Loading...
1i. Kerber Blvd Bituminous Overlay: Change Order.1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 MEMORANDUM 1� CITY OF -- 690 COULTER DRIVE • P.O. BOX 147 • CHANHASSEN, MINNESOTA 55317 (612) 937 -1900 • FAX (612) 937 -5739 TO: Charles Folch, Director of Public Works FROM: Bill Bement, Engineering Technician H DATE: October 31, 1996 SUBJ: Change Order No. 1 for Kerber Boulevard Bituminous Overlay Project No. 96 -5 (S.A.P. 194- 101 -09) Action by City Administrator, Endorsed ✓ T�fw A Modified Rejected Dat 1 - Date Submitted to Commission W pate f0 ~` CAJnCIi �-_ _ /1 - I'- - y I - Change Order No. 1 consists of an additional 476.85 tons of MnDOT Type 41A wear course material to the plan quantities. In order to achieve a minimum finished surface crown of 1 %2 %, a leveling course was installed prior to the actual bituminous overlay process, thereby bringing the pre - overlay road contour within a tolerable range. ktm g:\eng\bill\memosVxrbcr change order.doc Director of Public Works Comment Municipal State Aid Funds will be used to fund the cost increase! CITY OF CHANHASSEN CHANGE ORDER NO. 1 CHANGE ORDER DATE .10 -24 -96 SHEET 1 of 2 Quantity ± PROJECT NO. 96-5 Increase Amount CONTRACTOR PROJECT NAME WM. MUELLER & SONS, INC. KERBER BOULEVARD BITUMINOUS OVERLAY ADDRESS 4,450 831 PARK AVENUE S.A.P. 194 - 101 -09 $10,381.02 TYPE OF WORK HAMBURG, MN 55339 RESURFACING 1 $10,381.02 ORIGINAL CONTRACT AMOUNT $114,975 Spec. No. Item No. Item of Work Unit Original t Previous Change Quantit Quantity ± Unit Price Increase Amount Decrease Amount 2341.508 1 WEAR COURSE TYPE 41A 21.77 4,450 476.85 21.77 $10,381.02 Net Increase or D°�s to Date $ 10,381.02 Totals 1 $10,381.02 Due to this change, the contract time: ❑ a: is increased /decreased by working days. is increased /decreased by calendar days. ❑ b: is not changed. ❑ c: may be revised if the work affects /affected the controlling operation EXPLANATION OF CHANGE IN PLAN RECOMMENDED (Attach additional sheets if necessarv) IN ORDER TO ACHIEVE A MINIMUM FINISHED SURFACE CROWN OF 1 %, A LEVELING COURSE WAS INSTALLED PRIOR TO THE ACTUAL BITUMINOUS OVERLAY PROCESS, THEREBY BRINGING THE PRE - OVERLAY ROAD CONTOUR WITHIN A TOLERABLE RANGE. CONTRACTOR SIGNATURE DATE CITY ENGINEER SIGNATURE DATE CITY INSPECTOR SIGNATURE DATE i r L n 0 C C r Ej