3. CSM Corp: Vacation, Preliminary Plat, Site Plan and Wetland Alteration Permit.CITY OF
�
CHANHASSEN
STAFF REPORT
PROPOSAL: 1) Site Plan Review for the construction of two 64,000 square foot Office
Warehouse buildings
2) Preliminary Plat to Subdivide 61.6 acres into 3 Lots and 2 Outlots,
Chanhassen East Business Center
3) Vacation of an abandoned Public Right -of -Way and a Utility and Drainage
Easement
J
CL
�a
1
1
1
1 I
�a
1 W
1
LOCATION: South of Highway 5, West of Dell Road, and North of Eden Prairie.
APPLICANT: CSM Investors, Inc.
2575 University Ave. W. Suite 150
St. Paul, MN 55114 -1024
646 -1717
P.C. DATE: 11 -1 -95
C.C. DATE: 11 -27 -95
CASE: 95 -18 Site Plan ��
95 -4 VAC, 95 -18 SUB
BY: Al -Jaffv
DataServ, Inc.
12125 Technology Dr.
Eden Prairie, MN 55344
829 -6553 Jim Paulet
PRESENT ZONING:
ACREAGE:
ADJACENT ZONING
AND LAND USE:
SEWER AND WATER:
SITE CHARACTERISTICS:
2000 LAND USE:
IOP, Industrial Office Park
61.6 acres
N - Highway 5
S - Eden Prairie, Residential
E - Dell Road, Eden Prairie, Residential
W - Abra/Highway Business
Services are available to the site.
Action by City Administrator
t
mate Svbm tted to Council —
The site is an old farmstead. Lake Drive East bisects the site
in the middle. There is an existing office industrial building
on the southwest corner of the site.
Office/Industrial
CSM Corporation
' November 1, 1995
Page 2
PROPOSAL /SUMMARY
' There are three actions being requested with this application, a subdivision, a site plan review for
two office warehouse buildings, and a vacation of an abandoned public right -of -way. The site is
zoned IOP, Industrial Office Park and bordered by Highway 5 to the north, Dell Road to the east,
' and a Lundgren Brothers residential development to the south. The lot area of the
office /warehouse sites are 5.43 acres for Lot 1 and 4.8 acres for Lot 2. The site is visible directly
from Highway 5 and has full access from Lake Drive East.
' The subdivision request consists of subdividing 61.6 acres into three lots and two outlots. Lots 1
and 2 will contain the proposed office warehouse buildings. Outlot A will be reserved for future
' development. Staff is not aware of any pending developments for the outlot. Outlot B will serve
as a site for a pond. The third lot will be labeled as Lot 1, Block 2. This parcel is located south
of Lake Drive East and contains the existing DataSery building. The subdivision request is a
' relatively straightforward action.
' The site plan is for the two office warehouse buildings. The buildings are well designed, "L"
shaped, and a mirror image of one another. They are proposed to utilize face brick on all four
corners of both buildings, as well as areas surrounding entrances into the buildings. Decorative
' pre- colored rockface block will be integrated into the walls, accented by pre- colored masonry
bands. Two pitched roof elements adorn each building.
The building can be divided depending the needs of the tenant. Loading docks are proposed for
those tenants that would need them. These buildings will serve office /industrial tenants. The
applicant has proposed to have the parking in front of the building. Staff was not receptive to
' this idea. After working with the applicant and understanding the needs of the tenants. We have
arrived at a workable solution. The office space will generate customer parking space.
Requiring all parking to the rear causes a conflict between the loading dock and customer space.
' This area is in the highway corridor which uses the underlying district for setbacks. The parking
as proposed including the screening does meet the Hwy. 5 zoning district requirement.
Parking for vehicles is located around the buildings. This issue was discussed in detail with the
applicant. Staff explained that this corner is the gateway into the city and special attention must
be paid to all details of the site. These buildings will require 246 parking spaces. Rather than
concentrating all spaces in one area, the spaces were designed surrounding the buildings. They
are broken by landscape islands and screened from views from Highway 5, Dell Road, and Lake
Drive East by berms and vegetation. There is a maximum of two rows of parking at any given
' location. The site landscaping is generally of high quality, however, there are certain areas such
as the south portion of the site, where the loading docks are located, that could use a variety of
CSM Corporation
November 1, 1995
Page 3
trees and bushes for additional screening. A meandering berm of 4 to 6 feet in height runs along
the entire edge of the site that does provide screening.
Staff regards the project as a reasonable use of the land. The overall design is sensitive to the
Highway 5 corridor's image. Based upon the foregoing, staff is recommending approval of the
site plan, without variances, the subdivision request, and the right -of -way vacation with
conditions outlined in the staff report.
GENERAL SITE PLAN /ARCHITECTURE
The proposed office /warehouse buildings, with an area of 64,000 square feet each, will be
situated parallel to and south of Highway 5. The site is bordered by Highway 5 to the north, and
Dell Road to the east. Access to the buildings is proposed from Lake Drive East. Parking will be
scattered around the buildings. A meandering berm with landscaping, 4 to 6 feet in height, is
proposed to be installed along the perimeter of the site to provide screening.
The buildings are located 120 feet from the north, 125 feet from the east, 85 feet from the south,
and 75 feet from the west property line.
Materials used on the "L" shaped buildings which are a mirror image of one another, are face
brick on all four corners of both buildings, as well as areas surrounding entrances into the
buildings. Decorative pre - colored rockface block will be integrated into the walls, accented by
pre - colored masonry bands. Two pre - colored pitched roof elements adorn each building. The
building's architecture is tastefully designed and meets the standards of the site plan ordinance
requirements. The different colors and materials give the building the desired visual appeal.
This development falls within the Highway Corridor Overlay and must comply with the district's
design standards in addition to the Industrial Office Park Standards. The purpose of the overlay
district is to promote high- quality architectural and site design through improved development
standards with the corridor. The design standards should create a unified, harmonious and high
quality visual environment. The plan and design of the proposed development meets the intent
of the overlay district with the following features:
The building will be one story and the architectural style is unique to the building but will
fit in. The building will provide a variation in style through the use of brick, block, glass,
and pitched roof elements. The building is utilizing exterior materials that are durable
and of high quality. Samples of the materials as well as computer generated colored
images have been submitted to the city and will be available at the meeting.
The site slopes easterly, and grading of the site is required. The existing site grade ranges
from 904 in the southeast corner to 936+ on the northwest corner. The landscaping plan
CSM Corporation
November 1, 1995
Page 4
' provides a variety of plant materials that are massed where possible, particularly along
Highway 5 and the corner of Dell Road and Highway 5. The berms and landscaping
materials will be continuous along the perimeter of the site. The plant materials are
repetitious in some locations and variable in others. Proposed plant materials are
indigenous to Minnesota. A curb is required along the perimeter of the green space area.
