MEMORANDUM
TO: Mayor and City Council
FROM: Don Ashworth, City Manager
DATE: November 14, 1997
SUBJ: 1998 Budget
Hopefully, the city council will be pleased with the efforts of all of our department heads in
achieving a balanced budget. During the course of the past two weeks, Pam and I have met with
each department head and agreed upon cuts that would be necessary to reduce expenditures by
approximately $1 million. The changes are primarily those submitted to the city council from
two weeks ago (see attached). All of the changes did not come without sacrifice, i.e. all
additional personnel were cut with the exception of the Park Maintenance Worker who was
moved to a mid -year hire. Each of the positions cut were justified, i.e. the street maintenance
position is needed to cover the additional route that was added for this year, as well as the
necessity for a secretary in the fire department recognizing the total number of records that must
be maintained. Two or three items on the attached list were maintained, but with the agreement
from the department head that a deduction in some other item would produce the same level of
reduction. Also included in the deductions was the proposed change in regards to the Public
Works Director position. Charles has asked that this be reconsidered and I have invited him to
include the attached memorandum further explaining why that change should occur.
What is the property tax implication of the proposed budget? My guesstimate is that the 1998
budget will produce an approximate 5 -6% reduction in regards to operations of the city.
However, also included in the proposed levy is the park referendum. My guess is that that will
add approximately 6% to the overall city levy. As voters approved the referendum knowing that
it would increase their property taxes by approximately 6 %, I sincerely believe that a net 0%
budget is in fact a tax reduction that the taxpayer had not anticipated.
Should the city council wish to cut taxes even further, consideration of adopting a franchise fee
against utility companies should strongly be considered. One of the reasons I did not include it
was to reach agreement with the council that the proposed 1998 budget meets the overall goals
Mayor and City Council
November 14,1997
Page 2
that were given to me by the city council. I personally believe that the proposed budget does in
fact meet those goals in that we were able to achieve the balanced budget, which appeared to be
the second goal of the council, as well as the city council's primary goal of a property tax
reduction. If these goals can be agreed to Monday evening, I would then be in the position of
achieving the city- council's third objective —to only consider a franchise fee if the council was
guaranteed that such would have a 1:1 reduction on property taxes. By agreeing that this is the
approved budget for 1998, we could then modify such to infuse $250,000 in franchise fees with a
similar 1:1 reduction of $250,000 in property tax levies.
gAmg698budget 11 -1 Tdoe
CITY OF CHANHASSEN
1998 BUDGET
REVENUE SUMMARY
101 General Fund
1997 1997 1998
ACCOUNT DESCRIPTION BUDGET RE- ESTIMATE BUDGET
GENERAL PROPERTY TAX
3001 Property Tax (Cert)
2,759,123
2,759,123
3,260,796
3002 Allowance for Delinquents
(90,750)
(90,750)
(97,824)
3011 Delinquent Property Tax
100,700
100,700
114,128
3041 Homestead Credit
928,083
928,083
841,286
3090 Other Property Taxes
1,100
2,000
2,000
* TOTAL GENERAL PROPERTY TAX
3,698,256
3,699,156
4,120,386
LICENSES
54,200
54,300
54,300
PERMITS
740,900
623,300
637,800
FINES & PENALTIES
28,000
34,000
31,500
INTERGOVERNMENTAL REVENUE
51,800
51,800
41,800
CHARGES FOR CURRENT SERVICES
527,600
499,900
480,300
OTHER REVENUE
118,000
165,400
117,800
** TOTAL GENERAL FUND REVENUE
Revenues by Type
Fines &Othr Chrg Svc
Prmt &Lcns 3% 9%
5,218,756
5,127,856 5,483,886
HACA
15%
InterGov't
1%
59%
CITY OF CHANHASSEN
1998 BUDGET
GENERAL FUND
Personal Materials & Contractual Capital
GENERAL GOVERNMENT
PUBLIC SAFETY
PUBLC WORKS
PARKS & RECREATION
COMMUNITY DEVELOPMENT
Services
Supplies
Services
Outlay
Misc.
