PROPOSAL: Site plan approval for a 96,288 sq. ft. church and school facility on 8.03 acres and a
soccer field on 2.48 acres. The property is included in the proposed. Villages on the
Ponds project which is requesting a rezoning to PUD, St. Hubert Catholic
Community.
LOCATION: East of Great Plains Blvd. and south of Hwy. 5, proposed Lots 10 and 11, Villages
on the Pond
APPLICANT: St. Hubert Catholic Community Dave Bangasser, Opus
7707 Great Plains Boulevard 700 Opus Center
Chanhassen, MN 55317 9900 Bren Road East
(612) 934-9106 Minnetonka, MN 55343
PRESENT ZONING: RSF, Proposed PUD as part of Villages on the Ponds
ACREAGE: 8.03 acres and 2.48 acres Action by City Administrator,
ADJACENT ZONING Endorsed &<-14-
AND LAND USE: N - IOP/RSF, Proposed PUD, Villages on the Ponds Modified-----_
S - RSF, Proposed PUD, Villages on the Ponds Rejecter 9
Date _ `i,6
E - RSF, single family homes Date Submitted to Commissioa
W - IOP, Proposed PUD, Villages on the Ponds
Date Submitted to Council
WATER AND SEWER: Available to the site 9 - 1- 9 ,6
PHYSICAL CHARACTER: The site includes the highest point within the Villages on the Pon(
project with an elevation of 972 feet located along the eastern
property line. The site slopes to the west and south from this poir.
The site is heavily wooded except where the existing Great Plains
Boulevard bisects the property.
2000 LAND USE PLAN: Low Density Residential, Proposed amendment to Mixed Use:
Office/Institutional as part of Villages on the Ponds
PON
M�
NNW
N
�
r��_� ��
' St. Hubert Catholic Community
August 21, 1996
' Page 2
PROPOSAL/SUMMARY
' The applicant is requesting site plan approval for a 96,288 sq. ft. church and school facility, St.
Hubert Catholic Community, on 8.03 acres and a soccer field on 2.48 acres. A 30,000 square foot
' expansion is envisioned as part of the ultimate plan for the site. It should be noted that the potential
future expansion area encroaches into the required 50 foot building setback from the eastern
property line. The property is included in the proposed Villages on the Ponds project which is
' requesting a rezoning to PUD.
Staff is still concerned about the location of the soccer field on Lot 11. As proposed, the soccer
' field grading fills additional wetlands on site in addition to removing the tree canopy coverage
and wildlife habitat.
' Staff is recommending approval of the site plan with conditions in the staff report and subject to
the final PUD agreement for Villages on the Ponds.
' BACKGROUND
' The proposed development is included in the Villages on the Ponds project which received
conceptual PUD approval on December 11, 1995. Villages on the Ponds received preliminary
PUD approval on August 12, 1996.
tGENERAL SITE PLAN/ARCHITECTURE
' The predominant building material will be brick. The main church structure will be a tan brick.
The school portion of the building will be constructed of a darker, rusty brown colored brick.
The two brick colors are used to differentiate between the Worship or parish areas of the building
' and the educational or school areas of the building. Both colors of brick will be accented with
the other color to tie the complex together while still expressing the unique functions. If the
budget allows, a buff/pink Mankato stone will be used as an accent to the brick at the base of the
' bell tower, the circular school library, and the entry columns at the trellises. The trellises, which
are located at the south and east entrance walkways, will be built of cedar with a brown stain.
The roof of the church, which represents approximately one-third of the roof area, is sloped,
' while the roof of the school is flat surrounded by parapet walls. The roof of the church will be
wood shakes. Either copper or coated aluminum, depending on the budget, will be used at the
edge where the wood shake roof meet the brick wall. The same material will be used at the bell
' tower and at the lantern on top of the wood shake roof. The areas of the lantern, lighted from
within, will be translucent fiberglass panels. The copper or coated aluminum metal will also be
used at all roof edges, including the projecting cornices at the Narthex and school library.
' Windows and doors at significant entrance points will be aluminum anodized a light bronze
color.
L
St. Hubert Catholic Community
August 21, 1996
Page 3
As part of the PUD, the applicant is required to incorporate street furniture in the plaza area west
of the church. This could be accomplished through the use of raised planter boxes, benches,
artwork, etc. In addition, bicycle racks should be provided within the project.
A minimum of 50 percent of the parking for the St. Hubert Catholic Community must be
provided through shared parking agreements. Cross access easements and the joint use of
parking facilities shall be protected by a recorded instrument acceptable to the city.
As part of the Villages on the Ponds Development, Design Standards have been established for
subsequent development of the individual properties.
DEVELOPMENT DESIGN STANDARDS
a. Intent
The purpose of this zone is to create a mixed use PUD consisting of commercial, institutional,
office, and residential uses. The use of the PUD zone is to allow for more flexible design
standards while creating a higher quality and more sensitive proposal. All utilities are required to
be placed underground. Each lot proposed for development shall proceed through site plan
review based on the development standards outlined below.
b. Permitted Uses
The permitted uses in this zone should be limited to uses as defined below or similar uses to
those as listed in the Standard Industrial Classification. If there is a question as to the whether or
not a use meets the definition, the Planning Director shall make that interpretation. No single
retail user shall exceed 20,000 square feet on a single level of a building. A maximum of thirty-
three (33) percent of the square footage of the retail users within the development may be of a
"big box" category. The intent of this requirement is to provide a variety of users, including
small retail shops, service providers, coffee shops, cabarets, etc., for residents of the Villages as
well as the community as a whole, rather than typical suburban type large, individual users
dominating the development and detracting from the "village" character. Retail users should be
those that support and compliment the residential development located within the development,
providing goods and services which enhance residents of the village and the community.
Office. Professional and business office, non -retail activity except for showroom type
display area for products stored or manufactured on -site provided that no more than 20
percent of the floor space is used for such display and sales.
bank/credit union
L
L
I
St. Hubert Catholic Community
August 21, 1996
Page 4
finance, insurance and real estate
health services - except nursing homes and hospitals
engineering, accounting, research management and related services
legal services
Personal Services. Establishments primarily engaged in providing services involving the
care of a person or his or her personal goods or apparel.
dry cleaning
beauty or barbershop
shoe repair
photographic studio
tax return preparation
laundromat
health club
optical goods
computer services
day care center
copying
mail stores
Institutional. Establishments that are public/semi-public in nature.
church
library
education services
day care
art gallery
dance studio
cultural facility
Commercial/Retail. Establishments engaged in commercial operations including retail sales
and services and hospitality industries.
Apparel and Accessory Stores
shoe stores
electronic and music store and musical instruments
restaurant - no drive through
restaurant - fast food only if integrated into a building
no freestanding fast food and no drive through
drug store/pharmacy
L
St. Hubert Catholic Community
August 21, 1996
Page 5
book/stationary
jewelry store
hobby/toy game
gift novelty and souvenir
sewing, needlework and piece good
florist
camera and photographic supply
art and art supplies, gallery
sporting goods
video rental
food stores including bakery and confectionery
hardware store
computer store
hotel/motel
entertainment
liquor store
pets and pet supplies
home furnishings
Residential. Residential units shall be provided as upper level units above the
commercial/office uses within the village core and as stand alone units. A minimum of 50
percent of the residential units shall be rental units. Of the rental units, the city has adopted
a goal of :35 percent of the units meeting the Metropolitan Council's affordable criteria. For
the ownership housing, the city has adopted the goal of 50 percent of the units meeting the
Metropolitan Council's affordable criteria.
Prohibited Uses:
auto related including auto sales, auto repair, gas stations
c. Setbacks
In the PUD standards, there is the requirement for landscape buffering in addition to building and
parking setbacks.
