include a temporary Class 5 road east front the end of the existing
payment at the intersection of Ruby and Sapphire Lanes. The proposed end of the temporary
road location will tie with a proposed city standard residential street as part of Lake Lucy Ridge
development. The temporary road will be used by the City's utility maintenance vehicles.
Services
Sanitary sewer and water services are proposed and will be located for future lots as shown on
the Ashling Meadows 2nd Addition development plans.
FeasibiliO' Reigort for Project 02-07A Pa~e 4
III. Cost Analysis / Financing
Cost Estimate
The estimated project cost to complete the improvements proposed herein are presented below in
Table 1. These costs include estimated 22% indirect costs' financial (2%), legal (5%),
administrative (5%), engineering (10%). The estimated indirect costs are reviewed at the time of
the final assessment hearing. This estimate does not include easement acquisition costs.
Table 1. Project 02-07A
Estimated Project Cost Summary
(See Appendix A for Detailed Cost Estimate)
Item
Sanitary Sewer
Water Main
Storm Sewer
Street
Total Cost
527,884.00
$33,132.00
$6,465.00
$6,380.00
Total $73,861.00
Assessments
Assessments are proposed for the benefited properties as shown on Appendix B. A Preliminary
Assessment Roll is presented in Table 2. The proposed assessments herein are consistent with
past practice and previous City Council direction concerning assessment methodology.
A summary of the proposed Assessment Roll is presented in Table 2 below.
Table 2
Item
Sanitary Sewer
Water Main
Services
Street
TOTALS
Project 02-07A Proposed Assessments
Ashling Meadows
$21,942.00
$17,661.00
$6,145.00
$0.00
Lake Lucy Ridge
$4,827.00
$15,471.00
$1,352.00
$6,465.00
$45,748.00
$28,115.00
02-0
The proposed assessments are for the developers of Ashling Meadows and Lake Lucy Ridge.
Fundin~ Summary
Table 3
Project 02-07A Funding Summary
Item Estimated Cost Assessments City Share
Sanitary Sewer $26,769.00 $26,769.00
Water Main $33,132.00 $33,132.00
Services $7,497.00 $7,497.00
Street $6,465.00 $6,465.00
TOTAL $73,863.00 $73,863.00
$0.00
$0.00
$0.00
$0.00
$0.00
Area to be Included
The area to be assessed for this project is listed in Table 2 and shown in Appendix B.
FeasibiliO, Report for Project 02-07A pa~ ~
IV. Project Schedule
The schedule shown is preliminary and is subject to revisions. The schedule is based on
completing construction in the spring of 2002. The project can be modified and/or delayed if the
City or adjacent property requests it.
Council Receive Report & Call for Heating
Public Heating
Order Preparation of Plans and Specifications
Approve Plans & Specs, Authorize Bids
Open Bids
Axvard Contract
Begin Construction
Substantial Completion
Assessment Heating
August 26, 2002
September 9, 2002
September 9, 2002
October 14, 2002
November 12, 2002
November 25, 2002
January, 2003
February, 2003
V. Easements and Permits
Easements for proposed construction will be required from the Ashling Meadows 2nd Addition
property owner(s). Temporary easements may be necessary for installing sewer and watermain.
It is assumed for this report that temporary easements will be provided.
Permits and approvals will be required from the following:
Minnesota Pollution Control Agency
Metropolitan Council Environmental Services
Mi~mesota Department of Health
Mim~esota Department of Natural Resources
Minnesota Department of Transportation
Board of Water and Soil Resources
Watershed District
City of Chm~hassen, Wetland Alteration Permit
Preparation of an Envirom~ental Assessment Worksheet (EAW) for the Public Lmprovements is
not required.
Fec~sibili(~, Report for P~'oj'ect 02-07,4 Paee 8
VI. Summary and Recommendations
The total estimated cost for this project is $73,863.00 including both construction and indirect
costs.
The proposed work is necessary, cost effective, and feasible from an engineering standpoint.
The following recommendations are presented for the Chanhassen City Council:
The City should adopt the report as the criteria for installation of the improvements
contained herein.
Feasibility Rel~ort for Project
APPENDIX B
Preliminary Assessment Roll
PID
25-0710320
25-4070200
25-0035100
OWNER
Lundgren
Bros.
Construction
Noecker &
Associates,
Inc.
PROPERTY
DESCRIPTION
Outlot A, $21-------~ 942
Ashling
Meadows
Lake Lucy $4,827
Ridge
SAN ITARY
WATERMAIN
$17,661
$15,471
SERVICES
$6,145
$1,352
STREET
$0.00
$6,465
TOTAL
$28,115.00
APPENDIX C
Map of Assessment Area
Ashling Meadows 2nd Addition
Utility Extension Improvements
City Project No. 02-07A
N
Noecker Development, LLC
8315 Pleasant View Drive
Mounds View, Minn. 55112
Teresa Burgess
Public Works Director/City Engineer
690 City Center Drive
City of Chanhassen
Chanhassen, Minnesota 55317
March 8. 2001
Re: Request for public improvements to Phase 2
of "Ashling Meadows" and "Lake Lucy Ridge".
Dear Teresa,
I am requesting a feasibility studv be completed for the installation of public improvements, city sewer and
water, in Phase 2 of Ashling Meadows a~'d my development, Lake Lucv Ridge. A preliminary grading plan is
attached. .
Sincereiv.
Randall R. ~' 'oec~rer, Presment
N T i · 1
Noecker Development, LLC
8315 Pleasant View Drive
Motmds View, Minn. 551 i 2
Cell 612-741-2662
Office 763-786-6387