Total
408,200
54,269
596,973
1,500
(98,392)
962,550
1,130,940
85,437
678,559
19,300
(61,944)
1,852,292
803,900
229,400
496,650
16,100
(199,295)
1,346,755
662,933
142,586
297,901
-
-
1,103,420
212,100
2,900
43,650
-
(46,280)
212,370
*` TOTAL GENERAL FUND 3,218,073 514,592 2,113,733 36,900 (405,911) 5,477,387
Expenditures by Type
f
CITY OF CHANHASSEN
1998 BUDGET
ALL FUNDS
ACCOUNT DESCRIPTION
GENERAL
FUND
INTERNAL
SERVICE
FUND
SPECIAL
REVENUE
FUNDS
CAPITAL
PROJECTS
FUNDS
ENTRPRS
FUNDS
HIST PRES
TRUST
FUND
TAX INCR
DISTRICT
FUNDS
G.O. DEBT
SERVICE
FUNDS
1998
TOTAL
FUNDS
GENERAL PROPERTY TAX
3001 Property Tax (Cert)
3,260,796
430,000
120,000
367,566
4,178,362
3002 Allowance for Delinquents
(97,824)
-
-
-
(97,824)
3011 Delinquent Property Tax
114,128
114,128
3012 Tax Increment Receipts
-
6,380,000
6,380,000
3041 Homestead Credit
841,286
-
-
841,286
3080 Franchise Fees
-
70,000
70,000
3090 Other Property Taxes
2,000
-
2,000
' GENERAL PROPERTY TAX
4,120,386
430,000
190,000
6,380,000
367,566
11,487,952
LICENSES
54,300
-
-
-
-
54,300
PERMITS
637,800
400,000
7,000
1,044,800
FINES & PENALTIES
31,500
-
-
31,500
INTERGOVERNMENTAL REVENUE
41,800
77,000
-
-
118,800
CHARGES FOR CURRENT SERVICES
480,300
2,000
380,000
2,603,500
100
-
-
3,465,900
OTHER REVENUE
117,800
23,000
34,000
75,500
440,500
244,000
110,000
19,022
1,063,822
TOTAL REVENUE
5,483,886
453,000
303,000
855,500
3,051,000
244,100
6,490,000
386,588
17,267,074
PERSONAL SERVICES
3,218,073
-
110,200
244,200
634,200
201,000
175,800
-
4,583,473
MATERIALS & SUPPLIES
514,592
16,100
13,559
123,800
18,500
1,600
688,151
CONTRACTUAL SERVICES
2,113,733
149,130
94,588
2,104,900
56,800
166,010
4,685,161
CAPITAL OUTLAY
36,900
459,000
10,000
412,490
180,000
6,000
49,708
1,154,098
MISCELLANEOUS
(405,911)
-
-
30,000
-
155,995
-
(219,916)
DEBT SERVICE
-
-
-
-
300,723
-
1,661,300
427,980
2,390,003
TOTAL EXPENDITURES
5,477,387
459,000
285,430
794,837
3,343,623
438,295
2,054
427,980
13,280
REVENUE OVER /(UNDER) EXPENSE
6
(6,000)
17,570
60,663
(292,623)
(194,195)
4,435,582
(41,392)
3,986,104
FUND BALANCE FORWARD
1,840,764
472,510
884,792
863,505
3,575,833
2,054,935
99,815
431,269
10,223,423
BOND PROCEEDS
-
-
-
-
-
-
-
-
TRANSFER IN/(OUT)
-
65,000
(65,000)
-
(100,000)
-
(4,909,597)
-
(5,009,597)
LESS REQUIRED RESERVE
1,847,263
531,510
837,362
796,936
3,183,210
1,860,740
(374,200)
389,877
9,072,698
TOTAL RESOURCES OVER /(UNDER) LIAB
-
-
127,232
-
-
127,232
CITY OF
CHANHASSEN
690 COULTER DRIVE • P.O. BOX 147 • CHANHASSEN, MINNESOTA 55317
(612) 937 -1900 • FAX (612) 937 -5739
DATE: October 28, 1997
TO: Don Ashworth, City Manager
FROM: Pam Snell, Finance Director
SUBJ: 1998 Budget
I've identified significant program changes from 1997 and other key areas in which to revisit in an effort to
balance the 1998 Proposed Budget.
