Loading...
9. Oakwood Estates: Preliminary & Final Plat.CITY OF CHANHASOU PC DATE: 2/21/96 9 CC DATE: 3/11/96 - CASE #: 92 -3 SUB By: Generous:v STAFF REPORT a 1 PROPOSAL: Preliminary plat approval for five lots on Outlot A, Oakwood Estates, on 2.06 for a project known as Oakwood Estates First Addition LOCATION: Lyman Boulevard and Quinn Road, N 1/2 Section 24, T 116, R 23 W APPLICANT: Mr. Gene R. Quinn 4510 West Shore Drive Rapid City, SD 57702 (605) 343 -0234 0 PRESENT ZONING: ACREAGE: DENSITY: ADJACENT ZONING AND LAND USE: WATER AND SEWER: Single Family Residential, RSF 2.06 acres 2.43 units /ac, gross & net Action by City AdminlstratO Endorsed Modified Rejected Date_ Date Submitted to Commissiott N - RSF, single - family home S - A2, proposed PUD for 134 single - family lots care �uhrnitted to Council E - A2, single - family homes 3 - �/- W - RSF, vacant Available to site as part of Lake Riley Area Trunk Utili Improvements PHYSICAL CHARACTER.: The site is fairly flat with a man-made pond located in the nc central portion of the parcel and wooded areas in the southwest northeast corners of the property. 2000 LAND USE PLAN: Residential - Low Density (Net Density Range 1.2 - 4.0 Units /Ac.) ��1 37� ■V�1 � ' • � �, �L�"11 . - . - �� •.. ; 111 111111 Est LYMA COUR ■ 1 M • LO CATION SANDIVERE HEIGHTS ,• RARK • PA RA' ..,� �e E � s v Oakwood Estates ' February 21, 1996 Page 2 PROPOSAL /SUMMARY ' The applicant is requesting preliminary plat approval to replat Outlot A, Oakwood Estates into five lots. As part of the request, the applicant is proposing the final platting of Lots 1 and 2. The site is generally flat with isolated groups of mature trees and a small pond. The proposal is to develop the site in two phases. Phase I includes Lots 1 and 2, Block 1. Utility service for Phase I of the development will be provided under the Lake Riley Area Trunk Utility Improvement Project. ' Phase II, however, will require that the applicant extend an improved road (Quinn Road) and utilities to the north line of Lot 5. In conjunction with this development proposal, the City will be upgrading Quinn Road to urban City standards to the north line of Phase I (Lot 2). The ' applicant will be responsible for the further upgrading of Quinn Road to the north line of Phase II (Lot 5) in conjunction with the second phase of development. A temporary turnaround will be required at the end of Quinn Road upon construction of Phase II. City ordinance requires the lowest floor elevation of dwellings adjacent to ponds, lakes, and wetlands be at least two feet above the 100 -year flood elevation. This will restrict the type of dwellings to split -entry type homes throughout the development. Staff also recommends that the walkout or lowest opening of each dwelling be constructed a minimum of one foot above the emergency overflow swale. The applicant's engineer and staff have discussed adjusting street grades to provide for the emergency overflow swale between Lots 3 and 4, Block 1. A 20 -foot wide drainage and utility easement will need to be dedicated on the final plat along the common property line of Lots 3 and 4. The applicant is required to have a 35% canopy coverage remaining after construction (.72 acres required). Tree removal for the development is .34 acres of the total canopy leaving .52 acres (25% canopy coverage). The difference is .2 acres and since required canopy is being removed, the required canopy will be increased 1.2 times. Therefore, the canopy replacement required by the applicant will be .24 acres or 9 trees. To ensure preservation of the remaining trees, a conservation easement or tree removal limit should be placed on Lots 1, 2, 3, and 5. This will protect these areas from house pad intrusion or further construction. Staff is recommending approval of the proposed plat subject to the conditions of the staff report. BACKGROUND On March 23, 1992, the City Council granted preliminary and final plat approval for Oakwood Estates to create one single - family lot and two outlots. One of the conditions of approval limited the replatting of the outlots until such time as city sewer and water are available to the site. Utility service for Phase I of the development will be provided under the Lake Riley Area Trunk Utility Improvement Project. Oakwood Estates February 21, 1996 ' Page 3 WETLANDS I The site contains an existing pond. The pond is listed in the City's Surface Water Management Plan (SWMP) as a utilized wetland. According to city ordinances, there are no buffer or setback ' restrictions required with a utilized wetland. This area is shown on the National Wetland Inventory. A question has been raised as to whether the utilized pond area was an expansion or contraction of the wetland on the site. Staff recommends that the applicant hire a wetland expert to delineate the edge of the wetland due to the marginal soil conditions in the area. Based on this delineation, Lots 3, 4, and 5 may not be developable or a Wetland Alteration Permit may be required. ' SURFACE WATER MANAGEMENT PLAN (SWMP) ' The City has adopted a Surface Water Management Plan (SWMP) to serve as a tool to protect, preserve, and enhance water resources. The plan identifies, from a regional perspective, the stormwater quantity and quality improvements necessary to allow future development to take ' place and minimize its impact to downstream water bodies. In general, the water quantity portion of the plan uses a 100 -year design storm interval for ponding and a 10 -year design storm interval for storm sewer piping. The water quality portion of the plan uses William Walker, Jr.'s ' Pondnet model for predicting phosphorus concentrations in shallow water bodies. An ultimate conditions model has been developed at each drainage area based on the projected future land ' use, and therefore, different sets of improvements under full development were analyzed to determine the optimum phosphorus reduction in priority water bodies. The development's storm drainage system will be required to be constructed in accordance with the City's SWMP ' requirements. The City's public improvement project, Lyman Boulevard Reconstruction/Lake Riley Trunk Utility Improvement Project No. 93 -32B, will be providing storm sewers and water quality treatment for the site. The development will be assessed in conjunction with these ' improvements accordingly. Storm Water Quality Fees ' The SWMP has established a water quality connection charge for each new subdivision based on Dedication be to the cost of land and volume needed for treatment of ' land use. shall equal pond the phosphorus load leaving the site. The requirement for cash in lieu of land and pond construction shall be based upon a schedule in accordance with the prescribed land use zoning. ' Values are calculated using the market values of land in the City of Chanhassen plus a value of $2.50 per cubic yard for excavation of the pond. The proposed SWMP water quality charge of $800 /acre for single family resident developments. Fees are based on a total developable land ' area of 2.06 acres minus the existing pond of 0.24 acres. Therefore, the applicant is responsible for $1,456.00 in water quality fees for both phases. Credits will be reviewed and applied to the applicant's SWMP fees upon final plat consideration. ' L�! L Oakwood Estates February 21, 1996 Page 4 Storm Water Quantity Fees The SWMP has established a connection charge for different land uses based on an average, city- wide rate for the installation of water quantity systems. This cost includes land acquisition, proposed SWMP culverts, and open channels and stormwater ponding areas for runoff storage. Single family residential developments have a connection charge of $1,980 per developable acre. The total net area of the property is 1.82 acres as discussed above. Therefore, the proposed development would be responsible for a water quantity connection charge of $3,603 for both phases. Credits will be reviewed and applied to the applicant's SWMP fees upon final plat consideration. All