Loading...
1m Library Change Order 27700 Markd Boulevard PO Box 147 .... ,:..,.~:.,.,. MN 55317 Administration P~ne: 952.227.1100 E%. Ore ,~..,~.22,.1110 Building Inspections ;'i~.:'~e: 952 227.; !80 ~.,,' .c~'.227 Engineering - r-.-, ~-,~. Finance ..~ ~: ~:~..,.-:':il. Park & Recreation ,~:...,...., - . :a., ~52 227.14..34 Planning & Natural Resources 7 :.:.~. ~2 227 ~ - · .%222:' Public Works Fax:~'~ ~7 Senior Center Web Site TO: Mayor & City Council FROM: Todd Gerhardt, City Manager' DATE: August 26, 2002 SUB J: Change Order No. 2, Chanhassen Library Project Attached for the City Council's consideration is Change Order No. 2 for the Chanhassen Library project. Staff is requesting the City Council approve this change order by increasing the original contract sum by $67,398.90, which will bring the total contract to $4,963,909.90. The attached change order provides a breakdown of the costs associated with each change order item. Change Order · Contractor · Owner · Architect · M + E Consults · Structural Consults Project: Contractor: Chanhassen Public Library 690 City Center Dr. Chanhassen, MN 55317 Kraus Anderson Const'n Co. 2500 Minnehaha Ave Mpls, MN 55404 Change Order Number: 2 Date: 22 August, 2002 Architect's Project No.: 2001021.00 Contract Date: 28 May 2002 Contract For: General Construction The Contract is changed as follows: CCD I Modify cavity wall rigid insulation PR 5.1 Additional site survey ~vork PR 5.2 Soil corrections deduct $2,926.00 add $1,105.00 add $69,219.90 Not valid until signed by the Owner, Architect and Contractor The original Contract Sum was ............................................................................................. $4,865,000.00 Net Change by previously authorized Change Orders ................................................................. $31,511.00 The Contract Sum prior to this Change Order xvas ................................................................. $4,896,511.00 The Contract Sum will be increased by this Change Order in the amount of ............................... $67,398.90 The new Contract Sum including this Change Order will be ................................................. $4,963,909.90 The Contract Time will be increased by ........................................................................................... 0 Days The da,50~'-'(,"Substantial Completion, resulting from this Change Order is ............................... 22June, 2003 KrausAr~ersonConstructionCo. City of Chanhassen 2500 M/4'n~zehaha~__Ave /~ 690 City Center Dr iMpls;~//~/ ~//~ Chanhassen, MN55317 Date Date L:X_2001021 CHA\dock2001021co02.doc Construction Change Directive Project: Chanhassen Public Library MS&R Owner [] Architect ' [] Consultant [] Contractor [] Construction Change Chanhassen, Minnesota Owner: City of Chanhassen 690 City Center Dr Chanhassen, Minnesota 55317 To: Kraus Anderson. 2500 Minnehaha Ave Minneapolis, Minnesota 55404 Contract For: General Construction Directive No.: Date of Issuance: 21 June 2002 Architect: Meyer, Scherer & Rockcastle 119 North Second Street Minneapolis, Minnesota 55401 Architect Project No.: 2001021.00 In order to expedite the Work and avoid or minimize delays in the Work which may affect Contract Sum or Contract Time, the Contract Documents are hereby amended as described below. Proceed with this Work promptly. Submit fi~,al costs for Work involved (including prices for all trades that may be affected) and change in Contract Time (if any), for inclusion in a subsequent Change Order. Description: Change all the 3 inch thick rigid masonry cavity wall insulation to 2 inches thick. F~xplanation: Incorrectly drawn and noted. Our typical cavity wall has a 4 inch space, accommodating 2 inches of insulation xvith a 2 inch air space. The following is based on information provided by the Contractor: Method Change Chang~ By Architect ~mining Change