Recreation Center Equipment $ 28,000
Reconstruction of Lake Ann Park road and parking lot $150,000
Irrigation & ballfield light monitoring system
1998 total expenditure impact is $. General Fund Impact is $ 65,000
Re- estimate of Building Permit Fees $185,000
Outdoor Warning Sirens $125,000
Creation of additional positions:
Split Public Works Director /City Engineer position into two positions (132,137,702)
1998 total expenditure impact is $11,600. General Fund Impact is
$ 46,000
Street Maintenance Light Equipment Operator (mid year hire)
$ 19,000
GIS Specialist (part time)
$ 20,000
$ 10,000
Custodian (part-time)
$ 13,000
Fire Department Secretary (part time)
$ 39,000
Park Maintenance Light Equipment Operator
Intern -Park & Recreation
$ 4,000
Upgrade of CSO to Police Officer
$ 9,000
1998 Clinton Cop grant program
Salary grade reclassification of two Finance Account Clerks from III to IV
1998 total expenditure impact is $1,000. General Fund Impact is
$ 400
Operating costs associated with senior congregate dining (117)
$ 3,200
Public works facility study /pre - design (132,137,702) - total is $45,000- General Fund impact is
$ 30,000
Three year lease -to -own photocopier (137 -4703)
$ 3,800
Q
Bituminous overlay - Pleasant View Road from Powers Blvd. To Trunk Highway 101. (132 -4540) $ 42,000
Sidewalks Repair & Maintenance (132 -4541) $ 5,000
Reallocate Computer purchases & training to Capital Projects Administration Fund
Alternative Revenue Sources
street lighting utility charge
franchise fees -gas, electric, telephone, etc.
contractor licensing
Fund 950 revisit capital program
13
CITY OF
CHANHASSEN
690 COULTER DRIVE • P.O. BOX 147 • CHANHASSEN, MINNESOTA 55317
(612) 937 -1900 • FAX (612) 937 -5739
MEMORANDUM
TO: Don Ashworth, City Manager
FROM: Charles Folch, Director of Public Works
DATE: November 12, 1997
SUBJ: Director of Public Works Operations
Since my presentation of the proposed 1998 Public Works budget to the City Council on October
6, 1997, including the proposed organizational change, I have become aware of a number of
questions that have been raised regarding the proposed staff position change. It is quite common
for organizational changes, particularly those that borderline a paradigm shift, to draw out many
questions. As such, I have put together a list of common questions and corresponding responses
regarding the proposed change. This memo may bring out additional questions which I will be
happy to discuss with the City Council at the next work session. It is important that the City
Council be able to make a highly informed decision on this matter.
To put it in somewhat of a poetic form, I believe that we are at an important crossroads in the life
of Chanhassen's Public Works Department. Whatever decision is made on the organizational
structure, it will have a direct impact on how effective and successful the Public Works
Department will become into the future.
g:Neng 1 char1es\memos\dpw memo.doc
Q: Why can't the current City Engineer also perform the work tasks /goals listed above
for the Director of Public Works Operations position?
A: See attached job description for the 1997 Director of Public Works /City Engineer
position. A review of the job description clearly indicates that the majority of the
described work tasks involve the administration of the Engineering that the focus capital
projects management. This, in essence, supports the content P of
staff time is devoted to Engineering and less time to the Public Works Maintenance
functions. Due to the lean staffing of the Engineering Department and to significant
amount of capital improvement projects being constructed each year (average of $9 to $10
million in capital projects and $5 to $7 million in private developer - installed public
improvements annually), it is necessary that the City Engineer devote the majority of the
work time managing these projects as well has having to deal with all to other
engineering issues which arise, i.e. stop sign requests, local street speed issues, drainage
complaints, etc. In order to operate in a highly effective manner, the City Engineer
position needs to continue to focus on managing the capital improvement projects and
day -to -day administration of the Engineering Department while the Director of Public
Works Operations position needs to concentrate efforts in the operations side of things.
Q: If the current Director of Public Works /City Engineer is reassigned to the Director
of Public Works Operations position, this organizational change would, in effect,
reduce the total number of staff in the Engineering Department by one. Can the
Engineering Department function properly with one less key person?
