Loading...
2 Ashling Meadows 2nd Addition CITYOF 7700 Market Boulevard PO Box 147 Chanhassen, MI,155317 Adminislration Phoag: 952.227.1 i00 Fax: 952.227.1110 TO: FROM: DATE: SUB J: Teresa J. Burgess, Public Works Director/City Engineer Mahmoud Sweidan, Engineer September 4, 2002 Public Hearing - Approve Feasibility Study for Extension of Utilities in Ashling Meadows 2nd Addition, Project No. 02-07A REOUESTED ACTION Building Inspections Phone. 952.227. i 180 Fax: 952.227.1190 Engineering ?h~ne: 952.227.1160 Fa:,:: 952.227. i 170 Finance Phc, ne: 952.227. i !-,"0 F~:: 952.227.ii10 Park & Recreation F:-s:.¢: 952.227.i i20 Fax. 952.227.!1'~0 ~,'n:-952.227.!400 ~,~.,~,. Fax: 95Z227.!404 Hold the Public Hearing, Approve the Feasibility Study, and Authorize Preparation of Plans and Specifications. DISCUSSION The developer of Lake Lucy Ridge petitioned the City for sanitary sewer and watermain connections. These utilities would be provided with the development of Ashling Meadows 2nd, however, the Lake Lucy Ridge developer desires to develop sooner than they would be available. To address the petitioner's request for sanitary sewer and watermain service, staff is recommending extending sanitary sewer, watermain and a temporary gravel road on Ruby Lane and ending with Emerald Lane, approximately 550 feet west of the existing terminus. Planning & Natural Resources Ph,cne: 952.227.ti30 Fa',:: 952.227.ii ]C The estimated total project cost is $73,863 and is proposed to be assessed 100% to the benefiting property owners of the Ashling Meadows 2nd Addition and Lake Lucy Ridge developments. Public Works i59! Park Road Phone: 952.227.1300 Fzx: 952.227.13i0 Senior Center Phone: 952.227.1 i25 Fax: 952.227. i 1i0 Web Site ,',Y,r. Ci.ghan hasse,,.-i.m n.us Failure to accept the Feasibility Study and Order the Preparation of Plans and Specifications will delay development of Lake Lucy Ridge. RECOMMENDED MOTION Move to approve the feasibility study and authorize preparation of plans and specifications for extension of sanitary sewer and watermain utilities through the Ashling Meadows 2nd Addition development. Attachments: 1. Feasibility Report. 2. Petition from property owner. C: Matt Saam, Project Engineer Randy Noecker, Noecker Development David Hinners, Lundgren Bros. Development G:kENG\PUBLIC\02-07Akstaff repolx 9-9-02 revised.doc the City of Chanhassen · A o~rov,,ing community v.,,ith clean lakes, quality schools, a cha.mning downtown, lhriving businesses, w riding trails, and beaulilul parks. A gear place to live. work. and play. FEASIBILITY REPORT FOR Ashling Meadows 2~a Addition Utility Extension Improvements City Project 02-07A Chanhassen, Minnesota August 20, 2002 Prepared by Matm~oud Sweidan, Engineer I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly Registered Professional Engineer under the laws of the State of Minnesota. ' Te'resa Burge~s, P~. - Date: 9--~'iz--z-lco'z.- Reg. No. 25315 Table of Contents Table of Contents ............. "'" .... "'"' ........... '"'"' ....... .. ........ · ........... · ................. . .................. 1 VI. I. Introduction/Summary ................................................................................................. 2 Figure 1 .- Location Map ....................................................................................... 3 II. Proposed Improvements ............................................................................................... 4 III. Cost Analysis/Financing .................. i ......................................................................... 5 Table 1 - Project Costs Table 2 - Proposed Assessment Rates ................................................................. 5 Table 3 - Funding Summary ................................................................................ 6 IV. Project Schedule ........................................................................................................... 7 V. Easements and Permits Summary and Recommendations ................................................................................ 9 Appendix A - Preliminary Cost Estimate Appendix B - Preliminary Assessment Roll Appendix C - Map of Assessment Area I. Introduction/Summary This report presents infom-~ation concerning extension of utilities in Ashling Meadows 2nd Addition. Streets included in the study are Ruby Lane and Emerald Lane. This project is part of the second phase of the Ashling Meadows development. Municipal improvements proposed herein include sanitary sewer and watem-min. was petitioned for by the developer of the adjacent Lake Lucy Ridge development. This project The costs of the proposed improvements are detailed in Appendix A. Cost allocation and a cost summary are presented in the Cost Analysis section. Financing for the project will come from assessments to adjacent properties or to the developers of Ashling Meadows and Lake Lucy Ridge. The report examines the feasibility of completing municipal improvements consisting of sanitary sewer and watermain in the project area. Assessments proposed in this report are consistent with past projects and Council direction concerning assessment methodology. The proposed project assessment area consists of the developer's parcels and is shown in Appendix C. The proposed assessments are based on the preliminary cost estimates and may be revised at the time of the final assessment hearing. Fec~sibiliO~, Report for Project 02-07A Page 2 ,Figure I - Location Plan ~ilit' Re II. Proposed Improvements SanitarX Sewer An 8-inch sanitary sewer was stubbed east at the intersection of Ruby and Sapphire Lanes as part of the Ashling Meadows Project (Phase I). The improvements proposed herein consist of extending the sewer 550 feet eastward through Emerald Lane. The