1a. Highlands on Lake St. Joe: Sanitary Sewer & Water Improvements.MEMORANDUM
CITY OF 4u
CHANHASSEN
690 COULTER DRIVE • P.O. BOX 147 • CHANHASSEN, MINNESOTA 55317
(612) 937 -1900 • FAX (612) 937 -5739
TO: Charles Folch, Director of Public Works /City Engineer
FROM: Dave Hempel, Assistant City Engineer
DATE: November 20, 1995
utilities in Highlands on Lake
ership conditioned upon the
15, 1995.
SUBJ: Accept Sanitary Sewer and Water Improvements in Highlands on Lake St. Joe
Project No. 93 -31
u��
Staff has received a letter from Mr. Robert Payette, 'Project Engineer with Sathre- Bergquist, Inc.,
requesting the City consider acceptance of the public "utility improvements in the above - referenced
project. According to Mr. Payette, the public utility improvements have been completed in
accordance with the approved plans and specifications including the first lift of bituminous asphalt.
The public utility improvements have been lested and approved by City staff. Staff has performed
a walk- through inspection of the project and found that some minor adjustments are required by the
contractor prior to final acceptance by, the City. For the record, the utility portion of the project
shall include only the watermain and sanitary sewer system The storm sewer and ponding facilities
shall be considered for acceptance,izpon completion of the final wear course (streets) in 1996.
It is therefore recommended °that the City Council accept the
St. Joe, Project No93 31, for perpetual maintenance ai
contractor comoletin anv °oiztstandinQ Dunch list°`if by De
ktm
Attachments: 1. Letter from R
1995.
2. Location map.
' c: Mike Pflaum, Lundgren Bros. Construction
g:\ eng \projects\hightand\accept.uti
Action by City Adnilr3ifttot
Endors D —L 4 LA
Modifie
Rejecte
Date Submitted to Confrnf on
D�4 g1 ed to Got"
O p 7
Inc. dated November 15,
.FROM;ved
ReVISIOn too.
Approve Matt:'
Approved by City 0ojnCi
Date
2 9
W �
e
SATHRE - I3ERGQUIST, INC.
150 SOUTH BROADWAY
(612) 476 - 6000
WAYZATA, MN 55391
FAX 476 -0104
November 15, 1995
Mr. Dave Hempel
CITY OF CHANHASSEN
690 Coulter Drive
P.O. Box #147
Chanhassen, Minnesota 55317
RE: HIGHLANDS ON LAKE ST. JOE
Lundgren Bros. Construction, Inc.
Dear Mr. Hempel:
The construction work on the above p o'ect has been completed through the
bituminous base course. The final bitury inous wear course will be completed in
September of 1996. All utility work anc street work completed to date on this
project has been done in conformance with the approved plans and
specifications. Therefore we would like to request that the City of Chanhassen
accept the sanitary sewer and water main utility portion of this project for
ownership and maintenance subject to a two (2) year maintenance bond from
Enebak Construction Company guaranteeing their work which is attached. Also
we would request that the City reduc the financial guarantee provided by
Lundgren Bros. Construction, Inc.
If you have any questions please
Sincerely,
SATHRE- BERGQUIST, INC.
G o
Robert E. Payette, P.E.
REP /dm
cc: Mr. Mike Pflaum, Lundgren Bros. Construction, Inc.
our office.
3m
L r
'ROJECT UOMATic