MEMORANDUM
1�
CITY OF
--
690 COULTER DRIVE • P.O. BOX 147 • CHANHASSEN, MINNESOTA 55317
(612) 937 -1900 • FAX (612) 937 -5739
TO: Charles Folch, Director of Public Works
FROM: Bill Bement, Engineering Technician H
DATE: October 31, 1996
SUBJ: Change Order No. 1 for Kerber Boulevard Bituminous Overlay
Project No. 96 -5 (S.A.P. 194- 101 -09)
Action by City Administrator,
Endorsed ✓ T�fw A
Modified
Rejected
Dat 1 -
Date Submitted to Commission
W pate f0 ~` CAJnCIi
�-_ _ /1 - I'- - y I -
Change Order No. 1 consists of an additional 476.85 tons of MnDOT Type 41A wear course
material to the plan quantities. In order to achieve a minimum finished surface crown of 1 %2 %, a
leveling course was installed prior to the actual bituminous overlay process, thereby bringing the
pre - overlay road contour within a tolerable range.
ktm
g:\eng\bill\memosVxrbcr change order.doc
Director of Public Works Comment
Municipal State Aid Funds will be used to fund the cost increase!
CITY OF CHANHASSEN
CHANGE ORDER NO.
1
CHANGE ORDER
DATE .10 -24 -96
SHEET 1 of 2
Quantity ±
PROJECT NO. 96-5
Increase
Amount
CONTRACTOR
PROJECT NAME
WM. MUELLER & SONS, INC.
KERBER BOULEVARD BITUMINOUS OVERLAY
ADDRESS
4,450
831 PARK AVENUE
S.A.P. 194 - 101 -09
$10,381.02
TYPE OF WORK
HAMBURG, MN 55339
RESURFACING
1 $10,381.02
ORIGINAL CONTRACT AMOUNT
$114,975
Spec.
No.
Item
No.
Item of Work
Unit
Original t
Previous
Change
Quantit
Quantity ±
Unit
Price
Increase
Amount
Decrease
Amount
2341.508
1
WEAR COURSE TYPE 41A
21.77
4,450
476.85
21.77
$10,381.02
Net Increase or D°�s to Date $ 10,381.02
Totals
1 $10,381.02
Due to this change, the contract time:
❑ a: is increased /decreased by working days.
is increased /decreased by calendar days.
❑ b: is not changed.
❑ c: may be revised if the work affects /affected the controlling operation
EXPLANATION OF CHANGE IN PLAN RECOMMENDED (Attach additional sheets if necessarv)
IN ORDER TO ACHIEVE A MINIMUM FINISHED SURFACE CROWN OF 1 %, A LEVELING COURSE WAS
INSTALLED PRIOR TO THE ACTUAL BITUMINOUS OVERLAY PROCESS, THEREBY BRINGING THE PRE -
OVERLAY ROAD CONTOUR WITHIN A TOLERABLE RANGE.
CONTRACTOR SIGNATURE
DATE
CITY ENGINEER SIGNATURE
DATE
CITY INSPECTOR SIGNATURE
DATE