A: In 1998 the capital project workload is anticipated to be somewhat less than what it has
been during the past 3 to 4 years. The department would, in effect, function at the same
staffing level it had until it added the new project engineer position in June of 1996. The
Engineering Department is staffed with very capable and competent people. The Assistant
City Engineer, with the exception of not being able to sign project plans as a licensed
professional engineer, is as capable, hardworking and dedicated individual as anyone could
ask for. The current Project Engineer is a licensed professional registered engineer with a
great deal of experience in hands -on administration of large -scale multi- million dollar
capital improvement projects and has shown the ability, over the last year and a half of
working with the City of Chanhassen, of being able to function more than adequately as a
City Engineer. I would also anticipate that the Engineering Technician H staff person (in
essence the Senior Technician) who has more than 20 years of construction experience
and currently functions to supervise the consultant engineering and project inspectors and
manages small in -house projects, could be assigned to devote more time to assist the
Engineering Department with project site plan reviews, etc. and continue managing small
in -house projects. The City could then assign the field inspector supervision to a City
consultant engineer whose costs would be billed to and paid by the private developer.
This type of change would make much more effective and better use of the Engineering
Technician II's work experience and provide new challenges and career growth potential
for him.
Page 3
Q: Does Charles Folch have to fill the proposed Director of Public Works Operations
Position?
A: No, but someone who is not also functioning as the City Engineer needs to be assigned to
this position. Originally it was anticipated that this position would be filled with a new
hire. However, when the City Council announced their goal of a 5% local tax cut for
1998, it became quite clear that no new staff additions were going to be approved. It also
became clear that for this organizational change to happen, another approach must be
taken. This new approach is what is being proposed before you with the in -house staff
reassignments. Charles Folch has been with this City for nearly 8 years and is very familiar
with the Public Works staff, infrastructure and operations. It would be difficult to find a
stronger, more qualified candidate than Charles. However, the important point is that
someone who is not also functioning as the City Engineer needs to be the Public Works
Operations Director. As evidence of this, the three neighboring communities of Chaska,
Eden Prairie and Minnetonka all have someone other than their City Engineer directly in
charge of the Public Works Operations Department.
Q: Can the Director of Public Works Operations position be funded without a 1998
general fund increase?
A: Yes.
Q: How?
A: All of the salary and benefits associated with the Project Engineer position for 1997 were
funded through Capital Project Fund 400. This fund is outside of the general fund. It has
been proposed that the Project Engineer staff person be promoted to the City Engineer
position leaving the Project Engineer position vacant for 1998. The result of this change
has initially shown a general fund increase of approximately $46,000 due to the previous
Project Engineer, now proposed new City Engineer, being funded in large part from
General Fund 131 for 1998. If the equivalent salary and benefit amount is transferred
from Fund 131 back to Fund 400 as it was in 1997, and if the proposed Director of Public
Works Operations staff position (Charles Folch) takes a salary and benefits reduction in
the amount of approximately $3,500, there would not be an increase to the general fund.
Q: Is it common for a staff person to voluntarily take a pay cut in an effort to achieve a
change they believe is necessary?
A: You have to answer that for yourselves. What do you think?
Attachments: 1. Proposed organizational chart.
2. 1997 Job Description for the City Engineer/Public Works Director.
gAcngbharles\director of public works operations.doc
Page 4
PUBLIC WORKS ORGANIZATIONAL CHART
......................................... ..................:............
........................................... ...............................
.......................................... ...............................
...................................... ...............................
..............
r I?5ikand Recrealbn::::;i:::i:
.................. .
............................
................................. ...............................
CITY OF CHANHASSEN
1998 PROPOSED ORGANIZATIONAL CHART
Public Works Operations
Director
Shop/Maintenance
Secretary
,
Park
E ui ment
q P
Utility
Street
:.: Superintendent
Superintendent
Superintendent
Pe
Superintendent
----- - - - - -- --- - - -__
r
r
-- --------- -- -
Park
Mechanic
Senior Utility
Heavy Equipment
Foreman
2
Maintenance Operator
Operator/Foreman
Equipment
Utility Heavy Equipment
Operators Maintenance Operators Operator
Equipment Operator
Laborer
JOB DESCRIPTION
CITY OF CHANHASSEN
POSITION: Director of Public Works/ CLASSIFICATION: Exempt
City Engineer
DEPARTMENT: Public Works DATE: January 1997
OBJECTIVE AND SCOPE
To provide overall planning and supervision of the Public Works Department operations (streets,
utilities, shop, and engineering) to achieve the goals of the City Manager and the policies set by
the City Council.