in the Contract: Lump Sum me: Ded;ct To Be Determined' . !n/A~°n~_'C'~.um: / / 1[' Date /wrier ~ Date Co~tr~a~r - / D~te KRAUS-ANDERSON® CONSTRUCTION COMPANY CONTRACTORS & CONSTRUCTION MANAGERS -- July 15, 2002 Mr. Barry Petit Meyer, Scherer & Rockcastle, Ltd. 119 North 2nd Street Minneapolis, MN 55401-1420 Re: Chanhassen Public Library Chanhassen, MN Dear Barry: We have reviewed Construction Change Directive #1 dated June 21, 2002 wherein we are directed to change all the 3" thick rigid masonry wall installation to 2", and therefore we submit a credit in the amount of $2,926.00 for this modification. We are enclosing a cost proposal received from Crosstown Masonry., Inc. confirming this deduct for your records. Please incorporate the following cost modification into a future change order. The cost therefore is a deduct of $2,926.00. If you have any questions or comments concerning the above, please contact me. Sincerely, K_RAUS-ANDERSON CONSTRUCTION COMPANY BUILDING DIVISION William M. Cox Project Manager cc: Jobsite Building Division 2500 Minnehaha Avenue, Minneapolis, MN 55404 Phone: (612) 721-7581 FAX: (612) 721-2660 d7112/02 13:31 FAX 7634347693 CROSSTOWN ~{ASONR ~ 001 1322 159TH ~l~l~/O~..~.~O(~'~Vl LAKE, MINNESOTA 55304 Attn: Bill Cox ~a~-~d~son B~l~g Di~on 2500 Minneh~ Ave M~po~s, ~ 55404 ~: Ch~sen Pubic Libr~ (763) 434-6371 FAX (763) 434-7693 FROM:~ DE~....~ PHONE: (612) 434-6371 COMMENTS~~ ~ ,~,~',~_~ CCD # 1 Price to replace ail 3"cavity wall insulation with 2" insulation. Deduct $2,926.00 If you h~ve any questions or concerns, please feel free to contact me. Sincerely, Jay Bird Crosstown Masonry, Incorporated ,f MS&R Proposal Request Todd Gerhardt Architect: Barry Petit Contractor: Bill Cox . Project: Chanhassen Public Library Chanhassen, Minnesota Proposal Request: No. ~ Owner: City of Chanhassen Date of Issuance' July 12, 2002 To: Bill Cox Kraus Anderson Construction Minneapolis Architect: Meyer, Scherer & Rockcastle, Ltd. 119 North Second Street Minneapolis, Minnesota 55401 Contract For' General Construction Architect Project No.: 2001021.00 Contract Dated: Tentative April 22, 2002 Please submit au itemized quotatiou for chauges iu the Contract Sltlll and/or Time resulting fi'om the 1)roposed modifications to the Coutract Documents described herein. This is not a change order uor a direction to proceed with the work described herein. Description: 1) Provide additional spot elevations to resolve the 6" discrepancy in the lower level City Hall floor elevation on the site survey. (2) Correct soils as required. Verification and testing provided by GME soils engineers. Attachments: None Architect: Meyer, Scherer & Rockcastle, Ltd. By: Barry Petit Proposal Request Number Four. July 22, 2002 Chanhasseu Public Library July 15, 2002 KRAUS-ANDERSON® CONSTRUCTION coMPANy CONTRACTORS & CONSTRUCTION MANAGERS Mr. Barry Petit Meyer, Scherer & Rockcastle, Ltd. 119 North 2nd Street Minneapolis, MN 55401-1420 Re: Chanhassen Public Library Chanhassen, MN Dear Barry: As directed at our Progress Meeting #2 held on June 20, 2002, to verify elevations as described in Item 1.4 of the Progress Meeting minutes, we submit Sunde Land Surveying Invoice Number 28416 dated July 3, 2002 in the amount of $1,041.50 to perform this additional work. The total additional cost to verify elevations and to prepare this document is $1,105.00 as sunmaarized below. We are attaching a copy of Sunde Land Surveying invoice for your records. Please incorporate this expense into a future change order. Sunde Land Surveying 5% OH. & P. Subtotal 1% Performance Bond Total Add $1,041.50 52.50 $1,094.00 11.00 $1,105.00 Should you have any questions or comments regarding the above, please contact me. Sincerely, KRAUS-A~ERSON CONSTRUCTION COMPANY BUILDING DIVISION William M. Cox Project Manager cc: Jobsite Building Division 2500 Minnehaha Avenue, Minneapolis, MN 