1.f. Chanhassen East Business Center: Amended Grading, Drainage, & Erosion Control Plan.CITY OF 44
CHANHASSEN
690 COULTER DRIVE • P.O. BOX 147 • CHANHASSEN, MINNESOTA 55317
(612) 937 -1900 • FAX (612) 937 -5739
MEMORANDUM
TO: Charles Folch, Director of Public Works
AAW br city AdMWMM
EFndorsed!�_ll.1c:�.� r
Modified - —
Rejected
Dat
Date Submitted to CommissioA
FROM: Anita Benson, Project Engineer ,.
Date Submitted to Council
DATE: July 23, 1997
SUBJ: Amend Grading, Drainage and Erosion Control Plan for Chanhassen East Business
Center, Second Addition - File No. 96 -27 LUR
Staff has received a request from RLK - Kuusito, Ltd on behalf of CSM Corporation to revise the
Grading, Drainage and Erosion Control Plan for the project. The proposal is to construct a six -
foot high temporary stockpile/berm along Trunk Highway 5 and a four -foot high stockpile/berm
along Lake Drive East on Lot 2, Block 1, Chanhassen East Business Center Second Addition.
These stockpiles/berms may be modified in size and scope when Lot 2, Block 1 is reviewed for a
site plan permit to provide permanent berming if feasible.
The proposed revised Grading, Drainage and Erosion Control Plan dated July 22, 1997 has been
reviewed by staff and approval is recommended contingent upon MnDOT approval of
constructing the berm within the right -of -way of Trunk Highway 5.
Attachment: Grading, Drainage and Erosion Control Plan
\ Icfsl\ vol2 'en&Wta'tn�2ndamend.doc
OFFICIAL ENGINEERING COPY
Received
Revision No.
Approved by City Engineer
Date (*'
ate .e
Appro2
Date ..