Loading...
1a. Highlands on Lake St. Joe: Sanitary Sewer & Water Improvements.MEMORANDUM CITY OF 4u CHANHASSEN 690 COULTER DRIVE • P.O. BOX 147 • CHANHASSEN, MINNESOTA 55317 (612) 937 -1900 • FAX (612) 937 -5739 TO: Charles Folch, Director of Public Works /City Engineer FROM: Dave Hempel, Assistant City Engineer DATE: November 20, 1995 utilities in Highlands on Lake ership conditioned upon the 15, 1995. SUBJ: Accept Sanitary Sewer and Water Improvements in Highlands on Lake St. Joe Project No. 93 -31 u�� Staff has received a letter from Mr. Robert Payette, 'Project Engineer with Sathre- Bergquist, Inc., requesting the City consider acceptance of the public "utility improvements in the above - referenced project. According to Mr. Payette, the public utility improvements have been completed in accordance with the approved plans and specifications including the first lift of bituminous asphalt. The public utility improvements have been lested and approved by City staff. Staff has performed a walk- through inspection of the project and found that some minor adjustments are required by the contractor prior to final acceptance by, the City. For the record, the utility portion of the project shall include only the watermain and sanitary sewer system The storm sewer and ponding facilities shall be considered for acceptance,izpon completion of the final wear course (streets) in 1996. It is therefore recommended °that the City Council accept the St. Joe, Project No93 31, for perpetual maintenance ai contractor comoletin anv °oiztstandinQ Dunch list°`if by De ktm Attachments: 1. Letter from R 1995. 2. Location map. ' c: Mike Pflaum, Lundgren Bros. Construction g:\ eng \projects\hightand\accept.uti Action by City Adnilr3ifttot Endors D —L 4 LA Modifie Rejecte Date Submitted to Confrnf on D�4 g1 ed to Got" O p 7 Inc. dated November 15, .FROM;ved ReVISIOn too. Approve Matt:' Approved by City 0ojnCi Date 2 9 W � e SATHRE - I3ERGQUIST, INC. 150 SOUTH BROADWAY (612) 476 - 6000 WAYZATA, MN 55391 FAX 476 -0104 November 15, 1995 Mr. Dave Hempel CITY OF CHANHASSEN 690 Coulter Drive P.O. Box #147 Chanhassen, Minnesota 55317 RE: HIGHLANDS ON LAKE ST. JOE Lundgren Bros. Construction, Inc. Dear Mr. Hempel: The construction work on the above p o'ect has been completed through the bituminous base course. The final bitury inous wear course will be completed in September of 1996. All utility work anc street work completed to date on this project has been done in conformance with the approved plans and specifications. Therefore we would like to request that the City of Chanhassen accept the sanitary sewer and water main utility portion of this project for ownership and maintenance subject to a two (2) year maintenance bond from Enebak Construction Company guaranteeing their work which is attached. Also we would request that the City reduc the financial guarantee provided by Lundgren Bros. Construction, Inc. If you have any questions please Sincerely, SATHRE- BERGQUIST, INC. G o Robert E. Payette, P.E. REP /dm cc: Mr. Mike Pflaum, Lundgren Bros. Construction, Inc. our office. 3m L r 'ROJECT UOMATic