Loading...
1b. Flamingo Dr-Basswood Cir Drainage Project: Award Contract0 CITY OF CHANHASSEN 7700 Market Boulevard PO Box 147 Chanhassen, MN 55317 Administration Phone: 952.227.1100 Fax: 952.227.1110 Building Inspections Phone: 952227.1180 Fax: 952.227.1190 Engineering Phone: 952.227.1160 Fax: 952.227.1170 Finance Phone: 952.227.1140 Fax: 952.227.1110 Park & Recreation Phone: 952.227.1120 Fax: 952.227.1110 Recreation Center 2310 Coulter Boulevard Phone: 952.227.1400 Fax: 952.227.1404 Planning & Natural Resources Phone: 952227.1130 Fax: 952.227.1110 Public Works 1591 Park Road Phone: 952.227.1300 Fax: 952.227.1310 h�IaL to ];7a.1 Pill L �1 0, TO: Paul Oehme, Director of Public Works /City Engineer \' FROM: Terrance Jeffery, Water Resources Coordinator fin\ DATE: May 23, 2011 SUBJ: Flamingo Drive and Basswood Circle Drainage Improvement Project SWMP19 11 -01: Award of Contract PROPOSED MOTION "The City Council approves a construction contract in the amount of $53,459.04 to Olson Construction for work to be performed on Flamingo Drive and Basswood Circle." City Council approval requires a simple majority vote of the City Council present. BACKGROUND Over the winter months, sump pump discharges in the Flamingo Drive and Basswood Circle neighborhoods has caused significant icing of streets and traffic problems. The Public Works department was called out several times this winter and dedicated dozens of hours to scrape the ice and apply salt to make the road safe to drive. Reports from residents in the Flamingo Drive neighborhood indicate that there were at least three minor accidents last winter due to slippery road conditions. As a result of this continued sump pump discharge water, the road section is seeing significant deterioration and settlement of the concrete curb and gutter because of the saturated soils. Staff has evaluated many alternatives other than drain tile, but due to the topography Senior Center Phone: 952227.1125 of the area, the volume of sump pump discharges and the soil conditions, having a Fax: 952.227.1110 dedicated drain tile for sump pump discharges was concluded to be the only viable option. Web Site wwaci.chanhassen.mn.us This issue is not unique to the Flamingo Drive or Basswood Circle areas but based upon the extent of the area affected, the number of property owners affected, the impact these drainage issues are having on the existing infrastructure in the neighborhood, and the resulting safety issues, these are high priority areas. Staff is Chanhassen is a Community for Life - Providing for Today and Planning for Tomorrow Paul Oehme Flamingo and Basswood Drainage Improvement Project May 23, 2011 Page 2 proposing to install 1,330 feet of drain tile at the back of curb for 8511 to 8647 Flamingo Drive and extend drain tile to three homes on Basswood Circle. The individual sump pump discharge points will be connected to this drain tile. Rather than discharging onto the street and migrating to the storm sewer via sheet flow forming ice, this water will be conveyed directly to the storm sewer system. BIDS Requests for Proposals were submitted to four contractors on May 3, 2011. Minger Construction elected not to submit a quote to the City. The bids received are as follows: Olson Construction has done work for the City of Chanhassen. Most recently they were involved in the construction of the Public Works facility. Their work performance was acceptable. The project is tentatively scheduled to start the week of May 23, 2011 with a completion date of June 17, 2011. Staff has held a neighborhood meeting with all affected property owners and has continued communicating with the homeowners through email and phone conversations. These property owners will be notified prior to the commencement of work. Funding for the project is proposed from the 720 - 000 -4300 fund of the Surface Water Management Fund. This fund will also be used for ongoing maintenance of the existing storm sewer infrastructure, including pond cleanouts and emergency repairs such as the outlet for Brenden Pond and the pond southwest of the intersection of Powers Boulevard and Lake Lucy Road. Also included in this funding is storm water improvements associated with the T.H. 101 and Pleasantview Road project including consulting fees and sediment testing. Other items funded from this include the Citizen Assisted Monitoring Program (C.A.M.P.) and our erosion control inspections program. Attachment: 1. SWMP Budget 720 - 000 -4300 2. Project Area Map 3. Construction Plans Ron Olson, Olson Construction g: \eng \swmp prcjects\swmp 19 11 -01 flamingo drainage \award construction_052311.doc The engineer's opinion of total project cost was $54,476.00. CITY OF CHANHASSEN 2011 BUDGET ENTERPRISE FUNDS 7zu Surface Water Management Fund 2010 to 2009 2010 2011 2011 ACCOUNT DESCRIPTION ACTUAL BUDGET BUDGET % INC/(DEC) f w w e 82 4010 Salaries & Wages -Reg 123,527 126,200 129,200 2.4% 4020 Salaries & Wages -Temp - 10,000 - 8,000 (20.0 %) 4030 Contributions - Retirement 16,968 18,200 18,200 0.0% 4040 Contributions - Insurance 18,166 19,000 21,000 10.5% 4050 Workers Compensation 326 900 500 (44.4 %) * TOTAL PERSONAL SERVICES 158,986 174,300 176,900 1.5% 4120 Supplies- Equipment 939 5,000 2,000 (60.0 %) 4130 Supplies - Program 5,857 5,000 7,500 50.0% 4150 Maintenance Materials 13,481 25,000 10,000 (60.0 %) 4210 Books and Periodicals - 100 100 0.0% 4240 Uniforms & Clothing - 100 100 0.0% * TOTAL MATERIALS & SUPPLIES 20,277 35,200 19,700 (44.0 %) ?4300 4301 Fees, Services Auditing - 99,379 8,000 175,000 8,000 175,000 8,000 0.0% 0.0% 4310 Telephone and Communications 491 600 600 0.0% 4340 Printing & Publishing 25 1,000 100 (90.0 %) 4360 Subscriptions & Memberships 1,060 1,800 1,200 (33.3 %) 4370 Travel & Training 1,427 4,500 2,000 (55.6 %) 4380 Mileage - 300 300 0.0% 4410 Rental- Equipment - 4,000 - (100.0 %) 4483 Insurance - General Liability 1,500 1,500 1,500 0.0% 4933 Sales Tax 117 - - * TOTAL CONTRACTUAL SERVICES 111,998 196,700 188,700 (4.1%) ** TOTAL EXPENDITURES 291,262 406,200 385,300 (5.1 %) f w w e 82 � Lake Ann MCGLYNN DI COULTER BLVD SPpDLF� SIERR Ao0 FRONp� Lotus Lake HIGHLAND DR �( OKCRV� > Basswood Curve SPpp�EgRO ! y O Y w pR T Q I P S S gNTA FE TRL [TAI Il k 0 �/ f �f� , co m � P� Flamingo Drive ON DR_ C� DOVE CT 4 o' GT m ! ' P C w . J 'OSP ?� o Susan a . ��� v P�71 i 86' - SHORE D% w P N w +c S U O O o o- m U) C V) O C m E O O O QJ O E � N • N 143�i MALLARD J Utility location based upon information provided from Qwest and Centerpoint Energy v and are approximate and for general use only. Gasline located 17 feet from ceterline 140 of Flamingo Drive Contractor will be responsible to call for field locations. J 8521 �/� 853�t 1 �50 4551 c 2 c� N - O 0 �r �o- 1421 8528 857 8570 Ci 8571 8612 W 8631 L8652 8647 1470 1480 \15201 8787 8 1 LEGEND file svinlet gwesl —4 0 st— Pipe 1364 Genterpoint Gaarne 8771 N w ; F S 1 inch equals 100 feet Draintile Installation Project SWMP 19:11 -01 Flamingo Dr Neighborhood t7Ti0F CAFHII�SSIX Utility location based upon information provided from Qwest and Centerpoint Energy and are approximate and for general use only. Gasline located 19 feet from ceterline — of Basswood and on a 49 foot radius from center of cul de sac. Qwest location shown I ; as approximate back of curb. Contractor will be responsible to call for field locations. h 40 / 2 i 0. � �3 20 en ier Poin \ Basswood Circle 7330 31 LEGEND i -- �tDrain Tile ■ swlnlet / Storm Pipe 7340 Centerpoint Gasline n.ie m 1 inch `equals 40 feet 7361 -- 37 .--_ U ' ° w °.-71 a ° °. °q . NN W+E VVS ----//// W 0 0) -0 O O O U) L U O 9z O N d U L 0 U 0 �- — o O C ch N M — m C M L- 0 CfFC OF