The following setbacks shall apply:
Building Parking
Great Plains Blvd.: Buffer yard & Setback
C, 0'
0'
Market Blvd.: Buffer yard & Setback
C, 50'
20'
Hwy. 5: Buffer yard & Setback
B, 50'
20'
F
R
L
St. Hubert Catholic Community
August 21, 1996
Page 6
Interior Side Lot Line: Buffer yard & setback
NA, 0'
0'
East Perimeter Side Lot Line (adjacent to
D, 50'
50'
residential): Buffer yard & setback
West Perimeter Side Lot Line (adjacent to
B, 50
20
industrial): Buffer yard & setback
Buffer yards are as specified in the City of Chanhassen Landscaping and Tree Removal
Ordinance, Article XXV.
No fences shall be permitted between the required landscape buffer and arterial and collector
roads.
d. Development Site Coverage and Building Height
1. The PUD standard for hard surface coverage is 70% for the overall development.
Individual lots may exceed this threshold, but in no case shall the average exceed 70
percent..
2. More than one (1) principal structure may be placed on one (1) platted lot.
3. The maximum building height shall be Sector I - three stories (with residential loft)/50 ft.
(retail and office buildings without residences above shall be limited to two stories/30
feet), Sector II - three stories/40 ft., Sector III - three stories/40 ft., exclusive of steeples
and bell towers, and Sector IV - four stories/50 feet
4. The maximum building footprint for any one building shall be limited to 20,000 square
feet without a street level break in the continuity of the building, e.g., pedestrian
passageways, except for the church and residential only buildings.
5. The following table shall govern the amount of building area for the different uses:
Commercial/
Retail (sq_ft.)
Sector I
114,500
Sector II
60,000
Sector III
0
Sector IV
0
TOTAL
174,500
Office/Service
Institutional
Dwelling
TOTAL sq. ft.
(sq. ft.)
(sq. ft.
Units
70,500 @
0
154
185,000
14,000
0
0
74,000
0
100,000
0
100,000
32,000 @
0
112 @
32,000
116,500
100,000
266
391,000
St. Hubert Catholic Community
August 21, 1996
Page 7 '
@ As an alternative, the office/service could be increase by 13,000 square feet in Sector I if the
32,000 square foot office building is deleted in Sector IV and replaced with 56 additional I
dwelling units.
* Includes 47,200 square foot, 106 unit motel.
,
Building square footages may be reallocated between sectors subject to approval by the Planning
Director. Building square footages may be reallocated between uses subject to approval of the
'
Planning Director. However, the reallocation of building square footages between uses shall
only be permitted to a less intensive use, i.e. from commercial to office or institutional, or from
office to institutional. In no instance shall more than 27,000 square feet of addition institutional
'
building square footage be reallocated without an amendment to the PUD.
e. Building Materials and Design
'
1. The PUD requires that the development demonstrate a higher quality of architectural
standards and site design. The intent is to create a pedestrian friendly, "traditional"
'
village character consistent with the European heritage of the upper midwest and the
atmosphere within this development, yet with the amenities and technological tools of
modern times. The village elevations shown on the PUD drawings are to be used only as
'
a general guideline and the reflection of the overall village image including the north-
midwestem architectural vocabulary, village like human scale and flavor, and variety in
'
design and facade treatment.
2. All materials shall be of high quality and durable. Major exterior surfaces of all walls shall
'
be face brick, stone, glass, stucco, architecturally treated concrete, cast in place panels,
decorative block, cedar siding, vinyl siding in residential with support materials, or
approved equivalent as determined by the city. Color shall be introduced through colored
'
block or panels and not painted block or brick. Bright, long, continuous bands are
prohibited. Bright or brilliant colors and sharply contrasting colors may be used only for
accent purposes and shall not exceed 10 percent of a wall area.
'
3. Block shall have a weathered face or be polished, fluted, or broken face. Exposed cement
("cinder") blocks shall be prohibited.
'
4. Metal siding, gray concrete, curtain walls and similar materials will not be approved except
as support material to one of the above materials, or as trim or as HVAC screen, and may
,
not exceed more than 25 percent of a wall area.
5. All accessory structures shall be designed to be compatible with the primary structure.
'
I
r
J
St. Hubert Catholic Community
August 21, 1996
Page 8
6. All roof mounted equipment shall be screened by walls of compatible appearing material.
Wood screen fences are prohibited. All exterior process machinery, tanks, etc., are to be
fully screened by compatible materials. All mechanical equipment shall be screened with
material compatible to the building.
7. The buildings shall have varied and interesting detailing. The use of large unadorned,
concrete panels and concrete block, or a solid wall unrelieved by architectural detailing,
such as change in materials, change in color, fenestrations, or other significant visual
relief provided in a manner or at intervals in keeping with the size, mass, and scale of the
wall and its views from public ways shall be prohibited. Acceptable materials will
incorporate textured surfaces, exposed aggregate and/or other patterning. All walls shall
be given added architectural interest through building design or appropriate landscaping.
8. Space for recycling shall be provided in the interior of all principal or accessory
structures.
9. There shall not be underdeveloped backsides of buildings. All elevations shall receive
nearly equal treatment and visual qualities.
10. The materials and colors used for each building shall be selected in context with the
adjacent building and provide for a harmonious integration with them. Extreme
variations between buildings on the same street in terms of overall appearance, bulk and
height, setbacks and colors shall be prohibited.
11. Slope roof elements shall be incorporated in all structures: Sector I - minimum 70
percent of roof area shall be sloped, Sector II - minimum of 70 percent of the roof area
shall be sloped, Sector III - minimum of 30 percent of the roof area shall be sloped, and
Sector IV - minimum of 70 percent of the roof area shall be sloped. An exception to this
requirement are roof areas designed for human use such as decks, garden areas, patios,
etc., which will not be counted towards flat roof area.
' 12. The following design elements should be incorporated into individual structures:
Building Accents
Towers, silos, arches, columns, bosses, tiling, cloisters, colonnades, buttresses, loggias,
marquees, minarets, portals, reveals, quoins, clerestories, pilasters.
Roof Types
Barrow, dome, gable, hip, flat.
St. Hubert Catholic Community
August 21, 1996
Page 9
11
Roof Accents
,
Cupolas, cornices, belfries, turrets, pinnacles, look -outs, gargoyles, parapets, lanterns.
Accent elements such as towers, turrets, spires, etc., shall be excluded from the sector
'
building height limitation.
Window Types
'
Bay, single paned, multi -paned, angular, square, rectangular, half -round, round, italianate.
'
Window Accents
Plant boxes, shutters, balconies, decks, grates, canopies, awnings, recesses, embrasures,
'
arches, lunettes.
13. Street level windows shall be provided for a minimum of 50 percent of the ground level
,
wall area.
f. Site Landscaping and Screening
'
1. All buffer landscaping, including boulevard landscaping, included in Phase I shall be
installed when the grading of the phase is completed. This may well result in landscaping
being required ahead of individual site plan approvals, but we believe the buffer yard and
plantings, in particular, need to be established immediately. In addition, to adhere to the
'
higher quality of development as spelled out in the PUD zone, all loading areas shall be
screened. Each lot for development shall submit a separate landscaping plan as a part of
the site plan review process.
'
2. All open spaces and non -parking lot surfaces, except for plaza area, shall be landscaped,
rockscaped, or covered with plantings and/or lawn material. Tree wells shall be included
'
in pedestrian areas and plazas.
3. Storage of material outdoors is prohibited.
'
4. Undulating or angular berms Y to 5' in height, south of Highway 5 and along Market
Boulevard shall be sodded or seeded at the conclusion of grading and utility construction.
,
The required buffer landscaping may be installed where it is deemed necessary to screen any
proposed development. All required boulevard landscaping shall be sodded.