RELATIONSHIPS
Reports to: City Manager
Supervises: Street Superintendent, Utility Superintendent, Equipment Superintendent, Assistant
City Engineer, Project Engineer, Engineering Tech II, Engineering Tech, Engineering Secretary.
SPECIFIC RESPONSIBILITIES
1. Coordinate the long -range planning and oversee the daily activities of the street, utility,
shop and engineering departments to assure administration of required services and
department policies.
2. Plan and direct all functions of the engineering department including:
a. Establishment of design and maintenance standards.
b. Project management of engineering consultants and construction contractors.
Preparation of long -range engineering plans and feasibility studies as well as
maintenance of as -built records.
d. Supplement the City planning process with engineering data and reports in the
area of community development.
3. Draft and administer an annual department budget including review of all equipment
purchases and capital expenses to insure department costs do not exceed budget.
4. Work with the City Council, City Commissions, City staff, and other government
agencies, developers, and residents towards fulfilling the needs of the City in the area of
public works.
102
REQUIREMENTS
1. Education: Registered professional engineer under the laws of the State of Minnesota or
the ability to receive registration.
2. Experience: Five years of experience in a position which can demonstrate thorough
knowledge of all the rules and regulations pertaining to municipal engineering, public
works, and engineering administration.
103
CITY OF CHANHASSEN
1998 BUDGET
ENTERPRISE FUNDS
710 Sanitary S & W Expansion Fnd
1997 1997 1998
IACCOUN DESCRIPTION BUDGET RE- ESTIMATE eunr.I=T
REVENUE
TOTAL OTHER REVENUE
** TOTAL REVENUE
EXPENDITURES
TOTAL MATERIALS & SUPPLIES
TOTAL CONTRACTUAL SERVICES
TOTAL CAPITAL OUTLAY
TOTAL DEBT SERVICE
" TOTAL EXPENDITURES
REVENUE OVER /(UNDER) EXPENDITURES
FUND BALANCE FORWARD
TRANSFERS IN /(OUT)
Bonds of 1990
LESS REQUIRED RESERVE
TOTAL RESOURCES OVER /(UNDER) LIABILITIES
350,000
345,000
345,000
350,000
345,000
345,000
1,000
1,000
1,000
206,100
221,100
158,100
480,000
225,000
95,000
176,650
176,650
300,723
863,750
623,750
554,823
(513,750)
(278,750)
(209,823)
1,250,133
1,559,426
1,245,676
(35,000)
(35 NO)
X35,000}
701,383
1,245;076
1';000,853::
q -7 A :S
cl
CITY OF CHANHASSEN
1997 BUDGET
Commentary
FIVE YEAR CAPITAL IMPROVEMENT PROGRAM
FOR THE CHANHASSEN WATER SYSTEM (cont.)
vo
i I
r
Public Service Enterprise Fund
Sanitary Sewer-and Water System Expansion
YEAR DESCRIPTION
1997 SCADA System annual maintenance
E-- 00esign of Well No. 8 (4 - 752)
1 Well No. 8
—Yq£ Revise Water Supply Plan (-75 z)
E--- Design for 2.0 MG storage tank:-7
-< ,� Test pump Lotus Lake area wellfield - E
.4,-- Land acquisition for storage tank % jG
-ec — , Acquire land for future Lotus Lake well sites
� Lake Minnewashta watermain loop
ti�Wellhead protection plan
General repairs - ate,;.':
ESTIMATED
COST
10,000
80,000
500,000 *
10,000
200,000 *
10,000
100,000 *
80,000 *
300,000 **
20,000
40.000
1,350,000
126
• G ,\usetica thy\98budget\odmnds \entrprsf.doc
CITY OF CHANHASSEN
1998 BUDGET
Commentary
FIVE YEAR CAPITAL IMPROVEMENT PROGRAM
FOR THE CHANHASSEN WATER SYSTEM (cont.)
