1m. Lyman Blvd Reconstruction and Lake Riley Trunk Utility Improvement: Change Order.L CITY OF CHANHASSEN b, 690 COULTER DRIVE • P.O. BOX 147 • CHANHASSEN, MINNESOTA 55317 (612) 937 -1900 • FAX (612) 937 -5739 I 7 DATE: February 21, 1996 SUBJ: Approve Change Order No. 1 to Lyman Boulevard Reconstruction/Lake Riley Area Trunk Utility Improvement Project No. 93 -32B The project engineer from OSM has prepared the documents necessary for the contract amendment (Change Order No. 1) to the Lyman Boulevard Reconstruction/Lake Riley Area Trunk Utility Improvement Project No. 93 -32B. This change order is necessary due to two primary areas of change to the project plans. The first project revision involves some additional costs associated with upsizing the manhole structure near the proposed connection of the City's trunk sanitary sewer line to the existing Metropolitan Council Waste Water Services (MCWWS) Lake Ann Interceptor. This change is needed to meet the MCWWS permits requirement which were received after the project was approved for bidding. This change results in a contract increase of $5,775. The second and much larger part of this change order involves the elimination of approximately 475 feet of 42- inch steel pipe casing (jacked). The elimination of this quantity of pipe jacking is th� result of realigning the trunk sanitary sewer line through the northern portion of the Jim Curry property and the Al Klingelhutz property which is ultimately made possible by the recent progress in the time schedule for the Trunk Highway 101 turnback. Now that the turnback appears to be very near; it is likely that a project to realign Trunk Highway 101 south of Highway 5 will be programmed within a couple of years. Given this news, the underlying property owners are much more cooperative in granting the necessary easements which would follow the new Trunk Highway 101 realignment through the middle of their properties. The net result is a contract decrease of more than $302,000. If the Council so chooses, this construction contract cost savings can be used to advance the acquisition of the Jesberg, Klein and Shorba properties along Trunk Highway 101 immediately north of Mission Hills. Ultimately, these acquisition costs would be reimbursed back to the City from the MnDOT County Trunk Highway Turnback account when the Trunk Highway 101 improvement project is initiated. The original construction contract awarded for the project was $2,763,482.53. This change order represents a decrease of $302,324.48 resulting in a revised contract amount of $2,461,158.05. Staff recommends that the City Council approve Change Order No. 1 to Lyman Boulevard Reconstruction/Lake Riley Area Trunk Utility Improvement Project No. 93 -32B resulting in a contract deduct in the amount of $302,324.48 yielding a revised construction contract amount of $2,461,158.05. ktm Attachment: Change Order No. 1 c: Dave Hempel, Assistant City Engineer David Mitchell, OSM Wayne Houle, OSM g."en&h arlesW\lyman.co 1 MEMORANDUM TO: Don Ashworth, City Manager ' FROM: Charles Folch, Director of Public Works I 7 DATE: February 21, 1996 SUBJ: Approve Change Order No. 1 to Lyman Boulevard Reconstruction/Lake Riley Area Trunk Utility Improvement Project No. 93 -32B The project engineer from OSM has prepared the documents necessary for the contract amendment (Change Order No. 1) to the Lyman Boulevard Reconstruction/Lake Riley Area Trunk Utility Improvement Project No. 93 -32B. This change order is necessary due to two primary areas of change to the project plans. The first project revision involves some additional costs associated with upsizing the manhole structure near the proposed connection of the City's trunk sanitary sewer line to the existing Metropolitan Council Waste Water Services (MCWWS) Lake Ann