SWMP connection charges will be due payable to the City at time of final plat recording. GRADING ' The site is generally flat with isolated groups of mature trees and a small pond. The proposal is to develop the site in two phases. Phase I includes Lots 1 and 2, Block 1. Both phases propose ' lot grading to be completed individually at time of house construction. Staff generally concurs with this idea on Lots 1, 2, and 5, however, Lots 3 and 4 should be graded in conjunction with Phase Il utility and street construction. Staff recommends that individual detailed grading, ' drainage, tree preservation, and erosion control plans be submitted for Lots 1, 2, and 5, Block 1 for review and approval by City staff at time of building permit application. The Carver County Soil Survey indicates Cordova and Webster silty clay loam soil present on all lots. This type of soil is typically unsuitable for building construction. A soils engineer can evaluate the house pads on the proposed lots and determine if soils corrections are required. City ordinance requires the lowest floor elevation of dwellings adjacent to ponds, lakes, and wetlands be at least two feet above the 100 -year flood elevation. This will restrict the type of dwellings to split -entry type homes throughout the development. Staff also recommends that the walkout or lowest opening of each dwelling be constructed a minimum of one foot above the emergency overflow swale. The applicant's engineer and staff have discussed adjusting street grades to provide for the emergency overflow swale between Lots 3 and 4, Block 1. A 20 -foot wide drainage and utility easement will need to be dedicated on the final plat along the common property line of Lots 3 and 4. In conjunction with the City's Lyman Boulevard Reconstruction/Lake Riley Area Trunk Utility Improvement Project No. 93 -32B, Quinn Road will be upgraded to a city standard urban road with utilities to the north line of Phase I (Lot 2). This development will be responsible for street and utility assessments as a result of these improvements. Installation of Phase lI improvements will be the responsibility of the applicant. r Oakwood Estates February 21, 1996 ' Page 5 DRAINAGE The site drains in a southeasterly direction towards Lyman Boulevard. Ultimately, the site ' drainage and existing pond overflow will need to be connected, via storm sewer pipe, to the City's storm sewer system to be installed along Lyman Boulevard this year. The applicant has ' the option to install this storm sewer system at their own expense under private contract or ' petition the City to include this work as a part of the Lyman Boulevard Reconstruction Project No. 93 -32B. If the applicant petitions the City, the applicant will be responsible for the entire from ' cost of constructing the outlet control and overflow storm sewer conveyance system the ' pond to Lyman Boulevard. The cost of this system will be assessed on a per -lot basis over Lots 1 through 5, inclusive. Since these additional storm drainage improvements are beyond the scope of work previously approved by the City Council, the applicant will be required to sign a ' document waiving their rights to all procedural or substantive objections to the special assessments associated with these storm drainage improvements including, but not limited to, hearing requirements and any claim that the assessment exceeds the benefit to the development. ' The applicant's engineer will need to submit to the City detailed storm drainage calculations for ' the storm drainage system as well as ponding calculations for 2 -, 10 -, and 100 -year storm events, 24 -hour duration for both pre- and post - development conditions for review and approval by City staff. , UTIL ITIES Utility service for Phase I of the development will be provided under the Lake Riley Area Trunk ' Utility Improvement Project. Phase II, however, will require that the applicant extend an improved Quinn Road and utilities to the north line of Lot 5. In conjunction with Phase II ' construction, utilities should also be provided to serve the parcels east of Quinn Road. The applicant will be reimbursed a proportionate cost of the sanitary sewer and water construction costs when these parcels connect to the utilities. Staff will determine the reimbursement amount t by distributing the cost of extending the sewer and water lines on a per -lot basis to the benefiting parcels. In the future the City will collect a connection charge from these parcels at time of ' connection to the City utilities and reimburse the proportionate share to the applicant accordingly. Since the utilities in Phase II will be installed by the applicant and eventually owned and ' maintained by the City upon completion, the street and utility improvements shall be constructed in accordance with the City's latest edition of Standard Specifications and Detail Plates. The ' developer will be required to enter into a development contract with the City and provide a financial security to guarantee installation of the public improvements and conditions of final plat approval for both phases. The final plat shall dedicate drainage and utility easements for all ' Oakwood Estates ' February 21, 1996 Page 6 ' utility lines which fall outside the street right -of -way. These easements shall be a minimum of 20 feet wide. ' Pursuant to city ordinance, existing homes within 150 feet of the city's sewer lines shall be connected to the line within 12 months after the line becomes operational. There are two dwellings on the east side of Quinn Road (520 and 530) that will be affected by this ordinance ' with the extension of utilities for Phase II of this development. ' STREETS The site will be serviced off of Quinn Road which is an unimproved gravel street. This street ' also services other residents in the area; therefore, access must be maintained at all times during construction. In conjunction with this development proposal, the City will be upgrading Quinn Road to urban City standards to the north line of Phase I (Lot 2). The applicant will be ' responsible for the further upgrading of Quinn Road to the north line of Phase II (Lot 5) in conjunction with the second phase of development. A temporary turnaround will be required at the end of Quinn Road upon construction of Phase II. A condition will be placed in the ' development contract that Quinn Road shall be extended in the future. A previous subdivision of this property dedicated the necessary 60- foot -wide right -of -way for Quinn Road. No additional right -of -way is required with this subdivision proposal. ' Quinn Road shall be constructed in accordance with the City's latest edition of Standard Specifications and Detail Plates. Detailed construction plans and specifications for the street and utility improvements will be required for City staff review and formal approval by the City Council in conjunction with final plat approval for Phase Il. EROSION CONTROL Erosion control measures and site restoration shall be developed and in accordance with the City's Best Management Practice Handbook (BMPH). The preliminary grading plan has incorporated Type I erosion control around the perimeter of the pond and construction limits adjacent to Quinn Road. A rock construction entrance shall be employed and maintained at all access points until the street has been paved with a bituminous surface. LANDSCAPING/TREE PRESERVATION The Oakwood Estates development site consists of an extensive stand of mature oak and maple ' trees with cleared openings. Wooded areas exist on four of the lots for a total site coverage of 42 percent (0.86 acres). Tree removal is necessary on Lots 1 and 5 where the wooded area is concentrated towards the front of the lots. Lots 2 and 3 will be able to avoid any tree removals Oakwood Estates ' February 21, 1996 ' Page 7 since all trees are at the rear of the lot except four that will be removed for the road ' improvements, driveways, and house pads. The applicant is required to have a 35% canopy coverage remaining