All planting areas are adequate in size to allow trees to grow. Additional plantings along
' the south portion of the site to further screen the loading dock will be required.
• A parking lot light plan is required. The plan should incorporate the light style and
' height. A detailed sign plan which include lighting method has been submitted.
Individual channeled letters with the option of back lighting are proposed.
' The site plan fails to show the trash enclosure location. The dumpsters must be screened
by a wing -wall and doors with siding and trim to match the building. Current state
' statutes require that recycling space be provided for all new buildings. The area of the
recycling space must be dedicated at the rate specified in Minnesota State Building Code
(MSBC) 1300.4700 Subp. 5. The applicant should demonstrate the required area will be
' provided in addition to the space required for other solid waste collection space.
Recycling space and other solid waste collection space should be contained within the
same enclosure.
' SITE PLAN FINDINGS
' In evaluating a site plan and building plan, the city shall consider the development's compliance
with the following:
' (1) Consistency with the elements and objectives of the city's development guides,
including the comprehensive plan, official road mapping, and other plans that may
be adopted;
' (2) Consistency with this division;
(3) Preservation of the site in its natural state to the extent practicable by minimizing
tree and soil removal and designing grade changes to be in keeping with the
general appearance of the neighboring developed or developing areas;
(4) Creation of a harmonious relationship of building and open space with natural site
features and with existing and future buildings having a visual relationship to the
development;
CSM Corporation
November 1, 1995
Page 5
(5) Creation of functional and harmonious design for structures and site features, with I
special attention to the following:
a. An internal sense of order for the buildings and use on the site and
provision of a desirable environment for occupants, visitors and general
community;
b. The amount and location of open space and landscaping;
C. Materials, textures, colors and details of construction as an expression of
the design concept and the compatibility of the same with adjacent and
neighboring structures and uses; and
d. Vehicular and pedestrian circulation, including walkways, interior drives
and parking in terms of location and number of access points to the public
streets, width of interior drives and access points, general interior
circulation, separation of pedestrian and vehicular traffic and arrangement
and amount of parking.
(6) Protection of adjacent and neighboring properties through reasonable provision
for surface water drainage, sound and sight buffers, preservation of views, light
and air and those aspects of design not adequately covered by other regulations
which may have substantial effects on neighboring land uses.
Finding: The proposed development is consistent with the City's Highway 5 corridor
design requirements, the comprehensive plan, the zoning ordinance, and the site plan
review requirements. The site design is compatible with the surrounding development. It
is functional and harmonious with the approved development for this area.
WETLANDS
A wetland delineation report was prepared by John Anderson with Wetlands Data. He found two
possible wetlands on site. Wetland A is located in the northeast corner and Wetland B is shown
on Outlot A in the plans. After two meetings with the Wetland Conservation Act's designated
technical evaluation panel (TEP), it was determined that Wetland B (noted on the plans) was not
jurisdictional. The owner has provided documentation that the wetland has not existed for more
than 20 years because of activities associated with public or private drainage systems. The TEP
also determined that Wetland A does not have the hydrology to define it as a wetland. Therefore,
the wetlands on site are exempt from the wetland regulation process and the applicant may fill or
drain them without replacement.
I
1
Ci
i
F1
CSM Corporation
November 1, 1995
Page 6
SURFACE WATER MANAGEMENT PLAN (SWMP)
The City has adopted a Surface Water Management Plan (SWMP) that serves as a tool to protect,
preserve and enhance water resources. The plan identifies, from a regional perspective, the
stormwater quantity and quality improvements necessary to allow future development to take place
and minimize its impact to downstream water bodies. In general, the water quantity portion of the
plan uses a 100 -year design storm interval for ponding and a 10 -year design storm interval for
storm sewer piping. The water quality portion of the plan uses William Walker, Jr.'s Pondnet
model for predicting phosphorus concentrations in shallow water bodies. An ultimate conditions
model has been developed at each drainage area based on the projected future land use, and
therefore, different sets of improvements under full development were analyzed to determine the
optimum phosphorus reduction in priority water bodies. The development will be required to be
constructed in accordance with the City's Surface Water Management Plan.
A regional stormwater pond has been designed for both water quality and quantity on this
property and the remaining undeveloped land of the DataSery property. The pond's best location
is in the southeast corner of the DataSery property adjacent to Dell Road. The stormwater runoff
would run through this pond and be discharged under Dell Road into a natural wetland.
Stormwater would then travel through the wetland and be discharge into Mitchell Lake. The City
of Eden Prairie and Chanhassen agree that the water quality pond should be designed for a
natural wetland, retaining 60% to 75% phosphorus according to the Pondnet Water Quality
Model
' Staff supports the water quantity analysis that was done on this site in the late 1980s, however,
hydrologic calculations are necessary to confirm the design. It appears that the applicant and the
property owner are reviewing an option to combine the existing pond just southeast of the
' DataSery building with the proposed pond in the southeast corner of the property. Staff will be
meeting with the project engineer to discuss these alternatives. In either case, the applicant will
have to dedicate a drainage easement over this property to construct the pond.
0
Storm Water Quality Fees
The SWMP has established a water quality connection charge for each new subdivision based on
land use. Dedication shall be equal to the cost of land and pond volume needed for treatment of the
phosphorus load leaving the site. The requirement for cash in lieu of land and pond construction
shall be based upon a schedule in accordance with the prescribed land use zoning. Values are
calculated using market values of land in the City of Chanhassen plus a value of $2.50 per cubic
yard for excavation of the pond. The proposed SWMP water quality charge of $5,909 /acre for
commercial developments will be waived if the applicant provides water quality treatment
according to the City's SWMP standards. The stormwater quality pond shall be designed to retain
60% to 75% phosphorus according to the Walker Pondnet model in order to provide for better
water quality to Eden Prairie wetland.
CSM Corporation
November 1, 1995 '
Page 7
Storm Water Quantity Fees I
The SWMP has established a connection charge for the different land uses based on an average
city -wide rate for the installation of water quantity systems. This cost includes land acquisition, '
proposed SWMP culverts, open channels and storm water ponding areas for runoff storage.
Commercial developments will have a connection charge of $4,360 per developable acre. The total
gross area of the property is 21.3 acres. Therefore, the proposed development would then be '
responsible for a water quantity connection charge of $92,868. The oversizing of the regional pond
and infrastructure will be credited to the applicant at the time of final plat. This fee will be due
payable to the City at time of final plat recording. I
GRADING & DRAINAGE
The site is designed to drain to the south southeast where the stormwater would discharge into '
the existing stormwater system in Lake Drive East. The applicant will have to construct a
stormwater pipe from Lake Drive East to the.regional pond, dedicate an easement over the '
property to both install the stormwater pipe and construct the pond, and come to an agreement
with DataSery on the location of the pipe and the regional pond so that it meets the needs of all
parties. The oversizing of the storm sewer pipe and pond will be credited against the applicant's ,
SWMP fees.