'
' St. Hubert Catholic Community
August 21, 1996
' Page 10
5. Loading areas shall be screened from public right-of-ways. Wing walls may be required
' where deemed appropriate.
6. Native species shall be incorporated into site landscaping, whenever possible.
'
g• Signage
' 1. One project identification sign shall be permitted for the development at each end of Lake
Drive and at the south end of Main Street. Project identification sign(s) may also be
located at the entrances to the development(s) in Sector IV. Project identification signs
' shall not exceed 24 square feet in sign display area nor be greater than five feet in height.
One project identification sign, with a maximum height of 20 feet, which may be
' increased in height subject to city approval based on the design and scale of the sign,
designed as a gateway to the project shall be located at the north end of Main Street.
Individual lots are not permitted low profile ground business sign. Within Sector III, one
' sign for the church and one sign for the school may be placed on streetscape walls. The
top of the signs shall not extend more than eight feet above the ground and the total sign
area for the signs shall not exceed 64 square feet. Pylon signs are prohibited. The sign
treatment is an element of the architecture and thus should reflect the quality of the
development. The signs should be consistent in color, size, and material and height
throughout the development. A common theme will be introduced at the development's
entrance monument and will be used throughout.
2. All signs require a separate sign permit.
' 3. Wall business signs shall comply with the city's sign ordinance for the central business
district for determination of maximum sign area. Wall signs may be permitted on the
' "street" front and primary parking lot front of each building.
4. Projecting signs are permitted along Main Street and Lake Drive and along pedestrian
' passageways subject to the conditions below.
Signage Plan and Restrictions
' Wall Sims
1. The location of letters and logos shall be restricted to the approved building sign bands,
the tops of which shall not extend greater than 20 feet above the ground. In Sector II,
' sign height may be increase based on the criteria that the signage is compatible with and
complementary to the building architecture and design. The letters and logos shall be
St. Hubert Catholic Community
August 21, 1996
Page 11
restricted to a maximum of 30 inches in height. All individual letters and logos comprising
each sign shall be constructed of wood, metal, or translucent facing.
2. If illuminated, individual dimensional letters and logos comprising each sign may be any
of the following:
a. Exposed neon/fiber optic,
b. Open channel with exposed neon,
c. Channel Letters with acrylic facing,
d. Reverse channel letters (halo lighted), or
e. Externally illuminated by separate lighting source.
3. Tenant Signage shall consist of store identification only. Copy is restricted to the tenant's
proper name and major product or service offered. Corporate logos, emblems and similar
identifying devices are permitted provided they are confined within the Signage band and
do not occupy more than 15% of the sign area unless the logo is the sign.
4. Within Sector II, architecturally, building -integrated panel tenant/logo sign may be
permitted based on criteria that the signage is compatible with and complementary to the
building design and architecture.
5. Back lit awnings are prohibited.
Projecting Signs
1. The letters and logos shall be restricted to the approved building sign area.
2. All wooden signs shall be sandblasted and letters shall be an integral part of the
building's architecture.
3. Signage shall consist of store identification only. Copy is restricted to the tenant's proper
name and major product or service offered and such minimal messages such as date of
establishment of business. Corporate logos, emblems and similar identifying devices are
permitted provided they are confined within the Signage band or within the projecting
sign and do not occupy more than fifteen (15) percent of the sign display area.
4. Projecting signs shall be stationary, may not be self -illuminated but may be lighted by '
surface mounted fixtures located on the sign or the adjacent facade.
St. Hubert Catholic Community
August 21, 1996
Page 12
5. Projecting signs shall be limited to one per tenant on street frontage and pedestrian
passageway and my not exceed six square feet. Letters shall have a maximum height of
12 inches.
6. Projecting signs shall be a minimum of eight feet above the sidewalk and shall not project
more than six feet from the building facade.
7. Plastic, plexi-glass, clear plex, or similar material projecting signs are prohibited unless
used in conjunction with other decorative materials.
8. Projecting signs may be painted, prefinished, or utilize exposed metal. Any exposed
metal shall be anodized aluminum, stainless steel, titanium, bronze, or other similar non-
corrosive or ono -oxidizing materials.
Window Si ns
1. Window signs shall not cover more than 25 percent of the window area in which they are
located.
2. Window signs shall not use bright, garish, or neon paint, tape, chalk, or paper.
Menu Signs
1. Shall be located at eye level adjacent to tenant entries and shall not exceed 4 feet in
height.
2. Shall be used only to convey daily specials, menus and offerings and shall be wood
framed chalkboard and/or electronic board with temporary handwritten lettering. No
paper construction or messages will be permitted.
3. Menu signs shall be limited to one per tenant and may not exceed 8 square feet.
Festive Flags/Banners
1. Flags and banners shall be permitted on approved standards attached to the building
facade and on standards attached to pedestrian area lighting.
2. Plastic flags and banners are prohibited.
3. Flags and banners shall be constructed of fabric.
St. Hubert Catholic Community
August 21, 1996
Page 13
4. Banners shall not contain advertising for individual users, businesses, services, or
products.
5. Flags and banners shall project from buildings a maximum of two feet.
6. Flags and banners shall have a maximum area of 10 square feet.
7. Flags and banners which are torn or excessively worn shall be removed at the request of
the city.
Building Directory
1. In multi -tenant buildings, one building directory sign may be permitted. The directory
sign shall not exceed eight square feet.
Pole Directory Sign
1. Pole directory signs consisting of single poles with individual nameplate type directional
arrows may be located within the development.
2. Pole directory sign shall not exceed 15 feet in height.
3. Directory signs shall be a minimum of eight feet above the sidewalk.
4. A maximum of eight directory signs may be provided per pole.
5. The maximum size of an individual sign shall be 18 inches long by four inches wide.
6. Poles shall be a minimum of 10 feet behind the curb.
h. Lighting
1. Lighting for the interior of the business center should be consistent throughout the
development. The plans do not provide for street lighting. As with previous
developments, the City has required the developer to install street lights throughout the
street system.
2. A shoe box fixture (high pressure sodium vapor lamps) with decorative natural colored
pole shall be used throughout the development parking lot area for lighting, Decorative,
pedestrian scale lighting shall be used in plaza and sidewalk areas and may be used in
parking lot areas.
1
1
7
St. Hubert Catholic Community
August 21, 1996
Page 14
3 Lighting equipment similar to what is mounted in the public street right-of-ways shall be
used in the private areas.
4. All light fixtures shall be shielded. Light level for site lighting shall be no more than 1/2
candle at the project perimeter property line. This does not apply to street lighting.
5. Light poles shall be limited to a height of 20 feet.
i. Parking
1. Parking shall be provided based on the shared use of surface parking areas whenever
possible. Cross access easements and the joint use of parking facilities shall be protected
by a recorded instrument acceptable to the city.
2. A minimum of 75 percent of a building's parking shall be located to the "rear" of the
structure and in underground garages.
3. The development shall be treated as a integrated shopping center and provide a minimum
of one space per 200 square feet of commercial/retail area. The office/personal service
component shall be treated as an integrated office building and provide 4.5 space per
1,000 square feet for the first 49,999 square feet, four per thousand square feet for the
second 50,000 square feet, and 3.5 per thousand square feet thereafter. Residential uses
shall provide 1.5 spaces per unit as underground parking with visitor spaces provided as
part of the commercial/office uses. Within sector IV, visitor parking shall be provided at
a rate of 0.5 stalls per unit. Hotel/motels shall comply with city ordinance.
Churches/schools shall comply with city ordinance, however, a minimum of 50 percent of
the parking shall be shared.
LANDSCAPING
Landscaping plans submitted by the applicant demonstrate a diverse schedule of plant materials
and well-balanced design. According to city ordinance, applicant is consistent with buffer yard
and general landscaping requirements, but fails to meet basic parking lot landscaping
requirements. Landscape islands are needed in the parking lot directly south of the building.