after construction (.72 acres , required). Tree removal for the development is .34 acres of the total canopy leaving .52 acres remaining ( 25% canopy coverage). The difference is .2 acres and since required canopy is being removed the required replacement canopy will be increased 1.2 times. Therefore, the canopy , replacement required by the applicant will be .24 acres or 10 trees. To ensure preservation of the remaining trees, a conservation easement or tree removal limit ' should be placed on Lots 1, 2, 3, and 5. This will protect these areas from house pad intrusion or further construction. COMPLIANCE TABLE ' Finding The proposed subdivision is consistent with applicable plans. I J ' LOT Ft. DEPTH Ft. AREA (Sq. Ft.) FRONTAGE ( ) ( ) TREE EASEMENT Code 15,000 90 125 1 28,000 112 250 N 145' and W 20' ' 2 15,767 99 159 W 60' 3 15,126 95 159 W 60' of S 30' 4 15,588 105 148 none , 5 15,117 111 136 N 35' TOTAL 89,600 ' Setbacks, Minimum: Front - 30 feet, side - 10 feet, rear - 30 feet ' FINDINGS 1. The proposed subdivision is consistent with the zoning ordinance; ' Findiny,: The subdivision meets all the requirements of the RSF, Residential Single Family District. ' 2. The proposed subdivision is consistent with all applicable city, county and regional plans including but not limited to the city's comprehensive plan; ' Finding The proposed subdivision is consistent with applicable plans. I J Oakwood Estates February 21, 1996 Page 8 ' 3. The physical characteristics of the site, including but not limited to topography, soils, vegetation, susceptibility to erosion and siltation, susceptibility to flooding, and storm water drainage are suitable for the proposed development; I C �I Finding: The proposed site is suitable for development subject to the conditions specified in this report. 4. The proposed subdivision makes adequate provision for water supply, storm drainage, sewage disposal, streets, erosion control and all other improvements required by this chapter; Finding: The proposed subdivision is served by adequate urban infrastructure. 5. The proposed subdivision will not cause environmental damage; Finding: The proposed subdivision will not cause environmental damage subject to conditions of approved. 6. The proposed subdivision will not conflict with easements of record. Finding The proposed subdivision will not conflict with existing easements, but rather will expand and provide all necessary easements. 7. The proposed subdivision is not premature. A subdivision is premature if any of the following exists: a. Lack of adequate storm water drainage. b. Lack of adequate roads. C. Lack of adequate sanitary sewer systems. d. Lack of adequate off -site public improvements or support systems. PLANNING COMMISSION UPDATE Finding The proposed subdivision is provided with adequate urban infrastructure. The Planning Commission held a public hearing on February 21, 1996. The Planning Commission voted unanimously to recommend approval of the preliminary plat subject to the conditions of the staff report with the addition of two conditions: 21. Assurance that the landscaping along Lyman Boulevard complies with City ordinance, and 22. Require the payment of full park and trail fees pursuant to City Ordinance. I Oakwood Estates ' February 21, 1996 Page 9 ' RECOMMENDATION I Staff recommends that the City Council adopt the following motion: "The City Council approves the preliminary plat of Oakwood Estates First Addition, prepared by William R. Engelhardt Associates, Inc., dated December 28, 1995, for five lots and grants final plat ' approval for Lots 1 and 2, Block 1, Oakwood Estates First Addition subject to the following conditions: 1. Submit an evaluation of the soils at the proposed house pads. This shall be done prior to , issuance of any building permits. 2. Revise the gadin plan to show the location, lowest floor and garage floor elevations and ' g type of dwelling using the City's standard designations prior to final plat approval. The lowest floor elevations of all dwellings shall be constructed a minimum of two (2) feet , above the 100 -year flood elevation of the pond. The lowest opening or walkout of each dwelling shall be a minimum of one (1) foot above the emergency overflow swale ' elevation. 3. Rock construction entrances shall be employed and maintained at all access points until ' the street has been paved with bituminous surface. 4. The applicant shall be responsible for water quality and quantity connection charges in ' accordance with the City Surface Water Management Plan (SWMP). Credits will be reviewed and applied to these charges upon final plat consideration based on the applicant's contribution for meeting the City's SWMP requirements. ' 5. The applicant shall dedicate on the final plat a drainage and ponding easement over the pond up to the 100 -year flood elevation and a 20 -foot drainage and utility easement ' centered upon the common lot line of Lots 3 and 4, Block 1 for the emergency overflow swale. ' The applicant's engineer shall work with City staff in revisin street grade along 6. T Pp g Y g g g Q uinn Road to provide for an emergency overflow from the pond out to Quinn Road. ' 7. Individual grading, drainage, tree preservation, and erosion control plans will be required for Lots 1, 2, and 5, Block 1 at the time of building permit application for the City to review and approve. Lots 3 and 4, Block 1 shall be graded in conjunction with Phase II ' site improvements. Oakwood Estates ' February 21, 1996 Page 10 ' 8. The public street and utility systems shall be designed and constructed in accordance with the City's latest edition of street and utility standards. Detailed construction plans and specifications shall be submitted for Phase II for City staff review and formal approval by ' the City Council in conjunction with final plat approval for Phase Il. The plans and specifications shall be prepared in accordance with the latest edition of the City's Standard Specifications and Detail Plates. ' 9. All areas disturbed as a result of construction activities shall be immediately restored with seed and disc - mulched or wood -fiber blanket or sod within two weeks of completion of ' each activity in accordance with the City's Best Management Practice Handbook. 10. The applicant shall provide detailed storm sewer calculations for 10 -year and 100 -year storm event providing ponding calculations for stormwater ponds in accordance with the City's SWMP for the City Engineer to review and approve prior to final plat approval. ' The applicant shall provide detailed pre- developed and post- developed stormwater calculations for 100 -year storm events and normal water level and high water level calculations in existing basins, created basins, and /or creeks. Individual storm sewer calculations between each catch basin segment will also be required to determine if sufficient catch basins are being utilized. ' 11. The applicant shall enter into a development contract with the City and provide the necessary financial security to guarantee compliance with the terms of the development contract. ' 12. The applicant shall apply for and obtain permits from the appropriate regulatory agencies, i.e. Watershed District, Metropolitan Waste Control Commission, Health Development, ' Minnesota Pollution Control Agency, Minnesota Department of Natural Resources and the Army Corps of Engineers and comply with their conditions of approval. ' 13. The applicant shall report to the City Engineer the location of any drain tiles found during construction and shall relocate or abandon the drain tile as directed by the City Engineer. ' 14. The applicant has the option to install the storm drainage improvements from the pond to Lyman Boulevard at their own expense. If the applicant petitions the City to install these ' drainage improvements under the Lyman Boulevard Reconstruction/Lake Riley Area Trunk Utility Improvement Project No. 93 -32B, the applicant shall accept the special assessment for the cost of extending the storm drainage