The applicant will need to submit to the City detailed storm drainage calculations for the storm '
sewers as well as ponding calculations for a 2 -, 10 -, and 100 -year storm event, 24 -hour duration
for staff review and approval. Based on these calculations, additional catch basins may be ,
required.
The site contains remnants from a farm house that will need to be properly abandoned. A ,
demolition permit from the City's Building Department may be required. A drain tile also exists
through proposed Lot 1, Block 1 to Lake Drive East that may need to be incorporated into the
storm drainage system. '
The grading plan proposes berming along three sides of the site. The grade difference on the
west side of the parcel prohibits berming. The site to the west will be approximately ten feet '
higher than the proposed west parking lot.
EROSION CONTROL '
Erosion measures and site restoration shall be developed in accordance with the City's Best
Management Practice Handbook (BMPH). The final grading plan shall incorporate erosion control '
fence (Type 1) around the perimeter of the grading limits. Rock construction entrance shall be
employed and maintained at all access points until the driveways and parking lots have been paved
CSM Corporation
' November 1, 1995
Page 8
' with a bituminous surface. Hay bales and/or silt fence shall be installed around all catch basins
until the parking lots have been paved.
UTILITIES
Individual sewer and water services have been extended to the lots from Lake Drive East. All
' utilities installed outside the City's drainage and utility easements or right -of -way shall be
considered private and not maintained by the City. These utilities will be inspected by the City's
Building Department. The applicant and/or contractor shall be responsible for obtaining the
' appropriate permits from the City's Building Department.
In conjunction with this development, the City will be requiring the upgrading of Dell Road south
' of Lake Drive East to the south city limits. Construction plans and specifications were previously
prepared by the City of Eden Prairie. The actual street, however, was only constructed on the Eden
Prairie side. The applicant should contact the City of Eden Prairie to obtain the rights to these
' construction plans and complete the remaining street and utility improvements along Dell Road
within the City of Chanhassen. The applicant will be required to enter into a development contract
with the City and provide financial security to guarantee construction of the public improvements
' and conditions of final plat approval. The applicant may be reimbursed through tax increment
financing for these public improvements along Dell Road. This will be further discussed at the City
' Council level. Fire hydrant locations throughout the site will be subject to City Fire Marshal
approval.
' Apparently, there are existing drainage and utility easements over the old alignment of Lake Drive
East which the applicant is requesting a vacation. The applicant should formally petition the City to
vacate these existing easements prior to final plat approval.
' STREETS/PARKING/INTERIOR CIRCULATION
The site is proposed to be serviced from two driveway access points off of Lake Drive East. The
westerly access drive is proposed to be shared with the site to the west in the future. Staff
recommends against sharing this driveway access due to the grade difference between the two sites.
' In addition, most of the time these access points will not be used because they do not line up with
the future site improvements.
The applicant's engineer has submitted to the City a preliminary traffic study for Lake Drive East
and Dell Road. The preliminary conclusions indicate acceptable levels of service through Phase I
of the development with eventually a level of service `B' for the forecast year 2005 assuming a
' signalized intersection. Level of service is defined as those operational conditions within a traffic
stream as perceived by users of the traffic facility. The concept of level of service was originally
defined as being a quantitative measure of operational conditions. Such a measure would ideally
1
CSM Corporation
November 1, 1995
Page 9
cover factors such as speed and travel time, delay, freedom to maneuver, traffic interruptions,
comfort and convenience, and safety. In practice, levels of service have been and continue to be
defined by one or two measures of effectiveness for each facility type. These measures relate more
to speed, delay, and density than they do to quantitative factors or to safety. For each facility type,
i.e. intersections, freeways, multi -lane highways, six levels of service, A through F, are defined.
Level of service A represents a free flow with individual vehicles being unaffected by the presence
of other vehicles. Level of service E represents operating conditions at capacity which may involve
delays or back ups and accidents.
Staff will be forwarding a copy of this preliminary traffic study along with the final study to an
independent consultant, SRF Consulting Group, Inc., for their evaluation of the traffic impacts at
the intersection of Lake Drive East and Dell Road as well as Dakota Avenue and Lake Drive East,
and forecast traffic impacts as well as any necessary geometric reconfigurations of intersections or
traffic control devices. Prior to receiving the final plat approval, a final traffic study should be
prepared and reviewed by the City's traffic consultant, SRF. Based on the traffic study it appears a
traffic signal may be required in the future at Lake Drive East and Dell Road. The developer shall
be responsible for a share of the local cost participation of this traffic signal on a percentage basis
based upon traffic generation from full development of this site in relation to the total traffic
volume of Dell Road. Security to guarantee payment for the developer's share of this traffic signal
for the entire development (Phase I and II) will be required.
As mentioned in the Utilities section of this report, staff is recommending that the upgrade of Dell
Road be required south of Lake Drive East in conjunction with this development. Detailed
construction plans and specifications will be required for submittal for review and approval by the
City. The City has already acquired the necessary easements from the upgrading of Dell Road
from DataServ. The applicant shall dedicate on the final plat these easements as right -of -way.
The City's parking ordinance for office warehouse buildings requires a total of 123 spaces per
building with a total of 246 spaces. The applicant is providing 246 spaces.
The Minnesota State Building Code (MSBC) requires that handicapped parking spaces be
provided at the rate of one handicapped space per every 50 spaces in the 16t(s). This calculates
out to 5 spaces. The submitted site plan includes eight handicapped parking spaces. The
Americans with Disabilities Act (ADA) has specific requirements for van spaces which currently
are not part of the MSBC. These requirements are not enforced by the Inspections Division, but
should be incorporated into the site plan. Site approaches are regulated by the MSBC, and are
not detailed on the site plan. Curb cuts, width, texture and slope are details that must be included
on the site plans.
CSM Corporation
' November 1, 1995
Page 10
' LANDSCAPING
The landscaping plan for the CSM Corporation development has been reviewed. The applicant
' is providing a total of 157 overstory, ornamental, and evergreen trees. Species selection is
diverse and well- represented by trees that are under utilized in most landscape plantings. The
applicant may want to consider specifying male plants on the plant schedule for two species,
' Kentucky coffeetree and Amur corktree. In locations where these trees are planted near a parking
area, a non -seed bearing variety would be appropriate.