Public Service Enterprise Fund
Sanitary Sewer and Water System Expansion
YEAR
DESCRIPTION
ESTIMATED COST
1998
SCADA System annual maintenance
Design and construct Well No. 8
$600,000 *
Acquire Land for Well No. 8
50,000
Design.and construct 2.0 MG storage tank
(TH 41 south of TH 5)
2,500,000 *
Wellhead Protection Plan :: --
25,000
Update Water Supply Comprehensive Plan
10,000
Inspect 1.5 MG storage tank (Lake Lucy Road)
25,000
General repairs
40.000
1999
SCADA System annual maintenance
12,000
Provide standby alternative power at 2 wells
150,000
Repaint 1.5 MG storage tank (Lake Lucy Road)
200,000
Test pump Lotus well field area
15,000
Arboretum Business Park Utilities Phase III
115,000 **
General repairs
40.000
2000
SCADA System annual maintenance
12,000
Acquire Land for Well No. 9
60,000
Design for Well No. 9
100,000
Inspect and repair West 76" Street Tower
40,000
South Lake Minnewashta watermain loop
350,000 **
Arboretum Business Park Phase IV
50,000
General repairs
45.000
2001
SCADA System annual maintenance
15,000
Construct Well No. 9
600,000
General repairs
40.000
2002
SCADA System annual maintenance
15,000
Land acquisition for Well No. 10
60,000
Design for Well No. 10
100,000
General repairs
40.000
3,262,000
532,000
657,000.
655,000
215,000
*Proposed funding via existing bond proceeds or future public improvement projects
* *Proposed funding via special assessments for public improvements
CITY OF c"=
cHaNHasssN
690 COULTER DRIVE 0 P.O. BOX 147 • CHANHASSEN, MINNESOTA 55317
(612) 937 -1900 • FAX (612) 937 -5739
MEMORANDUM
TO: Mayor & City Council
Don Ashworth, City Manager
FROM: Scott Harr, Public Safety Director
DATE: November 14, 1997
SUBJ: Kerri Nolden
The mayor has asked that I provide this commentary on our desire to expand Kerri Nolden's duties. As
you probably know, Kerri has been employed with Chanhassen as a Community Service Officer for
several years. During this time, she has completed her schooling to enable her to become a police
officer, as well as gaining the respect of city staff, deputies and troopers. Simply put, Kerri is the type of
employee that has proven herself and we wish to keep her. Because her goals are to become a licensed
officer, it is unrealistic to think we could keep her at the CSO level.
I approached Don Ashworth during the summer as Kerri was completing her education and suggested a
"win -win" possibility. I suggested that we keep Kerri by simply expanding her duties. She would then
basically do what Bob Zydowsky does, which because of the types of calls that would be included, would
enable us to activate her law enforcement license. While this would, naturally, involve increasing her
salary, we would get more diversity in her work. This in turn would enable us to continue maintaining
the number of police contract hours we have for the last number of years.
In addition to keeping a great employee, this enables us to continue fine tuning the type of response we
want for Chanhassen. I have every intention of continuing with the police contract through Carver
County. The cost benefit analysis of having Carver County do our basic patrol more than justifies this
contract. The level of service our residents want, and that we want to provide, involves doing more
specific activities including: crime prevention, animal control and other activities more closely linked to
community oriented policing than basic patrol. Rather than continuing to add patrol hours as our
community increases, we can expand Kerri's duties to meet this need.
The question was raised whether this means we are starting our own police department. In fact, we have
our own police department because Bob Zydowsky and I are licensed police officers. There is no
statutory number of police that makes a department. Another question was whether the intent would be
to license every CSO. This has not, nor will it be the case. This is a unique situation to keep a valued
employee to meet the growing needs of public safety in Chanhassen.
Mayor & City Council
Don Ashworth
November 14, 1997
Page 2
This was not brought before the Council because we simply saw it as adjusting the job requirements of
an employee. As of this time, we expect to hear on the Clinton Cop grant within a couple weeks, but
wish to keep Kerri at any rate.
The recommendation I have made to the City Manager is that we get Kerri's field training, which Carver
County has agreed to do at no cost, going right away so we can continue to utilize her most effectively.