Currently there are only two landscape islands in an expanse of pavement that is 28,750 sq. ft.
Four additional islands or peninsulas will be required in the southern lot. The applicant is also
required to provide at least 33 trees in the parking lots, plans note 29. The applicant will be
required to provide 4 more. Landscape islands less than 10 feet in width will require the
installation of aeration piping. All new planting areas, including parking lot islands, peninsulas,
and boulevards, shall have an irrigation system installed.
St. Hubert Catholic Community
August 21, 1996
Page 15 '
On the southern end of the school, seven black hills spruce are scheduled to be installed within
an area of future expansion. Staff recommends these trees be relocated to areas outside of the
,
proposed expansion since there is adequate room in other locations nearby. Placing evergreens
on the south side of buildings is also poor design for energy conservation. The trees will
'
effectively block any passive solar heat gained during the winter months and fail to shade the
building in the summer. In addition, south of the future school expansion area is an area
proposed to be graded with steep slopes. This area should be revegetated with sumac, live
t
willow and dogwood stakes, and other fast growing materials to improve soil stability and reduce
potential erosion
The applicant has included plans for a soccer field located in an area with 100% canopy
coverage. Although the Planning Commission and City Council have given preliminary approval
of the soccer field south of the creek, staff does not recommend approval of the field. Alternative
'
locations for the field do exist and have been proposed by city staff. Staff recommends a
conservation easement be placed over the wooded area south of the proposed development in
order to preserve the natural features for future generations.
WETLANDS
identified on this site. The larger of these wetlands Rice Marsh '
There are three wetland areas g ,
Lake and Riley Creek, which feeds into the lake has been delineated by the applicant to the
satisfaction of the City. However there is an additional wetland area that appears on the soccer
field grading plan, that the City does not have delineation data on this wetland. If the proposed
soccer field impacts this unidentified wetland, it must be mitigated with replacement wetlands at '
a ratio of 2:1. These impacts must also be included with the wetland impacts of the whole site,
and may push the wetland impacts of this project above 3 acres. If the proposed wetland impacts
exceed 3 acres, an individual permit must be obtained from the Army Corps of Engineers. City '
staff recommends relocating the soccer field to eliminate further wetland impacts.
The largest wetland is Rice Marsh Lake, located on the southern edge of this site, east of the '
soccer field. This lake waters is identified as DNR protected waters and are connected by Riley
Creek which is also a DNR protected water. The areas adjoining these lakes are mostly
undisturbed trees and wetland vegetation. These trees and upland vegetation provide an '
excellent natural buffer for these important natural waterways. City staff highly recommends
leaving this area as a natural buffer. The wetland alteration permit is a part of the PUD process.
GRADING '
The majority of the site grading is anticipated to be completed by the developer of Villages on '
the Ponds. Only finish grading and site restoration will be performed by the applicant. Site
' St. Hubert Catholic Community
August 21, 1996
' Page 16
grading is also proposed south of the church site to construct the soccer field. In order to prepare
' the site for the soccer field, wetlands will need to be filled. The soccer field may be able to be
redesigned to fit the parcel to avoid filling the wetland. However, approximately six significant
trees will be lost as a part of the construction. In addition, the topographic characteristics of the
' site will be lowered and leveled 7 to 11 feet overall. Staff still believes that this is an
inappropriate use of the property given the environmental feature and traffic constraints for
access. The developer (Villages on the Ponds) is already having difficulty finding sufficient
' wetland mitigation on the site. Thus, filling the wetlands for the soccer field will only exacerbate
the problem.
' Retaining walls are proposed along the south and east sides of the site. The south retaining wall
is proposed to be 12 to 20 feet high. Staff recommends that a safety fence should be required to
' be installed along all retaining walls in excess of six feet in height. A series of retaining walls
are proposed along the northeast corner of the site adjacent to Grandview Road. They range from
6 to 10 feet high. Again, a safety fence should also be installed along the top of the wall. The
' existing site grades range from elevation 890 at the south end of the project to 970 in the
northeast corner of the site. Proposed site grades range from an elevation of 890 to 942. The
difference in grade in necessary in order to develop the site. The difference in grade will be
' negotiated by providing retaining walls and a walkout -type building to blend into the terrain.
The plans also propose fairly steep slopes south of the building (2:1). Staff believes that these
slopes will be difficult to establish and maintain vegetation. At a minimum, slopes should be no
' steeper than 2.5:1. The applicant should revise the site grades not to exceed 2.5:1 slope or
consider extending a retaining wall along the south side of the property.
' The applicant and development are both requesting to commence grading operations as soon as
possible. One of the problem areas is existing Great Plains Boulevard. This street meanders
through the parcel and building footprint. Great Plains Boulevard is still under MnDOT's
' jurisdiction; therefore, closure and/or vacation of the road will require MnDOT approval. Staff
anticipates MnDOT will formalize a tumback of Great Plains Boulevard some time this fall
(November). Given this timeline, staff is doubtful that much of the grading will be accomplished
' this year. The final plat must first be recorded prior to the City granting a notice to proceed with
site grading. The developer is proposing to submit the final plat for City Council consideration at
the September 9, 1996 City Council meeting. An enormous amount of work is still required
' (preparation of construction plans, wetland mitigation and other governmental agency permit
approvals) in order for the final plat to be recorded.
' The grading plans will also need to be revised to accommodate future upgrading of Grandview
Road on the east side of the parcel. A 17-foot wide right-of-way will be dedicated along the
' easterly property line in the northeast corner of the site. This will result in relocating the
proposed retaining walls westerly which, in turn, impacts the proposed parking lot. The
realignment of the parking lot will involve the loss of five parking stalls.
St. Hubert Catholic Community '
August 21, 1996
Page 17 '
UTILITIES I
Municipal sewer and water service is proposed to be extended to the site in conjunction with The
Villages on the Ponds development. A sanitary sewer line will need to be extended along the '
south end of the building to the easterly property limits for service to Grandview Road.
DRAINAGE I
A comprehensive grading and drainage plan is in the process of being prepared for The Villages
on the Ponds. The site plan is in general conformance with those plans; however, the final '
grading and drainage plans are still being drafted for review and approval by the City. The
applicant should be aware that site modifications to their grading and drainage plan may be
forthcoming after final review and approval of the drainage and ponding calculations. Detailed '
storm drainage calculations for a 10-year, 24-hour storm event be submitted to the City for
review and approval. Pending staff s review of the storm sewer calculations, additional catch
basins may be required on the site. The plans propose a storm sewer line at the easterly driveway '
access (southeast corner) which will convey runoff to a drainage swale on the east side of the
building down to Lake Riley. Staff recommends that the parking lot grades in this area be '
revised to reroute the parking lot runoff northerly into another catch basin, thus eliminating the
need for the storm sewer. All storm sewer improvements on the site will be privately owned and
maintained by the applicant.
EROSION CONTROL
A detailed erosion control plan will be required prior to building permit issuance. The plan shall '
be developed in accordance with the City's Best Management Practice Handbook. Type III
erosion control fence shall be installed and maintained along the southerly grading limits until
the site is fully revegetated and the parking lots paved. Storm sewer inlets should also be
protected with rock filter dikes or erosion control fence until the parking lots and drive aisles are
paved. Rock construction entrances shall be employed and maintained at all access points. I
Maintenance and upkeep of the erosion control system will be enforced.
STREETS I
Proposed traffic and pedestrian circulation appears functional from an engineering standpoint.
