6.5. Lake Ann Ballfield Lighting Change Order.CITY OF 6 CHANHASSEN 690 COULTER DRIVE • P.O. BOX 147 • CHANHASSEN, MINNESOTA 55317 (612) 937 -1900 • FAX (612) 937 -5739 ' qty Aci ninistratN MEMORANDUM / P ar r'msed t Yia�ified TO: Don Ashworth, City Manager i;�;ecte .c.te 1— 2 I � ` L�.. FROM: Todd Hoffman, Park & Recreation Director E e Submitted to cemmisSfal DATE: November 20, 1996 Date Sv - - mound i i - 3.S -fie ' SUBJ: Lake Ann Ballfield Lighting Project, Change Order No. 1 ' It is my understanding that the city council has requested responses to three questions regarding the aforementioned change order: Regarding the wiring configuration: 1. Why did the consultant not think of this? ' 2. Why did staff not find this? Regarding the grounded I.D. conductors: 3. Was this required by state statute? 1. Why did consultant(s) not think of this? Barton Aschman & Associates and Holden & ' Associates worked off a plan set produced for the lighting of Ballfield #1 in 1986. That plan "cut" the corners of the ballfield to save costs. The same design was utilized on Fields #4 and #5. The consultants and staff were aware that this would require some in -house work on ' the irrigation system now present in the fields and would require trenching across the fields. 2. Why did staff not find this? I was cognizant of the impacts under each wiring alternative. In an effort to minimize costs, I made the decision to allow the contract to go out with the wiring diagram cutting the corners. ' As the council is aware, a favorable bid was received on this project. In light of this and the contractors interest in avoiding the irrigation system and trench settlement in the playing area, I allowed him to submit an estimate for the additional wiring. Upon receipt of this quotation, it appeared high. However, upon inspection by the electrical consultant, he reported the estimate to be well within industry standards (based on lineal foot costs). Mr. Don Ashworth , November 20, 1996 Page 2 ' 3. Was this required by state statute? These were left out of the contract to save costs: However, at the discretion of the state electrical inspector, they can be required. Upon review ' of project plans, the state inspector requested the addition of these conductors. The pertinent question regarding this change order is one of value. Is it worth $1,925 per field to , avoid disturbing the underground sprinkling system and trench settlement in the playing area? Cash out of hand to repair the irrigation lines is estimated, at $500 -$700 per field (time and material). The value of not subjecting the fields to trench settlement is less defined. The value ' of avoiding the nuisances of trench settlement does not equal $1,225 or more per field. However, forecast a potential sprained ankle or twisted knee and the cost is warranted. RECOMMENDATION It is recommended that the city council approve Change Order No. 1 to the Lake Ann Park ' Ballfield Lighting Project in the amount of $4,350. GApark \th \changeorder 1 J C CITY OF 3 CHANHASSEN 690 COULTER DRIVE • P.O. BOX 147 • CHANHASSEN, MINNESOTA 55317 (612) 937 -1900 • FAX (612) 937 -5739 ' MEMORANDUM ' TO: Don Ashworth, City Manager ' FROM: Todd Hoffman, Park & Recreation Director ' DATE: November 5, 1996 ' SUBJ: Lake Ann Ballfield Lighting Project, Approve Change Order No. 1 Action by City Adminig"b7., Endorsed Modified Rejected Dat �� Date Submitted to Commissieit Date u'.:r *t d to Councif jj )Z —G b ' On September 23, the city council awarded the Lake Ann Park Ballfield Lighting Project to Electrical Installation and Maintenance Company (EIM). Upon detailed review of construction documents, Mr. Ken Pysick, President of EIM contacted me to discuss two contract amendments: ' 1. Installation of identified I.D. conductors in service lateral. * Grounded I.D. conductors required by inspector. 