2b.2. Oak Ridge of Minnewashta: Development Contract, Plans & Specs.I MEMORANDUM
CITY OF
CHANHASSEN
690 COULTER DRIVE • P.O. BOX 147 • CHANHASSEN, MINNESOTA 55317
(612) 937 -1900 0 FAX (612) 937 -5739
Attu" it bY Cify���-- hiift�itM
Endotsed—
Modil
iReinte
Da Z d
TO: Charles Folch, Director of Public Works Date Submitted to Commissiod
FROM: Dave Hempel, Assistant City Engineer ¢ '� nete s »aaa to council
DATE: April 30, 1996
SUBJ: Approve Development Contract and Construction Plans and Specifications for
Oak Ridge of Lake Minnewashta - , Project No. 96 -
The attached development contract incorporates,fe " of approval from the final platting
and construction plans and specifications review process. Staff has calculated the required
financial security to guarantee compliance with ;the tens of the development contract at $456,000
and the development contract administration fees tota which includes SWMP fees and
1/3 of the required Park and Trail fees. iU, I t
The applicant has also submitted de
and City Council approval. Staff ha s
the specifications in general confo
still need some minor modifications
requests that the City Council grant
working with the applicant'senginee
It is therefore recotxurAded,that.the
Minnewashta dated prtl 12 ' 1996
the develoDmentontract dated M "av'
reviewed the construc
rmance to the City stand%
The plans were recen#
staff the flexibility to adi
r in modifying the plans
1. The applicant enter into the del
or letter of credit in the amount
2. The applicant's engineer shall work
meet City standards.
' Attachments: 1.
2.
' 3.
' c: Greg Hahi
g:'eng1davc
contract and
with a cash escrow
fee of $47,667.
staff in revising the construction plans to
Development contract dated May 6, 1996.
Construction plans and specifications are available
for review in the Engineering Department.
Breakdown of administration fees dated April 29, 1996.
i, Hahn Properties
and specifications for staff review
1 plans and specifications and fords
s; however, the construction plans
returned for modifications. Staff
inistratively approve the plans after
cordingly to meet City standards.
ecifications for Oak Ridge of Lake
fared by Loucks & Associates and
+.' r "'ML ENGINEERING CORY
Revision No.
ApptOVedi b� Ci Cnginecr
APP MV8d by City Council
Date
CITY OF CHANHASSEN
OAK RIDGE OF LAKE MINNEWASHTA
PROJECT NO. 96-9
BREAKDOWN OF ADMINISTRATION FEES - 4/29/96
Estimated Total Cost of Public Improvements ............................
.......... $389,700.00*
- 3% of Public Improvement Costs (Under $500,000) ......................... ..............................$ 11,691.00
- Street Lighting Charge (for electricity)
FourLights @ $ 200.00 ........................................................... ............................... $ 800.00
- Final Plat Process (Attorney Fee for Review and Recording of Plat
and Development Contract) .................................................... ............................... $ 350.00
- Recording Fees
a. Development Contract ......................................................... ..............................$ 30.00
b. Plat Filing ........................................................................... ............................... $ 30.00
- Park & Trail Fees (1/3) [22 lots x $1,467/31 ...................................... ..............................$ 10,758.00
- SWIVIP Fees ....................................................................................... ..............................$ 24,008.00
TOTAL ADMINISTRATION FEES ............................................... .............................. 47,667.00
*This figure does not include landscaping costs.
g:\,eng\dc\oakridge.fee
J
1
CITY OF CHANHASSEN
CARVER AND HENNEPIN COUNTIES, MINNESOTA
OAK RIDGE OF LAKE MINNEWASHTA
(Developer Installed Improvements)
L
C
TABLE OF CONTENTS
PAGE
SPECIAL PROVISIONS
1.
REQUEST FOR PLAT APPROVAL ..............................
SP -1
2.
CONDITIONS OF PLAT APPROVAL ............................
SP - 1
3.
DEVELOPMENT PLANS ....... ...............................
SP -1
4.
IMPROVEMENTS ............ ...............................
SP -2
5.
TIME OF PERFORMANCE ..... ...............................
SP -2
6 .
SECURITY ................ ...............................
SP -2
7 .
NOTICES ................. ...............................
SP -3
8.
OTHER SPECIAL CONDITIONS ...............................
SP -3
9.
GENERAL CONDITIONS ...... ...............................
SP -5
GENERAL
CONDITIONS
1.
RIGHT TO PROCEED ........ ...............................
GC -1
GC -1
2.
PHASE DEVELOPMENT ....... ...............................
3.
EFFECT OF SUBDIVISION APPROVAL .........................
GC -1
4.
IMPROVEMENTS ............ ...............................
GC -1
5.
IRON MONUMENTS .......... ...............................
GC -2
II
6 .
LICENSE ................. ...............................
GC
-2
7.
SITE EROSION CONTROL .... ...............................
GC
-2
7A.
EROSION CONTROL DURING CONSTRUCTION
OF A DWELLING OR OTHER
BUILDING................ ...............................
GC
-3
8 .
CLEAN UP ................ ...............................
GC
-3
9.
ACCEPTANCE AND OWNERSHIP OF IMPROVEMENTS ...............
GC
-3
10 .
CLAIMS .................. ...............................
GC
-3
11.
PARK AND TRAIL DEDICATION ..............................
GC
-4
12.
LANDSCAPING ............. ...............................
GC
-4
13.