55404 Bill Cox Kraus-Anderson Building Division 2500 M/rmehaha Avenue Minneapolis, MN 55404 // 9001 East Bloomington Freeway (35W) - Suite 118 Bloomington Minnesota 55420-3435 952/881-2455 · Fax: 952/888-9526 INVOICE FOR SERVICES Invoice number 28416 Date July 03, 2002 Customer: K608 Project No: 2002070 West ?8th St. & Kerber Blvd. - Chanhassen, ~ "Chanhass en Library" Professional Services 1.) Shot topography to verify grades. Topographic Survey Larry Alman Keith Johnson Justin Thiers Topographic Survey subtotal Draw Contours Arlee Carlson Draw Contours subtotal Field Data Preparation Mark A. Peterson Field Data Preparation subtotal Field Drafting Keith Johnson Field Drafting subtotal Topographic Survey Scott Soukup, P.L.S. Brandon Sandberg Topographic Survey subtotal Digitizing Maria Engebritson Digifiz/ng subtotal Date Hours Rate Amount 06/24/02 3.50 76.00 266.00 06/24/02 3.50 66.00 231.00 ' 06/24/02 3.50 60.00 210.00 10.50 707.00 06/25/02 1.00 76.00 76.00 1.00 76.00 06/28/02 0.50 74.00 37.00 0.50 37.00 06/24/02 1.00 66.00 66.00 1.00 66.00 06/25/02 0.25 94.00 23.50 06/25/02 1.50 68.00 102.00 1.75 125.50 06/24/02 0.50 60.00 30.00 0.50 30.00 15.25 1,041.50 For payment by credit card contact TERMS: Due and payable upon receipt. Please refer to contract documents if other credit terms apply or call Accounts Payable v~your g. re~ card information. July 30, 2002 KRAUS-ANDERSON® CONSTRUCTION COMPANY CONTRACTORS & CONSTRUCTION MANAGERS Mr. Barry Petit Meyer, Scherer & Rockcastle, Ltd. 119 North 2nd Street Minneapolis, MN 55401-1420 Re: Chanhassen Public Library Chanhassen, MN Dear Barry: Please find attached Ingrain Excavating cubic yardage calculations for the soil correction work performed to date on the above referenced project. Their calculations are based on actual spot elevations taken in the field, which have been substantiated by GME Consultants, h~c. A copy of the elevation survey is attached for your review. Based on the information provided, the additional quantity of soil correction volume is 3,219.53 c.y. The additional cost to perform this work is as follows- Unit Price #1 Structurally unsuitable soil removal ~ $7.50 per c.y. = Unit Price #2 - Add re-compacted fill in place ~ $14.00 per c.y. = $24,146.48 $45,073.42 TOTAL $69,219.90 The above unit prices represent those responded to in our March 14, 2002 bid form. Please incorporate this additional cost into a future Change Order. If you have any questions or comments concerning the above, please contact me. Sincerely, KRAUS-ANDERSON CONSTRUCTION COMPANY BUI~ISION William M. Cox Project Manager cc.' Todd Gerhardt, City Manager Jobsite Building Division 2500 Minnehaha Avenue, Minneapolis, MN 55404 18900 Pioneer Trail Eden Praidel MN 55347 July 24, 2002 Tel: (952) 934-091.7 Fax: (952) 934-0901 Kraus Anderson Construction Company 2500 Minnehaha Avenue Minneapolis, Minnesota 55404 Attention: Bill Cox Project Manager Reference: Chanhassen Library Soil Correction Dear Bill: Attached are all our shots for the correction depths at the Chanhassen Library. The correction quantifies include ff~e mater/al in the ex/sting utility trench down to a 971.10. This does not include any material that may have to be corrected below a 971.10 in the area of the existing utilities that.have yet to be pulled out. Th/s also does not include anything south of grid line 6. .. · Average correction elevation per soil report was at 972.94. The actual a-cemge 'depths as you can see by the survey-as directed and ver/fied by Braun Intertec on site was 971.10. Correction perimeter at outs/de of footing is 3.2,412 s.f. 32,412 s.f. x 1.84 dividedby 27 Additional oversize Total additional correction: = 2,208.82 c.y. = 1010.71' c.y. = 3,219.53 c.y. Unit Pr/ce # 1 - Structurally unsuitable soil removal: 3,219.53 c.y. Unit Price # 2 - Add re-compacted fill in place: 3,215}.53 c.y. Regards, ters Project Manager