' In the east parking lot, the applicant must provide two landscaped peninsulas as required by city
ordinance. In the central parking lot, one landscaped peninsula is also required. On the south
side of the development, additional screening is needed around the truck loading area. Screening
elements may include berms and planting of ornamental and/or evergreen trees as well as
extending the landscaped area along East lake Drive into peninsulas that mirror the peninsulas
that extend south of the central parking lot.
'
Landscaping is proposed along the north east and west side of Lots 1 and 2, to screen the parking
P g P p g p g
' areas. A meandering landscaped berm, 4 to 6 feet in height, is proposed to be installed along the
perimeter of the site. Staff is recommending additional landscaping materials be _added to screen
the loading area along the south portion of the site.
' LIGHTING
' Lighting locations for the parking lot have not been illustrated on the plans. Only shielded
fixtures are allowed and the applicant shall demonstrate that there is no more than Moot candles
of light at the property line as required by ordinance. A detailed lighting plan should be
' submitted when building permits are requested. Accent lights are located above entry ways into
the buildings. Street lights consistent with Lake Drive East will be at 200 feet intervals,
staggered from one side to the other.
' SIGNAGE
The applicant has submitted a signage plan. One ground low profile business sign is permitted
per lot. The area of the sign may not exceed 80 square feet and a height of 8 feet.
' Also, one wall mounted sign per business shall be permitted per street frontage. The total display
area shall not exceed 15% of the total area of the building wall upon which the signs are
mounted. No sign may exceed 90 square feet. Staff is recommending the following criteria be
' adopted:
CSM Corporation
November 1, 1995 ,
Page 11
1. All businesses shall share one monument sign. Monument signage shall be I
subject to the monument standards in the sign ordinance.
2. Wall signs are permitted on no more that 2 street frontages as shown on the sign ,
plan dated November 1, 1995. -r,..e +eW e f eaeh wall r„ „*sa sign di .•
Ash all no t a esa MA s e feet)
3. All signs require a separate permit.
4. The signage will have consistency throughout the development and add an
architectural accent to the building.
5. Consistency in signage shall relate to color, size, materials, and heights.
6. No illuminated signs within the development may be viewed from the residential
section south -west of the site. Signage on the west side of the building will
be allowed or declined based on visibility to the neighborhood residents, and
consistent with the city's sign ordinance.
7. Back -lit individual letter signs are permitted.
8. Individual letters may not exceed 2 feet in height and logos shall not exceed 30
inches in height and consistent with the standards for the signage.
9. Only the name and logo of the business occupying the unit will be permitted on
the sign.
The applicant must obtain a sign permit prior to erecting the signs on site. One stop sign must be
posted on the driveway at the exit point of both sites. A detailed sign plan incorporating the
method of lighting, acceptable to staff should be provided prior to requesting a building permit.
COMPLIANCE TABLE - IOP DISTRICT
Ordinance
Building 1
Building 2
Building Height 2 stories
1 story
1 story
Building Setback N -30' E -30'
N -120' E -125
N -120' E -30'
5 -30' W -30'
5 -85' W -30'
5- 85.33' W -75'
7
J
u
CSM Corporation
November 1, 1995
Page 12
Parking stalls
123 stalls
123 stalls
Parking Setback
N -25' E -25'
N -30' E -47'
S -25' W -10'
S -30 W -NA
Hard surface
70%
58%
Coverage
Lot Area
1 acre
5.43 acres
123 stalls
N -30' E -NA
S -30' W -5'*
69.3%
4.8 acres
* The zoning ordinance requires a 10 foot side yard setback for parking areas, and no
setback when parking lots are adjacent to one another. Since it is unknown at this point
what the layout for the buildings on Outlot A will be, staff is recommending a 10 side
yard setback for the parking area on Lot 2, Block 1 be maintained.
' PARK AND TRAIL DEDICATION FEES
The City is requiring that park and trails fees be submitted in lieu of park land. Fees are to be
' paid in accordance to city ordinance. One third of the fees will be required at the time of final
plat recording.
SUBDIVISION
' The subdivision proposal will subdivide 61.6 acres into three lots and two outlots. Lots 1 and 2,
Block 1, will contain office /warehouse buildings. Outlot A will be reserved for future
development. The parcel located south of Lake Drive East must be shown as Lot 1, Block 2.
' This parcel contain the DataSery building. Outlot B will contain a pond. The subdivision request
is a relatively straightforward action. The following easements are either illustrated on the plat or
should be acquired:
1. Standard drainage and utility easements around the perimeter of all lots.
' 2. Dedication of public right -of -way.
3. Dedication of drainage and utility easements over ponds and drainage ways.
VACATION
' There is an existing right -of -way easement for an abandoned road, located on Outlot A. This
easement serves no function or purpose. There is also a watermain easement located on the outlot
which also serves no purpose. Staff is recommending both easements be vacated.
1
CSM Corporation
November 1, 1995 ,
Page 13
PLANNING COMMISSION UPDATE 1
On November 1, 1995, the Planning Commission reviewed and unanimously approved this I
application. Issues discussed were as follows:
Issue:
The applicant submitted a sign package as part of this application. These
buildings will be the gateway into the city. Staff wanted to ensure the signage
,
remain consistent throughout the development. Some recommendations were
made to address the uniformity of the signage, and other recommendations were
,
made to prevent illuminated signs from facing the residential section to the south
and west of the site. The applicants requested they be all allowed to have
illuminated signs since future buildings will block views between the proposed
'
buildings and existing homes. They also submitted elevations of the buildings
reflecting proposed locations of the signs. This approach limits the number of the
signs as well as the height of the letters rather than the size of the sign.
'
Finding:
The Planning Commission found the applicant's proposal which limits the
number of the signs and the height of the letters and logos to be acceptable and the
'
conditions of approval was amended accordingly. As to the condition pertaining
to illuminated signs facing the residential neighborhood to the south, the Planning
Commission elected to base their recommendation on a case by case situation.
'
For example, if a sign was proposed along the south elevation of either building,
and the parcel separating the proposed building from the residential subdivision
was vacant, the sign will be viewed from the residential neighborhood. Therefore,
'
it will be a non illuminated sign, and vise versa.
Issue:
The applicant is requesting permission to have signage along the westerly
'
elevation of building 2. The sign ordinance states "Wall business signs shall be
permitted on street frontage for each business occupant within a building only."
,
Building 2 does not have street frontage along the west.
Finding:
We believe that as long as signage is limited to two elevations only, the request
'
would be acceptable. The total number of signs will not increase and staff has no
objection to this request.
Issue:
The Planning Commission recommended the applicant provide perimeter
coniferous landscaping in the east parking lot, along Dell Road.