WARRANT Y ................ ...............................
GC
-5
14.
LOT PLANS ............... ...............................
GC
-5
15.
EXISTING ASSESSMENTS .... ...............................
GC
-5
16.
STREET LIGHTING ........................................
GC
-5
17 .
SIGNAGE ................. ...............................
GC
-5
18.
19.
HOUSE PADS .............. ...............................
RESPONSIBILITY FOR COSTS ...............................
GC
GC
-5
-5
20.
DEVELOPER'S DEFAULT ..... ...............................
GC
-7
21.
MISCELLANEOUS
A. Construction Trailers .............................
GC
-7
B. Postal Service ..... ...............................
GC
-7
C. Third Parties ...... ...............................
GC
-7
D. Breach of Contract . ...............................
GC
-8
'I
E. Severability ....... ...............................
GC
-8
F. Building Permits ... ...........................•..•
GC
-8
G. Waivers / Amendments .... ............................
GC
-8
H. Release ............ ...............................
GC
- 8
I. Insurance .......... ...............................
GC
-8
J. Remedies ........... ...............................
GC
-9
a
I
i
K. Assignability ...... ............................... GC -9
L. Construction Hours . .... ........................... rr -9
�Ll
1
ii
M.
Access ............. GC -9
N.
Street Maintenance ...............................
GC -9
0.
Storm Sewer Maintenance ..........................
GC -10
'
P.
Q.
Soil Treatment Systems ...........................
Variances
GC -10
GC -10
R.
Compliance with Laws, Ordinances, and Regulations
GC -10
'
S.
T.
Proof of Title. ::::::
Soil Conditions :::::::::::::e:::::::::
GC -10
GC -10
U.
Soil Correction ... ...............................
GC -11
�Ll
1
ii
CITY OF CHANHASSEN
DEVELOPMENT CONTRACT
(Developer Installed Improvements)
OAK RIDGE OF LAKE MINNEWASHTA
SPECIAL PROVISIONS
AGREEMENT dated May 6, 1996 by and between
CHANHASSEN, a Minnesota municipal corporation (the
FOUR HAHN PROPERTIES, a Minnesota limited liability
(the "Developer ") .
1
the CITY OF
"City "), and a
corporation
1. Request for Plat Approval. The Developer has asked the
City to approve a plat for OAK RIDGE OF LAKE MINNEWASHTA (referred
to in this Contract as the "plat "). The land is legally described
on the attached Exhibit "A ".
2. Conditions of Plat Approval. The City hereby approves
the plat on condition that the Developer enter into this Contract
and furnish the security required by it.
3. Development Plans. The plat shall be developed in
accordance with the following plans. The plans shall not be
attached to this Contract. With the exception of Plan A, the plans
may be prepared, subject to City approval, after entering the
Contract, but before commencement of any work in the plat. If the
plans vary from the written terms of this Contract, the written
terms shall control. The plans are:
Plan A: Final plat prepared by Loucks & Associates, Inc. and
approved by the Chanhassen City Council on May 6, 1996.
Plan B: Grading, Drainage and Erosion Control Plan dated April
4, 1996, revised May 6, 1996, prepared by Loucks &
Associates, Inc.
v
Plan C: Street and Utility Plans and Specifications for
Improvements dated April 12, 1996, revised May 6, 1996, a
prepared by Loucks & Associates, Inc.
Plan D: Landscape Plan dated April 12, 1996, prepared by Loucks
& Associates, Inc.
Revised 3 /22/94
SP -1 I
J
'
Site Grading ........ ..............................$
66,500.00
'
4.
Improvements. The Developer shall install and pay
for
61,000.00
the following:
Watermain ........... ..............................$
45,000.00
Storm Sewer, Drainage System,
'
including cleaning and maintenance ................$
A. Storm Water Drainage System
Streets ............. ..............................$
121,600.00
B. Streets
Street Lights and Signs ...........................$
1,200.00
'
C. Concrete Curb and Gutter
$ 5,000.00
'
Engineering, Surveying, and Inspection ............
D. Street Signs
E. Street Lights
'
F. Site Grading
G. Underground Utilities (e.g. gas, electric,
telephone, CATV)
H. Setting of Lot and Block Monuments
'
I. Surveying and Staking
J. Sanitary Sewer System
K. Water System
'
L. Landscaping /Site Restoration
M. Erosion Control /Tree Protection Fencing
5.
Time of Performance. The Developer shall install
all
'
required
improvements by November 15, 1997. The Developer may,
however,
request an extension of time from the City. If
an
extension
is granted, it shall be conditioned upon updating
the
security
posted by the Developer to reflect cost increases and
the
extended
completion date.
' 6. Security. To guarantee compliance with the terms of
this Contract, payment of special assessments, payment of the costs
' of all public improvements, and construction of all public
improvements, the Developer shall furnish the City with a letter of
credit from a bank, cash escrow, or equivalent ( "security ") for
' $456,000.00. The amount of the security was calculated as 1100 of
the following:
J
I SP -2
Site Grading ........ ..............................$
66,500.00
'
Sanitary Sewer ...... ..............................$
61,000.00
'
Watermain ........... ..............................$
45,000.00
Storm Sewer, Drainage System,
'
including cleaning and maintenance ................$
64,400.00
Streets ............. ..............................$
121,600.00
'
Street Lights and Signs ...........................$
1,200.00
'
Erosion Control /Tree Protection Fencing ...........