The site is providing a secondary access for Grandview Road. Staff believes it will not be ,
necessary to keep the access open to Grandview Road at all times. Its purpose is for secondary
emergency access only. A breakaway gate or chain could be installed to prohibit traffic from
shortcutting through the school/church parking lot. Cross -access and maintenance agreements '
will need to be recorded against the property for use of the secondary access road to the general
I
St. Hubert Catholic Community
August 21, 1996
Page 18
public. The parking lot layout should be revised to include landscaped islands at the ends of the
parking aisles and a striped area/pedestrian ramp where trail accesses parking lot.
LIGHTING/SIGNAGE
The applicant is proposing the use of 20 foot tall single and double lamp parking lot lighting.
Fifteen foot tall pedestrian lighting is provided around the north, west, and south of the building.
Wallpack lighting units are proposed along the eastern side of the building. For project
consistency, the Villages Architectural and Landscape Review Committee must review the plans.
Signage is proposed on walls west of the church. Primarily, the proposed signage complies with
the PUD ordinance. However, a separate sign permit must be submitted for all site signage,
except for traffic control signage.
SITE PLAN FINDINGS
In evaluating a site plan and building plan, the city shall consider the development's compliance
with the following:
(1) Consistency with the elements and objectives of the city's development guides,
including the comprehensive plan, official road mapping, and other plans that may
be adopted;
(2) Consistency with this division;
(3) Preservation of the site in its natural state to the extent practicable by minimizing
tree and soil removal and designing grade changes to be in keeping with the
general appearance of the neighboring developed or developing or developing
areas;
(4) Creation of a harmonious relationship of building and open space with natural site
features and with existing and future buildings having a visual relationship to the
development;
(5) Creation of functional and harmonious design for structures and site features, with
special attention to the following:
a. An internal sense of order for the buildings and use on the site and
provision of a desirable environment for occupants, visitors and general
community;
St. Hubert Catholic Community '
August 21, 1996
Page 19 '
b. The amount and location of open space and landscaping;
C. Materials, textures, colors and details of construction as an expression of
the design concept and the compatibility of the same with adjacent and
neighboring structures and uses; and '
d. Vehicular and pedestrian circulation, including walkways, interior drives
and parking in terms of location and number of access points to the public '
streets, width of interior drives and access points, general interior
circulation, separation of pedestrian and vehicular traffic and arrangement
and amount of parking. '
(6) Protection of adjacent and neighboring properties through reasonable provision
for surface water drainage, sound and sight buffers, preservation of views, light
,
and air and those aspects of design not adequately covered by other regulations
which may have substantial effects on neighboring land uses.
'
Finding: The proposed development is consistent with the comprehensive plan,. The
proposed development is consistent with the Villages on the Ponds design requirements,
the comprehensive plan, as amended as part of the Villages on the Ponds project, the
,
zoning ordinance, and the site plan review requirements. The site has few existing
natural amenities due to previous development in the area. The site design is compatible
with the surrounding development and enhances the open space and landscaping being
,
established as part of the development of Villages on the Ponds. The site design is
functional and harmonious with the approved development for this area.
'
PLANNING COMMISSION UPDATE
'
The Planning Commission held a public hearing on August 21, 1996 to review the proposed site
plan. The Planning Commission voted unanimously to recommend approval of site plan 96-11
with a modification to condition 1. and the addition of the following conditions:
'
• The applicant shall provide plans for City Council review for ultimate soccer field location
and effects on wetland mitigation and tree removal if the soccer field remains south of Riley
'
Creek. It should also provide the City Council with the effects of locating the soccer field
north of Riley Creek.
• The applicant shall meet with the architectural and landscape review committee to review the
additional architectural details of the building before the City Council meeting.
F
r
St. Hubert Catholic Community
August 21, 1996
Page 20
• The applicant shall provide details of material and color renderings of the retaining walls on
the east and south side for City Council review.
• A comprehensive light plan for Villages on the Ponds shall be compiled.
The applicant has provided details regarding the options for the location of the soccer field. The
first alternative, which was reviewed by the Planning Commission and is in the development
plans submitted for review, impacts wetlands on the western side of the field, but preserves some
significant trees on the east side of the soccer field. This option would require additional wetland
mitigation within the Villages on the Ponds project.
The second option, Athletic field grading plan option five, relocates the soccer field on the north
side of the trail system. This option removes the preserved vegetation north of the trail,
eliminates a required stormwater pond that must be replaced on the site. However the storm
pond could be relocated south of the trail between the creek, and the upland buffer and tree be
preserved where the soccer field was proposed. However, the Villages on the Ponds developer
may then request that this area be used for locating tennis courts or some other recreation facility,
requiring the removal of trees. Staff supports the relocation of the soccer field north of the trail.
However, any development within this area would have to minimally impact the trees and
topography. It has always been staff s preference to leave the area south of the creek natural.
Nature is a component of a neotraditional development.
The third option, Atheletic Field Grading Plan Option 6, revising the location of the soccer field
within Lot 11. This option removes the significant trees that were to be preserved as part of the
submitted plan, but with some minor revisions to the grading plan, would preserve the wetlands.
The applicant has met with the Architectural/Landscape Review Committee for Villages on the
Ponds. This committee is satisfied with the additional detailing being proposed for the building
elevations.
The applicant has provided color brochures for Roma Pisa retaining wall systems for the
proposed retaining walls on the site. A rendering of the retaining walls as proposed has not been
submitted. However, staff believes that this retaining wall system and color will be an acceptable
' system to be used within the development. Staff recommends that a condition be added requiring
the use of the Roman Pisa retaining wall system.
The applicant is required by their contract to purchase the property to comply with the Villages
on the Ponds Design Standards as well as the developers design standards. One element of these
standards will be the use of consistent lighting throughout the project. Staff believes that the
' development will incorporate a high quality light standard for the development.
St. Hubert Catholic Community '
August 21, 1996
Page 21 '
Staff is recommending that the conditions added by the Planning Commission not be included as
part of the conditions of approval. However, staff requests that the Council provide direction as ,
to the final location for the soccer field.
RECOMMENDATION
'
Staff recommends that the City Council adopt the following motion:
'
"The City Council approves Site Plan 96-11 for a 96,288 square foot school church facility for
St. Hubert Catholic Community, plans prepared by OPUS Architects & Engineers, Inc., dated
7/19/96, subject to the following conditions:
'
1. The applicant must provide three more islands or peninsulas in the south parking lot and
add perimeter landscaping in the north parking lots in order to meet city ordinance
,
requirements.
2. The applicant must provide four more overstory trees within the parking lot areas in order to
,
meet city requirements.
3. The seven Black Hills Spruce south of the school are to be relocated outside of the future
'
expansion area.
4. If it is feasible to relocate the soccer field north of the trail, the wooded area south of
'
Highway 101 shall be placed under a conservation easement. If the soccer field is to be
constructed in the proposed location, grading shall be modified to avoid filling of any
'
wetlands on the site.
5. The applicant shall revise the landscaping plan south of the school site on the steep slope. '
This area shall be revegetated with sumac, live willow and dogwood stakes, and other fast
growing materials to improve soil stability and reduce potential erosion.
6. Landscape islands less than 10 feet in width will require the installation of aeration piping. '
7. All new planting areas, including parking lot islands, peninsulas, and boulevards, shall have I
an irrigation system installed.
8. The applicant is required to incorporate street furniture in the plaza area west of the church. '
9. A bicycle parking area and bicycle racks shall be provided on site.
St. Hubert Catholic Community
August 21, 1996
' Page 22
10. A minimum of 50 percent of the parking for the St. Hubert Catholic Community must be
' provided through shared parking agreements. Cross access easements and the joint use of
parking facilities shall be protected by a recorded instrument acceptable to the city.
' 11. A separate sign permit must be submitted for all site signage, except for traffic control
signage.