improvements from Lyman ' Boulevard to the pond. The cost of these storm drainage improvements will be assessed on a per -lot basis over Lots 1 through 5, inclusive. The applicant and/or property owners shall waive any and all procedural or substantive objections to the special assessments 1 associated with City public improvement Project No. 93 -32B including, but not limited 17. A conservation easement or tree removal limit shall be placed over the following lots areas: a. The northern 145 feet and western 20 feet of Lot 1 t b. The western 60 feet of Lot 2 C. The westerly 60 feet of the southerly 30 feet of Lot 3 d. The northern 35 feet of Lot 5 18. Tree protection fencing shall be installed around all trees and wooded areas that are to be preserved on the site. Such fencing shall be installed prior to commencing grading, ' Oakwood Estates February 21, 1996 Page 11 ' comply with city code. to, hearing requirements and any claim that the assessment exceeds the benefit to the property. ' marginal soil conditions in the area. Based on this delineation, Lots 3, 4, and 5 may not 15. Quinn Road shall be extended and upgraded to a city standard urban road in the future. ' The applicant shall provide a temporary turnaround with Phase II improvements that , meets City standards with a barricade and signage stating that it is a temporary cul -de -sac , and this road will be extended in the future. ' 16. Applicant is required to plant 10 trees as replacements for canopy lost. These trees shall ' be 2 and 1/2 inches in diameter and from the primary species in the Approved Tree List. ' Three trees shall be planted on each of Lots 3, and 4 and four on Lot 2. 17. A conservation easement or tree removal limit shall be placed over the following lots areas: a. The northern 145 feet and western 20 feet of Lot 1 t b. The western 60 feet of Lot 2 C. The westerly 60 feet of the southerly 30 feet of Lot 3 d. The northern 35 feet of Lot 5 18. Tree protection fencing shall be installed around all trees and wooded areas that are to be preserved on the site. Such fencing shall be installed prior to commencing grading, ' excavations or other site improvements on or adjacent to the lots. 19. Entry monumentation for the development shall require a separate sign permit and must ' comply with city code. 20. The applicant shall hire a wetland expert to delineate the edge of the wetland due to the ' marginal soil conditions in the area. Based on this delineation, Lots 3, 4, and 5 may not be developable or a Wetland Alteration Permit may be required. Such delineation must ' be done prior to final plat approval for phase II of the development. 21. Review the plat to ensure that the landscaping along the collector street meets city , ordinance. 22. Full park and trail fees shall be paid pursuant to City Ordinance." ' ATTACHMENTS 1. Development Review Application 2. Reduced Preliminary Plat Oakwood Estates ' February 21, 1996 Page 12 3. Memo from Steve A. Kirchman to Bob Generous dated 2/5/96 4. Memo from Mark Littfin to Bob Generous dated 11/29/95 5. Public Hearing Notice and Mailing List 6. Preliminary plat dated December 28, 1995 7. Planning Commission Minutes of 2/21/96. L 7 APPLICANT: Mr. Gene R. Quinn ADDRESS: 4510 West Shore Drive Rapid City, S.D. 57702 OWNER: Eug ene R. & Therese A. Quinn ADDRESS: 4510 West Shore Drive TELEPHONE (Day time) � O, 343 - Q Z 3 Z7 TELEPHONE: Rapid City, S.D. 57702 ' iy _ 1. Comprehensive Plan Amendment CITY OF CHANHASSEN ' 690 COULTER DRIVE Conditional Use Permit CHANHASSEN, MN 55317 Variance (612) 937.1900 Interim Use Permit DEVELOPMENT REVIEW APPLICATION Wetland Alteration Permit APPLICANT: Mr. Gene R. Quinn ADDRESS: 4510 West Shore Drive Rapid City, S.D. 57702 OWNER: Eug ene R. & Therese A. Quinn ADDRESS: 4510 West Shore Drive TELEPHONE (Day time) � O, 343 - Q Z 3 Z7 TELEPHONE: Rapid City, S.D. 57702 ' iy _ 1. Comprehensive Plan Amendment 11. Vacation of ROW /Easements 2. Conditional Use Permit 12. Variance 3. Interim Use Permit 13. Wetland Alteration Permit 4. Non - conforming Use Permit 14. Zoning Appeal 5. Planned Unit Development 15. Zoning Ordinance Amendment 6. Rezoning 7. Sign Permits 8. Sign Plan Review Notification Signs 9. Site Plan Review X Escrow for Filing Fees /Attorney Cost" ($50 CUP /SPRNAC /VAR /WAP /Metes and Bounds, $400 Minor SUB) 10. Subdivision l � TOTAL FEE $ b A list of all property owners within 500 feet of the boundaries of the property must included with the application. Twenty -six full size folded copies of the plans must be submitted. 8' /2" X 11" Reduced copy of transparency for each plan sheet. ` NOTE - When multiple applications are processed, the appropriate fee shall be charged for each application. " Escrow will be required for other applications through the development contract ' I PROJECT NAME First Addition t o Oakwood Estates F LOCATION Lyman Boulevard and Quinn Road LEGAL DESCRIPTION Outlot A, Oakwood Estates, Carver County, Minnesota PRESENT ZONING R S F REQUESTED ZONING R S F PRESENT LAND USE DESIGNATION REQUESTED LAND USE DESIGNATION REASON FOR THIS REQUEST Subdivision This application must be completed in full and be typewritten or clearly printed and must be accompanied by all information and plans required by applicable City Ordinance provisions. Before filing this application, you should confer with the Planning Department to determine the specific ordinance and procedural requirements applicable to your application. This is to certify that I am making application for the described action by the City and that I am responsible for complying with all City requirements with regard to this request. This application should be processed in my name and I am the party whom the City should contact regarding any matter pertaining to this application. I have attached a copy of proof of ownership (either copy of Owner's Duplicate Certificate of Title, Abstract of Title or purchase agreement), or I am the authorized person to make this application and the fee owner has also signed this application. I will keep myself informed of the deadlines for submission of material and the progress of this application. I further understand that additional fees may be charged for consulting fees, feasibility studies, etc. with an estimate prior to any authorization to proceed with the study. The documents and information I have submitted are true and correct to the best of my knowledge. Signature of App icant Date Signature of Fee Owner Date ' Application Received on Paid _ Receipt No. The applicant should contact staff for a copy of the staff report which will be available on Friday prior to the meeting. If not contacted, a copy of the report will be mailed to the applicant's address. JA.MES Al CU RRY ( j P�HAS - E LINE , �1� J �E/- ✓ I 7 Yi -, fi' , ! w (( t t � - Y VYYWYYWWYYY "vWYYV'lrl� / t m I if /LOT i 1 /. P B i i$XISTING� h v L I R z I I I /N.W.L 919 56 eo �, L i L , V N.W.L. 917 6 � //����// �I 160. t N. }n� �.r l�.A it ONE G 4 /r '.}•� ��• \ '`, �_. '( 4 �'. 1 ., H. (i ;EL.K w s n -I I LOT 2I LOT ! I�I LOT 4 li >L T, � ,� /°vt, ezr•� 1 i / -,- � �F7 �. x , q 1, I C Ii r Fr I 4 10.0 0 f 4 N 00'1808 W t i 1 1 I SKA (❑ y i - R c;C,: Si!