Loading...
1f. Acce[t Streets amd Stpr, Sewer Drainage System in Pointe Lake LucyCITY OF CHANHASSEN 690 COULTER DRIVE • P.O. BOX 147 • CHANHASSEN, MINNESOTA 55317 (612) 937 -1900 • FAX (612) 937 -5739 Action by City Administrator TO: Charles Folch, Director of Public Works /City Engineer FROM: Anita Benson, Project Engineer A46 Endorsed Modifind Reject &i Daro Date Submitted to Commissiod Date Submitted to Council ' DATE: September 13, 1996 SUBJ: Acceptance of Streets and Storm Sewer Drainage System in Pointe Lake ' Lucy, Project No. 95 -9 ' Staff has received a letter from Kenneth Adolf, Project Engineer with Schoell & Madson, Inc., requesting the City consider acceptance of the public street and storm sewer drainage system improvements in the above - referenced project. According to Mr. Adolf, the public street and ' storm sewer drainage system improvements have been completed in conformance with the approved plans and specifications. City staff performed a walk - through inspection of the project and found the project is in satisfactory condition. t It is therefore recomtrended that the City Council accept the public street and storm sewer drainage system improvements in Creekside Addition, Project 95 -5 for perpetual maintenance ' and ownership conditioned upon the developer and/or contractor supplying the City with an acceptable maintenance bond for two years from the date of acceptance. Also a separate five year maintenance bond will be required for the concrete curb and gutter. 1 Attachments: 1. Letter from Kenneth Adolf dated September 9, 1996. ' 2. Location Map. & .b�s\wcaaaoc U TICIN� ENGINEEFIING COPY Received U vision No. Approved b aw Engineer ' Date Approved by City Council ' Date MEMORANDUM Schoell & Madson, Inc. Engineers • Surveyors • Planners Sol/ Testing • EnWronmentai Services Q 10560 Wayzata Boulevard, Suite 1 Minnetorka, MN 55305 -1525 Office 612- 546 -7601 Fax 612- 546 -9065 September 9, 1996 Mr. Dave Hempel Assistant City Engineer City of Chanhassen 690 Coulter Drive Chanhassen, MN 55317 Subject: Pointe Lake Lucy Chanhassen, MN Dear Dave: CITY OF CHANHASSEN MUM3 $FP 06 1996 ENGINEERNIG DEPT. Representatives of Schoell & Madson, Inc. provided construction staking and part-time construction observation on the Point Lake Lucy Development. On this basis, we certify the public storm sewer and streets for Pointe Lake Lucy have been completed in substantial compliance with the approved plans and specifications. We request, on behalf of our client Robert H. Mason Homes, Inc., that the City of Chanhassen accept the storm sewer and streets for ownership. Northdale Construction, Inc. will provide a two -year maintenance bond as required by the City. If you have any questions or require additional information, please call. Sincerely, SCHOELL & MADSON, INC. Kenneth Adolf KEA/cj cc: Doug McNamara, Robert H. Mason Homes mmmitauvehcuon,r-quai upponurnty tmpioyer SO n.� ter �o�. � , .'*:� MR "All d. hristmas Lake' z I r 4 1te Lu" Rd 1 1 ;hen fl Carver B�hl KH Me r4- L Lake Ann, Lake A= Prowl Rel r i�-' ' ¢vim-- �,'�`�����?r�' -� ;c�� — 3 T L4! 59 Cgnter I bury S� n ant Green a A Greenwood Park Shores 0* Park 41 - took X SieNt' - r74 villa C6