Interceptor. This change is needed to meet the MCWWS permits requirement which were received after the project was approved for bidding. This change results in a contract increase of $5,775. The second and much larger part of this change order involves the elimination of approximately 475 feet of 42- inch steel pipe casing (jacked). The elimination of this quantity of pipe jacking is th� result of realigning the trunk sanitary sewer line through the northern portion of the Jim Curry property and the Al Klingelhutz property which is ultimately made possible by the recent progress in the time schedule for the Trunk Highway 101 turnback. Now that the turnback appears to be very near; it is likely that a project to realign Trunk Highway 101 south of Highway 5 will be programmed within a couple of years. Given this news, the underlying property owners are much more cooperative in granting the necessary easements which would follow the new Trunk Highway 101 realignment through the middle of their properties. The net result is a contract decrease of more than $302,000. If the Council so chooses, this construction contract cost savings can be used to advance the acquisition of the Jesberg, Klein and Shorba properties along Trunk Highway 101 immediately north of Mission Hills. Ultimately, these acquisition costs would be reimbursed back to the City from the MnDOT County Trunk Highway Turnback account when the Trunk Highway 101 improvement project is initiated. The original construction contract awarded for the project was $2,763,482.53. This change order represents a decrease of $302,324.48 resulting in a revised contract amount of $2,461,158.05. Staff recommends that the City Council approve Change Order No. 1 to Lyman Boulevard Reconstruction/Lake Riley Area Trunk Utility Improvement Project No. 93 -32B resulting in a contract deduct in the amount of $302,324.48 yielding a revised construction contract amount of $2,461,158.05. ktm Attachment: Change Order No. 1 c: Dave Hempel, Assistant City Engineer David Mitchell, OSM Wayne Houle, OSM g."en&h arlesW\lyman.co 1 MEMORANDUM `p °+ C',m A Orr SChelen h%yeron& 300 Park Place East 612 - 595 -5775 5775 Wayzata Boulevard 1- 800 - 753 -5775 Date of Issuance: February 26, 1996 AsSodates,Inc. Minneapolis, MN 55416 -1228 FAX 595 -5774 CHANGE ORDER Change Order No: 1 City Project No. 93-32b Project: Lake Riley Area Trunk Utilities, Improvements Phase II OSM Project No. 5183.04 Owner: City of Chanhassen Date of Issuance: February 26, 1996 P. 0. Box 147 690 Coulter Drive Chanhassen, MN 55317 Contractor: Richard Knutson, Inc. Engineer: Orr - Schelen - Mayeron 12585 Rhode Island Ave South and Associates, Inc. Savage, MN 55378 You are directed to make the following changes in the Contract Documents: Description: 1) Additional funds needed for trunk sanitary sewer connection to MCES Interceptor. $ 5775.00 2) Change in contract quantity for items affected by realignment of sanitary sewer along STH101. $(- )320,083.43 3) Additional funds needed by supplier for change in manholes. $ 11.983.95 Total Change Order No. 1 $(- )302,324.48 Purpose of Change Order: Attachments (list documents supporting change): 1 Letter from Richard Knutson, Inc., dated November 16, 1995. 2) Item list indicating changes. 