`Raz . \ \. \ RICHARD CHAD.: CK L Z PROPERTY DESCRIPTION: 0 25 50 too COMOT A. OAKWOOD ESTATES CARVER COUNTY, MINNESOTA 6(: /,LE IN FEET LOT AREA TABULATIONS BLOCK ONE LOT 1 26,000.13 aq. N. 0.81 area LOT 2 15,767.28 eq. ft. 0.38 acres DRAINAGE AND UTLITY EASEMENTS ARE LOT 3 15,126.1] p. IL 0.35 1,— SHOWN MUS: LOT 4 15.588.36 sq. fl. 0.36 area -- .00' LOT 5 15,117.35 4T fl. 0.35 TOTAL PROPERTY AREA 89,599.90 p. It. 2.06 ores g PENSIIY EiiLSANSi CANOPY COVERAGE �� I I 2.43 UNIT$ /ACRE (NET) 0.80 ACRES 38.83% I I _ 70NING CANOPY AREA TO BE REMOVED E%ISRNG RSF O.tt ACRES PROPOSED ' RISE PROPOSED CANOPY COVERAGE SETBACKS 0.66 ACRES 32.01% LOT ONES AN' KING 0.0 F D IN a WiDM FRONT YARD - 30 FEET REOVIRED CANOPY COVERAGE AND ADJONIN<� STREET RICNT OF WAY IINES REAR YARD - 30 FEET (LOW DENSITY RESIDENTIAL) UNLESS OMERWSE INDICATED CN ME PLAT. SIDE YARD - tOFKT 0.62 ACRES - 30.00% SITE LOCATION ENGINEER CERTIFICATION DESIGN REVISIONS OWNER PROJECT SHEET TITLE DATE WILLIAM R. ENGELHARDT ASSOCIATES, INC. CONSULTING ENGINEERS 1107 HAZELTINE BOULEVARD-SUITE 480 _ CHA>�NESOl� vc+,EO er. DATE DESCRIPTION AND EUGENE R. OUINN A THERESE A. OUI A 4610 WEST SHORE DRIVE APID � UTH D 67702 848- FIRST ADDITION TO OAKWOOD ESTATES PRELIMINARY PLAT DEC., 1995 o«' N a. SCALE — e.. o am Tvr _ 1 CITY OF CHANHASSEN 690 COULTER DRIVE • P.O. BOX 147 • CHANHASSEN, MINNESOTA 55317 (612) 937 -1900 • FAX (612) 937 -5739 MEMORANDUM ' TO: Bob Generous, Planner II FROM: Steve A. Kirchman, Building Official DATE: February 5, 1996 ' SUBJECT: 92 -3 SUB (First Addition to Oakwood Estates, Eugene Quinn) Background: ' I was asked to review the plans stamped "CITY ` OF CHANHASSEN, RECEIVED, DEC 28 1995, CHANHASSEN PLANNING DEPT." for the above referenced project. Below are an analysis and ' reconunendations from the Inspections Division for the proposed project. Analysis: Building Pads. Locations of proposed dwelling pads and the type of dwelling is necessary to enable the Inspections Division and Engineering Department to perform a satisfactory plan review of the structure at the time of building permit issuance. For the same reason, proposed lowest level floor elevations as well as garage floor elevations and entry level elevations are required to be indicated on the proposed pad location. Standard designations (FLO or RLO, R, SE, SEWO, TU, WO) must be shown for proposed dwelling types. These standard designations lessen the chance for errors during the plan review process. The memo explaining these designations is enclosed. ' The Carver County Soil Survey indicates Cordova and Webster silty clay loam soil present on all lots. This type of soil is typically unsuitable for building construction. A soils engineer can evaluate the house pads on the proposed lots and determine if soils corrections are required. ' Recommendations: ' The following conditions should be added to the conditions of approval. 1. Revise the preliminary grading plan to show the location of proposed dwelling pads, using standard ' designations and the lowest level floor and garage floor elevations. This should be done prior to final plat approval. 2. Submit an evaluation of the soils at the proposed house pads. This should be done prior to issuance of any building permits. I g: \safety"sak\memos\plarMA%dl.doc CITY OF CHANHASSEN 690 COULTER DRIVE • P:O. BOX 147 • CHANHASSEN, MINNESOTA 55317 (612) 937 -1900 • FAX (612) 937 -5739 TO: Inspections, Planning, & Engineering Staff FROM: Steve A. Kirchman, Building Official 4-cr- DATE: .January 29, 1993 SUBJ: Dwelling Type Designation We have been requesting on site plan reviews that the developer designate the type of dwelling that is acceptable on each proposed lot in a new development. I thought perhaps it might be helpful to staff to explain and diagram these designations and the reasoning behind the requirements. FLO or RLO Designates Front Lookout or Rear Lookout This includes dwellings with me basement floor level approximately 8' below grade at its deepest with the surrounding grade sloping down to approximately 4' above the basement floor level. R Designates Rambler. This includes dwellings with the basement floor level approximately 8' below grade with the surrounding grade approximately level. This would include two story's and many 4 level dwellings. SE Designates Split Entry. This includes dwellings with the basement floor level approximately 4' below grade with the surrounding grade approximately level. SEWO Designates Split Entry Walk Out This includes dwellings with the basement floor level approximately 4' below grade at its deepest with the surrounding grade sloping down to lowest floor level. TU Designates Tuck Under. This includes dwellings with the basement floor level approximately 8' below grade at its deepest with the surrounding grade sloping down to the lowest floor level in the front of the dwelling. WO Designates Walk Out This includes dwellings with the basement floor level approximately 8' below grade at its deepest with the surrounding grade sloping down to the lowest floor level in the rear of the dwelling. TU ( SE R SEWO WO FLO or RLO - — r =� Inspections staff uses these designations when reviewing plans which are then passed to the engineering staff for further review. Approved grading plans are compared to proposed building plans to insure compliance to approved conditions. The same designation must be used on all documents in order to avoid confusion and incorrect plan reviews. 4ft flu PRINTED ON RECYCLED PAPER i F J �I J I 1 7] G CITY OF CHANHASSEN 690 COULTER DRIVE • P.O. BOX 147 0 CHANHASSEN, MINNESOTA 55317 (612) 937 -1900 • FAX (612) 937 -5739 MEMORANDUM TO: Bob Generous, AICP Planner II FROM: Mark Littfin, Fire Marshal DATE: November 29, 1995 SUBJ: Oakwood Estates First Addition Planning Case #92 -3 SUB I have reviewed the preliminary plat approval for the subdivision for the above project. In order to comply with the Chanhassen Fire Department/Fire Prevention Division, I have the following fire code or city ordinance /policy requirements. The site plan review is based on the available information submitted at this time. As additional plans or changes are submitted, the appropriate code or policy item will be addressed. 1. No comments at this time. L 1 i NOTICE OF PUBLIC HEARING PLANNING COMMISSION MEETING Wednesday, FEBRUARY 21, 1996 at 7:00 p.m. City Hall Council Chambers 690 Coulter Drive Project: Oakwood Estates First Addition Developer: Eugene Quinn Location: At Approximately 532 Lyman Blvd p _�� LOCATION 1 1 I ( BAIVOIMEI HEIGHTS PARK lu Notice: You are invited to attend a public hearing about a development proposed in your area. The applicant is proposing preliminary plat approval to subdivide Outlot A, Oakwood Estates (2.06 acres) into 5 single family lots on property zoned RSF and located ' at approximately 532 Lyman Blvd., First Addition to Oakwood Estates. What Happens at the Meeting The purpose of this public hearing is to inform you 1 about the developer's request and to obtain input from the neighborhood about this project. During the meeting, the Commission Chair will lead the public hearing through the following steps: 1 1. Staff will give an over view of the proposed project. 2. The Developer will present plans on the project. , 3. Comments are received from the public. 4. Public hearing is closed and the Commission discusses project. The Commission will then make a recommendation to the City Council. , Questions or Comments: If you want to see the plans before the meeting, please stop by City ' Hall during office hours, 8:00 a.m. to 4:30 p.m., Monday through Friday. If you wish to talk to someone about this project, please contact Bob at 937 -1900, ext. 141. If you choose to submit written comments, it is helpful to have one copy to the department in advance of the meeting. Staff 1 will provide copies to the Commission. Notice of this public hearing has been published in the Chanhassen Villager on February 8, 1996. ' \ J. Q i 6 TH 1� .EVAR -- _J �_J ' Thomas & Kristine Uppman 532 Lyman Blvd. Chanhassen, MN 55317 Timothy & Diane Srdar 550 Lyman Blvd. Chanhassen, MN 55317 Bailey & Mary Lou Janssen ' 500 Lyman Blvd. Chanhassen, MN 55317 ' Richard Chadwick 9530 Foxford Road Chanhassen, MN 55317 1 F I Eugene & Therese Quinn 4510 West Shore Drive Rapid City, SD 57702 Gary Skalberg 510 Lyman Blvd. Chanhassen, MN 55317 Russell & Orletta Frederick 540 Lyman Blvd. Chanhassen, MN 55317 James A. Curry 4817 Upper Terrace Edina, MN 55435 James & Patricia Dolejsi 9260 Kiowa Trail Chanhassen, MN 55317 Dixon & Karen Blosberg 530 Lyman Blvd. Chanhassen, MN 55317 Andrew & K. Poepoe 520 Lyman Blvd. Chanhassen, MN 55317 1 CHANHASSEN PLANNING COMMISSION REGULAR MEETING FEBRUARY 1996 Chairwoman Mancino called the meeting to order at 7:00 p.m. ' MEMBERS PRESENT: Craig Peterson, Mike Meyer, Bob Skubic, Nancy Mancino, Don ' Mehl and Jeff Farmakes MEMBERS ABSENT: Ladd Conrad , STAFF PRESENT: Kate Aanenson, Planning Director; Sharmin Al -Jaff, Planner II; Bob Generous, Planner II; John Rask, Planner I; and Dave Hempel, Asst. City Engineer , PUBLIC HEARING: PRELIMINARY PLAT APPROVAL TO SUBDIVIDE OUTLOT A. OAK ESTATES (2.06 ACRES) INTO 5 SINGLE FAMILY LOTS ON PROPERTY ZONED RSF AND LOCATED AT APPROXIMATELY 532 LYMAN BLVD., EUGENE QUINN, FIRST ADDITION TO OAK ESTATES. Public Present: Name Address ' Gene & Therese Quinn 4510 Shore Drive, Rapid City, SD Gary & Nina Skalberg 510 Lyman Blvd. Orletta F. & Russell L. Frederick 540 Lyman Blvd. Kristine & Tom Uppman 532 Lyman Blvd. ' Sherry Jensen 530 Lyman Blvd. Scott Blosberg 530 Lyman Blvd. Jeff Frederick 540 Lyman Blvd. , Bob Generous presented the staff report on this item. ' Mancino: Any questions from commissioners at this time? Meyer: I do have one. Bob, number 15 of, as part of your recommendation. Can you ' explain why we need the temporary turn around? That goes through doesn't it? Generous: No, it would dead end at the end of this subdivision and it would be an ' emergency vehicle turn around. The snowplow turn around. From this point to the north it's a private drive and until those properties develop, there would be no need to upgrade that roadway. L L7- L� C Planning Commission Meeting - February 21, 1996 Meyer: So that's the reason for that turn around? Generous: Right. Mancino: Excuse me. So it would be a turn around that also had access or curb cuts for the private drive to continue and as that, that goes east right now. Hempel: Correct. Mancino: And that is not going to be upgraded at all. It can stay as it is as a private drive, etc. Generous: Until those properties would come in for development. Mancino: Okay, thank you. Any other questions at this time? Okay. Would the applicant like to come up and address the Planning Commission at this time? Gene Quinn: My name is Gene Quinn. We now live in Rapid City, South Dakota but we lived here for about 14 years... As far as comments, as far as phase 2, we don't anticipate doing anything with that until somebody further north wants to develop and pushes the road. So as far as the turn around... Mancino: Okay. Any other questions that you had on the conditions of the staff report? Gene Quinn: I don't think so. I'm... Mancino: Any questions for the applicant from the commissioners? Thank you. Gene Quinn: Thank you. Mancino: Appreciate your comments. May I have a motion to open this for a public hearing please. Faimakes moved, Meyer seconded to open the public healing. The public healing was opened. Mancino: Anyone wishing to address the Planning Commission please come up and state your name and address. 2 1 Planning Commission Meeting - February 21, 1996 Russell Frederick: I'm Russell Frederick. I live at 540 Lyman Boulevard and with this , development I see no problem with Lots 1, 2 and 5. 3 and 4 1 think are not suitable ground to build on, number one. And number two, I think it's not considering the rest of the neighborhood. It's not blending with the rest of the neighborhood. This is my only real ' objection is those two points. Other than that, three houses on that 2 acres I think blends with the neighborhood real good and I don't see a problem. Mancino: We do have a city ordinance which does allow the landowner to subdivide and ' make it denser than the 3 lots. So that is in our city code. Our city ordinance that legally the applicant can. ' Russell Frederick: Is there also ... 5 development units? Mancino: Yes. ' Russell Frederick: For the sewer going in. Meaning the trunk line. I Mancino: Is that correct Dave? Hempel: It would be in the future as the parcel subdivides. They would be responsible for hook -up and connection charges. Russell Frederick: But not the trunk line? ' Hempel: That would include the trunk line. That's a hook -up charge. t Russell Frederick: Okay. Mancino: An other questions? Anyone else wishing ? ' Any q y e shmg to address the Planning Commission. Tom Uppman: I'm Tom Uppman. I live at 532 Lyman Boulevard, just adjacent to this ' property and I guess I don't have a problem with developing in the city. It's their property. they can do what they choose. I was privileged to have a copy of the drawings that spelled out in much detail the discussion of the trunk watermain, the sewer, storm sewer and that and one of the notations on the drawing state that this will be supplied by others. I'm not a developer but I've purchased property from a developer before and all of those things were in ' and available to me when I tried to buy a lot and I just paid the hook -up charge for my house to the street. Being a neighbor there, I'm on a well and septic right now. I would be very strongly opposed to subsidizing any development in there for water and sewer. I agree with ' Mr. Frederick that there are two lots, they're Lots 3 and 4 that really need to be looked at and 11 Planning Commission - g ssion Meeting February 21, 1996 ' studied. I don't believe that they're sound property to put a house on ... I maintained and I mowed that area and it's constantly wet all the time. ' Mancino: So you're talking about the soils? Tom Uppman: I'm afraid that someone will put a house in there that will sink out of sight. ' Mancino: Well one of the conditions of our report is that the soils do have to be looked at and who was it, I don't know what department comes and checks the soils. Hempel: The building department's responsibility. They require a soils report from a professional soils engineer. Soils have to be, if they're poor soils, they have to be replaced ' with a granular back fill and capable of supporting. Mancino: So that means they're taking out, the poor soils are taken out and new soils are put ' in if they don't meet the test. The soils test. Hempel: That's right. ' Mancino: Okay. ' Tom Uppman: Another notation I noticed on the drawings for the pond there. They had a catch basin that would drain into the storm sewer, the city storm sewer. And I'm new in that area. I've only been there a couple years but it's my understanding that that pond was considered wetlands and there was drainage that drained into wetlands. I don't think a wetlands should... city sewer system. Mancino: Dave, do you want to describe how that? ' Hempel: Certainly. We did review the previous wetland history there, and according to the National Wetlands Inventory Map there was a small wetland on the property some time ago. It's our understanding that the applicant has excavated it to increase the size of it over the years. I also understand that there is an agricultural drain the that does drain that periodically. It's my understanding from the property owner that there's water in it pretty much year round except during the summer drought. The water will dry down. What's proposed with this development is a storm sewer system that will maintain a water level hopefully throughout the year. To maintain the water level to create vegetation and habitat and essentially restore that wetland. Hopefully the wetland will act as a water quality pond as well as a water quantity pond to maintain flood control on it and so forth. The pond does require an outlet structure because of the agricultural tile that's in there right now. It F 4 Planning Commission Meeting - February 21, 1996 meanders through many properties downstream. Typically those do get abandoned as , development occurs. This wetland, storm pond will be then tied into the city's overall storm sewer system in Lyman Boulevard and will re- connect. Mancino: Will it go to a regional pond? ' Hempel: It will go down to the wetland that's down by Lake Riley there on the north side of Lyman where it supposedly goes right now through a drain tile. Tom Uppman: There's no drainage tile. I Hempel: There is some drain tiles underneath. Tom Uppman: There might be drain tile under it but it doesn't drain. Like I say, I maintain that and last summer during the rain season, water was all the way up to Quinn Road. That whole area was swamp. You couldn't even drive a lawnmower