'
Finding:
The landscaping plan currently shows a 2 to 6 foot berm with Red Oaks. There
will be some areas along Dell Road where parked cars will be seen. To ensure
CSM Corporation
November 1, 1995
Page 14
adequate screening, staff is recommending clustered coniferous landscaping along
Dell Road be provided.
Issue: The zoning ordinance requires landscaped peninsulas in parking lots. Staff
recommended the applicant provide two landscaped peninsulas in the east parking
lot and one in the central parking lot.
Finding: Staff discussed this issue with the applicant. In order for the applicant to provide
these peninsulas, parking stalls will be lost. The only alternate location for these
stalls is where the berms are proposed to screen the loading docks. We believe
that screening these loading docks is more essential than providing these
landscaped peninsulas. Hence, we are amending this condition.
STAFF RECOMMENDATION
Staff recommends that City Council adopt the following motion:
I. SITE PLAN REVIEW
"The City Council adopts the following motions:
"The City Council approves Site Plan Review #95 -18 as shown on the site plan received October
2, 1995, subject to the following conditions:
1. The materials used to screen the trash enclosure shall be the same type of brick used on
the building.
2. Signage criteria:
a. All businesses Each building shall share one monument sign. Monument
signage shall be subject to the monument standards in the sign ordinance.
b. Wall signs are permitted on no more that 2 street frontages as shown on sign
plan dated November 1, 1995.
sh91 no t o ee (24 s e fe
C. All signs require a separate permit.
d. The signage will have consistency throughout the development and add an
architectural accent to the building.
CSM Corporation
November 1, 1995
Page 15
e. Consistency in signage shall relate to color, size, materials, and heights.
1
1
f. No illuminated signs within the development may be viewed from the residential
section south and west of the site. Signage on the west side of the building will '
be allowed or declined based on visibility to the neighborhood residents, and
consistent with the city's sign ordinance.
g. Back -lit individual letter signs are permitted.
h. Individual letters may not exceed 2 feet in height, and logos shall not exceed 30
inches in height and consistent with the standards for the signage.
i. Only the name and logo of the business occupying the unit will be permitted on
the sign.
j. The applicant must obtain a sign permit prior to erecting the signs on site. One
stop sign must be posted on the driveway at the exit point of both sites. A
detailed sign plan incorporating the method of lighting, acceptable to staff should
be provided prior to requesting a sign permit.
k. Signage on building 1 shall be limited to the north and east elevations.
Signage on building 2 shall be limited to the north and west elevations.
3.
marking let. Screening of truck loading area along East Lake Drive must be
increased to include coniferous double row screening the entire length of the dock
area.. Screening may include berms, ornamental, and evergreen trees. An extended
peninsula parallel to the entryway may also be considered on the condition that it does not
impede truck access to the loading areas. The applicant must provide perimeter
coniferous landscaping in the east parking lot, along Dell Road.
4. The applicant shall enter into a site plan contract with the city and provide the necessary
financial securities as required for landscaping.
5. Fire Marshal conditions:
a. Additional fire hydrants will be required. One fire hydrant must be relocated.
Contact Fire Marshal for exact changes and modification.
b. "No Parking Fire Lane" signage and yellow curbing must be provided. Contact
Fire Marshal for exact "Fire Lane" areas.
Fj
Fj
1
CSM Corporation
November 1, 1995
Page 16
C. P.I.V. (Post Indicator Valves) must be installed. Show on utility plans.
d. A ten foot clear space must be provided around fine hydrants.
6. Concurrent with the building permit, a detailed lighting plan meeting city standards shall
be submitted.
7. Meet with the Building Official as requested in his attached memo to discuss.
8. The applicant will need to develop a sediment and erosion control plan in accordance with
the City's Best Management Practice Handbook and the Surface Water Management Plan
requirements for new developments. The building setback line and erosion control fencing
shall be denoted on the final grading and drainage plans prior to final plat approval. The
plan shall be submitted to the City for review and formal approval.
9. All areas disturbed as a result of construction activities shall be immediately restored with
seed and disc - mulched or wood -fiber blanket or sod within two weeks of completion of
each activity in accordance with the City's Best Management Practice Handbook.
10. The applicant shall upgrade /extend Dell Road south of Lake Drive East to the south City
limits as well as install a storm drainage system from Lake Drive East to the regional pond
site. All public utility and street improvements shall be constructed in accordance with the
latest edition of the City's Standard Specifications and Detail Plates. Detailed street and
utility plans and specifications shall be submitted for staff' review and City Council
approval. The private utilities will be inspected by the City's Building Department. The
applicant and/or builder shall be responsible for obtaining the necessary permits from the
City.
11. The applicant shall provide detailed storm sewer calculations for 10 -year and 100 -year
storm events and provide ponding calculations for stormwater ponds in accordance with the
City's Surface Water Management Plan for the City Engineer to review and approve prior to
final plat approval. The applicant shall provide detailed pre - developed and post developed
stormwater calculations for 100 -year storm events and normal water level and high water
level calculations in existing basins, created basins, and or creeks. Individual storm sewer
calculations between each catch basin segment will also be required to determine if
sufficient catch basins are being utilized. In addition, water quality ponding design
calculations shall be based on Walker's Pondnet model.
12. The applicant shall apply for and obtain permits from the appropriate regulatory agencies,
i.e. Carver County, Watershed District, Metropolitan Waste Control Commission, Health
CSM Corporation
November 1, 1995 '
Page 17
Department, Minnesota Pollution Control Agency, Minnesota Department of Natural '
Resources, Army Corps of Engineers and Minnesota Department of Transportation and
comply with their conditions of approval.
13. No berming or landscaping will be allowed within the right -of -way. '.
14. The lowest floor elevation of all buildings adjacent to wetlands and storm ponds shall be a
minimum of 2 feet above the 100 -year high water level.
15.
A regional water quality and water quantity pond shall be provided on site to pretreat
stormwater runoff prior to discharging under Dell Road into the Eden Prairie wetland. The
proposed stormwater pond must have side slopes of 10:1 for the first ten feet at the normal
water level and no more than 3:1 thereafter or 4:1 throughout for safety purposes. The
stormwater pond shall be designed to 60% to 75% phosphorus removal efficiently. A
landscape plan providing upland and wetland plants to naturally blend into the landscape is
recommended.
i
16.
Existing wells and/or septic systems on site will have to be properly abandoned in
accordance to City and Minnesota Department of Health codes /regulations.
17.
The proposed commercial development of 21.3 acres of which 10.23 acres are being
developed shall be develepable aems is responsible for a water quantity and quality
connection charges of $92,868 in accordance with the City's Surface Water
Management Plan. These fees are payable to the City prior to the City filing the final plat.
:Phe water- quality fees The final water quality and quantity connection fees will be
'
determined based on final construction drawings
en site steffi+Ve4ef tfeatffi .