12. Site plan approval shall be conditioned upon the developer of The Villages on the Ponds
receiving final plat approval by the City of Chanhassen. Once the developer has supplied the
City with an executed PUD/development contract and financial escrow to guarantee site
' improvements, the site grading may commence upon receipt of the appropriate permits from
other governmental agencies.
13. All retaining walls in excess of four feet in height shall be engineered and will require a
building permit from the City's Building Department. All retaining walls in excess of six
feet in height shall have safety fences installed above them.
14. The grading plan shall be revised to take into account an additional 17 feet of right-of-way to
be dedicated to the City for Grandview Road in the northeast corner of the site. The parking
lot configuration shall be revised accordingly. Parking lot grades in the easterly side of the
building shall be modified to eliminate the isolated storm sewer line south of the secondary
access point. Landscaped islands shall be provided at the ends of the parking aisles. The
parking stall in front of the trail shall be striped and a pedestrian ramp installed.
15. Final grading and drainage plans shall be modified to be compatible with the overall
comprehensive grading and drainage plans from The Villages on the Ponds development.
16. A sanitary sewer line shall be extended around the southerly end of the building to the
easterly property line for future extension along Grandview Road.
17. The applicant will need to develop a sediment and erosion control plan in accordance with the
City's Best Management Practice Handbook and the Surface Water Management Plan
requirements for new developments. The plan shall be submitted to the City for review and
formal approval
18. All areas disturbed as a result of construction activities shall be immediately restored with seed
and disc -mulched or wood -fiber blanket or sod within two weeks of completion of each activity
in accordance with the City's Best Management Practice Handbook. Slopes steeper than 3:1
shall be restored with erosion control blankets.
St. Hubert Catholic Community
August 21, 1996
Page 23
19. Wetland buffer areas shall be surveyed and staked in accordance with the City's wetland
ordinance. The City will install wetland buffer edge signs before accepting the utilities and will
charge the applicant $20 per sign.
20. The applicant shall provide detailed storm sewer calculations for 10-year and 100-year storm
events and provide ponding calculations for stormwater quality/quantity ponds in accordance
with the City's Surface Water Management Plan for the City Engineer to review and approve.
The applicant shall provide detailed pre -developed and post developed stormwater calculations
for 100-year storm events and normal water level and high water level calculations in existing
basins, created basins, and or creeks. Individual storm sewer calculations between each catch
basin segment will also be required to determine if sufficient catch basins are being utilized. In
addition, water quality ponding design calculations shall be based on Walker's Pondnet model.
21. The applicant shall enter into a site plan agreement with the City and provide the necessary
financial security to guarantee compliance with the terms of the agreement.
22. The applicant will meet wetland rules and regulations as stated in Corps of Engineers section
404 permit, the State Wetland Conservation Act, and the City's Wetland Ordinance. Mitigation
work shall be implemented prior to or concurrent with wetland fill activity in all phases of the
project.
23. The applicant shall apply for and obtain permits from the appropriate regulatory agencies, i.e.
Carver County, Watershed District, Metropolitan Waste Control Commission, Health
Department, Minnesota Pollution Control Agency, Minnesota Department of Natural
Resources, Army Corps of Engineers and Minnesota Department of Transportation and comply
with their conditions of approval.
24. Fire hydrants shall be incorporated per the Fire Marshal's recommendations. A ten foot clear
space must be maintained around fire hydrants, i.e. street lamps, trees, shrubs, bushes, NSP,
US West, cable TV, transformer boxes. This is to ensure that fire hydrants can be quickly
located and safely operated by firefighters (pursuant to City Ordinance 9-1). An additional
fire hydrant will be required -- the location to be on the southwest corner of the property.
Contact Chanhassen Fire Marshal for exact location.
25. Yellow painted curbing and No Parking Fire Lane Signs will be required. Contact Fire
Marshal for exact location of signage and determination of curbing to be painted. Pursuant to
1991 Uniform Fire Code Section 10-206 and Section 20-207a. and Chanhassen Fire
Department Fire Prevention Policy 06-1991
I
r
St. Hubert Catholic Community
August 21, 1996
Page 24
26. A post indicator valve (PIV) will be required on the 8" water line coming into the building.
Contact Chanhassen Fire Marshal for exact location.
27. Comply with Chanhassen Fire Department/Fire Prevention Division, Policy #01-1990, Fire
Alarm Systems (copy enclosed).
28. Comply with Chanhassen Fire Department/Fire Prevention Division, Policy #04-1991 (notes
to be included on site plans) (copy enclosed).
29. Comply with Chanhassen Fire Department/Fire Prevention Division, Policy #07-1991, Pre -
Fire Plan Policy (copy enclosed).
30. Comply with Chanhassen Fire Department/Fire Prevention Division, Policy #29-1992,
Premise Identification (copy enclosed).
31. Comply with Chanhassen Fire Department/Fire Prevention Division, Policy #36-1994, Water
Line Sizing (copy enclosed).
32. Comply with Chanhassen Fire Department/Fire Prevention Division, Policy #40-1995, Fire
Sprinkler Systems.
33. Comply with Inspection Division, Policy #34-1993, Water Service Installation.
34. Fire apparatus access roads shall be provided for every facility, building or portion of a
building. After constructed or moved into or within the jurisdiction when any portion of the
facility or any portion of an exterior wall of the first story of the building is located more than
150 feet, fire apparatus access as measured by an approved route around the exterior of the
building or facility. With regards to the school wing, either provide fire apparatus access to
within 150 feet of all portions of the building or install Class I stand pipes within the
stairways of the school portion of the complex. This is taking into account the future
expansion of the school.
35. Submit turning radiuses of Fire Department access routes to City Engineer and Fire Marshal
for review and approval. .
36. The applicant is required to use the Roman Pisa retaining wall systems."
St. Hubert Catholic Community
August 21, 1996
Page 25
ATTACHMENTS
1. Development Review Application '
2. Letter from Fr. Steven Ulrick and David F. Bangasser to Date Aanenson dated 7/19/96
3. Reduced Site Plan, Church/School '
4. Reduced Building Elevation
5. Reduced Site Plan, Soccer Field
6. Memo from Steve A. Kirchman to Bob Generous dated 8/9/96 '
7. Notice of Public Hearing and Mailing List
8. Planning Commission Minutes for August 21, 1996
CITY OF CHANHASSEN
' 690 COULTER DRIVE
CHANHASSEN, MN 55317
(612) 937-1900
' DEVELOPMENT REVIEW APPLICATION
APPLICANT: St. Hubert Catholic Community OWNER: Same
ADDRESS: 7707 Great Plains Boulevard ADDRESS:
' Chanhassen, MN
TELEPHONE (Day time) 934-9106 TELEPHONE:
Attn: Dave Bangasser 936-4457
1
i
1
Comprehensive Plan Amendment
_ Temporary Sales Permit
Conditional Use Permit
_ Vacation of ROW/Easements
Interim Use Permit
_ Variance
Non -conforming Use Permit
_ Wetland Alteration Permit
Planned Unit Development*
_ Zoning Appeal
Rezoning
_ Zoning Ordinance Amendment
Sign Permits
X Sign Plan Review Z)t
Notification Sign 50 + too
Site Plan Review*
X Escrow for Filing Fees/Attomey Cost" 'gyp
($50 CUP/SPRNACNARANAP/Metes
and Bounds, $400 Minor SUB)
Subdivision*
TOTAL FEE $ MA
A list of all property owners within 500 feet of the boundaries of the property must be included with the
application.
Building material samples must be submitted with site plan reviews.
*Twenty-six full size folded copies of the plans must be submitted, including an 81/2' X 11" reduced copy of
transparency for each plan sheet
Escrow will be required for other applications through the development contract
NOTE - When multiple applications are processed, the appropriate fee shall be charged for each application.
1
L
PROJECT NAME St. Hubert Catholic Communi.
