Loading...
1h. Lake Ann Park Ballfield Lighting Project: Change Order.7 C I TY OF CHANHASSEN 690 COULTER DRIVE • P.O. BOX 147 • CHANHASSEN, MINNESOTA 55317 (612) 937 -1900 • FAX (612) 937 -5739 MEMORANDUM TO: Don Ashworth, City Manager FROM: Todd Hoffman, Park & Recreation Director ' DATE: November 5, 1996 Action by City Adm1n1ftTdfb7 Endorsed Modified Rejected Dat Date Submitted to Commissioft Date ~ tt ^d to Cound ' SUBJ: Lake Ann Ballfield Lighting Project, Approve Change Order No. 1 ' On September 23, the city council awarded the Lake Ann Park Ballfield Lighting Project to Electrical Installation and Maintenance Company (EIM). Upon detailed review of construction documents, Mr. Ken Pysick, President of EIM contacted me to discuss two contract amendments: 1. Installation of identified I.D. conductors in service lateral. Grounded I.D. conductors required by inspector. 2. Route wiring system around perimeter of ballfields in lieu of across fields. A desired plan amendment to minimize disturbance of irrigation systems and to avoid trench settlements on the playing surface. The addition of both these items is supported by staff and is well within the original project ' budget. RECOMMENDATION ' It is recommended that the city council approve Change Order No. 1 to the Lake Ann Park Ballfield Lighting Project in the amount of $4,350. ' c: Dale Gregory, Park Superintendent p ' Mark Holden, Holden and Associates Scott Midness, Barton Aschman & Associates Ken Pysick, Electrical Installation and Maintenance ' ATTACHMENTS 1. Proposal from EIM 2. Memorandum from Holden and Associates gApark\di \bal lfieldlightchgord F roposN ( Page No. of Pages ' ECEP ELF EIM ELECTRICAL INSTALLATION & MAINTENANCE CO. ' 1wr 4985 BROADMOOR DRIVE 6 INDEPENDENCE, MN 55359 OCT 21 1996 (612)479.3744 FAX (612)479.3745 CITY OF CH.ANHASSEN , PROPOSAL SUBMITTED TO PHONE DATE City of Chanhassen 612- 937 -1900 October 17, 1996 STREET JOB NAME 690 Coulter Drive P.O. Box 147 Lake Ann Park Ballfield Lighting CITY, STATE AND ZIP CODE JOB LOCATION Chanhassen, MN 55317 Chanhassen, MN ARCHITECT DATE OF PLANS JOB PHONE ' ATTN: Todd Hoffman We hereby submit specifications and estimates for: Install ID conducters in service lateral $500.00 ' Route wiring system around perimeter of ball field instead of thru Yield $3,850.00 ' Or f rop hereby to furnish material and labor — complete in accordance with above specifications, for the sum of: ' dollars ($ 4, 350.00 �. Payment to be made as follows: , All material is guaranteed to be as specified. All work to be completed in a workmanlike Authorized manner according to standard practices. Any alteration or deviation from above specifica- Signature tions involving extra costs will be executed only upon written orders, and will become an extra charge over and above the estimate. All agreements contingent upon strikes, accidents Note: This proposal may be or delays beyond our control. Owner to carry fire, tornado and other necessary insurance. Our workers are fully covered by Workmen's Compensation Insurance. withdrawn by us if not accepted within days. Arreptaurr of f ropood —The above prices, specifications and conditions are satisfactory and are hereby accepted. You are authorized Signature to do the work as specified. Payment will be made as outlined above. Date of Acceptance: Signature FORM 118 COPYRIGHT 1960 - NEW ENGLAND BUSINESS SERVICE. INC.. TOWNSEND. MASS. 01469 r HOLDEN & ASSOCIATES CONSULTING Inc. Electrical Design ForBuilding Construction ' Cedarvale Business Center Off: (612) 688 -9315 3906 Beau D'Rue Drive, Eagan, Minnesota 55122 Fax: (612) 688 -2994 MEMORANDUM cc: File ' DATE: October 30, 1996 TO: Todd Hoffman PHONE# 937 -1900 ext. 121 FAX# 937 -5739 FROM: Mark Hold PROJECT: Lake Ann Park Ballfield COMM# 1496 ' Field Lighting Project, City of Chanhassen 690 Coulter Drive Chanhassen, MN 55317 Per your request, I have reviewed EIM's estimate dated October 17, 1996 for a change to the subject ' project for: 1. The inclusion of identified conductors (ID) in service lateral. $500.00 2. Routing of system conductors around the field in lieu of across the field. $3,850.00 The amounts are in accordance with current construction costs and are therefore recommended to be included in the project contract agreement. ' 7� / �o1,� 0 ? 199E File: MEM06 t