there. The drainage is not I working. Hempel: That's one of the reasons why the storm sewer system will be put in to maintain ' that level so you don't have that flooding problem. Mancino: And the soils will be looked at too, so. ' Tom Uppman: I guess, you know the utility aspect of it ... subsidize so. Mancino: I understand that. Dave. Are those people that live on the east side of Quinn Road, when this is developed, do they, they are required to hook up to city sewer when it is available? Hempel: With Phase II it would be required for the sanitary sewer and water lines be ' extended adjacent to those properties and the street upgraded. The city ordinance does require those properties that are adjacent to a sewer line be connected up within 12 months after a system becomes operational. They do not have to hook up to city water unless their well fails. Mancino: Okay. And they can at any time get a cost estimate from the city, how much it I costs to hook up to the city sewer? Hempel: Certainly. We can get some figures. I n 1 I' 1 J Planning Commission Meeting - February 21, 1996 Mancino: Okay, thank you. Russell Frederick: Can I ask one more question? Mancino: Certainly. Russell Frederick: This wetland, I thought I heard something stated that it was ... enlarged where the pond is. The reason this bothers me is this wetland is almost to the roadway. The platted roadway coming in and that is filled with anywhere from IS inches to probably 2, maybe 2 1/2 feet of fill. This is why I mentioned before that Lots 3 and 4 are not suitable building ground. They would have to be excavated. I don't know how deep. I never did... but there's a lot of muck in there. So that is not suitable building ground... and considerable fill before you dare put a house in. Mancino: Well the city will investigate. Hempel: Madam Chair. One of the conditions of approval tonight is the applicant shall hire a wetland expert to delineate the edge of the wetland as a part of this project as well, so we'll know more from that investigation. Mancino: Okay, thank you. Aanenson: Maybe I can just make a little more clarification on that. Again we're just approving the first two lots. We agree that those other lots may be marginal and that's why we spelled out that there is an additional condition that they do investigate those. We want to make sure before we plat those lots that they are suitable, have a suitable building site so again we're just approving the first two lots and 3, 4, and 5 are for a future date. We had the concerns, the same concerns that have been addressed tonight about the soils and the wetlands. Mancino: But we are approving the preliminary plat with those conditions? Aanenson: Correct. Mancino: Okay, thank you. Sherry Benson: My name is Sherry Benson. I live at 530 Lyman Boulevard. I have concerns about the size of the lots. First of all they're not even half the size ... half the size of one of the smallest lots which is ... area so that does take off the balance then—it would wreck the balance... I also have concerns about the price of the homes that will be placed in this rel Planning Commission Meeting - February 21, 1996 area ... third of an acre. I don't understand how you can put very large houses in there. Is I there a...value of the homes surrounding that area. That's about it. Mancino: Okay, thank you. Anyone else? Seeing none, may I have a motion to close the public hearing? Fwmakes moved, Meyei• seconded to close the public hewing. The public healing was I closed. Mancino: Comments from commissioners. Questions or comments that you would like to , make on the report on the conditions. Craig. Peterson: I think it's pretty well straight forward as far as the development goes. I really don't have anything to offer other than the fact that I wish they were all this easy. Mancino: Bob. I mean Mike, sorry. ' Meyer: Nothing. Mancino: Bob. Skubic: I don't have any comments other than it appears that the soil concern is well covered with the recommendations that the staff has made... Mancino: Don. Mehl: I also think it's pretty simple and straight forward, you know subject to the conditions ' and so on. I assume that the lot sizes are within the guide lines for the area. But other than that, I really don't have anything additional to say. Mancino: Thank you. Jeff. Farmakes: My only comment on this is, I'll touch on briefly, is to elaborate what you mentioned for the people who have questions in regards to minimum lot size. The city defines what the minimum lot size is for the zone and there may be adjacent properties who choose to build fewer dwellings on more land. That's their prerogative but that still does not change the minimum zone that minimum lot size is. And so you're going to have, as the city grows, you're going to have some large areas, larger lots I think someone mentioned an adjacent lot was 3/4 of an acre. There are very few homes now being built on an acre or 3/4 ' Planning Commission Meeting - February 21, 1996 of an acre and the average price of the home in Chanhassen, which I think is like up to $140,000.00 some. Mancino: $160,000.00. Farmakes: Is it $160,000.00 now? As it keeps continuing to go up and up and up you're going to see the demand for smaller and smaller minimum lot sizes. Chanhassen actually has one of the larger minimum lot sizes in the metro area. And anywhere, that just brings you up to date on that. It might be helpful for some of the people who are upset about this. Other ' than that I have no further comments. Mancino: Okay, thank you. I have a couple, just a couple questions. I think it was Dave in ' your comments about dwelling type you had put down in the report that a split entry home would be the only dwelling type that you felt would work on this, in these lots. I mean I know we haven't had for 3, 4 and 5, we haven't had the soils testing done. However, I didn't ' see that in the conditions of approval and I also saw on this preliminary plat that most of the houses, the dwelling types that I see are walkouts. So is that something that should be a condition? Hempel: I believe condition number 2. Mancino: Does that say it? Hempel: It says revise the grading plan to show location of the lowest floor, garage floor elevation and the type of dwelling. That was a condition that we placed on the applicant to show on the grading development plan, what those elevations of the homes are and we've indicated to him, based on the 100 year flood elevation of the pond, that those homes will most likely be a split entry type home, or even a slab on grade home. You will not have a full basement because of the water level. t Mancino: Because of the water level, okay. I just wanted to make sure that the applicant was aware of that and it was part of the conditions. Bob, can you tell me a little bit about Lyman Boulevard. Is that a collector? Is that what we would, is it a collector? Aanenson: To my knowledge it is. ' Mancino: Do we need to do some landscaping or some sort of berming when we have homes that face onto a collector, according to our city code? ' Generous: Based on ordinance, yes. There should be landscaping. t E✓' Planning Commission Meeting - February 21, 1996 Mancino: Okay. Is there any in this plan for buffering of those homes on the collector? Generous: Just the requirement on Lot 2 that they provide 4 trees. It didn't go beyond that. And on Lot 1, it's mostly wooded so if they stick to a building area, they wouldn't be able to save the trees. Mancino: Are they going to be able to save most of those very nice older trees on Lot 1? I Generous: They should be. We've required an easement over the rear and the western portion but not on the front. I Mancino: Okay. When the final landscaping plan is developed, I'd like to make sure that we do have some sort of buffering there on the collector per our city ordinance. Did the Park , and Rec Commission get a chance to look at that, and I didn't see anything about fees. Generous: I'm sorry. I must have, or Todd or I either missed it. Yes, they did review