LOCATION Villages on the Ponds
LEGAL DESCRIPTION Lots 10 and 11, Block 1
TOTALACREAGE 10.3 Acres
WETLANDS PRESENT -YES X NO
PRESENT ZONING
REQUESTED ZONING PUD (separate request by land owner currently being reviewed)
PRESENT LAND USE DESIGNATION
REQUESTED LAND USE DESIGNATION
REASON FOR THIS REQUEST Construct a new church and school
This application must be completed in fall and be typewritten or clearly printed and must be accompanied by all information
and plans required by applicable City Ordinance provisions. Before filing this application, you should confer with the Planning
Department to determine the specific ordinance and procedural requirements applicable to your application.
A determination of completeness of the application shall be made within ten business days of application submittal. A written I
notice of application deficiencies shall be mailed to the applicant within ten business days of application.
This is to certify that I am making application for the described action by the City and that I am responsible for complying with
all City requirements with regard to this request. This application should be processed in my name and I am the party whom
the City should contact regarding any matter pertaining to this application. I have attached a copy of proof of ownership
(either copy of Owner's Duplicate Certificate of Title, Abstract of Title or purchase agreement), or I am the authorized person
to make this application and the fee owner has also signed this application.
I will keep myself informed of the deadlines for submission of material and the progress of this application. I further
understand that additional fees may be charged for consulting fees, feasibility studies, etc. with an estimate prior to any
authorization to proceed with the study. The documents and information I have submitted are true and correct to the best of
my knowledge.
The city hereby notifies the applicant that development review cannot be completed within 60 days due to public hearing
requirements and agency review. Therefore, the city is notifying the applicant that the city requires an automatic 60 day
extension for development review. Development review shall be completed within 120 days unless additional review
extensions are approved by the applicant.
Signature of
Sigfiiaturle of Fee Owner
Application Received on 71
,,)) C
Fee Paid /`7 / I I E-C
1 db(
Date
/ Date
Receipt No.
The applicant should contact staff for a copy of the staff report which will be available on Friday prior to the meeting.
If not contacted, a copy of the report will be mailed to the applicant's address.
F_
St. Hubert Catholic Community
Parish Office: 7707 Great Plains Blvd. • Chanhassen, Minnesota 55317 • (612) 934-9106
' July 19, 1996
IMs. Kate Aanenson
CITY OF CHANHASSEN
' 690 Coulter Drive, P.O. Box 147
Chanhassen, MN 55317
RE: Proposed St. Hubert Catholic Community Church & School
' Site Plan Review
Dear Ms. Aanenson:
' St. Huberts Catholic Community is pleased to submit the attached development review application
requesting site plan review for St. Hubert's new church and school to be constructed on 10.3 acres of
' land which St. Hubert's is proposing to purchase from the Ward family as part of the Villages On The
Ponds development. The Villages On The Ponds development is currently being reviewed by the
City of Chanhassen for final PUD approval. Accompanying this application please find a check in the
amount of $1,411 as well as 26 folded sets of the required plans. We request the City of Chanhassen
' review this application in order for consideration by the Planning Commission at its August 21st
Public Hearing and by the City Council on September 9.
' St. Hubert Catholic Community has been in Chanhassen since 1865 and has experienced tremendous
growth in recent years due to development in the area. The Parish Council has determined that
expansion at our present location in order to accommodate this growth is not feasible and that a new
site should be acquired which would be suitable for constructing a 1500 seat church, education
' center, gymnasium and associated support spaces. The long term master plan for the development
may approach up to 125,000 square feet, part of which is intended to be on a second floor.
' After a thorough site selection process, St. Hubert's has agreed to purchase 2 lots totaling 10.3 acres
from the Ward family as part of their proposed Villages On The Ponds development. St. Hubert's is
very excited to be a key part of this planned unit development which will allow the church to remain a
' part of downtown Chanhassen. A key benefit to all parties of the Villages On The Ponds
development is the use of shared parking. St. Hubert's intends to construct 297 parking stalls
dedicated to the Church's use. In addition, the Church will have access to an additional 435 parking
stalls shared with surrounding uses which will accommodate the Parish's peak parking on evenings
' and weekends.
Thank you for your consideration in reviewing this project. If you have any questions or require any
' additional information, please call Dave Bangasser at 936-4457.
Sincerely,
' ST. HUB RT CATHO IC COMMUNITY
' Fr. *Stevenick David F. Bangasser
Pastor Building Committee Member
r
.e \I tw •
KWH I — rf
'IllrlHIA
CwmILA/l
l�J . w
�Te RAN
DM DATA
NID.W DATA
VWN" DATA
ALMSAM
�..........�
'GC
ALQtLm
=71••1.
en .fl,(.•���.� /A�IM 1e1 y
Mn1 a..P• ..l•
•ieWf non
�.•�• wM � = H
Am• rl. MMN•�.
M �iMl /0 �••1 H
w_ Faa..�w
elm
•
M1� ��� .iV
��MA•I�.•.�A
M.eP.MFf
Q OPUS
F, .•..• A afr• W.
"tom
w 4 to
MM r..t 04
III-at-4m P. MMIMMf
ST. HUBW
CAnoom
an MAN
7
L
���i.�'��iilli�.�� i���•� iiiiiiiiiiiiiii � ��' :::e ::
• • lllll��i '■�
.�
■ ®®
M-
--.
I
i OR OR WI��L•9L•J3J
..
,� NOIRH RtVAl10N
m0 ®®®® ® ®® ®®®® ®®® a 0 0 0 0
®®®® ®®®® m®®® ®®®m ®®®®---------------------------------
tinw
4 eAer E.lVATION
uK..i•.
� i• i• i• i• i• i• i• f• � i• i• i• f• i• i•
min
r=w.
R R.fM�
aw0
a K:.
8T. F1L66►f
CATHOW
OCMML ty
ExiaroR
EIiVAT10N9
,� NOIRH RtVAl10N
m0 ®®®® ® ®® ®®®® ®®® a 0 0 0 0
®®®® ®®®® m®®® ®®®m ®®®®---------------------------------
tinw
4 eAer E.lVATION
uK..i•.
� i• i• i• i• i• i• i• f• � i• i• i• f• i• i•
min
r=w.
R R.fM�
aw0
a K:.
8T. F1L66►f
CATHOW
OCMML ty
ExiaroR
EIiVAT10N9
LMOSCAPE PLAN — SOOCEM FELD
elm
I=U:7r
P.ROPUS.
" Yfm. a (.*— -
3FMBEFrT
CAIVIOLIC
COMK*M
LAPDSCAPE
RAN + MA"
U.2
CITY OF
CHANHASSEN
690 COULTER DRIVE • P.O. BOX 147 • CHANHASSEN, MINNESOTA 55317
(612) 937-1900 0 FAX (612) 937-5739
MEMORANDUM
TO: Bob Generous, Senior Planner
FROM: Steve A. Kirchman, Building Official a•
DATE: August 9, 1996
SUBJECT: 96-11 SPR (St. Hubert Catholic Community)
I was asked to review the site plan proposal stamped "CITY of CHANHASSEN, RECEIVED, JUL 2 3
19 9 6 , CHANHASSEN PLANNING DEPT. for the above referenced project.
I have no comments or recommendations concerning this application at this time.
gAsafety\sak\memos\plan\sthurt 1
NOTICE OF PUBLIC
HEARING
PLANNING COMMISSION
MEETING
Wednesday, August 21, 1996
at 7:00 p.m.
