1c. Lyman Boulevard Change Order No. 2.0 CITY OF 1 q, CHANHASSEN 690 COULTER DRIVE • P.O. BOX 147 • CHANHASSEN, MINNESOTA 55317 (612) 937 -1900 • FAX (612) 937 -5739 MEMORANDUM TO: Don Ashworth, City Manager FROM: Charles Folch, Director of Public Works DATE: November 18,1996 Action !iy CRY Aibntrifstffit& 1_ndofsed —A ft .fWodified Rejected Dat I l Date Submitted to Commisslort Date Submitted to Council _!1_ a s' - SUBJ: Approve Change Order No. 2 to Lyman Boulevard Reconstruction and Lake Riley I Area Trunk Utility Improvement Project No. 93 -32 ' The attached Change Order No. 2 for the above - referenced project consists of four primary elements as outlined in the engineer's letter dated November 15, 1996. The first two items were changes which needed to be made to comply with other governmental agency permit approvals which were not able to be obtained prior to the ' contract letting. Had approvals been able to be obtained prior to the contract letting, this work would have been designed into the plans and still completed as such. Item number three is a time and materials item which was required to protect adjacent properties from ponding damage until the project's ponding and storm drainage system was constructed. The fourth and final item is a cooperative effort change with the proposed Fawn Hill ' development and the City. It became apparent that these proposed improvements would be more appropriate to be constructed under this improvement contract so as to disturb the existing neighborhood only one summer rather than two (which is what would have happened if the developer installed these improvements at a later ' date). The developer has agreed to pay for their share of the additional drainage improvements which were needed. ' The total of Change Order No. 2 amounts to a total revised contract increase of $37,228.33. Of this amount, $14,418.17 will be reimbursed by the developer of the Fawn Hill development. The previous bonding for this improvement project will adequately cover the cost increase associated with Change Order No. 2 since Change ' Order No. 1 actually reduced the original contract amount by some $302,000. It is therefore recommended that the City Council approve Change Order No. 2 in the amount of $37,228.33 yielding a revised contract amount of $2,498,386.38 for the Lyman Boulevard Reconstruction and Lake Riley Area Trunk Utility Improvement Project No. 93 -32B. Attachment: Change Order No. 2 c: Anita Benson, Project Engineer Dave Mitchell, OSM ' Rueben Mausolf, Richard Knutson, Ir_e. g:�enepublic\93- 32bldmnge order no. 2 memo.doc Chanhassen, MN 55317 Re: Change Order No. 2 Orr proposed TH 101 and Lyman Boulevard intersection. This realignment of the Lake Riley Area Trunk Utility Improvements - Phase II Schelen Mayeron& , Inc. Associates OAMS , November 15, 1996 300 Park Place East of casing pipes and the lowering of the watermain which was in direct conflict City Project No. 93 -32B 5775 Wayzata Boulevard , OSM Project No. 5183.04 Minneapolis, MN 55416 -1228 , Dear Charles: 612- 595 -5775 Enclosed please find a copy of Change Order No. 2 on the above - referenced project in the 1- 800 - 753 -5775 amount of $37,228.33. Signed originals will be arriving soon from Mr. Charles Folch, P.E FAX 595 -5774 Engineers ' City of Chanhassen Architects ' 690 Coulter Drive Planners Surveyors P.O. Box 147 , Chanhassen, MN 55317 Re: Change Order No. 2 i+ proposed TH 101 and Lyman Boulevard intersection. This realignment of the Lake Riley Area Trunk Utility Improvements - Phase II watermain was precipitated during the review process with Mn /DOT. Their City of Chanhassen, Minnesota ' of casing pipes and the lowering of the watermain which was in direct conflict City Project No. 93 -32B J J , OSM Project No. 5183.04 , 2. The second item includes the outlet structure as required by the DNR Dear Charles: �r�c�n o.,, b54 F;. ed HI L Enclosed please find a copy of Change Order No. 2 on the above - referenced project in the amount of $37,228.33. Signed originals will be arriving soon from the contractor for your Engineers. approval. This change order contains four items that are discussed below. 