it. , They're requiring the fees instead of the dedication of land and it's based on city ordinance in effect when they final plat. Mancino: Okay. So that we do need to add a condition that full ark and trail fees shall be ' Y p paid at the time of building permit approval in the amount in force at the time of the building , permit application. Okay. Those are all my comments and questions. Is there a motion? Meyer: I'll make a motion. I'll make a motion that the Planning Commission recommends ' that the City Council approve the preliminary plat of Oakwood Estates First Addition, prepared by William R. Engelhardt Associates, Inc., dated December 28, 1995 for five lots subject to the following conditions 1 through 20 with an additional of number 21. Review ' the plat to ensure landscaping is up to the city ordinance, and that'd be. Mancino: Along the collector road. I Meyer: Along the collector road. And I'll let you go ahead with 22. Mancino: Okay. And 22 says, full park and trail fees shall be paid at the time of building permit approval in the amount in force at the time of building application. Is there a second to the motion? Mehl: I'll make the second. Mancino: Any discussion? ' 9 1 P1 _ Planning Commission Meeting February 21, 1996 ' Meyer moved, Mehl seconded that the Planning Commission recommends that the City Council approve the preliminary plat of Oakwood Estates First Addition, prepared by William R Engelhardt Associates, Inc., dated December 28, 1995 for five lots subject to the following conditions: I. Submit an evaluation of the soils at the proposed house pads. This shall be done prior ' to issuance of any building permits. 2. Revise the grading plan to show the location, lowest floor and garage floor elevations ' and type of dwelling using the city's standard designations prior to final plat approval. the lowest floor elevations of all dwellings shall be constructed a minimum of two (2) feet above the 100 year flood elevation of the pond. The lowest opening or walkout of each dwelling shall be a minimum of one (1) foot above the emergency overflow swale elevation. 3. Rock construction entrances shall be employed and maintained at all access points until the street has been paved with bituminous surface. ' 4. The applicant shall be responsible for water quality and quantity connection charges in accordance with the City Surface Water Management Plan (SWMP). Credits will be reviewed and applied to these charges upon final plat consideration based on the ' applicant's contribution for meeting the City's SWMP requirements. 1 1 5. The applicant shall dedicate on the final plat a drainage and ponding easement over the pond up to the 100 year flood elevation and a 20 foot drainage and utility easement centered upon the common lot line of Lots 3 and 4, Block 1 for the emergency overflow swale. 6. The applicant's engineer shall work with city staff in revising street grades along Quinn Road to provide for an emergency overflow from the pond out to Quinn Road. 7. Individual grading, drainage, tree preservation and erosion control plans will be required for Lots 1, 2 and 5, Block 1 at the time of building permit application for the city to review and approve. Lots 3 and 4, Block 1 shall be graded in conjunction with Phase II site improvements. 8. The public street and utility system shall be designed and constructed in accordance with the city's latest edition of street and utility standards. Detailed construction plans and specifications shall be submitted for Phase II for city staff review and formal approval by the City Council in conjunction with final plat approval for Phase II. The plans and 10 11 I Planning Commission Meeting - February 21, 1996 specifications shall be prepared in accordance with the latest edition of the city's Standard Specifications and Detail Plates. ' 9. All areas disturbed as a result of construction activities shall be immediately restored with seed and disc - mulched or wood -fiber blanket or sod within two weeks of completion of each activity in accordance with the city's Best Management Practice Handbook. , 10. The applicant shall provide detailed storm sewer calculations for 10 year and 100 year storm event providing ponding calculations for stormwater ponds in accordance with the , City's SWMP for the City Engineer to review and approve prior to final plat approval. The applicant shall provide detailed pre - developed and post- developed stormwater calculations in existing basins, created basins, and /or creeks. Individual storm sewer calculations between each catch basin segment will also be required to determine if sufficient catch basins are being utilized. 11. The applicant shall enter into a development contract with the city and provide the necessary financial security to guarantee compliance with the terms of the development contract. ' 12. The applicant shall apply for and obtain permits from the appropriate regulatory agencies, i.e. Watershed District, Metropolitan Waste Control Commission, Health ' Department, Minnesota Pollution Control Agency, Minnesota Department of Natural Resources, and the Army Corps of Engineers and comply with their conditions of approval. ' 13. The applicant shall report to the City Engineer the location of any drain tiles found during construction and shall relocate or abandon the drain tile as directed by the City Engineer, 14. The applicant has the option to install the storm drainage improvements from the pond to Lyman Boulevard at their own expense. If the applicant petitions the city to install these drainage improvements under the Lyman Boulevard Reconstruction/Lake Riley Area Trunk Utility Improvement Project No. 93 -32B, the applicant shall accept the special assessment for the cost of extending the storm drainage improvements from Lyman Boulevard to the pond. The cost of these storm drainage improvements will be assessed on a per lot basis over Lots 1 through 5, inclusive. The applicant and /or property owners shall waive any and all procedural or substantive objections to the special assessments associated with city public improvement Project No. 93 -32B , 11 I Planning Commission Meeting - February 21, 1996 including, but not limited to, hearing requirements and any claim that the assessment exceeds the benefit to the property. 15. Quinn Road shall be extended and upgraded to a city standard urban road in the future. The applicant shall provide a temporary turn around with Phase II improvements that meets city standards with a barricade and signage stating that it is a temporary cul-de- sac and this road will be extended in the future. 16. Applicant is required to plant 10 trees as replacements for canopy lost. These trees shall ' be 2 1/2 inches in diameter and from the primary species in the Approved Tree List. Three trees shall be planted on each of Lots 3 and 4, and four on Lot 2. 17. A conservation easement or tree removal limit shall be placed over the following lot areas: ' a. The northern 145 feet and western 20 feet of Lot 1. b. The western 60 feet of Lot 2. C. The westerly 60 feet of the southerly 30 feet of Lot 3. d. The northern 35 feet of Lot 5. 18. Tree protection fencing shall be installed around all trees and wooded areas that are to be preserved on the site. Such fencing shall be installed prior to commencing grading, excavations or other site improvements on or adjacent to the lots. 19. Entry monumentation for the development shall require a separate sign permit and must comply with city code. 20. The applicant shall hire a wetland expert to delineate the edge of the wetland due to the marginal soil conditions in the area. Based on this delineation, Lots 3, 4 and 5 may not be developable or a Wetland Alteration Permit may be required. 21. Review the plat to enswr, that the landscaping along the collector street meets city oillinance. 22. Full park and ti-ail fees shall be paid at the time of building permit approval in the amount in foire at the time of final plat. All voted in favor and the motion carried unanimously. 12 5