Loading...
1b. The Woods at Longacres: Utility Improvements.A MEMORANDUM CITY OF M 690 COULTER DRIVE • P.O. BOX 147 • CHANHASSEN, MINNESOTA 55317 (612) 937 -1900 • FAX (612) 937 -5739 Action by City Administrator Endorsed--- V I)CUq Modifie Rejected Dat TO: Charles Folch, Director of Public Works Date submitted to commission FROM: Dave Hempel, Assistant City Engineer We — '" submitted tonc;j cou 7 DATE: July 15, 1996 SUBJ: Consider Acceptance of Public Utility Improvements in The Woods at Longacres Project No. 93 -28 The City has received a request to consider acceptance and ownership of the public utilities in The ' Woods at Longacres; specifically the 10 -inch sanitary sewer line which was extended across a wetland .on Lot 4, Block 1 and Outlot F this past winter to service future phases. The City did accept the overall utilities in The Woods at Longacres on December 11, 1995 with the exception of this small portion of sanitary sewer. Staff has inspected the sanitary sewer line and found the system acceptable contingent upon completion of any outstanding punch list items. Therefore, it is recommended that the City Council accept the remaining portion of public utilities, specifically the 10 -inch sanitary sewer line extended across Lot 4, Block 1 and Outlot F, The Woods at Longacres, contingent upon completion of any outstanding punch list items. ' ktm ' Attachments: 1. Letter from Ken Adolf dated July 9, 1996. 2. Location map. ' c: David Hinners, Lundgren Bros. g- \eng\projects \woods\utitity.doc OFFICIAL ENGINEERING COPY Received ' Revlsic� No. Apps ovsdd tkCiryy ,w7ylrWer Date S�1/_� - i Q ' Approved by City COMC Date - - Schoell & Madson, Inc. Engineers • Surveyors • P/annel-s Soil Testing • Envir'onmenta/ Services 10580 Wayzata Boulevard, Suite 1 Minnetonka, MN 55305 -1525 Office. 612 -546 -7601 Fax 612 - 546 -9065 July 9, 1996 City of Chanhassen c/o Mr. David Hempel Assistant City Engineer P.O. Box 147 Chanhassen, MN 55317 Subject: The Woods At Longacres Project No. 93 -28 Gentlemen: The City acceptance of the public utilities did not include the 10 -inch sanitary sewer extension north of the project across the wetland. The construction was completed last winter. Representatives of Schoell & Madson, Inc. provided construction staking and observation of this sewer. On this basis, we certify that this sewer was constructed in substantial compliance with the City approved plans and specifications. On behalf of Lundgren Bros. Construction, Inc., we are requesting City acceptance of the completed utilities. Please contact me with any questions. Very truly yours, SCHOELL & MADSO INC. nn �0/Yi1' E DE PT \ {, Kenneth Adolf, P.E. MN Reg. No. 12408 KEA/cj cc: Dave Hinners, Lundgren Bros. Construction, Inc. A 1 1 1 1 1 1 1 1 1 1 1 1 1 7 rum11iauvvn%,uvm L-Wuui vNNviLuiuLy u11Vwyc1 ATTACHMENT 1 I A U D, Cre Lane Lake — Harrison , r%k Bluff Elem C oulter BIvc Or OC TIO MAP CH ENT 2