extension will include six manholes and approximately five sewer wyes. The sewer will be installed at minimum ~ade. The sewer will be installed so that it can be extended further south along Ruby Lane, Watermain Watermain proposed herein consists of extending and 8-inch diameter main approximately 550 feet east front the existing 8-inch diameter stub, Construction will include fire hydrants near the and the middle of the extension to provide fire coverage and a means of flushing the line. Street Street improvements will include a temporary Class 5 road east front the end of the existing payment at the intersection of Ruby and Sapphire Lanes. The proposed end of the temporary road location will tie with a proposed city standard residential street as part of Lake Lucy Ridge development. The temporary road will be used by the City's utility maintenance vehicles. Services Sanitary sewer and water services are proposed and will be located for future lots as shown on the Ashling Meadows 2nd Addition development plans. FeasibiliO' Reigort for Project 02-07A Pa~e 4 III. Cost Analysis / Financing Cost Estimate The estimated project cost to complete the improvements proposed herein are presented below in Table 1. These costs include estimated 22% indirect costs' financial (2%), legal (5%), administrative (5%), engineering (10%). The estimated indirect costs are reviewed at the time of the final assessment hearing. This estimate does not include easement acquisition costs. Table 1. Project 02-07A Estimated Project Cost Summary (See Appendix A for Detailed Cost Estimate) Item Sanitary Sewer Water Main Storm Sewer Street Total Cost 527,884.00 $33,132.00 $6,465.00 $6,380.00 Total $73,861.00 Assessments Assessments are proposed for the benefited properties as shown on Appendix B. A Preliminary Assessment Roll is presented in Table 2. The proposed assessments herein are consistent with past practice and previous City Council direction concerning assessment methodology. A summary of the proposed Assessment Roll is presented in Table 2 below. Table 2 Item Sanitary Sewer Water Main Services Street TOTALS Project 02-07A Proposed Assessments Ashling Meadows $21,942.00 $17,661.00 $6,145.00 $0.00 Lake Lucy Ridge $4,827.00 $15,471.00 $1,352.00 $6,465.00 $45,748.00 $28,115.00 02-0 The proposed assessments are for the developers of Ashling Meadows and Lake Lucy Ridge. Fundin~ Summary Table 3 Project 02-07A Funding Summary Item Estimated Cost Assessments City Share Sanitary Sewer $26,769.00 $26,769.00 Water Main $33,132.00 $33,132.00 Services $7,497.00 $7,497.00 Street $6,465.00 $6,465.00 TOTAL $73,863.00 $73,863.00 $0.00 $0.00 $0.00 $0.00 $0.00 Area to be Included The area to be assessed for this project is listed in Table 2 and shown in Appendix B. FeasibiliO, Report for Project 02-07A pa~ ~ IV. Project Schedule The schedule shown is preliminary and is subject to revisions. The schedule is based on completing construction in the spring of 2002. The project can be modified and/or delayed if the City or adjacent property requests it. Council Receive Report & Call for Heating Public Heating Order Preparation of Plans and Specifications Approve Plans & Specs, Authorize Bids Open Bids Axvard Contract Begin Construction Substantial Completion Assessment Heating August 26, 2002 September 9, 2002 September 9, 2002 October 14, 2002 November 12, 2002 November 25, 2002 January, 2003 February, 2003 V. Easements and Permits Easements for proposed construction will be required from the Ashling Meadows 2nd Addition property owner(s). Temporary easements may be necessary for installing sewer and watermain. It is assumed for this report that temporary easements will be provided. Permits and approvals will be required from the following: Minnesota Pollution Control Agency Metropolitan Council Environmental Services Mi~mesota Department of Health Mim~esota Department of Natural Resources Minnesota Department of Transportation Board of Water and Soil Resources Watershed District City of Chm~hassen, Wetland Alteration Permit Preparation of an Envirom~ental Assessment Worksheet (EAW) for the Public Lmprovements is not required. Fec~sibili(~, Report for P~'oj'ect 02-07,4 Paee 8 VI. Summary and Recommendations The total estimated cost for this project is $73,863.00 including both construction and indirect costs. The proposed work is necessary, cost effective, and feasible from an engineering standpoint. The following recommendations are presented for the Chanhassen City Council: The City should adopt the report as the criteria for installation of the improvements contained herein. Feasibility Rel~ort for Project APPENDIX B Preliminary Assessment Roll PID 25-0710320 25-4070200 25-0035100 OWNER Lundgren Bros. Construction Noecker & Associates, Inc. PROPERTY DESCRIPTION Outlot A, $21-------~ 942 Ashling Meadows Lake Lucy $4,827 Ridge SAN ITARY WATERMAIN $17,661 $15,471 SERVICES $6,145 $1,352 STREET $0.00 $6,465 TOTAL $28,115.00 APPENDIX C Map of Assessment Area Ashling Meadows 2nd Addition Utility Extension Improvements City Project No. 02-07A N Noecker Development, LLC 8315 Pleasant View Drive Mounds View, Minn. 55112 Teresa Burgess Public Works Director/City Engineer 690 City Center Drive City of Chanhassen Chanhassen, Minnesota 55317 March 8. 2001 Re: Request for public improvements to Phase 2 of "Ashling Meadows" and "Lake Lucy Ridge". Dear Teresa, I am requesting a feasibility studv be completed for the installation of public improvements, city sewer and water, in Phase 2 of Ashling Meadows a~'d my development, Lake Lucv Ridge. A preliminary grading plan is attached. . Sincereiv. Randall R. ~' 'oec~rer, Presment N T i · 1 Noecker Development, LLC 8315 Pleasant View Drive Motmds View, Minn. 551 i 2 Cell 612-741-2662 Office 763-786-6387