3) Letter from Richard Knutson, Inc. dated February 15, 1996. CHANGE IN CONTRACT PRICE CHANGE IN CONTRACT TIME Originai Contract Price: $2,763,482.53 Original Contract Time: July 15, 1997 Previous Change Orders No. 0 to No. 0: Net Change from Previous Change Orders: $ N/A Contract Price Prior to this Change Order: Contract Time Prior to this Change Order: $2,763,482.53 July 15, 1997 Net Increase (Decrease) of this Change Order: Net Increase (decrease) of Change Order: $(- )302,324.48 N/A Contract Price with all Approved Change Orders: Contract Time with Approved Change Orders: $2,461,158.05 JuJy,15, ...1.997 _ M; Recommended By: Approv day: p �Z David D. Mitchell, P. L. Richard Knutson, Inc. Approved By: Approved By: Date of Council Action: (City Engineer) (City Manager) H: \5183.00 \CM L \PHASEJ1 \CO.1 1 I February 15, 1996 RICHARD KNUTSON, INC. 12585 RHODE ISLAND AVE. SO. • SAVAGE, MN 55378 • 612/890 -8811 FAX 612/890 -8346 ' Mr. Wayne Houle Orr - Schelen - Mayeron 300 Park Place Ctr. ' 5775 Wayzata Blvd. Mpls., MN 55416 -1228 ' Re: RKI Project #528 Lake Riley Tr. Util., Ph. II Chanhassen, MN HEGOVED Orr - Schelen- Mayeron & Assoc. COMM4 FEB 20 19'3 hlame ' ha �cpy Name Heu'd Copy ' Dear Wayne: Due to the new alignment, the manhole bases fabricated ' for manholes #102, usable between Sta. 103, 36 104, 105 and + 22 and 16 + 106 are all now un- 77. The to re- place these bases, will be $5,094.96. cost RKI will also agree to install the 21" RCP 4,000 D in the new alignment at the ' same unit price as the old alignment of $64.11 per foot. After you have had a chance to review this submittal, ' please contact me for further discussion. Thank you. Sincerely, ' Richard Knutson, Inc. a - -- GtN ?6- Zl ' Reuben Mausolf President I RM /cjp I I I EQUAL OPPORTUNITY EMPLOYER/ CONTRACTOR CHANGE ORDER NO. 1 LAKE RILEY AREA TRUNK UTILITY IMPROVEMENTS - PHASE II CITY OF CHANHASSEN, MINNESOTA CITY PROJECT NO. 93 -32b OSM PROJECT NO. 5183.04 MR w O ITEM ORIGINAL PROPOSED QUANTITY CORRECTED CONTRACT ORIGINAL CORRECTED w NUMBERS DESCRIPTION UNITS CONTRACT DIFFERENCE CONTRACT UNIT PRICE CONTRACT CONTRACT L) — QUANTITY (NOTE 1) QUANTITY AMOUNT AMOUNT SCHEDULE D: SANITARY,SEWER: TH101 D 57 0504.603 42" STEEL CASING PIPE JACKED LIN FT 560 -475 85 $699.57 $391,759.20 $59,463.45 D 61 2506.501 EXTRA 48" DIA. M.H. DEPTH OVER 8 LIN FT 184 0.21 184.21 $89.50 $16,468.00 $16,486.80 D 62 2506.502 CONSTRUCT MANHOLE DESIGN 48 -4020 EACH 12 2 14 $1,547.00 $18,564.00 $21,658.00 D 66 2503.541 21" RC PIPE SEWER DESIGN 3006 CL III LIN FT 560 -475 85 $23.00 $12,880.00 $1,955.00 D' 68 2503.541 21" RC PIPE SEWER DESIGN 3006 CL V LIN FT 834 167 1001 $39.29 $32,767.86 $39,329.29 D 69 2503.541 . i1' RC PIPE SEWER DESIGN 4000D LIN FT 2608 210 2818 $64.11 $167,198.88 $180,661.98 TOTALS ; ; $639,637.94 $319,554.52 TOTAL DIFFERENCE ($320,083.43) NOTES: i i 1. CHANGES PER REVISED PLAN SHEETS 13,13A, & 14 DATED 1- 22 -96, PER CITY STAFF ITEM LIST NO.2 CHGRDR2.XLS _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 2/21/96 m `^ RCHHRD November 16, 1995 12585 RHODE ISLAND AVE. SO. - SAVAGE, MN 55378 - 6121890.8811 FAX 612/890.8346 M -kUI E &Assoc. David Mitchell, P: E. E, 1 1 VIIVI IT Orr - Schelen- I•Sayeron 300 Park Place Center 5775 :Wayzata Blvd. I,:pls., ir,N 55416 -1228 Re: RKI Project 4528 Lake Riley Area Tr. Util. Imp., Ph. Chanhassen, I, City Proj. 493 -323 Osm Proj. I revised plans per State Aid Approval Dear I�r. Kitchell: NOV 17 lg0c tie i E ?�!, v: ,Nv rcv' i;r. -r 1, y 1 In review of the revised plans of the above mentioned project, it appears there will be a necessary pricing revision to the connection structure as per the detail on sheets of the revision. Elevations appear to be similar. However, the increasing Of the botto section Di ameter fro-m 54" to 108' si cantly.effects the price of the structure. The connection structure was originally quoted at $9,550.00• The revised s will ro„a be S15,325.00. do not ap ear to effect The revisions on sheets X12 & j13 P unit pricing. The revision of sheet? could. I am in. t h e process. of going over this change with our Sub- Con tractor_ -to see if there will be a change in price. Please contact me if there are any questions. Thank you. ` GEB /cj P l KNUTS0N, INC Sincerely) ' Richard-Knutson, Inc. I ' Grant E. 3oisner Estimator ` GEB /cj P l KNUTS0N, INC