5. Kerber Blvd.Mill and Overlay ProjectI
n
MEMORANDUM
CITY OF S
CHANHASSEN
690 COULTER DRIVE • P.O. BOX 147 • CHANHASSEN, MINNESOTA 55317
(612) 937 -1900 • FAX (612) 937 -5739
TO: Don Ashworth, City Engineer
FROM: Charles Folch, Director of Public Works
DATE: June 4, 1996
SUBJ: Award of Bids for Kerber Boulevard Resurfacing Project
Project No. 96 -5, S.A.P 194 - 101 -05
Action by Cdy �Aftini�stnMW
fndorsed.Jr— ^
modifiee
Re oet�e..- G' .
Pete Submitted to CommiseIN
!fete su ed t 9 �
' On Friday, May 31, 1996, bids were received ai
Project. A total of five bids were received with
Sons at a total cost of $114,975. ;
1
P
;d for the Kerber Boulevard Resurfacing
bid being received from Wm. Mueller &
The Council may recall Jorablke reliminary ject cost t
difference between the pry enginee estimate
the unit price per ton for inous s acing. The p
on a relatively conservatprice o 0 per ton for the
had a price of $21.77 pethe minous. The renu
$24.50 per ton. The unir minus received is vi
projects. Staff was not er the size of the Kerber
enough to entice this typrable bid for bituminous.
Wm. Mueller & So:
therefore reco
101 -09 be a warded
to was $149,000. The major
low bidder on the project involves
nary engineer's estimate was based
uminous. The low bid received
ig bids ranged up to $22.50 to
e tcal of that with sizeable
vard project would be large
& Sons at a total bid of $114,975.
May 14, 1996.
within the city. It is
P. 194-
in-s --
Attachment: 1. Bid tabulation.
'
2. Memo from Bill Bement
c: Dave Hempel, Assistant City Engineer
'
Bill Bement, Engineering Technician H
Mike Wegler, Street Superintendent
May 14, 1996.
within the city. It is
P. 194-
°o°O °o
�i
10
_j LO N
== ON1'COS
� g }1 $ � 1°if)0�i
tb10 O�� iO
Z
0
Q
Z
W O
F' VAN
SIO•.- N l7
X•N r.. -•iV
CL
LNRfj r G C r
Y IA
a
808 ��1��ppQQ 8
S 818' 8 s
V
p
� NN
O
SSgtg Cd
N
Z
r M
~ •r
r
n
N
U
r
pppp�p
O 8 N N '—
?` r C 11 0
O
pOIpO
O Orr O r
N
8 888
58 8888
$
~
J
p
a• OD Inn
SlIn
N ��
�=
�
Oo •7a0 r
W
N
N
CL
( ,81088
818 O't Q�
B
la/
a
888888
8 �p
J 888 . � } 8 o
�N�tON
wi
100 pN 1
N
Q
J
�
Q S N N r
WWW
r
r
W
Q
O
~ r r
r
0
_
WIOOmO
O OW ODODN CM M
NO z9to
- 10
V r'CCe=
F-
Lo t r
z
0 0 0 , 0 0 8
888i88W
8
ern
<,
�w 06
r
WD
Qt61NON
_
m 0
D co
Q°
�U 888
888�NN
j . r rp
C:CrGC�"
�Y YfI
D
l 0 7
ul
8:88888
0 0
Q �C.nCm
cj. QOSO
1� 10 10
W
(1r��
N O
r CO
¢
Wa
W
Y
Z p oli'r'1d
O� 1a LL..iL.iL.:L
34 (7.rn W
W W J �L jvj
Q
C
J
C
z
0 O
c O
3::3 c
U d.
•
a c•-i c
3::3
c
Uy�,� � o
�� ro z
-W� j C Ula
H lMMILJ Olrovv ° r D
-01 ge l U ps
81IG I I
,
o
i1�3
d
pp p O p
WQ10 8808
p p p p
808
8
J
Q
H•Z•, cm cl ari
IC 1.:
F-
1
1
1
I
1
1
CITY OF-
CHANHASSEN
690 COULTER DRIVE • P.O. BOX 147 • CHANHASSEN, MINNESOTA 55317
(612) 937 -1900 • FAX (612) 937 -5739
TO! Charles Folch, Director of Public Works
FROM: Bill Bement, Engineering Technician Il J''1I e
DATE: May 14, 1996
Action by City Administrator
Endors -r ✓ W
Modified
Rejectrs+ _ c,
Dat `? /..�7 — 1
Date Submitted to Commission
Cate Su ` .1ted to Council
J_
SUBJ. Request for City Council Approval - Kerber Boulevard Resurfacing Project
1 Project No. 96- 5 /S.A.P. No. 194- 101 -05
1 The intent of this resurfacing project will be to restore the existing crown, enhance rideability and
structural strength thereby increasing the service "life of this roadway. The project will consist of
milling the curbline followed by constructing a 2 -inch bituminous overlay on the entire width of
1 the roadway which will begin at West 78th Street and terminate at Powers Boulevard. Also
included will be the restoration of pavement markings (stripping, crosswalks, etc.).
1 Since Kerber Boulevard is a municipal state aid roadway,'State monies are proposed to be used to
finance the majority of the project with an estimated cost being approximately $149,000.00. On
1 April 15, 1996, the project plans and specifications received preliminary approval from the
MnDOT State Aid Office and at this point, City Council approval is requested. Therefore, please
add this item to the May 20, 1996 City Council agenda for its review and approval.
1 � r
1 .m..
DIRECTOR OF PUBLIC WORKS' COMMENT:
1 As Bill has indicated, Municipal State Aid construction dollars are proposed to fund the majority
of this project. The current condition of Kerber Boulevard makes this repair necessary at this
1 time before further deterioration and more costly repairs are required. Staff recommends plan and
specification approval and authorization for advertising for bids.
1
1
MEMORANDUM
Engineer's Estimate
Project: Kerber Boulevard Bituminous Overlay Project
City Project No. 96 -5
S.A.P. No. 194-101-05
March 22, 1996
Item
MnDOT
Desciption
Estimated
Estimated
Estimated
No.
Spec. No.
quantity
Price
Total
1
2341.508
Type 41A Wearcourse
4,450 Ton
30.00
133,500.00
2
2357.502
Bituminous Tack Coat
2,570 Gal.
1.00
2,570.00
3
2232.500
Milling Curbline
10,300 s.y.
0.75
7,725.00
4
2506.3
Manhole Casting Adjust.
8 Each
200.00
1,600.00
5
0564.602
Painted Pavement Markings
6
0564.602
Left Arrow
2 Each
50.00
100.00
7
0564.602
Only
1 Each
70.00
70.00
8
0564.602
6" Solid White Crosswalk Line
8501.f.
0.35
297.50
9
0564.602
4" Solid White Lane Line
1501.f.
0.25
37.50
10
0564.602
4" Double Yellow Line
6,8001.f.
0.50
3,400.00
11
0564.602
18" Stop White Line
501.f.
1.00
50.00
TOTAL: