2b Contract WSB & AssociatesMEMORANDUM CITYOF CHAN SEN 690 City Center Drive PO Box 147 Chanhassen. Mi, nesota 55317 ahoIle 952.937.1900 General Fax 952.937.5739 TO: Todd Gerhardt, City Manager FROM: DATE: Teresa J. Burgess, Public Works Director/City Engine.e/~ January 9, 2002 SUBJ: Approve Revision to Consultant Contract with WSB & Associates, Inc. for Century Boulevard Improvement Project 97-1C Requested Action City Council is requested to approve an increase to the consultant contract with WSB in the amount of $7,360. Enginm'ing Department Faa' 952.937.9152 Building Departm en t Fax 952.934.2524 Web Site www. ci. cha,hasse,. Discussion The City has received a request from WSB for an increase in the contract amount for additional engineering services for the above project. The request is attached. 1. Online Bidding Coordination with Quest.cdn. ' $1,700 The City requested that online bidding be utilized for this project. This was a change of scope from the original contract. 2. Revising the Median Design $ 700 The City requested afield change to allow a median opening to allow full access (both left and right turns in and ouO for the lot at the southwest quadrant of the intersection. 3. Additional Construction Services $4,960 This cost increase was brought to the City's attention after completion of the project and the assessment hearing had been held. The costs may not be assessed to the property owners at this time and would come out of the City funds. Recommendation Staff recommends that this request be approved; however, staffwill inform' all Engineering Consultants working on City of Chanhassen projects that in future, all increases to the not-to-exceed amount must be approved prior to incurring additional costs to allow an opportunity for cost containment and to allow Council the opportunity to review and approve the increase. Attachment: Request from WSB for increase in consultant contract c: Dave Hutton, WSB Inc. g:\eng\public\97-1 cXstaff report 1-14-02.doc Cit~ of Chanhassen. A crowin¢ com,nmin, u,it/.~ c/ea, lakes, aua/in, schooh, a chamin~ d,,,,to,,~, t/,'i,i,~ hud,e.,se.,, and/~e,,ti[~,/ &.,4xsociates, Inc. December 31,2001 Mrs. Teresa Burgess, P.E. Public Works Director/City Engineer City of Chanhassen 690 City Center Drive PO Box 147 Chanhassen, MN 55317 Century Boulevard Street and Utility Improvements WSB Project No. 1339-00 CITY OF CHANHASSEN JAN 0 2 2002 ENGINEERING DEPT,. Dear Teresa, The purpose of this letter is to request additional compensation for engineering services related to the Century Boulevard project due to changes in scope or additional services requested. Currently, the total cOntract with WSB consists of the following items' Fee Design Services Construction Services Non-salary Expenses $21,700 $27,2OO $1,000 Total Contract $49,900 4150 Olson Memorial Highway Suite 300 Minneapolis Minnesota 55422 763.541.4800 763.541-1700 FAX There are a couple of items that have been added or modified from the original scope of services that have increased our cost and fees as follows' Online Bidding Coordination with Quest.cdn at the City's Request: Providing online bidding services for the project resulted in coordination time and formatting electronic files for Quest.cdn's system. Estimated Fee Increase .................................................................................. $!, 700 . Revising the Median Design at the City's Request: Additional effort was needed on the design of the revised median due to issues with the Developer and the City. Estimated Fee Increase ..................................................................................... $700 Minneapolis · St. Cloud · Equal Opportunity Employer F.',~PlYhVq339-OOi12190I-tb. doc~ z Mrs. Teresa Burgess December 31, 2001 Page 2 , Additional Construction Services Fee: The final project scope had several additional construction related items that were not included in the original feasibility report, which was the basis for our original construction services fee in our proposal. The following items were above and beyond the scope of the project as outlined in the feasibility report provided to WSB. The feasibility report was prepared by a different consultant. a. Additional fill material was needed to construct the road. This resulted in an additional 2.5 days (20 hours) of construction observation time. b. No soil borings were taken as part of the feasibility report. During construction, marginal soils were encountered that resulted in additional delays (i.e., removing the soils, additional compaction, etc.). This item resulted in an additional 8 hours of construction observation time. c. The revised median design resulted in an additional 3.5 days (28 hours) of construction observation time due to removal of the old median and installation of the new median. There were contractor delays in scheduling the curb crew, additional inspections, etc. d. Additional survey time to re-stake the median re-design (4 hours). e. Additional construction project management time for the aboVe-referenced items (8 hours). Estimated Construction Services Fee Increase .............................................. $4,960 Total Est#hated Fee Increase (Items 1-3) .................................................... $7,360 Attached is a breakdown of the estimated hours used on each task. This would increase our total design and construction contract to $57,260. Please review these costs and advise if they are acceptable. I am available at your convenience to discuss these items in more detail. Please contact me at (763) 287-7195. Thank you. Sincerely, David E. Hutton, P.E. Project Manager Attachment sb F: I WP WIN~13 3 9-OOI121901-tb.doc Hourly Breakdown of Fee Increases for Century Boulevard Project Task Hours Total 1. Online Biddinq Coordination Design Engineer Technician 15 10 $1,000.00 $700.00 Subtotal 2. Revised Median Desiqn Design Engineer Technician $1,700.00 $350.00 $35O.OO o Subtotal Additional Construction Services Fees a. Additional Fill Material- C.O. Time b. Poor Soils - C.O. Time c. Median Revisions - C.O. Time d. Additional Survey Time to Re-stake Median Changes e. Project Management for Above Items 2O 8 28 4 12 $700.00 $1,200.00 $48O.OO $1,680.00 $4OO.OO $1,200.00 Subtotal GRAND TOTAL $4,960.00 $7,360.00 F.q tYPlWN~1339-OOi121901-tb.doc