2. Route wiring system around perimeter of ballfields in lieu of across fields. * A desired plan amendment to minimize disturbance of irrigation systems and to avoid ' trench settlements on the playing surface. The addition of both these items is supported by staff and is well within the original project budget. ' RECOMMENDATION It is recommended that the city council approve Change Order No. 1 to the Lake Ann Park Ballfield Lighting Project in the amount of $4,350. c: Dale Gregory, Park Superintendent ' Mark Holden, Holden and Associates Scott Midness, Barton Aschman & Associates Ken Pysick, Electrical Installation and Maintenance ATTACHMENTS ' 1. Proposal from EIM 2. Memorandum from Holden and Associates ' g: \park \th \ballfieldlightchgord r Np f ropefir hereby to furnish material and labor — complete in accordance with above specifications, for the sum of: ' �nr thrniGand thrPp hundrPc3 fift)z dollars and 00 dents dollars($ 4,350.00 ). Payment to be made as follows: t All material is guaranteed to be as specified. All work to be completed in a workmanlike manner according to standard practices. Any alteration or deviation from above specifica- Authorized tions involving extra costs will be executed only upon written orders, and will become an Signature extra charge over and above the estimate. All agreements contingent upon strikes, accidents or delays beyond our control. Owner to carry fire, tornado and other necessary insurance. Note: This proposal may be ' Our workers are fully covered by Workmen's Compensation Insurance. withdrawn by us if not accepted within days. I ,ra,ptunrp of f ropood —The above prices, specifications and conditions are satisfactory and are hereby accepted. You are authorized Signature to do the work as specified. Payment will be made as outlined above. Date of Acceptance: Signature FORM 11S COPYRIGHT 1980 - NEW ENGLAND BUSINESS SERVICE. INC.. TOWNSEND. MAS3.01409 ' Page No. of Pages ' RECEPd ED Elm ELECTRICAL INSTALLATION & MAINTENANCE CO. , BROADMOOR DRIVE a INDEPENDENCE, MN 55359 OCT 21 1996 VtF 4985 (612)479.3744 FAX (612)479 -3745 CITY OF CH14AHASSEN ' PROPOSAL SUBMITTED TO PHONE DATE City of Chanhassen 612- 937 -1900 October 17, 1996 STREET JOB NAME 690 Coulter Drive P.O. Box 147 Lake Ann Park Ballfield Lighting ' CITY, STATE AND ZIP CODE JOB LOCATION Chanhassen, MN 55317 Chanhassen, MN ARCHITECT DATE OF PLANS JOB PHONE ' ATTN: Todd Hoffman We hereby submit specifications and estimates for: Install ID conducters in service lateral $500.00 ' Route wiring system around perimeter of ball field instead of thru field $3,850.00 ' r Np f ropefir hereby to furnish material and labor — complete in accordance with above specifications, for the sum of: ' �nr thrniGand thrPp hundrPc3 fift)z dollars and 00 dents dollars($ 4,350.00 ). Payment to be made as follows: t All material is guaranteed to be as specified. All work to be completed in a workmanlike manner according to standard practices. Any alteration or deviation from above specifica- Authorized tions involving extra costs will be executed only upon written orders, and will become an Signature extra charge over and above the estimate. All agreements contingent upon strikes, accidents or delays beyond our control. Owner to carry fire, tornado and other necessary insurance. Note: This proposal may be ' Our workers are fully covered by Workmen's Compensation Insurance. withdrawn by us if not accepted within days. I ,ra,ptunrp of f ropood —The above prices, specifications and conditions are satisfactory and are hereby accepted. You are authorized Signature to do the work as specified. Payment will be made as outlined above. Date of Acceptance: Signature FORM 11S COPYRIGHT 1980 - NEW ENGLAND BUSINESS SERVICE. INC.. TOWNSEND. MAS3.01409 ' HOLDEN & ASSOCIATES CONSULTING i e. Electrical Design ForBuildingConstruction Cedarvale Business Center Off: (612) 688 -9315 3906 Beau D'Rue Drive, Eagan, Minnesota 55122 Fax: (612) 688 -2994 ' MEMORANDUM cc: File ' DATE: October 30, 1996 TO: Todd Hoffman PHONE # 937 -1900 ext. 121 ' FROM: Mark Hold FAX# 937 -5739 PROJECT: Lake Ann Park Ballfield COMM# 1496 Field Lighting Project, City of Chanhassen 690 Coulter Drive ' Chanhassen, MN 55317 Per your request, I have reviewed EIM's estimate dated October 17, 1996 for a change to the subject ' project for: 1. The inclusion of identified conductors (ID) in service lateral. $500.00 ' 2. Routing of system conductors around the field in lieu of across the field. $3,850.00 The amounts are in accordance with current construction costs and are therefore recommended to be included in the project contract agreement. R� ' NOV 0 1 1996 File: MEM06 CITY U� unh,�"'�`'3L