Loading...
1.e. Dempsey Addition: Accept Street & Utility Improvements.CITY OF 1e CHANHASSEN 690 COULTER DRIVE a P.O. BOX 147 • CHANHASSEN, MINNESOTA 55317 (612) 937 -1900 • FAX (612) 937 -5739 TO: Charles Folch, Director of Public Works /City Engineer FROM: Anita Benson, Project Engineer kfg DATE: July 23, 1997 SUBJ: Accept Street and Utility Improvements in the Dempsey Addition Project No. 96 -1 " 4 aty vwor ✓ bw4 A- Modifie Rejected Pat# suhiftted to Commission Staff has received a letter from Peter J. Knaeble, Project Engineer with Terra Engineering, Inc., requesting the City consider acceptance of the public street and utility improvements in the above - referenced project. According to Mr. Knaeble, the public street and utility improvements have been completed in conformance with the approved plans and specifications. City staff performed a walk - through inspection of the project and found the project is in satisfactory condition. It is therefore recommended that the City Council accept the public street and utility improvements in Dempsey Addition, Project 96 -1, for perpetual maintenance and ownership conditioned upon the developer and/or contractor supplying the City with an acceptable maintenance bond for two years from the date of acceptance and providing certification from a registered land surveyor that all monuments have been installed. lllLJ Attachments: 1. Letter from Peter J. Knaeble dated July 7, 1997. 2. Location Map. c: Peter J. Knaeble, Terra Engineering, Inc. W fs 1\voWeng\projects\dempsey\acc strud. doe OFRCIAL ENGINEERING COPy Received Revision No. Approved b City Engineer Date -'23- Approved by City Council Date MEMORANDUM 9G TERRA ENGINEERING, INC. CIVIL ENGINEERING • LAND PLANNING • CONSULTING July 7, 1997 David Hempel City of Chanhassen PO Box 147 Chanhassen, MN 55317 RE: Utility and Street Certification Dempsey Addition Chanhassen, MN Dear Dave: 6001 Glenwood Ave. Minneapolis, Minnesota 55422 (phone /fax) 593 -9325 11 gA n rgtf,l JUL 1 C 1957 EN NNEERNG I hereby certify or attest that the public utility and street improvements in the Dempsey Addition have been constructed in accordance with the approved plans and specifications. Deviations from the plans and specifications, if observed by us, were reflected in the record drawings which were previously submitted. We hereby request final acceptance of the public utility and street improvements by the City for ownership and maintenance. The surveyor for this project will be forwarding a separate certification letter, that all monuments have been correctly installed. Sincerely, Peter J. Knaeble, P.E. TERRA ENGINEERING, INC. CC: Rob Wavinak, RLK Associates LTD (fax 595 -9518) LOCATION MAP C O ' ulter Blvd rJc \1 •. C Lyman BA ., 1 1 WAR I 9000 9100 y Parlfrr - ' Bluff Creek °.. ', �` a% k /r, Elem School *� r Coulter BNa s Nf a "Park . be r A.K. r T D .. F 7 „ DEMP SEY ADD ITION _ C O ' ulter Blvd rJc \1 •. C Lyman BA ., 1 1 WAR I 9000 9100