Loading...
1b Lift Station 10 Improvements CITYOF 1700 Markel Boulevard PO Box 147 Chanhassen. MN 553t 7 Adminislration Phone: 952.227.1100 Fa:,',: 952.227.i110 Building Inspections .. <,u~-. 9:,2.~Z7.1180 Fa:.:: 952.227.i 190 Engineering Ph;se: 952.227.1160 Fa:<: 952.227.i 170 Finance Pscxe. 952.227.1140 952.22711i0 Park & Recreation ,~.~ :. ~.~..~120 Fax: 952.227.1 i 10 ?h:.ne: 952.227.1z.00 -,. Or~ ~.~-. ~,~,, Fda. ~3x. ZLI. ,.gq Planning & Natural Resources ??-.e: ~>,.2, :.~ 130 Fzx: 952.227.1110 Public Works i591 Park Road Phone: 952.227.1300 Fax: 952.227.i310 Senior Center PhoF. e: 952.227.1125 Fa,:: 952.227.i1!0 Web Site .... ¢' C:. c~a,?:ass~n FV',.US MEMORANDUM TO: Todd Gerhardt, City Manager FROM: DATE: SUBJ: Teresa J. Burgess, Public Works Director/City Engineer June 18, 2002 Receive Feasibility Report & Call a Public Hearing for Lift Station 10 System Utility Improvements- Project No. 01-11 ~ REQUESTED ACTION Receive the Feasibility Report and Call a Public Hearing for improvements to Lift Stations 10 and 2 for July 8th. DISCUSSION The City has received the feasibility report that considered improvements to Lift Stations 1, 2, and 10. The report recommends improvements to all three stations. A copy of the Summary and Recommendations is attached. The entire study is available on file in the Engineering Department. This project is proposed to be financed out of the City's Utility Fund. For that reason, Staff is recommending that the No. 1 and 2 priorities be done in 2002 with the remaining projects to be scheduled in the Capitol Improvements Plan (CIP) for future construction. Attachment: l. Summary and Recommendations Section of Feasibility Report. c: David and Rachel Igel g :\eng\public\O 1 - 11Xstaff report 6-24-02.doc The City of Chanhassen ~'~;;r/r~C COn",n~un;ti' :','/th C>-~n lakes. '~'" "~ ' · ,', ~ ,u ct' r~.~ . qiR ~ ,, in ;nn ~-~'~ ~,,~ t-~ .... ~o,,.,~ .... uu,~. a cbarmino dovmtown, thrwino bu~,, es~s ..... ,d,,u tldhS, arks a omar ¢l~c¢ tn ire work. and play. ~ ~ dHg U~dUt~ UI VII. Summary and Recommendations The following list of recommendations summarizes a priority list of projects based on immediate needs identified by this study, Priority No. Description Construct the emergency generator portion of Option A at Lift Station No. 10. If a. privacy fence is desired, it could be built with the generator project or a local independent contractor could be hired to build a fence, which blends with the development project. Cost savings and uniformity of appearance may be achieved throughout the development if other decorative landscaping work is required in the development. The cost estimate includes the privacy fence and the generator installation. The remaining dements of the recommended Option A are included under the 4th priority recommendation. Estimated Cost: 7,68,700 (with fence) Estimated Cost: 548,700 (without fence) Construct Lift Station No. 2 modifications and the new independent forcemain for Lift Station No. 2. Because of the overloading problem currently being experienced at Lift Station No. 2, this station needs to be upgraded prior to rerouting the flow from Lift Station No. 1 into the gravity system contributory to Lift Station No. 2. This recommended project needs to be coordinated with the results of the ongoing I/I investigation pertaining to Lift Station No. 2. The results of that investigation will be used to finalize the lift station and forcemain size. At this time, it is assumed that the results of the I/I analysis will show that a Lift Station No. 2 capacity of 450 ~m will be sufficient to handle the required inflow. This assumptions results in a recommendation to install two new 15 HP submersible pumps into the existing 6 foot diameter wet well and to furnish and install the associated new control panel. This assumption also results in a recommended 8" diameter forcemain. This is the maximum station capacity that can be accommodated with the existing wet well. If a larger capacity is needed, then a new wet well will need to be constructed: which would cause a substantial increase to the estimated cost for this project. At this time, it is also assumed that the new forcemain will be installed by utilizing directional drilling as needed to minimize reconstruction costs of the streets and other restoration work. Lastly, the up~ade in pump size will require the electric service to the site to be upgraded to a true 3-phase service. Estimated Cost: $258,000 Construct a parallel 10" forcemain adjacent to the 6" forcemain from Lift Station No. 1 to the existing 8" forcemain on Frontier Trail. Flow from Lift Station No. 1 Lift Station No. 10 System Utilit7' Improvements FeasibiIiu Report Page 25 will pump to the gravity sewer on Frontier Trail utilizing the existing 6" forcemain. The gravity flow from this point flows to Lift Station No. 2. Near Lift Station No. 1, the existing 8" forcemain from Lift Station No. 10 would be connected to the new section of 10" forcemain, and it would be disconnected from the existing 6" forcemain. Again, it is assumed that directional drilling could be utilized to minimize disruption to the adjacent properties. It is also recommended that the existing pumps in Lift Station No.1 be downsized to reflect the much lower TDH that will be seen at this lift station. This will provide the City with an ongoing energy savings. Estimated Cost: $131,000 Construct the remaining options listed in Option A as an equipment upgTade and control panel replacement project. The addition of a 10 foot diameter wet well will improve cycle times and increase the response time available to the City in an emergency. The existing control panel should be upgraded by the addition of level sensing equipment for the new wet well, additional surge protection, additional telemetry points, and spare parts including starter, phase monitor, relays, timers, overload relays, circuit breakers, and fuses. In order to improve the aesthetics at the site, it is recommended that a new lighting pole be installed. It is recommended that the three existing gate valves be replaced, and that the new wet well be piped into the forcemain so that the City could drop the existing spare into the new wet well in the event of an emergency. A mobile starter panel that would plug into the emergency generator and into the pump cable would also be provided to facilitate running the temporary pump. Odor control, in the form of activated carbon style forced air filters could be added to the wet well vent pipe system if odors become a nuisance. Since the flow throuzh this lift station is primarily fresh domestic waste, odor control equipment m;y not be necessary. Estimated Cost: $141,300 (with odor control) Estimated Cost: $ 91,300 (without odor control) Due to the high cost of Option B and C and the lack of additional benefit to the City, Options B and C are not recommended improvements. Lift Station No. 10 System UtiliO, h~zprovements FeasibiliO, Report Page 26