$ 5,000.00
Engineering, Surveying, and Inspection ............
$ 25,000.00
J
I SP -2
Hahn Properties
Restoration ...................... 25
Landscaping /Site $ 000.00 ,
TOTAL COST OF PUBLIC IMPROVEMENTS ..............®..$ 414,700.00
This breakdown is for historical reference; it is not a restriction
on the use of the security. The security shall be subject to the
approval of the City. The security shall be for a term ending
December 31, 1997. The City may draw down the security, without
notice, for any violation of the terms of this Contract. If the
required public improvements are not completed at least thirty (30)
days prior to the expiration of the security, the City may also
draw it down. If the security is drawn down, the draw shall be
used to cure the default. With City approval, the security may be
u
reduced from time to time as financial obligations are paid, but in
no case shall the security be reduced to a point less than 10% of
the original amount until all improvements are complete and
accepted by the City.
7. Notice. Required notices to the Developer shall be in
writing, and shall be either hand delivered to the Developer, its
employees or agents, or mailed to the Developer by registered mail
at the following address:
Hahn Properties
Attn: Greg Hahn
1865 West Wayzata Boulevard
Long Lake, MN 55356
(612) 475 -9240
Notices to the City shall be in writing and shall be either hand
delivered to the City Manager, or mailed to the City by registered
mail in care of the City Manager at the following address:
Chanhassen City Hall, 690 Coulter Drive, P.O. Box 147, Chanhassen,
Minnesota 55317, Telephone (612) 937 -1900.
8. Other Special Conditions.
A. Forestation and replacement plantings for the
u
development requires 72 trees chosen from the City's Approved
Tree List. Conifer trees shall average seven feet in height with
a six foot minimum height. The applicant shall submit a revised
landscaping plan, incorporating these changes, to the city for
review and approval prior to final plat recording.
B. The building pads for lots around the western cut-
de -sac be located closer to the road in order to pull the houses
away from the existing wooded area in the northwestern corner.
"
C. Trees that are to be preserved on -site shall be
protected with tree protection fencing pursuant to city
SP -3 I
ordinance. Such fencing shall be installed in conjunction with
the installation of the erosion control fences and prior to site
' grading.
D. A ten foot clear space must be maintained around
' fire hydrants. City Ordinance 9 -1.
E. In lieu of land dedication, the development shall
' pay full park and trail fees pursuant to City Ordinance.
F. A demolition permit shall be required prior to the
removal of any structures on the parcel. This should be done prior
to any grading on the property.
G. The applicant shall be responsible for SWMP water
' quality and quantity connection charges in the amount of $644 and
$23,364, respectively. Credits will be applied to the these
charges when the easement agreement has been finalized for the
' drainage easement through the church property. These fees are
payable to the City prior to recording the final plat.
' H. The applicant shall supply the City with a letter
from a certified wetland delineator verifying that there are no
wetlands on site and that no wetlands will be impacted by this
' project.
I. Erosion control measures shall be implemented on
' the site to control runoff. All catch basins shall be protected
with erosion control fence until the site has been fully
revegetated and the streets paved. Rock construction entrances
shall be installed and maintained at all construction entrance
' points until the first lift of asphalt has been installed.
J. The applicant shall be responsible for payment of
the deferred assessments for the Minnewashta Parkway improvements
including interest to date. In addition, the applicant shall be
responsible for seven additional lot assessments for a total of
22 lots in the amount of $760 per lot plus interest from October,
1993.
1
K. Upon completion, the developer shall dedicate to
the City the utility and street improvements within the public
right -of -way and drainage and utility easements for permanent
ownership.
L. All areas disturbed as a result of construction
activities shall be immediately restored with seed and disc - mulched
or wood -fiber blanket or sod within two weeks of completion of each
activity in accordance with the City's Best Management Practice
Handbook.
SP -4
S. Existing wells and /or septic systems will have to II
be properly abandoned in accordance to City and State Health
Department codes. The existing home on Lot 12, Block 1 shall be
connected to the sanitary sewer system within 30 days after the "
system becomes operational. The resident may continue to utilize
the well until the well fails, at which time the parcel shall be
connected to City water service.
T. The applicant shall report to the City Engineer the
location of any drain tiles found during construction and shall re-
locate or abandon the drain tile as directed by the City Engineer."
9. General Conditions. The general conditions of this
Contract, approved by the City Council on February 13, 1995 are 'I
attached as Exhibit "B" and incorporated herein.
I
u
SP -5 11
M. The applicant shall enter into a development
contract with the City and provide the necessary financial security
to guarantee compliance with the terms of the development contract.
N. The applicant shall apply for and obtain permits
from the appropriate regulatory agencies, i.e. Carver County,
Watershed District, Metropolitan Waste Control Commission, Health
Department, and Minnesota Pollution Control Agency.
'I
O. The applicant shall submit to the City soil boring
information prior to building permit issuance.
P. The applicant shall be responsible for acquiring
drainage easements outside the plat for the extension of the storm
sewer to the Country Oaks pond.
"
Q. No berming or landscaping will be allowed within
the right -of -way.
R. The lowest exposed floor or opening elevation of
all buildings should be a minimum of 2 feet above the 100 -year high
'I
water level.
S. Existing wells and /or septic systems will have to II
be properly abandoned in accordance to City and State Health
Department codes. The existing home on Lot 12, Block 1 shall be
connected to the sanitary sewer system within 30 days after the "
system becomes operational. The resident may continue to utilize
the well until the well fails, at which time the parcel shall be
connected to City water service.