SH:cd
MANAGER'S COMMENT - Nancy had asked that this item be placed onto the work session as a
discussion item. I am not quite sure why. To me, the two primary factors in Kerri's potential
employment include: 1) whether we receive the Clinton Cop grant; and 2) whether we approve that
position as part of the 1998 budget or a subsequent modification to such. To me, the field training is no
different than the academic training that she has previously completed - both are necessary if she is going
to become a police officer for somebody. Having her work for us part -time during either of these
training periods does not guarantee her job, nor does it take away from the City Council's ultimate ability
to approve or disapprove a full -time position.
Page 1
iw
ee-y &,,i Lit'r
Sheet1
KATE AANENSON
35.28 MEE - I - ING WITH DEVELOPER ON AFFORDABLE HOUSING WITH TCF AND NSP
LUNCH WITH MAYOR, BOB AND KATE
ABRA AUTOBODY /GLASS
450.00 THEY WERE USED TO SHOW PUBLIC HOW AIR BAGS DEPLOY - EDUCATION
AMER!CAN HEAT VIDEO PRO
936.00 FIRE TP INING V!DEQ- MONTHLY C- THLY - URRERT ! SSA.DES!TRAINING -V!DEO MAGAZINE
DON ASHWORTH
544.00 REGISTRATION TABS $540, GAS $37 CHAMBER MEETING $12
CHANHASSEN VILLAGER
140.00 SUBSCRIPTIONS OF THE PAPER FOR:ADMIN, PLAN, ENG, PUBLIC SAFETY,
BUILDING, PARKS, SENIORS
COUNTRY FLAGS
323.50 FLAG IS WORN OUT - PURCHASED 2- ONE TO REPLACE -1 EXTRA
PATTY DEXTER
199.45 PATTY IS OUT OF THE OFFICE UNTIL 11/17 -NOT ABLE TO RESOLVE QUESTION
ENFORCEMENT ponni ICTS
493.96 JI MIOD POLICE B;;DGES FvR v!-lILDREh; v!!, /EA�J�J;�IVS
HARTLEY ASSOCIATES
1,056.88 DEFINE DATA SOURCE, ACCURACY, PROCEDURE INTO GIS, PLAT 331, RECOVER
COGO AFTER COMPUTER ERROR, ORGANIZE OPTICAL DATA FOR
TRANSFER TO WINDOWS NT OPERATING SYSTEM 22.25 HOURS
JEFFERSON FIRE /SAFETY
3,915.00 GEAR THEY WEAR TO FIRES -THREE SETS
S. KROISS HOMES
1,087.26 IN ERROR THEY WERE BILLED FOR A SAC CHARGE, SEWER SURCHARGE,
WATER METER AND HORN, THERE IS NO SEWER OR WATER IN THE AREA.
MCvOivALD HO�J1ES
A A ^^ ^^ 1 \' r^ -�� 1 1 ., 1 Ir r�r 111 1 r /11'1 A A /1 /11 , I, 1— ,-1 /rn , , ,1 1 A r1 r
I, Iua 1) 0 i Et"CR0R Tr1E T V EzI'CE BILLED FO N SAA C' ls R E, S EV�►Em SUR,, HAm G E,
WATER METER AND HORN, THERE IS NO SEWER OR WATER IN THE AREA.
\ nr P11 1 It'1
IVtCRL11�IJ
A ^ ^^ ^/I /1 1 A ►11'1 n 1/ A A A
I,yLL.00 ON M0I 1 I- 1 /
moss s, p
UL D IN'AVY
� r� rt t pn �!.^ ^s tF rrp,1 F s�:�t• r, A ra Rpnr F E F r T t }r �p s. r� sr� - p t^ ^ e
ta 50 ATf i 1 0�JT �iF f ljr- 0i° f p E UN s iiL s ii i7 -N ABEL F 0 ftii_JS VE_ `,l.L - vS ' i I t41
1 KU S F l T IV ESS
^ ^^ ^r 11I TT./ tI1 I tT I T[1 A A IA— \1/1T A r11 r T/1 f1r11,11 \ /r /11 Ir/1T1/1 \I
JGJ.Oo RA I 1 T IS UU 1 Ut I PIE OFFICE UN I IL III 1 / -IVU I HDLG 1 U RESULVE I+IUEJ 1 IUIV
WEATHER WATCH
960.00 WEATHER REPORTS ARE FAXED TWICE DAILY -WILL PAGE IF WEATHER GETS
__r _—•_ _ -- - —' m-
VVUMOr- 7CC A I I A%- #rICL.J �Al�lPLC
�1\lil Cnnl'C KIUD zr:pV
YILV VIYV 1Y 11V 11 \I
Q t;�R Z(1 TDF -:C:C 1/1 /CDC CnD YWC: rinlAIKITn%A /KI DI=DI A(_'I= KAGAIT
V,V IV.VV 11 \11V YYI_Il11 VI\ 1111 VVYYItI VVYI♦ 1111 ✓\VL.IVILI.1
D"!".COR!