1. The first item is due to realigning the sanitary sewer and watermain at the , proposed TH 101 and Lyman Boulevard intersection. This realignment of the watermain was precipitated during the review process with Mn /DOT. Their comments were received after the project was bid and required the addition ' of casing pipes and the lowering of the watermain which was in direct conflict with the sanitary sewer. , 2. The second item includes the outlet structure as required by the DNR (Department of Natural Resources), and the recommendations from City staff. This outlet structure was not designed with the original construction documents due to lack of comments from the DNR and Army Corp. of Engineers. ' 3. The third item is for the P P g um in of the pond located along Lyman Boulevard. The elevation of the pond topped the high water elevation this past spring and during the early summer rains; this was due to the failure of the drain tile outlet. We assume this failure is due to the prior placement of surcharge material along the south boulevard area of Lyman Boulevard. This pond did not have a reliable outlet prior to this project and the outlet had not ' been constructed at the time the high water was experienced. 4. The fourth item is for the construction of a storm sewer system through the , Sunny Slope Addition. This was facilitated to provide a future outlet to ponds proposed by the development of the adjacent property to the north. At the time the plans were prepared, it was assumed that the developer would be H: \5183.00 \CIVIL \CORRES \111596.CF , Equal opportunity Employer n Mr. Charles Folch, P.E. City of Chanhassen November 15, 1996 Page 2 installing this pipe system. The work was added to the City contract to eliminate the need to disrupt this area again in the next year or two. The cost of this work was approved by the developer and he will pay for 100% for the cost of installation solely for future development and 50% of the costs for upgrading existing storm sewer system. The developers portion of item 4 is $14,418.17, and the City's portion is $10,642.26. The developer has agreed to have the costs specially assessed against the plat of the Fawn Hill Development. I have reviewed the information and find it in order. I recommend that we present this change order to the Chanhassen City Council for approval. I am available to present this change to the council. Please contact me if you would like me present at this meeting. If you have any questions or need additional information on this matter, please contact me at 595 -5699. Sincerely, ORR- SCHELEN- MAYERON & ASSOCIATES, INC. Q.J0XW* I J I H: \5111.00 \CIVIL \CORRES1111596.CF David D. Mitchell, P.E. Project Manager ' Enclosures DDM:ce I J I H: \5111.00 \CIVIL \CORRES1111596.CF CHANGE ORDER I Orr Schelen 300 Park Place East 612 -595 -5775 a ' omsx eron& 5775 Wayzata Boulevard 1- 800 - 753 -5775 nriatPC rnr T%,VnnPannlic MN .S.S41h -1228 FAX 595 -5774 F nge Order No: 2 City Project No. 93 -32B ect: Lake Riley Area Trunk Utilities, Improvements Phase II OSM Project No. 5183.04 Owner: City of Chanhassen Date of Issuance: November 14, 1996 P. O. Box 147 690 Coulter Drive Chanhassen, MN 55317 Contractor: Richard Knutson, Inc. Engineer: Orr - Schelen - Mayeron 12585 Rhode Island Avenue South and Associates, Inc. Savage, MN 55378 You are directed to make the following changes in the Contract Documents: Description: 1) Additional funds needed to lower watermain at T.H. 101 and Lyman Blvd. $2,613.03 2) Additional funds needed for change in outlet structure. $7,800.00 3) Additional funds needed for excavating drain tile & pumping pond along Lyman Blvd. $1,754.87 4) Additional funds needed for addition of storm sewer through the Sunny Slope area. $25.060.43 TOTAL AMOUNT OF CHANGE ORDER $37,228.33 Purpose of Change Order: To compensate the contractor for work not anticipated at the time of bidding. Attachments (list documents supporting change): 1) Letters from Richard Knutson, Inc. dated May 9, 1996 and November 4, 1996. 2) Letters with quote from Richard Knutson, Inc. dated May 15, 1996. 3) Letters from Richard Knutson, Inc., dated May 14, 1996, May 22, 1996, and June 26, 1996 and November 4, 1996. 4) Letter with quote from Richard Knutson, Inc., dated August 13, 1996. CHANGE IN CONTRACT PRICE CHANGE IN CONTRACT TIME Original Contract Price: $2,763,482.53 Original Contract Time: July 15, 1997 Previous Change Orders No.1 to No. 1: Net Change from Previous Change Orders: (- )$302,324.48 N/A Contract Price Prior to this Change Order: Contract Time Prior to this Change Order: $2,461,158.05 July 15, 1997 Net Increase (Decrease) of this Change Order: Net Increase (decrease) of Change Order: $37,228.33 N/A Contract Price with all Approved Change Orders: Contract Time with Approved Change Orders: $2,498,386.38 July 19 Recommended By: �Mjp Appro *4 f - kkk& David D. Mitchell, PE. Inc. Approved By: Approved By: Date of Council Action: (City Engineer) (City Manager) H: \5183.00 \C1VIL \C0RRES\ 111496.002 I '. fl C! I