T. The applicant shall report to the City Engineer the
location of any drain tiles found during construction and shall re-
locate or abandon the drain tile as directed by the City Engineer."
9. General Conditions. The general conditions of this
Contract, approved by the City Council on February 13, 1995 are 'I
attached as Exhibit "B" and incorporated herein.
I
u
SP -5 11
i
CITY OF CHANHASSEN
BY:
Donald J. Chmiel, Mayor
(SEAL)
AND:
Don Ashworth, City Manager
HAHN PROPERTIES:
BY:
Its
STATE OF MINNESOTA )
( ss.
COUNTY OF CARVER )
The foregoing instrument was acknowledged before me this
day of , 19 , by Donald J. Chmiel, Mayor, and by
Don Ashworth, City Manager, of the City of Chanhassen, a Minnesota
municipal corporation, on behalf of the corporation and pursuant to
the authority granted by its City Council.
NOTARY PUBLIC
STATE OF MINNESOTA )
( ss.
COUNTY OF )
The foregoing instrument was acknowledged before me this
day of , 19 , by
NOTARY PUBLIC
DRAFTED BY:
Campbell, Knutson, Scott & Fuchs, P.A.
317 Eagandale Office Center
1380 Corporate Center Curve
Eagan, Minnesota 55121
(612) 452 -5000
SP -6
1 F
1
EXHIBIT "A"
TO
DEVELOPMENT CONTRACT
A
LEGAL DESCRIPTION OF SUBJECT PROPERTY: I
The part of the southeast quarter of the southeast quarter of
Section 6, Township 116 North, Range 23 West of the 5th Principal
Meridian described as follows:
Beginning at the northeast corner of said southeast quarter of the
southeast quarter; thence southerly along the east line of said "
southeast quarter of the southeast quarter, a distance of 389.40
feet; thence westerly a distance of 1308.03 feet, to a point on the
west line of said southeast quarter of the southeast quarter
distant 395.90 feet southerly from the northwest corner of said
southeast quarter of the southeast quarter; thence northerly a
distance of 395.90 feet to said northwest corner; thence easterly
along the north line of said southeast quarter of the southeast
quarter a distance of 1310.18 feet, to said point of beginning.
SP -7 11
FEE OWNER CONSENT
TO
DEVELOPMENT CONTRACT
fee owners of all or part of the subject property, the development
of which is governed by the foregoing Development Contract, affirm
and consent to the provisions thereof and agree to be bound by the
provisions as the same may apply to that portion of the subject
property owned by them.
Dated this day of , 19
STATE OF MINNESOTA )
( ss.
COUNTY OF )
The foregoing instrument was acknowledged before me this
day of , 19 ,
NOTARY PUBLIC
DRAFTED BY:
Campbell, Knutson, Scott
& Fuchs, P.A.
317 Eagandale Office Center
1380 Corporate Center Curve
Eagan, Minnesota 55121
(612) 452 -5000
MORTGAGE HOLDER CONSENT
TO
DEVELOPMENT CONTRACT
which holds a mortgage on the subject property, the development of
which is governed by the foregoing Development Contract, agrees
that the Development Contract shall remain in full force and effect
even if it forecloses on its mortgage.
Dated this day of , 19
STATE OF MINNESOTA
ss.
COUNTY OF )
The foregoing instrument was acknowledged before me this
day of , 19 ,
NOTARY PUBLIC
DRAFTED BY:
Campbell, Knutson, Scott
& Fuchs, P.A.
317 Eagandale Office Center
1380 Corporate Center Curve
Eagan, Minnesota 55121
(612) 452 -5000
SP -9
CITY OF CHANHASSEN
DEVELOPMENT CONTRACT
(Developer Installed Improvements)
EXHIBIT "B"
GENERAL CONDITIONS
1. Right to Proceed. Within the plat or land to be
platted, the Developer may not grade or otherwise disturb the
earth, remove trees, construct sewer lines, water lines, streets,
utilities, public or private improvements, or any buildings until
all the following conditions have been satisfied: 1) this agreement
has been fully executed by both parties and filed with the City
Clerk, 2) the necessary security and fees have been received by the
City, 3) the plat has been recorded with the County Recorder's
Office of the County where the plat is located, and 4) the City
Engineer has issued a letter that the foregoing conditions have
been satisfied and then the Developer may proceed.
2. Phased Development. If the plat is a phase of a multi -
phased preliminary plat, the City may refuse to approve final plats
of subsequent phases if the Developer has breached this Contract
and the breach has not been remedied. Development of subsequent
phases may not proceed until Development Contracts for such phases
are approved by the City.
3. Effect of Subdivision Approval. For two (2) years from
the date of this Contract, no amendments to the City's
Comprehensive Plan, except an amendment placing the plat in the
current urban service area, or official controls shall apply to or
affect the use, development density, lot size, lot layout or
dedications of the approved plat unless required by state or
federal law or agreed to in writing by the City and the Developer.
Thereafter, notwithstanding anything in this Contract to the
contrary, to the full extent permitted by state law the City may
require compliance with any amendments to the City's Comprehensive
Plan, official controls, platting or dedication requirements
enacted after the date of this Contract.
4. Improvements. The improvements specified in the Special
Provisions of this Contract shall be installed in accordance with
City standards, ordinances, and plans and specifications which have
been prepared and signed by a competent registered professional
engineer furnished to the City and approved by the City Engineer.
