C. Discuss 2012 Street Improvement ProjectMEMORANDUM CITY OF TO: Paul Oehme, Director of Public Works /City Engineer CIIAN 1Hi SE FROM: Alyson Fauske, Assistant City Engineer 7700 Market Boulevard DATE: May 9, 2011 p PO Box 147 Chanhassen, MN 55317 SUBJECT: Discuss 2012 Street Improvement Project - Project No. 12 -01 Administration Phone: 952.227.1100 DISCUSSION Fax: 952.227.1110 Staff is planning to discuss the proposed Building Inspections 2012 street reconstruction project with the Phone: 952.227.1180 Council. Fax: 952.227.1190 Engineering The Capital Improvement Program had Phone: 952,227.1160 planned for reconstructing the Fax: 952.227.1170 Minnewashta Heights Neighborhood (north of Lake Minnewashta) next year. Finance Phone: 952.227.1140 Fax: 952.227.1110 Park & Recreation Phone: 952.227.1120 Fax: 952.227.1110 Recreation Center 2310 Coulter Boulevard Phone: 952,227.1400 Fax: 952.227.1404 Planning & Natural Resources Phone: 952.227.1130 Fax: 952.227.1110 Public Works 1591 Park Road Phone: 952.227.1300 Fax: 952.227.1310 Senior Center Phone: 952.227.1125 Fax: 952.227.1110 Web Site wwadchanhassen.mn.us The streets proposed for reconstruction were chosen using the City's Pavement Management Program and were identified due to utility problems in the area. STATZ HIGH WAY 7 Proj ect LAKE MINNEWASHTA Location r 3 � STATE HIGHWAY 5 The streets in Minnewashta Heights are 40 years old and cannot be cost effectively repaired with minor maintenance or even a bituminous overlay. The streets were last sealcoated in 1994 and 1999. Chanhassen is a Community for Life - Providing for Today and Planning for Tomorrow Paul Oehme 2012 Street Improvement Project Page 2 For the 2006 Surface Water Management plan, this area was modeled and a preliminary drainage analysis was completed. Also, several years ago a consultant was hired to give recommendations for drainage improvements south of Highway 7 in the Minnewashta Landings development to the west. Staff intends to use this information and gather additional information to complete a storm water design for the area. The project area is developed and streets have 50' right - of -way; therefore there is minimal space to provide traditional storm water management, namely curb and gutter, storm sewer and treatment ponds. Staff may need to look at alternative storm water management systems for this project. Staff plans to meet with the neighborhood in June to discuss the storm water management options. The streets are in poor condition with an average pavement condition index of 38. A road under 45 typically indicates distress that would require a full depth reconstruction. The west portion of Shore Drive has a pavement condition index between 52 and 64; however these scores are artificially high since there are three watermain break patches in this vicinity. The watermain in this area is cast iron pipe and has eight documented breaks. The sanitary sewer will be televised to determine its condition and if there is inflow /infiltration into the system. SSP�� Minnewashta Heights Park There are overhead private utilities within the project area. The private utility companies will be notified of the proposed project and asked to provide an estimate to bury the utility. Should the neighborhood wish to pursue burying the private utilities, 100% of the cost will be assessed to the benefitting property owners. Budgets for the proposed work have been included in the 2011 CIP. The budgets will need to be reviewed and updated based upon current construction cost estimates. G:\ENG\PUBLIC\ 2012 PROJECTS \12 -01 Minnewashta Hts recon \05 -09 -2011 work session.doc Paul Oehme 2012 Street Improvement Project Page 3 Assessments will be based off the City's assessment practice of assessing 40% of the street improvements to the benefiting properties on a per lot basis. The assessments would be proposed for 10 years at 6% interest. A consultation report should be drafted to help determine the final assessment amount. One Hundred Percent (100 %) of the utility and stormwater improvements would be funded out of the respective utility funds. As with all improvement projects, the Engineering Department will hold several neighborhood meetings to answer resident questions about the proposed improvements and assessments. These meetings also give staff an opportunity to gather additional information about the area to help make the project successful. Consultant engineering services would be needed for the street and utility reconstruction. The engineering services would include feasibility report preparation, final design and construction administrative services. Staff expects to have two proposals for engineering services by May 12, 2011. A tentative schedule is as follows: Approve Consultant Contract Complete Soil Borings Neighborhood Meeting Complete Consultation Report Neighborhood Open House Accept Feasibility Report Hold Public Hearing Bid Opening Assessment Hearing Start Construction Construction Substantially Complete FUTURE STREET IMPROVEMENT PROJECTS May 23, 2011 June, 2011 June, 2011 August, 2011 September, 2011 October, 2011 November, 2011 March, 2012 April, 2012 May, 2012 September, 2012 Staff will also review future planned street improvement projects with the Council at the worksession. Attachments: Preliminary CIP pages GAENG\PUBLIC\ 2012 PROJECTS \12 -01 Minnewashta Hts recon \05 -09 -2011 work session.doe Capital Improvement Program City of Chanhassen, MN 2011 thru 2015 Project SS -014 Project Name Sanitary Sewer Replacement Account #1 701 - 7025 -4751 Account #3 Account #2 Account #4 1 VIAL 11 VJ— �.vua. .vv ✓v,v v.. Description Replacement or rehabilitation of existing_sanitary sewer lines in conjunction with the reconstruction of the City street. Justification the City considers the condition of the existing utilities in the process to select streets for rehabilitation in an effort to realize cost savings by ,onsolidating these projects. Prior Expenditures 250,000 Construction Total Prior Funding Sources 250,000 Sewer Utility Fund Total P- 2015 Tot 600,000 Total 300,000 300,000 600,000 1 2015 Total 600,000 Total 300,000 300,000 600,000 Budget Impact/Other This project will decrease maintenance costs. 