City Hall Council Chambers
690 Coulter Drive
Project: St. Hubert Catholic Community
Developer: Lotus Realty/St. Hubert's Church
Location: East of Great Plains Blvd and
South of Hwy. 5
■
Notice: You are invited to attend a public hearing about a development proposed in your
area. The applicant, Lotus Realty/St. Hubert's Church, is requesting site plan approval for a '
96,288 sq. ft. church and school facility on 8.03 acres and a soccer field on 2.48 acres. The
property is included in the proposed Villages on the Ponds project which is requesting a rezoning to
PUD and is located east of Great Plains Blvd. and south of Hwy. 5, proposed Lots 10 and 11,
Villages on the Pond, St. Hubert Catholic Community.
What Happens at the Meeting: The purpose of this public hearing is to inform you about the ,
developer's request and to obtain input from the neighborhood about this project. During the
meeting, the Commission Chair will lead the public hearing through the following steps:
1. Staff will give an over view of the proposed project. '
2. The Developer will present plans on the project. '
3. Comments are received from the public.
4. Public hearing is closed and the Commission discusses project. The Commission
will then make a recommendation to the City Council. '
Questions or Comments: If you want to see the plans before the meeting, please stop by City
Hall during office hours, 8:00 a.m. to 4:30 p.m., Monday through Friday. If you wish to talk to '
someone about this project, please contact Bob at 937-1900, ext. 141. If you choose to submit
written comments, it is helpful to have one copy to the department in advance of the meeting. Staff
will provide copies to the Commission.
Notice of this public hearing has been published in the Chanhassen Villager on August 8, 1996.
I ��
NOTICE OF PUBLIC HEARING
SITE PLAN REVIEW
' CITY OF CHANHASSEN
NOTICE IS HEREBY GIVEN that the Chanhassen Planning Commission will hold a
public hearing on Wednesday, August 21, 1996, at 7:00 p.m. in the Council Chambers in
Chanhassen City Hall, 690 Coulter Drive. The purpose of this hearing is to consider the application
' of St. Hubert's Church for site plan approval for a 96,288 sq. ft. church and school facility on 8.03
acres and a soccer field on 2.48 acres. The property is included in the proposed Villages on the
Ponds project which is requesting a rezoning to PUD and is located east of Great Plains Blvd. and
south of Hwy. 5, proposed Lots 10 and 11, Villages on the Pond, St. Hubert Catholic Community.
A plan showing the location of the proposal is available for public review at City Hall
' during regular business hours.
All interested persons are invited to attend this public hearing and express their opinions
' with respect to this proposal.
Robert Generous, Planner H
Phone: 937-1900, ext. 141
I
(Publish in the Chanhassen Villager on August 8, 1995)
n
Steven Kokesh & Nancy Ecoff
Albert & Jean Sinnen
Richard & Linda Anderson
8201 Grandview Road
8150 Grandview Road
8210 Grandview Road
Chanhassen, MN 55317
Chanhassen, MN 55317
Chanhassen, MN 55317
'
Mary S. Bernier
Greg & Mary Larsen
Robert W. Armstrong, Jr.
8155 Grandview Road, Box 157
8151 Grandview Road
8400 Great Plains Blvd.
Chanhassen, MN 55317
Chanhassen, MN 55317
Chanhassen, MN 55317
James & Kathryn Jacoby
R. Lawrence & T. Harris
Mark & Lori Jesberg
t
8410 Great Plains Blvd.
8408 Great Plains Blvd.
8407 Great Plains Blvd.
Chanhassen, MN 55317
Chanhassen, MN 55317
Chanhassen, MN 55317
'
Andrew Freseth &
Milton Bathke
Willis & Anita Klein
Lynda Williamson
8404 Great Plains Blvd.
8405 Great Plains Blvd.
'
8411 Great Plains Blvd.
Chanhassen, MN 55317
Chanhassen, MN 55317
Chanhassen, MN 55317
'
George, Jr. & Margaret Shorba
Donald & Dorothy Gale
Rosemount, Inca
304 Chan View
8402 Great Plains Blvd.
Attn: Controller
'
Chanhassen, MN 55317
Chanhassen, MN 55317
12001 Technology Drive
Eden Prairie, MN 55317
'
Robert Dittrich
Holiday Station Stores
Thaddeus Korzenowski
1827 Crestview Drive
4567 80th Street West
20645 Radisson Road
New Ulm, MN 56073
Bloomington, MN 55437
Excelsior, MN 55331-9181
'
Chanhassen Inn
B. C. Burdick
,
531 West 79th Street
684 Excelsior Blvd.
Chanhassen, MN 55317
Excelsior, MN 55331
'
James & Carol Udstuen
Peter & Mary Staudohar Knoll
Bisrat & Denise Alemayehu
360 Hidden Lane
370 Hidden Lane
380 Hidden Lane
,
Chanhassen, MN 55317
Chanhassen, MN 55317
Chanhassen, MN 55317
William & Debra Prigge
Andrew & Jeannine Cone
Brian Semke & Deborah Duetsch
390 Hidden Lane
321 Hidden Lane
331 Hidden Lane
Chanhassen, MN 55317
Chanhassen, MN 55317
Chanhassen, MN 55317
,
Rand & Kimbra Green
y
Michael & Prudence Busch
Mark & Alexandra Lepage
8103 Marsh Drive
8113 Marsh Drive
MN 55317
8123 Marsh Drive
Chanhassen, MN 55317
'
Chanhassen, MN 55317
Chanhassen,
Lon & Mary Stutelberg
C133 Marsh Drive
hanhassen, MN 55317
tartin & Timaree Fajdetich
8100 Marsh Drive
Ihanhassen, MN 55317
aul & Rita Klauda
130 Marsh Drive
Chanhassen, MN 55317
�teven & Julie Lundeen
160 Marsh Drive
Chanhassen, MN 55317
Randal & J Meyer
0 Sinnen Circle
hanhassen, MN 55317
1homas & Jill Hansen
31 Sinnen Circle
hanhassen, MN 55317
ugh Faulds & Karyn Knutson
136 Dakota Lane
Chanhassen, MN 55317
on White
1139 Dakota Lane
Chanhassen, MN 55317
Arthur & Jo Ann Mulligan
O1 Tigua Lane
hanhassen, MN 55317
1
Tom -Don Real Estate Holdings
10 1 Lady Bird Lane
urnsville, MN 55337
Robert & Lois Savard
8080 Marsh Drive
Chanhassen, MN 55317
Yagui Wei & YuYi Lin
8110 Marsh Drive
Chanhassen, MN 55317
Walt & Pamela Chapman
8140 Marsh Drive
Chanhassen, MN 55317
Gary & Debra Disch
8170 Marsh Drive
Chanhassen, MN 55317
Richard, Jr. & Patricia Hamblin
340 Sinnen Circle
Chanhassen, MN 55317
Mike & Mary Regnier
321 Sinnen Circle
Chanhassen, MN 55317
Thomas & Rita Mohs
8138 Dakota Lane
Chanhassen, MN 55317
Blue Circle Investment
6125 Blue Circle Drive
Minnetonka, MN 55343
David & Sharon Nickolay
8500 Tigua Lane
Chanhassen, MN 55317
Jay S. Anders
8090 Marsh Drive
Chanhassen, MN 55317
David & Karli Wandling
8120 Marsh Drive
Chanhassen, MN 55317
Bruce & Cynthia Marengo
8150 Marsh Drive
Chanhassen, MN 55317
Eric Johnson & Molly Surbrook
320 Sinnen Circle
Chanhassen, MN 55317
Mark & Sharon Nicpon
341 Sinnen Circle
Chanhassen, MN 55317
Robert Langley & Laurie Soper
8134 Dakota Lane
Chanhassen, MN 55317
John & Brenda Lund
8140 Dakota Lane
Chanhassen, MN 55317
Chanhassen NH Partnership
900 2nd Ave. S.
1100 International Ctr.
Minneapolis, MN 55402
Apple American Ltd. Partnership
4551 W. 100`h Street, Suite 100
Overland Park, Kansas