The Developer shall obtain all necessary permits from the
Metropolitan Waste Control Commission and other agencies before
proceeding with construction. The City will, at the Developer's
expense, have one or more construction inspectors and a soil
GC -1
work on a full or
engineer inspect the wo art -time basis. The p
Developer shall also provide a qualified inspector to perform site I'
inspections on a daily basis. Inspector qualifications shall be
submitted in writing to the City Engineer. The Developer shall
instruct its project engineer/ inspector to respond to questions
from the City Inspector(s) and to make periodic site visits to
satisfy that the construction is being performed to an acceptable
level of quality in accordance with the engineer's design. The
Developer or his engineer shall schedule a preconstruction meeting
at a mutually agreeable time at the City Council chambers with all
parties concerned, including the City staff, to review the program
for the construction work. Within sixty (60) days after the
completion of the improvements and before the security is released,
the Developer shall supply the City with the following: (1) a
complete set of reproducible Mylar as -built plans, (2) two complete
sets of blue line as -built plans, (3) two complete sets of utility
tie sheets, (4) location of buried fabric used for soil
stabilization, (5) location stationing and swing ties of all
utility stubs, and (6) bench mark network.
5. Iron Monuments. Before the security for the completion
of utilities is released, all monuments must be correctly placed in
the ground in accordance with Minn. Stat. § 505.02, Subd. 1. The
Developer's surveyor shall submit a written notice to the City
certifying that the monuments have been installed.
�I
6. License. The Developer hereby grants the City, its
agents, employees, officers and contractors a license to enter the
plat to perform all work and inspections deemed appropriate by the
City in conjunction with plat development.
7. Site Erosion Control. Before the site is rough graded,
a
and before any utility construction is commenced or building
permits are issued, the erosion control plan, Plan B, shall be
implemented, inspected, and approved by the City. The City may
'
impose additional erosion control requirements if they would be
beneficial. All areas disturbed by the excavation and backfilling
operations shall be reseeded forthwith after the completion of the
I �
work in that area. Except as otherwise provided in the erosion
control plan, seed shall be certified seed to provide a temporary
ground cover as rapidly as possible. All seeded areas shall be
'I
fertilized, mulched, and disc anchored as necessary for seed
retention. The parties recognize that time is of the essence in
controlling erosion. If the Developer does not comply with the
erosion control plan and schedule of supplementary instructions
received from the City, the City may take such action as it deems
appropriate to control erosion at the Developer's expense. The
City will endeavor to notify the Developer in advance of any
proposed action, but failure of the City to do so will not affect
the Developer's and City's rights or obligations hereunder. No
GC -2 11
development will be allowed and no building permits will be issued
unless the plat is in full compliance with the erosion control
' requirements. Erosion control needs to be maintained until
vegetative cover has been restored, even if construction has been
completed and accepted. After the site has been stabilized to
' where, in the opinion of the City, there is no longer a need for
erosion control, the City will authorize the removal of the erosion
control, i.e. hay bales and silt fence. The Developer shall remove
' and dispose of the erosion control measures.
7a. Erosion Control During Construction of a Dwelling or
' Other Building. Before a building permit is issued for
construction of a dwelling or other building on a lot, a $500.00
cash escrow or letter of credit per lot shall also be furnished the
City to guarantee compliance with City Code § 20 -94.
' 8. Clean up. The Developer shall maintain a neat and
orderly work site and shall daily clean, on and off site, dirt and
debris, including blowables, from streets and the surrounding area
that has resulted from construction work by the Developer, its
agents or assigns.
9. Acceptance and Ownership of Improvements. Upon
completion and acceptance by the City of the work and construction
' required by this Contract, the improvements lying within public
easements shall become City property. After completion of the
improvements, a representative of the contractor, and a
' representative of the Developer's engineer will make a final
inspection of the work with the City Engineer. Before the City
accepts the improvements, the City Engineer shall be satisfied that
' all work is satisfactorily completed in accordance with the
approved plans and specifications and the Developer and his
engineer shall submit a written statement attesting to same with
appropriate contractor waivers. Final acceptance of the public
' improvements shall be by City Council resolution.
10. Claims. In the event that the City receives claims from
' laborers, materialmen, or others that work required by this
Contract has been performed, the sums due them have not been paid,
and the laborers, materialmen, or others are seeking payment out of
' the financial guarantees posted with the City, and if the claims
are not resolved at least ninety (90) days before the security
required by this Contract will expire, the Developer hereby
' authorizes the City to commence an Interpleader action pursuant to
Rule 22, Minnesota Rules of Civil Procedure for the District
Courts, to draw upon the letters of credit in an amount up to 1250
of the claim(s) and deposit the funds in compliance with the Rule,
and upon such deposit, the Developer shall release, discharge, and
dismiss the City from any further proceedings as it pertains to the
I GC -3
letters of cred i t d osited with the District Court, except that I '
the Court shall retain jurisdiction to determine attorneys' fees. I'
11. Park and Trail Dedication. At the time of issuance of
building permits for construction, the Developer, its successors or
assigns, shall pay to the City the park and trail dedication fees
then in force pursuant to Chanhassen City Ordinances and City
Council resolutions. One -third (1/3) of the park and trail cash
contribution shall be paid contemporaneously with the City's
approval of the subdivision. The balance, calculated as follows,
shall be paid at the time building permits are issued: rate in
effect when a building permit is issued minus the amount previously
paid.
