Loading...
1e Hwy. 312 FundingCITYOF CHANHASSEI 7700 Market Boulevard PO Box 147 Chanhassen, MN 55317 Administration Phone: 952.227.1100 Fax: 952.227.1110 Building Inspections Phone: 952.227.1180 Fax: 952.227.1190 Engineering Phone: 952.227.1160 Fax: 952.227.1170 Finance Phone: 952.227.1140 Fax: 952.227.1110 Park & Recreation Phone: 952.227.1120 Fax: 952.227.1110 Recreation Center 2310 Coulter Boulevard Phone: 952.227.1400 Fax: 952.227.1404 Planning & Natural Resources Phone: 952.227.1130 Fax: 952.227.1110 Public Works 1591 Park Road Phone: 952.227.1300 Fax: 952.227.1310 Senior Center Phone: 952.227.1125 Fax: 952.227.1110 Web Site www.ci.chanhassen.mn.us MEMORANDUM TO: FROM: DATE: SUB J: Todd Gerhardt, City Manager Teresa J. Burgess, Public Works Director/City Engin,~ July 21, 2003 Resolution for Hwy 312 Funding REOUESTED ACTION Adopt the attached resolution. DISCUSSION New Highway 212 (commonly referred to as TH 312) is being considered as a potential project for financing to accelerate construction to FY 2005 (July 2004). The Southwest Corridor Transportation Coalition has requested that local governments show their support for funding TH 312. The City has previously adopted a resolution supporting funding of TH 312; however, that resolution was prior to the Legislature authorizing the Governor's Transportation Package. The attached resolution reiterates the City's support for this project as well as emphasizes the importance of TH 312 to the City. c: Robert J. Lindall, President SWCTC GAENG\TH 312~Staff Report Funding Resolution 7-28-03.doc The City of Chanhassen · A growing community with clean lakes, quality schools, a charming downtown, thriving businesses, winding trails, and beautiful parks. A great place to live, work, and play. CITY OF CHANHASSEN CARVER AND HENNEPIN COUNTIES, MINNESOTA DATE: RESOLUTION NO: MOTION BY: SECONDED BY: RESOLUTION OF LEGISLATIVE PRIORITY: STATE LEGISLATIVE ACTION IN 2003 TO APPROVE FUNDING FOR CONSTRUCTION OF NEW TRUNK HIGHWAY 212 IN THE SOUTHWEST METRO AREA WHEREAS, state Trunk Highway 212 is a critical transportation comdor serving the economic interests of Southwest Minnesota from the Twin Cities to the South Dakota border; and WHEREAS, the United States Congress has designated TH 212 as part of the National Highway System and the Minnesota Department of Transportation has officially identified TH 212 as a critical "inter-regional corridor" in the state; and WHEREAS, reconstruction of TH 212 to a four-lane state highway from the Twin Cities to the South Dakota border has long been recognized as one of the top transportation and economic priorities for Southwest Minnesota; and WHEREAS, construction of New Highway 212 in the counties of Hennepin and Carver (CR 147 to CSAH 4) represents a critical component in improving transportation service throughout Southwest Minnesota; and WHEREAS, the section of New Highway 212 from 1-494 to Hennepin County Road 4 has been completed and opened to traffic; and WHEREAS, the remaining section of the New Highway 212 project is in the design/build process for construction; and WHEREAS, substantially all required right-of-way for the New Highway 212 project has been or is now been acquired; and WHEREAS, the remaining section of the New Highway 212 project is scheduled to be ready for construction in the 2004-05 time period; and WHEREAS, over $100 million has already been invested in New Highway 212 in acquiring right-of-way, design and construction ,but the full benefit of this investment will not be realized until the remaining section of the realignment project is constructed and operational; and WHEREAS, the Minnesota Department of Transportation has designated the New Highway 212 project as one of the state's top highway expansion projects and one of the first projects to receive necessary state funding when such funding is available; and WHEREAS, due to insufficient state highway funding, construction of New Highway 212 is currently scheduled to begin in 2013, which is a schedule considered unacceptable by this council and the citizens it represents; and WHEREAS, construction of New Highway 212 could be advanced from 2013 to 2004- 05 with approval of sufficient state funding by the 2003 Minnesota Legislature. WHEREAS, the Minnesota Legislature has authorized bonding to accelerate projects such as New Highway 212. WHEREAS, the Minnesota Department of Transportation is currently considering which projects to accelerate. NOW, THEREFORE, BE IT RESOLVED 1. The City of Chanhassen supports and endorses selection of New Highway 212 for acceleration under the funding authorized by the Minnesota Legislature during the 2003 session. 2. Staff is directed to send a copy of this resolution to Lt. Governor Molnau. 3. Staff is directed to send a copy of the City's previous resolution supporting legislative action to Lt. Governor Molnau. 4. Staff is directed to send a letter to Lt. Governor Molnau stating the City's strong support for selection of New Highway 212 for acceleration. Passed and adopted by the Chanhassen City Council this 28th day of July, 2003. ATTEST: Todd Gerhardt, City Manager YES GAENG\TH 312~resolution 7-28-03.DOC Thomas A. Furlong, Mayor NO ABSENT