18.
The applicant shall report to the City Engineer the location of any drain tiles found during
construction and shall re- locate or abandon the drain tile as directed by the City Engineer.
19.
The installation of traffic signals at the intersection of Lake Drive East and Dell Road is
expected in the future. The developer shall be responsible or share the local cost
,
participation of this signal on a percentage basis based upon traffic generation from full
development of this site in relation to the total traffic volume of Dell Road. Seeerity te
paFantee pa)qneFA for- the develepeF's shafe ef this tFaffie signal fer- the entire dovelopment
(Phases 1 an m will be r°quiwa. The traffic signals, when they meet warrants, will be
installed through a City public improvement project. The developers and/or property
owners shall waive any and all procedural and substantive objections to the special
'
assessment, including but not limited to hearing requirements and any claim that the
assessment exceeds the benefit to the properties.
'
CSM Corporation
' November 1, 1995
Page 18
' 20. All roof top equipment must be screened in accordance with city ordinances.
21. The parking area for Lot 2 shall maintain a 10 foot side yard setback along the west edge of
the property."
II. SUBDIVISION
"The City Council approves the preliminary plat for Subdivision #95 -18 for Chanhassen East
Business Center as shown on the plat received October 2, 1995, with the following conditions:
1. Park and trail dedication fees to be collected per city ordinance.
2. The applicant shall enter into a development contract with the City and provide the
necessary financial security to guarantee compliance with the terms of the development
contract.
3. All areas disturbed as a result of construction activities shall be immediately restored with
' seed and disc - mulched or wood -fiber blanket or sod within two weeks of completion of
each activity in accordance with the City's Best Management Practice Handbook. All
catch basins shall be protected with silt fence or hay bales until the parking lot is paved.
4. The applicant shall provide detailed pre - developed and post - developed stormwater
' calculations for a 10 -year and 100 -year storm event, 24 -hour duration. Individual storm
sewer calculations between each catch basin segment will also be required to determine if
sufficient catch basins are being utilized.
5. The applicant shall apply for and obtain permits from the appropriate regulatory agencies,
i.e. Carver County, Watershed District, Metropolitan Waste Control Commission, Health
Department, Minnesota Pollution Control Agency, Minnesota Department of Natural
Resources, Army Corps of Engineers and Minnesota Department of Transportation and
comply with their conditions of approval.
6. The appropriate drainage and utility easements should be dedicated on the final plat for all
utilities and ponding areas lying outside the right -of -way. The easement width shall be a
' minimum of 20 feet wide. Consideration shall also be given for access for maintenance of
the ponding areas.
' 7. The applicant shall dedicate on the final plat the necessary right -of -way for the upgrade of
Dell Road.
CSM Corporation
November 1, 1995 '
Page 19
8. The site with the DataSery building shall be shown on the plat as Lot 2, Block 1. '
9. The applicant shall dedicate cross - access easements over:
a. Lots 1 and 2, Block 1,
b. Lot 2, Block 1 and Outlot A."
III. VACATION
"The City Council approves Vacation 95 -4 of the old alignment of Lake Drive East through Outlot
A and the abandoned watermain easements subject to the following condition:
1.
The applicant shall provide the city with a legal description of the old alignment of Lake
Drive East through Outlot A and the abandoned watermain easements per deed Doc. No.
4556054, proposed to be vacated."
ATTACHMENTS
'
1.
Memo from Diane Desotelle Water Resource Engineer, and Dave Hempel, Assistant
$ 9 P
2.
City Engineer, dated October 24, 1995.
Memo from Eden Prairies Engineering Department dated October 23, 1995.
3.
Memo from Steve Kirchman dated October 23, 1995.
4.
Memo from Jill Sinclair, dated October 17, 1995.
" 5.
Application.
'
6.
Narrative dated October 2, 1995.
7.
Signage Criteria.
8.
Narrative describing CSM.
9.
Memo from Mark Littfm, Fire Marshal, dated October 18, 1995.
10.
Letter from Minnesota Department of Transportation dated November 14, 1995.
11.
Planning Commission minutes dated November 1, 1995.
12.
Building elevations showing sign band submitted November 1, 1995.
13.
Plans received October 2, 1995.
C
1
1
MEMORANDUM
TO:
FROM:
DATE:
SUBJ:
CITY OF
CHANHASSEN
690 COULTER DRIVE • P.O. BOX 147 • CHANHASSEN, MINNESOTA 55317
(612) 937 -1900 • FAX (612) 937 -5739
Sharmin Al -Jaff, Planner H
Diane Desotelle, Water Resources Coordinator
David Hempel, Assistant City Engineer :��
October 24, 1995
Review of Preliminary Plan for
CSM Corporation - File No. 95-
Upon review of the preliminary plat drawings
we offer the following comments and recomm
WETLANDS
with Wetlands Data. He found two
ast corner and Wetland B is shown
land Conservation Act's designated
and B (noted on the plans) was not
to wetland has not existed for more
vate drainage systems. The TEP
o'define it as a wetland. Therefore,
rocess and the Applicant may fill or
The City has adopted a Surface Water Manager t Plan (SWMP) that serves as a tool to protect,
preserve and enhance water resources. Thep identifies, from a regional perspective, the
stormwater quantity and quality improvements necessary to allow future development to take place
and minimize its impact to downstream water bodies. In general, the water quantity portion of the
plan uses a 100 -year design storm interval for ponding and a 10 -year design storm interval for
storm sewer piping. The water quality portion of the plan uses William Walker, Jr.'s Pondnet
East Business Center and Site Plan for
by RLK Associates dated October 2, 1995,
Sharmin Al -Jaff
October 24, 1995
,
Page 2
model for gp phosphorus hos horus concentrations in shallow water bodies. An ultimate conditions
P
model has been developed at each drainage area based on the projected future land use, and
therefore, different sets of improvements under full development were analyzed to determine the
optimum phosphorus reduction in priority water bodies. The development will be required to be
constructed in accordance with the City's Surface Water Management Plan.
,
A regional stormwater and has been design for both water quality and quantity on this
g p g q Y q Y
property and the remaining undeveloped land of the Datasery property. The pond's best location
is in the southeast corner of the Datasery property adjacent to Dell Road. The stormwater runoff
would run through this pond and be discharged under Dell Road into a natural wetland.
Stormwater would then travel through the wetland and be discharge into Mitchell Lake. The City
of Eden Prairie and Chanhassen agree that the water quality pond should be designed for a
,
natural wetland, retaining 60% to 75% phosphorus according to the Pondnet Water Quality
Model.