12. Landscaping.
Unless the lot
already has one tree in the
front yard of suitable
species, the
Developer or lot purchaser
shall plant a tree in
the front yard
of every lot in the plat.
Suitable trees include:
Maples
Birch
Linden
Ginkgo
Locust
Kentucky
Coffee Tree
I'
Hackberry
Hawthorn
Oak
Hickory
Ash
Other species of trees may be approved by the building inspector.
Trees which can cause a public nuisance, such as cotton producing
trees, or can be a public hazard, such as bug infestation or weak
bark, are prohibited. The minimum tree size shall be two and
one -half (2 inches caliper, either bare root in season, or balled II
and burlapped. The trees may not be planted in the boulevard (area
between curb and property line). In addition to any sod required
as a part of the erosion control plan, Plan B, the Developer or lot "
purchaser shall sod the boulevard area and all drainage ways on
each lot utilizing a minimum of four (4) inches of topsoil as a
base. Seed or sod shall also be placed on all disturbed areas of �
the lot. If these improvements are not in place at the time a
certificate of occupancy is requested, a financial guarantee of
$750.00 in the form of cash or letter of credit shall be provided
to the City. These conditions must then be complied with within two II
(2) months after the certificate of occupancy issued, except that
if the certificate of occupancy is issued between October 1 through
May 1 these conditions must be complied with by the following July
1st. Upon expiration of the time period, inspections will be
conducted by City staff to verify satisfactory completion of all
conditions. City staff will conduct inspections of incomplete
items with a $50.00 inspection fee deducted from the escrow fund
for each inspection. After satisfactory inspection, the financial
guarantee shall be returned. If the requirements are not I
GC -4 I
satisfied, the City may use the security to satisfy the
requirements. The City may also use the escrowed funds for
' maintenance of erosion control pursuant to City Code Section 20 -94
or to satisfy any other requirements of this Contract or of City
ordinances. These requirements supplement, but do not replace,
' specific landscaping conditions that may have been required by the
City Council for project approval.
' 13. Warranty. The Developer warrants all work required to
be performed by it against poor material and faulty workmanship for
a period of two (2) years after its completion and acceptance by
' the City. All trees, grass, and sod shall be warranted to be
alive, of good quality, and disease free at the time of planting.
All landscape plantings shall be warranted for twelve (12) months
from the time of planting. The Developer or his contractor(s)
shall post a letter of credit or other security acceptable to the
City to secure the warranties at the time of final acceptance.
' 14. Lot Plans. Prior to the issuance of building permits,
an acceptable Grading, Drainage, Erosion Control including silt
fences, and Tree Removal Plan shall be submitted for each lot for
' review and approval by the City Engineer. Each plan shall assure
that drainage is maintained away from buildings and that tree
removal is consistent with development plans and City Ordinance.
' 15. Existing Assessments. Any existing assessments against
the plat will be re- spread against the plat in accordance with City
standards.
16. Street Lighting. The Developer shall have installed and
' pay for street lights in accordance with City standards. A plan
shall be submitted for the City Engineer's approval prior to the
installation. Before the City signs the final plat, the Developer
' shall pay the City a fee of $200.00 for each street light installed
in the plat. The fee shall be used by the City for furnishing
electricity for each light for twenty (20) months.
' 17. Signage. All street name, traffic signs, and wetland
monumentation required by the City as a part of the public
improvements shall be furnished and installed by the City at the
' sole expense of the Developer.
18. House Pads. The Developer shall promptly furnish the
' City "as- built" plans indicating the amount, type and limits of
fill on any house pad location.
' 19. Responsibility for Costs.
A. The Developer shall pay an administrative fee in
' conjunction with the installation of the plat improvements. This
1 GC -5
C. The Developer shall hold the City and its officers
and employees harmless from claims made by itself and third parties
for damages sustained or costs incurred resulting from plat
approval and development. The Developer shall indemnify the City
and its officers and employees for all costs, damages, or expenses
which the City may pay or incur in consequence of such claims,
including attorneys' fees.
D. In addition to the administrative fee, the Developer
shall reimburse the City for costs incurred in the enforcement of
this Contract, including engineering and attorneys' fees. 'I
GC -6 I
City fee is to cover the cost of Staff time and overhead for items
such as review of construction documents, preparation of the
Development Contract, monitoring construction progress, processing
I�
pay requests, processing security reductions, and final acceptance
of improvements. This fee does not cover the City's cost for
resident construction inspections. The fee shall be shall be
a
calculated as follows:
i) if the cost of the construction of public
improvements is less than $500,000, three
percent (3 %) of construction costs;
ii) if the cost of the construction of public
improvements is between $500,000 and
$1,000,000, three percent (3 %) of
construction costs for the first $500,000
I �
and two percent (2 %) of construction
costs over $500,000;
iii) if the cost of the construction of public
"
improvements is over $1,000,000, two and
one -half percent (2% %) of construction
I'
costs for the first $1,000,000 and one
and one -half percent (1 %) of
construction costs over $1,000,000.
'I
Before the City signs the final plat, the Developer shall deposit
with the City a fee based upon construction estimates. After
construction is completed, the final fee shall be determined based
'I
upon actual construction costs. The cost of public improvements is
defined in paragraph 6 of the Special Provisions.