100 2011 2012 2013 2014 300,000 300,000 2011 2012 2013 201 300,000 300,000 Department Sanitary Sewer Improvements Contact Paul Oehme Type Improvement Useful Life Unassigned Category Utilities Priority n/a 1 VIAL 11 VJ— �.vua. .vv ✓v,v v.. Description Replacement or rehabilitation of existing_sanitary sewer lines in conjunction with the reconstruction of the City street. Justification the City considers the condition of the existing utilities in the process to select streets for rehabilitation in an effort to realize cost savings by ,onsolidating these projects. Prior Expenditures 250,000 Construction Total Prior Funding Sources 250,000 Sewer Utility Fund Total P- 2015 Tot 600,000 Total 300,000 300,000 600,000 1 2015 Total 600,000 Total 300,000 300,000 600,000 Budget Impact/Other This project will decrease maintenance costs. 100 2011 2012 2013 2014 300,000 300,000 2011 2012 2013 201 300,000 300,000 Capital Improvement Program C of Ch MN 2011 thru 2015 Project # ST -012 Project Name Annual Street Improvement Program Department Street Improvements Contact Paul Oehme Type Improvement Useful Life Unassigned Category Streets/Highways Account #1 601 -xxxx -4751 Account #3 Priority n/a Account #2 Account #4 Description Total Project Cost: $9,700,000 Annual project to rehabilitate and reconstruct streets in the City. Current 5 -year plan shows the following neighborhood areas: 2esidential 2011 - Timberwood Drive neighborhood, Saratoga, Santa Vera, Chippewa, Picha and Kerber (S of W 78th), Target lane and W 78th >treet (Powers Blvd to Market Blvd) 2012 - Greenbriar, Fir Tree, Elm Tree, Dogwood, Shore Drive and Maplewood Circle (Reconstruction) 2013 - Greenwood Shores and West 78th Street (Powers to Market) 2014 - Dartmouth Drive and Cypress Drive 2015 - Carver Beach area (south and west of Carver Beach Road) Justification The City uses a Pavement Management System to monitor the condition of the City streets. While proper preventative maintenance extends the life of the street and is cost effective, a street will eventually deteriorate to a point that further maintenance is no longer cost effective. kehabilitation projects extend the life of the street. In cases with utility or poor sub grade needs to be replaced or where streets have deteriorated to a point where rehabilitation will no longer be practical reconstruction of the street is necessary. A feasibility study is written to consider the merits of the project and scope of work. Prior Expenditures 2011 2012 2013 2014 2015 Total 3,200,000 I Construction 1,500,000 1,700,000 1,200,000 1,100,000 1,000,000 6,500,000 Total Total 1,500,000 1,700,000 1,200,000 1,100,000 1,000,000 6,500,000 Prior Funding Sources 2011 2012 2013 2014 2015 Total 3,200,000 I Assessment/Revolving Assess 1,200,000 1,700,000 1,200,000 1,100,000 1,000,000 6,200,000 Total Street Pavement Management 300,000 300 Total 1,500,000 1,700,000 1,200,000 1,100,000 1,000,000 6,500,000 [get Impact/Other project may decrease maintenance costs. Fslj] Capital improvement Program 2011 thru 2015 City of Chanhassen, MN Project # SWMP -019 Project Name Street Improvement Projects - Storm Water Mgmt Department Surface Water Management Contact Paul Oehme Type Improvement Useful Life Unassigned Category SWMP Account #1 720 - 7025 -4751 Account #3 Priority n/a Account #2 Account #4 Description Total Project Cost: $1,250,000 kn annual amount set aside for storm water management infrastructure construction or expansion associated with street improvement projects mdertaken by the engineering and public works departments. Justification Street improvement projects frequently require construction or expansion of storm water management infrastructure in order to comply with federal, state and local regulations, as well as protecting existing and proposed development adjacent to the projects. Prior Expenditures 450,000 Construction Total Total 400,000 400,000 800,000 Prior Funding Sources 2011 2012 2013 2014 2015 Total [ Surface Water Utility Fund 400,000 400,000 800,000 Total Total 400,000 400,000 800,000 Budget Impact/Other Inventory, inspection and maintenance of new infrastructure will be required. Citywide. No map 2 011 2012 2013 - 400,000 2014 2015 Total 400,000 800,000 lollf Capital Improvement Program City of Chanhassen, MN 2011 thru 2015 Project # W -024 Project Name Watermain Replacement Account #1 700- 7025 -4751 Account #3 Account #2 Account #4 Department Water System Improvements Contact Paul Oehme Type Improvement Useful Life Unassigned Category Utilities Priority n/a Description Replacement of existing water main lines in coordination with the reconstruction of the City street. Justification The City considers the condition of the existing utilities in the process to select streets for rehabilitation in an effort to realize cost savings by consolidating these projects and also to avoid potential cuts in recently improved streets. If significant repairs are necessary to the existing water main, replacement may be the most cost effective option. Given the highly corrosive soils in the City, water main replacement is an ongoing ,project in the City. Prior Expenditures 800,000 Construction Total 700,000 700,000 1,400,000 Total 700,000 700,000 1,400,000 Prior Funding Sources 2011 2012 2013 2014 2015 Total 80 Water Utility Fund 700,000 700,000 1,400,000 a Total Total 700,000 700,000 1,400,000 0 projects will decrease maintenance costs. 201 2012 2013 2 014 2015 Total 131