2b Contract WSB & AssociatesMEMORANDUM
CITYOF
CHAN SEN
690 City Center Drive
PO Box 147
Chanhassen. Mi, nesota 55317
ahoIle
952.937.1900
General Fax
952.937.5739
TO:
Todd Gerhardt, City Manager
FROM:
DATE:
Teresa J. Burgess, Public Works Director/City Engine.e/~
January 9, 2002
SUBJ:
Approve Revision to Consultant Contract with WSB & Associates,
Inc. for Century Boulevard Improvement Project 97-1C
Requested Action
City Council is requested to approve an increase to the consultant contract with
WSB in the amount of $7,360.
Enginm'ing Department Faa'
952.937.9152
Building Departm en t Fax
952.934.2524
Web Site
www. ci. cha,hasse,.
Discussion
The City has received a request from WSB for an increase in the contract amount
for additional engineering services for the above project. The request is attached.
1. Online Bidding Coordination with Quest.cdn. ' $1,700
The City requested that online bidding be utilized for this project.
This was a change of scope from the original contract.
2. Revising the Median Design $ 700
The City requested afield change to allow a median opening to
allow full access (both left and right turns in and ouO for the lot at
the southwest quadrant of the intersection.
3. Additional Construction Services
$4,960
This cost increase was brought to the City's attention after completion of the
project and the assessment hearing had been held. The costs may not be assessed
to the property owners at this time and would come out of the City funds.
Recommendation
Staff recommends that this request be approved; however, staffwill inform' all
Engineering Consultants working on City of Chanhassen projects that in future,
all increases to the not-to-exceed amount must be approved prior to incurring
additional costs to allow an opportunity for cost containment and to allow Council
the opportunity to review and approve the increase.
Attachment: Request from WSB for increase in consultant contract
c: Dave Hutton, WSB Inc.
g:\eng\public\97-1 cXstaff report 1-14-02.doc
Cit~ of Chanhassen. A crowin¢ com,nmin, u,it/.~ c/ea, lakes, aua/in, schooh, a chamin~ d,,,,to,,~, t/,'i,i,~ hud,e.,se.,, and/~e,,ti[~,/
&.,4xsociates, Inc.
December 31,2001
Mrs. Teresa Burgess, P.E.
Public Works Director/City Engineer
City of Chanhassen
690 City Center Drive
PO Box 147
Chanhassen, MN 55317
Century Boulevard Street and Utility Improvements
WSB Project No. 1339-00
CITY OF CHANHASSEN
JAN 0 2 2002
ENGINEERING DEPT,.
Dear Teresa,
The purpose of this letter is to request additional compensation for engineering services related
to the Century Boulevard project due to changes in scope or additional services requested.
Currently, the total cOntract with WSB consists of the following items'
Fee
Design Services
Construction Services
Non-salary Expenses
$21,700
$27,2OO
$1,000
Total Contract $49,900
4150 Olson
Memorial Highway
Suite 300
Minneapolis
Minnesota
55422
763.541.4800
763.541-1700 FAX
There are a couple of items that have been added or modified from the original scope of
services that have increased our cost and fees as follows'
Online Bidding Coordination with Quest.cdn at the City's Request:
Providing online bidding services for the project resulted in coordination time and
formatting electronic files for Quest.cdn's system.
Estimated Fee Increase .................................................................................. $!, 700
.
Revising the Median Design at the City's Request:
Additional effort was needed on the design of the revised median due to issues with the
Developer and the City.
Estimated Fee Increase ..................................................................................... $700
Minneapolis · St. Cloud · Equal Opportunity Employer F.',~PlYhVq339-OOi12190I-tb. doc~ z
Mrs. Teresa Burgess
December 31, 2001
Page 2
,
Additional Construction Services Fee:
The final project scope had several additional construction related items that were not
included in the original feasibility report, which was the basis for our original
construction services fee in our proposal. The following items were above and beyond
the scope of the project as outlined in the feasibility report provided to WSB. The
feasibility report was prepared by a different consultant.
a. Additional fill material was needed to construct the road. This resulted in an
additional 2.5 days (20 hours) of construction observation time.
b. No soil borings were taken as part of the feasibility report. During construction,
marginal soils were encountered that resulted in additional delays (i.e., removing
the soils, additional compaction, etc.). This item resulted in an additional 8 hours
of construction observation time.
c. The revised median design resulted in an additional 3.5 days (28 hours) of
construction observation time due to removal of the old median and installation of
the new median. There were contractor delays in scheduling the curb crew,
additional inspections, etc.
d. Additional survey time to re-stake the median re-design (4 hours).
e. Additional construction project management time for the aboVe-referenced items (8
hours).
Estimated Construction Services Fee Increase .............................................. $4,960
Total Est#hated Fee Increase (Items 1-3) .................................................... $7,360
Attached is a breakdown of the estimated hours used on each task. This would increase our
total design and construction contract to $57,260.
Please review these costs and advise if they are acceptable. I am available at your convenience
to discuss these items in more detail. Please contact me at (763) 287-7195. Thank you.
Sincerely,
David E. Hutton, P.E.
Project Manager
Attachment
sb
F: I WP WIN~13 3 9-OOI121901-tb.doc
Hourly Breakdown of Fee Increases for
Century Boulevard Project
Task Hours Total
1. Online Biddinq Coordination
Design Engineer
Technician
15
10
$1,000.00
$700.00
Subtotal
2. Revised Median Desiqn
Design Engineer
Technician
$1,700.00
$350.00
$35O.OO
o
Subtotal
Additional Construction Services Fees
a. Additional Fill Material- C.O. Time
b. Poor Soils - C.O. Time
c. Median Revisions - C.O. Time
d. Additional Survey Time to Re-stake Median Changes
e. Project Management for Above Items
2O
8
28
4
12
$700.00
$1,200.00
$48O.OO
$1,680.00
$4OO.OO
$1,200.00
Subtotal
GRAND TOTAL
$4,960.00
$7,360.00