B. In addition to the administrative fee, the Developer
shall reimburse the City for all out -of- pocket costs incurred by
the City for providing resident construction inspections. This
cost will be periodically billed directly to the Developer based on
the actual progress of the construction. Payment shall be due in
accordance with Article 19E of this Agreement.
C. The Developer shall hold the City and its officers
and employees harmless from claims made by itself and third parties
for damages sustained or costs incurred resulting from plat
approval and development. The Developer shall indemnify the City
and its officers and employees for all costs, damages, or expenses
which the City may pay or incur in consequence of such claims,
including attorneys' fees.
D. In addition to the administrative fee, the Developer
shall reimburse the City for costs incurred in the enforcement of
this Contract, including engineering and attorneys' fees. 'I
GC -6 I
I
E. The Developer shall pay in full all bills submitted
to it by the City for obligations incurred under this Contract
within thirty (30) days after receipt. If the bills are not paid
on time, the City may halt all plat development work and
installed and pay for the installation of electrical, natural gas,
' telephone, and cable television service in conjunction with the
overall development improvements. These services shall be provided
in accordance with each of the respective franchise agreements held
' with the City.
20. Developer's Default. In the event of default by the
Developer as to any of the work to be performed by it hereunder,
the City may, at its option, perform the work and the Developer
shall promptly reimburse the City for any expense incurred by the
' City, provided the Developer is first given notice of the work in
default, not less than four (4) days in advance. This Contract is
a license for the City to act, and it shall not be necessary for
the City to seek a Court order for permission to enter the land.
' When the City does any such work, the City may, in addition to its
other remedies, assess the cost in whole or in part.
' 21. Miscellaneous.
A. Construction Trailers. Placement of on -site
' construction trailers and temporary job site offices shall be
approved by the City Engineer as a part of the pre- construction
meeting for installation of public improvements. Trailers shall be
' removed from the subject property within thirty (30) days following
the acceptance of the public improvements unless otherwise approved
by the City Engineer.
' B. Postal Service The Developer shall provide for the
maintenance of postal service in accordance with the local
Postmaster's request.
' C. Third Parties Third parties shall have no recourse
against the City under this Contract.
I GC -7
construction, including but not limited to
the issuance of building
'
permits for lots which the Developer may
or may not have sold,
until the bills are paid in full. Bills
not paid within thirty
'
(30) days shall accrue interest at the rate
of 8% per year.
F. In addition to the charges
and special assessments
referred to herein, other charges and special assessments may be
imposed such as, but not limited to, sewer availability charges
( "SAC "), City water connection charges,
City sewer connection
charges, and building permit fees.
G. Private Utilities. The
Developer shall have
installed and pay for the installation of electrical, natural gas,
' telephone, and cable television service in conjunction with the
overall development improvements. These services shall be provided
in accordance with each of the respective franchise agreements held
' with the City.
20. Developer's Default. In the event of default by the
Developer as to any of the work to be performed by it hereunder,
the City may, at its option, perform the work and the Developer
shall promptly reimburse the City for any expense incurred by the
' City, provided the Developer is first given notice of the work in
default, not less than four (4) days in advance. This Contract is
a license for the City to act, and it shall not be necessary for
the City to seek a Court order for permission to enter the land.
' When the City does any such work, the City may, in addition to its
other remedies, assess the cost in whole or in part.
' 21. Miscellaneous.
A. Construction Trailers. Placement of on -site
' construction trailers and temporary job site offices shall be
approved by the City Engineer as a part of the pre- construction
meeting for installation of public improvements. Trailers shall be
' removed from the subject property within thirty (30) days following
the acceptance of the public improvements unless otherwise approved
by the City Engineer.
' B. Postal Service The Developer shall provide for the
maintenance of postal service in accordance with the local
Postmaster's request.
' C. Third Parties Third parties shall have no recourse
against the City under this Contract.
I GC -7
it
D. Breach of Contract Breach of the terms of this
Contract by the Developer shall be grounds for denial of building �I
permits, including lots sold to third parties.
E. Severability If any portion, section, subsection, I'
sentence, clause, paragraph, or phrase of this Contract is for any
reason held invalid, such decision shall not affect the validity of
the remaining portion of this Contract. I'
F. Building Permits Building permits will not be
issued in the plat until sanitary sewer, watermain, and storm sewer
have been installed, tested, and accepted by the City, and the
streets needed for access have been paved with a bituminous surface
and the site graded and revegetated in accordance with Plan B of I �
the development plans.
G. Waivers /Amendments
The action or inaction of the
City shall not constitute a waiver
or amendment to the
provisions
of this Contract. To be binding, amendments or waivers
shall be in
writing, signed by the parties and
approved by written
resolution
of the City Council. The City's
failure to promptly
take legal
action to enforce this Contract shall
not be a waiver or
release.
H. Release This Contract shall run with the land and II
may be recorded against the title to the property . After the
Developer has completed the work required of it under this
Contract, at the Developer's request the City Manager will issue a
Certificate of Compliance. Prior to the issuance of such a
certificate, individual lot owners may make as written request for
a certificate applicable to an individual lot allowing a minimum of �
ten (10) days for processing.
