1a. Chan Rec Center/Bluff Creek Elementary School Parking Lot Expansion: Change Order.CITY of SSE 690 COULTER DRIVE • P.O. BOX 147 • CHANHASSEN, MINNESOTA 55317 (612) 937 -1900 0 FAX (612) 937 -5739 MEMORANDUM TO: FROM: DATE: SUBJ: Don Ashworth, City Manager Todd Hoffman, Park & Recreation Director Anita Benson, Project Engineer AiLP) September 2, 1997 Approve Change Order No. 1 for Coulter Boulevard Street Improvements and Trunk Utilities - Project 93 -26B This change order consists of two parts. Park A being the work required for the Chanhassen Recreation Center/Bluff Creek Elementary School parking lot expansion and Part B being additional items required for the construction of Coulter Boulevard. Part A On August 11, the city council took the following action regarding the parking lot expansion: "Councilman Berquist moved, Councilman Engel seconded to approve plans & specifications, Chanhassen Recreation Center/Bluff Creek Elementary School Parking Lot Expansions, Authorize Advertising for Bids. All voted in favor, except Councilman Senn who opposed, and the motion carried with a vote of 3 to 1." In response to this action, city staff negotiated a change order with Minger Construction. Mr. Minger's original response quoted a cost of $93,981.05. Of the 25 items on the change order, approximately one -half required clarification. On Tuesday, August 19, staff met with Mr. Minger to resolve these items. As a result of that meeting, the change order was tightened up. On Friday, August 29, Mr. Minger submitted an adjusted quote of $84,737.1.5. Staff is comfortable with this pricing. Part B The items required for the construction of Coulter Boulevard are geotextile reinforcing fabric and concrete headwalls for draintile outlets. The geotextile reinforcing fabric was required due to poor and wet soils encountered in the major cut section. of the project. The concrete headwalls are needed to provide stable outlets for the edgedrain at the Bluff Creek crossing. i :: MINGER CONSTRUCTION PHONE NO. : 6124709539 Au 29 1997 08:34AM P2 CHANGE ORDER COULTER BLVD QUANITI E - - ,EXTENSIONS CHANHASSENiMN 8A5,97 3077.00 1,40 4307.80 EA* DESCRIPTION UNIT QUANITIE FINAL BID EXTENSIONS PART A RE .CENTER/ 4n t-%U . LF 300.00 2.00 600.00 1 EROS,CONT.SILT FENCE LF 495-00 1.06 524.70 2 RE.CONC. C& G 3 RE-CONCWALk SF .... 730■00 0.60 438.00 4 RE.BIT. PAVEMENT SY 550.00 1.60 880.00 6 SAL I HYDRANT GV & 13OX EA 1 .00 685-00 685.00 230.00 7 SAL.30'LIGHT POLE EAST EA 1.00 . 230.00 9 EXCAVATION P CY 2500.00 80,'oo 4.10 10250-00 692.00 10 4" PE DRAIN TILE 11 12"GRAN.BORROW CY 1250.00 ..8.65. 9.80 12250-00 12 RES.SAL.TOPSOIL Ls 1.00 1 3200.00 -7800-00 . 3200.00 7800-0.0 13 DISPOSE OF EXCESS MATERIAL LS .00 34.45 3789.50 14 12"'RCP CL5 LF EA 110.00 2,00 1318.00 2636,00 15 STD-CI3 16 B612 ON LF 928■00 10.35 9604.80 .C& 17 411 CONC.WALK/BASE SF 1504,00 3.35 5038.40 .18 CONC.LITE PIER EA 2.00 900,00 1800.00 19 9"CL5 AGG.BASE SY 1825,00 2.85 3,00 .5201.25 4698.00 20 11/2"BIT.BASE COURSE 21 11/2"BIT WEAR COURSE SY Sy 1566.00 156 6,00 3.25 5089.50 22 F&I 30'LIGHT IN PLACE/WIRING LS 1.00 5200.00 5200■00 23 INSTALL SAL.LITE EA 1.00 900.00 900,00 24 SOD IN PLACE SY 1700.00 1,90 3230.00 • TOTALS 84737.15 _...._. .. DESCRIPTION PART B COULTER BOULD I GEOTEX.FAB. 2 CONCRETE FiEAC7WALl. TOTALS UNIT QUANITI E - - ,EXTENSIONS S T 3077.00 1,40 4307.80 EA* .4.00 440.00 1760M 110110%L4 Rosen Owner: City of Chanhassen, 690 Coulter Drive, Chanhassen, MN 55317 Date August 29, 199 AndertaC Assalate Contractor: Min er Construction, P.O. Box 236, Chanhassen, MN 55317 , rs & Ott Bond Co. CHANGE ORDER NO. 1 COULTER BOULEVARD CITY PROJECT NO, 93-26B. STREET AND TRUNK UTILITY IMPROVEMENTS OUR FILE NO. 39335 Description of Work This change order includes work to construct the parking lot expansions for the Bluff Creek Elementary School/Chanhassen Recreation Center and miscellaneous revisions for Coulter Boulevard (Project 93 -26B). The parkin lot improvements shall be in accordance with g p h plans and specifications prepared by HGA, Inc. This change order extends the project completion date for Coulter Boulevard to October 10, 1997, and. establishes a completion date for the parking lot work of October 24, 1997. Contract Unit Tod No. Item Unit Quantity Price Amoui Part A - Rec. Center /School Parking Facilities 1 Erosion control silt fence LF 300 2.00 $600.00 2 Remove conc. curb and gutter e LF 495 1.06 $524.70 3 Remove conc. walk SF 730 0.60 $438.00 4 Remove bituminous pavement SY 550 1.60 $880.00 5 Salvage hydrant, valve, and box EA 1 685.00 $685.00 6 Salvage 30' light pole at east lot EA 1 230.00 $230.00 7 Excavation (P) CY 2500 4.10 10 25 $ 0.00 8 4" PE draintile LF 80 8.65 $692.00 9 12" Granular borrow CY 1250 9.80 12 2 $ 50.00 10 Respread salvaged topsoil LS 1 3 $3,200.00 11 Dispose of excess material off -site LS 1 7 9 800.00 $7,800.00 12 12" RCP CL 5 in -place LF 110 34.45 $3,789.50 13 Std. catchbasin EA 2 1 $2,636.00 14 B 612 Concrete curb and gutter LF 928 10.35 $9 _ 15 4 conc. walk with base SF -1504 3.35 $5 702941combl 16 Concrete light pier EA 17 9" thick class 5 agg. base SY 18 11/2 " bituminous base course SY 19 11/2" bituminous wear course SY 20 F & I 30' light in place and all wiring EA 21 Install salvaged light on new P ier EA 22 Sod in place SY Total Part A - Parking Facilities Part B - Coulter Boulevard 23 Geotextile fabric 24 Concrete headwell for draintile Total Part B - Coulter Blvd. Total Part A - Parking Facilites Total Part B - Coulter Blvd. TOTAL CHANGE ORDER NO, I SY EA MMU� 1711 1825 2.85 $5, 1566 3.00 $42698.00 1566 3.25 $5,089.50 1 5,200.00 $5,200.00 1 900.00 $ 900.00 1700 1.90 $3,230.00 $84 3077 1.40 $4,307.80 4 440.00 $ $6,067.80 $84,737.15 $6,067.80 $90,804.95 70294 /co.wbl Original Contract Amount Previous Change Orders This Change Order No. 1 Revised Contract Amount (including this change order) $1 $0.00 $90, 804.95 $1 Recommended for Approval by: BONESTROO, ROSENE, ANDERLIK &ASSOCIATES, INC. date: Approved by Contractor: Approved by Owner: MINGER CONSTRUCTION CITY OF CHANHASSEN C� cc: Owner Contractor Bonding Company Bonestroo & Assoc. 70294 /combl AUG -29 -1997 08:08 FROM HENN CTY PUBLIC WORKS TO 1IGHWAY 101 rVeROVEMENT Chanhassen City Council Issues Discussion DESIGN ISSUES • Numbers of Through Lanes Trails /Walks Bicycle Accommodations + Environmental Issues Noise Drainage, 'water Quality, Wetland, Impacts Air • Traffic Signals • Right of Way • Construction Staging /Access PUBLIC INVOLVEMENT • Consistency in Notification • Use of Newsletter • Open House Concept Presentation Preliminary Design Presentation Final (Detail) Design Presentation During PnvironmenW Documentation/Hearing Phase CITY COUNCIL IWOLVEMENT • Study Sessions Concept Issue Discussions Environmental Documentation Review Preview of Open Mouse Agenda/Materials • For Sessions Preliminary Layout Approvals Final Plan Approvals PROJECT FUNDING • Federal/State Funds ISTEA Turnback • Counties' Cost Participation Policies PROJECT SC DULE 99379152 P.03 TOTAL P.03