163 ��0 �� TI-Ilc �nJnS /nlDCn AKIn SHOULD H WA�,M RCCnI oplrD T n n�Ilnlr:�R rn1`cT Ir`� -Innl
I V . Y,"l 1✓ ! V✓ 1 V I 1, -, 1 BEE, • I \ 1 V 1 1 11 V V L V `/ 1 V i l\ V V I V I V
Page 1
iw
FROM CHAN PUBLIC WORKS 11.12.1957 16:08 F. 2
W ; ather
Date: 11 /12 Time
Today's High:
Toni,g i s Low: _Z -
w
TIME Sky Conditions
WED
3pr11
0pn1
open
THU
3aa 11
Oai11
0 a I11
Noon
3 x.1111
....e-pm
8p111
701177
60
50°
4a°
1'reezille
so
t o p
10°
612- 630 -2555
W ateh 11
2yin Confidence Rating I -10): s
Tomo rrow's Nigh: 9.7 - ..... Pr ecip Total next 24 houm Non,.
Tomorrow's Low: � 16 _ Best ehanee for:
Preaip Ref. I 1011 - 101'
!r 01 station 'I�pa Amo P Temp Wind (1up111 1111111, q6' Windcl�;l1
Partly clomly
Show... .80%
1/81,
29
Ilai l l y c101:(ly
75
Ctouci
25
Parily (..loudy
28
23
Parity cl oudy
3 G 9 12 pm $
2 0
Partly cloudy
20
Partly cloudy
23
Mostly cloudy
24
Mostly cloudy
27
Clc)11dy
Flu:xies .............30%
Trace
28
Cloudy
Snow .............. -60%
1/8"
28
;+I. 10.1 C) 63
10.15 � 6'1)'Y,
SI: 10 -1 �i
SK 10.15
SI1. 10-15
SEA 10 -1
Sl
I� 12 - 20
1? 12 -20
6
)'rb
(5 %,
7 -1 '1
78%'-
(i8%
(i2 '•4•
5(i%
0 1 11%,
Cloudy
Show... .80%
1/81,
-
NI�, 12
75
Ctouci
Suow ....... .........8 0%
1 t3
28
i
7`+'/%�)
G 9 12ain
3 G 9 12 pm $
1'reclp
100%
80%
80%
40%
; 0%
U111 I 1119h 28
Year Date: - X1.53 Sn to Date
Asomaly:. - 7. 18 ' Year to Date: 1•6
Sunrise: ,..7.;07 Sunset-. 4:44
Average High: .. 44 Low: 28
Extended:.... c 000 ('Lttitl(c
week end with no iwv('ii) i(1reciist.
1
FRI C`lgt.iciy 7 1 i o I > > y
ISAT C Xctt. t(1Y... ..._ ... 11 i 2G Lo 13 N 10- 15
i
SUN Partly r1n11dv 1 1 t ,i 1 Lo 20 SW 1i - M
Forecast Discussion
** MORE SNOW N TIE FORECAST'
Pi-wily cloudy and dry for today At.h a high near 30, 1 haw bo oh oft on t!io liming of 1 114
Mart of the Snow. 11 will 2110st likely 1101 siart to snow here until tonusrrovv (cfferiloos1.,w)(1 n)( n
like -ly ovornight Thursday into all the day on Friday. We still have o good lsc lontiicl fo 1i 1-:V
snowf1.111. We'll keels you hosted!