I. Insurance Developer shall take out and maintain
until six (6) months after the City has accepted the public
improvements, public liability and property damage insurance
covering personal injury, including death, and claims for property
damage which may arise out of Developer's work or the work of its
subcontractors or by one directly or indirectly employed by any of
them. Limits for bodily injury and death shall be not less than
$500,000 for one person and $1,000,000 for each occurrence; limits
for property damage shall be not less than $500,000 for each
occurrence; or a combination single limit policy of $1,000,000 or
more. The City shall be named as an additional insured on the 'I
policy, and the Developer shall file with the City a certificate
evidencing coverage prior to the City signing the plat. The
certificate shall provide that the City must be given ten (10) days 'I
advance written notice of the cancellation of the insurance. The
certificate may not contain any disclaimer for failure to give the
required notice. I
GC -8
C
L
J. Remedies Each right, power or remedy herein
conferred upon the City is cumulative and in addition to every
other right, power or remedy, expressed or implied, now or
hereafter arising, available to City, at law or in equity, or under
any other agreement, and each and every right, power and remedy
herein set forth or otherwise so existing may be exercised from
time to time as often and in such order as may be deemed expedient
by the City and shall not be a waiver of the right to exercise at
any time thereafter any other right, power or remedy.
K. Assignability The Developer may not assign this
Contract without the written permission of the City Council. The
Developer's obligation hereunder shall continue in full force and
effect even if the Developer sells one or more lots, the entire
plat, or any part of it.
L. Construction Hours The normal construction hours
under this contract shall be from 7 :00 a.m. to 7:00 p.m. on
weekdays, from 9:00 a.m. to 5:00 p.m. on Saturdays with no such
activity allowed on Sundays or any recognized legal holidays.
Operation of all internal combustion engines used for construction
or dewatering purposes beyond the normal working hours will require
City Council approval. Under emergency conditions, this limitation
may be waived by the consent of the City Engineer.
Any approved work performed after dark shall be adequately
illuminated.
M. Access All access to the plat prior to the City
accepting the roadway improvements shall be the responsibility of
the Developer regardless if the City has issued building permits or
occupancy permits for lots within the plat.
N. Street Maintenance The Developer shall be
responsible for all street maintenance until streets within the
plat are accepted by the City. Warning signs shall be placed by
the Developer when hazards develop in streets to prevent the public
from traveling on same and directing attention to detours. If
streets become impassable, the City may order that such streets
shall be barricaded and closed. The Developer shall maintain a
smooth roadway surface and provide proper surface drainage. The
Developer may request, in writing, that the City plow snow on the
streets prior to final acceptance of the streets. The City shall
have complete discretion to approve or reject the request. The
City shall not be responsible for reshaping or damage to the street
base or utilities because of snow plowing operations. The provision
of City snow plowing service does not constitute final acceptance
of the streets by the City.
GC -9
Q. Variances By approving the plat, the Developer
represents that all lots in the plat are buildable without the need
for variances from the City's ordinances.
R. Compliance with Laws, Ordinances, and Regulations.
II
0. Storm Sewer Maintenance The Developer shall be
responsible for cleaning and maintenance of the storm sewer system
(including ponds, pipes, catch basins, culverts and swales) within
II
the plat and the adjacent off -site storm sewer system that receives
storm water from the plat. The Developer shall follow all
instructions it receives from the City concerning the cleaning and
maintenance of the storm sewer system. The Developer's obligations
under this paragraph shall end two (2) years after the public
improvements in the plat have been accepted by the City.
P. Soil Treatment Systems If soil treatment systems
are required, the Developer shall clearly identify in the field and
protect from alteration, unless suitable alternative sites are
first provided, the two soil treatment sites identified during the
platting process for each lot. This shall be done prior to the
issuance of a Grading Permit. Any violation /disturbance of these
sites shall render them as unacceptable and replacement sites will
need to be located for each violated site in order to obtain a
building permit.
Q. Variances By approving the plat, the Developer
represents that all lots in the plat are buildable without the need
for variances from the City's ordinances.
R. Compliance with Laws, Ordinances, and Regulations.
II
In the development of the plat the Developer shall comply with all
laws, ordinances, and regulations of the following authorities:
1. City of Chanhassen;
2. State of Minnesota, its agencies, departments
and commissions;
3. United States Army Corps of Engineers;
4. watershed District(s);
5. Metropolitan Government, its agencies,
departments and commissions.
S. Proof of Title Upon request, the Developer shall
furnish the City with evidence satisfactory to the City that it has I�
the authority of the fee owners and contract for deed purchasers to
enter into this Development Contract.
T. Soil Conditions The Developer acknowledges that
the City makes no representations or warranties as to the condition
of the soils on the property or its fitness for construction of the
improvements or any other purpose for which the Developer may make
use of such property. The Developer further agrees that it will
indemnify, defend, and hold harmless the City, its governing body
members, officers, and employees from any claims or actions arising
out of the presence, if any, of hazardous wastes or pollutants on
GC -10 11
the property, unless hazardous wastes or pollutants were caused to
be there by the City.
' U. Soil Correction The Developer shall be responsible
for soil correction work on the property. The City makes no
' representation to the Developer concerning the nature of
suitability of soils nor the cost of correcting any unsuitable soil
conditions which may exist. On lots which have no fill material a
' soils report from a qualified soils engineer is not required unless
the City's building inspection department determines from
observation that there may be a soils problem. On lots with fill
1 material that have been mass graded as part of a multi -lot grading
project, a satisfactory soils report from a qualified soils
engineer shall be provided before the City issues a building permit
for the lot. On lots with fill material that have been custom
' graded, a satisfactory soils report from a qualified soils engineer
shall be provided before the City inspects the foundation for a
building on the lot.
r
r
L
1 GC -11