Staff supports the water quantity analysis that was done on this site in the late 1980s, however,
hydrologic calculations are necessary to confirm the design. It appears that the applicant and the
property owner are reviewing an option to combine the existing pond just southeast of the
Datasery building with the proposed pond in the southeast corner of the property. Staff will be
meeting with the project engineer to discuss these alternatives. In either case, the applicant will
have to dedicate a drainage easement over this property to construct the pond.
Storm Water Quality Fees ,
The SWMP has established a water quality connection charge for each new subdivision based on
land use. Dedication shall be equal to the cost of land and pond volume needed for treatment of the
phosphorus load leaving the site. The requirement for cash in lieu of land and pond construction
shall be based upon a schedule in accordance with the prescribed land use zoning. Values are
calculated using market values of land in the City of Chanhassen plus a value of $2.50 per cubic
yard for excavation of the pond. The proposed SWMP water quality charge of $5,909 /acre for
commercial developments will be waived if the applicant provides water quality treatment
according to the City's SWMP standards. The stormwater quality pond shall be designed to retain '
60% to 75% phosphorus according to the Walker Pondnet model in order to provide for better
water quality to Eden Prairie wetland.
Storm Water Quantity Fees
The SWMP has established a connection charge for the different land uses based on an average
city -wide rate for the installation of water quantity systems. This cost includes land acquisition,
proposed SWMP culverts, open channels and storm water ponding areas for runoff storage.
Commercial developments will have a connection charge of $4,360 per developable acre. The total
gross area of the property is 21.3 acres. Therefore, the proposed development would then be
Sharmin Al -Jaff
October 24, 1995
Page 3
responsible for a water quantity connection charge of $92,868. The oversizing of the regional pond
and infrastructure will be credited to the applicant at the time of final plat. This fee will be due
payable to the City at time of final plat recording.
GRADING & DRAINAGE
' The site is designed to drain to the south southeast where the stormwater would discharge into
the existing stormwater system in Lake Drive East. The applicant will have to construct a
' stormwater pipe from Lake Drive East to the regional pond, dedicate an easement over the
property to both install the stormwater pipe and construct the pond, and come to an agreement
' with Datasery on the location of the pipe and the regional pond so that it meets the needs of all
parties. The oversizing of the storm sewer pipe and pond will be credited against the applicant's
SWMP fees.
The applicant will need to submit to the City detailed storm drainage calculations for the storm
sewers as well as ponding calculations for a 2 -, 10 -, and 100 -year storm event, 24 -hour duration
' for staff review and approval. Based on these calculations, additional catch basins may be
required.
The site contains remnants from a farm house that will need to be properly abandoned. A
demolition permit from the City's Building Department may be required. A drain tile also exists
through proposed Lot 1, Block 1 to Lake Drive East that may need to be incorporated into the
storm drainage system.
The grading plan proposes berming along three sides of the site. The grade difference on the
1 west side of the parcel prohibits berming. The site to the west will be approximately ten feet
higher than the proposed west parking lot.
EROSION CONTROL
' Erosion measures and site restoration shall be developed in accordance with the City's Best
Management Practice Handbook (BMPH). The final grading plan shall incorporate erosion control
fence (Type 1) around the perimeter of the grading limits. Rock construction entrance shall be
employed and maintained at all access points until the driveways and parking lots have been paved
with a bituminous surface. Hay bales and/or silt fence shall be installed around all catch basins
until the parking lots have been paved.
Sharmin Al -Jaff
October 24, 1995
Page 4
UTILITIES I
Individual sewer and water services have been extended to the lots from Lake Drive East. All
utilities installed outside the City's drainage and utility easements or right -of -way shall be
considered private and not maintained by the City. These utilities will be inspected by the City's
Building Department. The applicant and/or contractor shall be responsible for obtaining the
appropriate permits from the City's Building Department.
In conjunction with this development, the City will be requiring the upgrading of Dell Road south
'
of Lake Drive East to the south city limits. Construction plans and specifications were previously
prepared by the City of Eden Prairie. The actual street, however, was only constructed on the Eden
Prairie side. The applicant should contact the City of Eden Prairie to obtain the rights to these
construction plans and complete the remaining street and utility improvements along Dell Road
within the City of Chanhassen. The applicant will be required to enter into a development contract
with the City and provide financial security to guarantee construction of the public improvements
and conditions of final plat approval. The applicant may be reimbursed through tax increment
financing for these public improvements along Dell Road. This will be further discussed at the City
,
Council level. Fire hydrant locations throughout the site will be subject to City Fire Marshal
approval.
Apparently, there are existing drainage and utility easements over the old alignment of Lake Drive
East which the applicant is requesting a vacation. The applicant should formally petition the City to
vacate these existing easements prior to final plat approval.
STREETS
,
The site is ro osed to be serviced from two driveway access points off of Lake Drive East. The
P P Y P
westerly access drive is proposed to be shared with the site to the west in the future. Staff
recommends against sharing this driveway access due to the grade difference between the two sites.
In addition, most of the time these access points will not be used because they do not line up with
the future site improvements.
,
The applicant's engineer has submitted to the City a preliminary traffic study for Lake Drive East
and Dell Road. The preliminary conclusions indicate acceptable levels of service through Phase I
of the development with eventually a level of service `B' for the forecast year 2005 assuming a
signalized intersection. Level of service is defined as those operational conditions within a traffic
stream as perceived by users of the traffic facility. The concept of level of service was originally
defined as being a quantitative measure of operational conditions. Such a measure would ideally
cover factors such as speed and travel time, delay, freedom to maneuver, traffic interruptions,
comfort and convenience, safety. In practice, levels of service have been and continue to be defined
Sharmin Al -Jaff
October 24, 1995
Page 5
by one or two measures of effectiveness for each facility type. These measures relate more to
speed, delay, and density than they do to quantitative factors or to safety. For each facility type, i.e.
intersections, freeways, multi -lane highways, six levels of service, A through F, are defined. Level
of service A represents a free flow with individual vehicles being unaffected by the presence of
other vehicles. Level of service E represents operating conditions at capacity which may involve
delays or back ups and accidents.
Staff will be forwarding a copy of this preliminary traffic study along with the final study to an
independent consultant, SRF Consulting Group, Inc., for their evaluation of the traffic impacts at
the intersection of Lake Drive East and Dell Road as well as Dakota Avenue and Lake Drive East,
and forecast traffic impacts as well as any necessary geometric reconfigurations of intersections or
traffic control devices. Prior to receiving the final plat approval, a final traffic study should be
prepared and reviewed by the City's traffic consultant, SRF. Based on the traffic study it appears a
' traffic signal may be required in the future at Lake Drive East and Dell Road. The developer shall
be responsible for a share of the local cost participation of this traffic signal on a percentage basis
based upon traffic generation from full development of this site in relation to -the total traffic
' volume of Dell Road. Security to guarantee payment for the developer's share of this traffic signal
for the entire development (Phase I and II) will be required.
' As mentioned in the Utilities section of this report, staff is recommending that the upgrade of Dell
Road be required south of Lake Drive East in conjunction with this development. Detailed
construction plans and specifications will be required for submittal for review and approval by the
City. The City has already acquired the necessary easements from the upgrading of Dell Road
from Dataserv. The applicant shall dedicate on the final plat these easements as right -of -way.
RECOMMENDED CONDITIONS OF APPROVAL FOR PRELIMINARY PLAT
1. The applicant will need to develop a sediment and erosion control plan in accordance with
the City's Best Management Practice Handbook and the Surface Water Management Plan
requirements for new developments. The building setback line and erosion control fencing
shall be denoted on the final grading and drainage plans prior to final plat approval. The
plan shall be submitted to the City for review and formal approval.
2. All areas disturbed as a result of construction activities shall be immediately restored with
seed and disc - mulched or wood -fiber blanket or sod within two weeks of completion of
each activity in accordance with the City's Best Management Practice Handbook.
' 3. The applicant shall upgrade /extend Dell Road south of Lake Drive East to the south City
limits as well as install a storm drainage system from Lake Drive East to the regional pond
I site. All public utility and street improvements shall be constructed in accordance with the
9. The lowest floor elevation of all buildings adjacent to wetlands and storm ponds shall be a
minimum of 2 feet above the 100 -year high water level.
10. A regional water quality and water quantity pond shall be provided on site to pretreat
stormwater runoff prior to discharging under Dell Road into the Eden Prairie wetland. The
proposed stormwater pond must have side slopes of 10:1 for the first ten feet at the normal
water level and no more than 3:1 thereafter or 4:1 throughout for safety purposes. The
i
Sharmin Al -Jaff
October 24, 1995
'
Page 6
latest edition of the City's Standard Specifications and Detail Plates. Detailed street and
utility plans and specifications shall be submitted for staff review and City Council
approval. The private utilities will be inspected by the City's Building Department. The
applicant and/or builder shall be responsible for obtaining the necessary permits from the
City.
4.
The applicant shall provide detailed storm sewer calculations for 10 -year and 100 -year
PP P
storm events and provide ponding calculations for stormwater ponds in accordance with the
City's Surface Water Management Plan for the City Engineer to review and approve prior to
final plat approval. The applicant shall provide detailed pre- developed and post developed
stormwater calculations for 100 -year storm events and normal water level and high water
level calculations in existing basins, created basins, and or creeks. Individual storm sewer
calculations between each catch basin segment will also be required to determine if
sufficient catch basins are being utilized. In addition, water quality ponding design
calculations shall be based on Walker's Pondnet model.
5.
The applicant shall enter into a development contract with the City and provide the
necessary financial security to guarantee compliance with the terms of the development
,
contract.
6.
The applicant shall apply for and obtain permits from the appropriate regulatory agencies,
i.e. Carver County, Watershed District, Metropolitan Waste Control Commission, Health
a
Department, Minnesota Pollution Control Agency, Minnesota Department of Natural
Resources, Army Corps of Engineers and Minnesota Department of Transportation and
comply with their conditions of approval.
7.
The appropriate drains a and utility easements should be dedicated on the final plat for all
g Y P
utilities and ponding areas lying outside the right -of -way. The easement width shall be a
minimum of 20 feet wide. Consideration shall also be given for access for maintenance of
'
the ponding areas.
8.
No berming or landscaping will be allowed within the right -of -way.
'
9. The lowest floor elevation of all buildings adjacent to wetlands and storm ponds shall be a
minimum of 2 feet above the 100 -year high water level.
10. A regional water quality and water quantity pond shall be provided on site to pretreat
stormwater runoff prior to discharging under Dell Road into the Eden Prairie wetland. The
proposed stormwater pond must have side slopes of 10:1 for the first ten feet at the normal
water level and no more than 3:1 thereafter or 4:1 throughout for safety purposes. The
i
Sharmin Al -Jaff
' October 24, 1995
Page 7
stormwater pond shall be designed to 60% to 75% phosphorus removal efficiently. A
landscape plan providing upland and wetland plants to naturally blend into the landscape is
recommended.
11. Existing wells and/or septic systems on site will have to be properly abandoned in
accordance to City and Minnesota Department of Health codes /regulations.
12. The proposed commercial development of 21.3 developable acres is responsible for a water
quality connection charge of $92,868. These fees are payable to the City prior to the City
filing the final plat. The water quality fees will be waived if the applicant provides for on-
site stormwater treatment.
13. The applicant shall report to the City Engineer the location of any drain tiles found during
construction and shall re- locate or abandon the drain tile as directed by the City Engineer.
14. The applicant shall dedicate on the final plat the necessary right -of -way for the upgrade of
Dell Road.
15. The installation of traffic signals at the intersection of Lake Drive East and Dell Road is
expected in the future. The developer shall be responsible or share the local cost
participation of this signal on a percentage basis based upon traffic generation from full
development of this site in relation to the total traffic volume of Dell Road. Security to
guarantee payment for the developer's share of this traffic signal for the entire development
(Phases I and II) will be required.
16. The applicant shall formally petition the City requesting the vacation of the old alignment of
Lake Drive East through Outlot A.
1 jms/ktm
I c: Charles D. Folch, Director of Public Works /City Engineer
gAeng \diane \planning \csm.ppr
11
City of Eden Prairie
City Offices
8080 Mitchell Road • Eden Prairie, MN 55344 -4485
Phone (612) 949 -8300 • TDD (612) 949 -8399 • Fax (612) 949 -8390
October 23, 1995
Sharmin Al -Jaff
City of Chanhassen
690 Colter Drive
P.O. Box 147
Chanhassen, MN 55317
RE: Development Proposal by CSM Corporation at the
Southwest Corner of Dell Road and Highway 5
Dear Ms. Al -Jaff:
'u
Thank you for providing us an opportunity to review and comment on the above referenced development
proposal. I feel there are two issues of critical importance to the City of Eden Prairie with regards to this project,
namely; the completion of Dell Road, and the construction of the proposed storm water pond. A summary of
Eden Prairie's concerns are as follows:
• The intersection of East Lake Drive and Dell Road will not fiinction adequately with development of this '
project until the westerly lanes of Dell Road are completed and south bound traffic is no longer diverted
to the north bound lanes of Dell Road.
• Based on the preliminary plat it appears that no right -of -way dedication for Dell Road is proposed at this
time. We would recommend that any City approvals for development of this property be conditioned
upon right -of -way dedication for Dell Road. City staff would like to meet with the staff of Chanhassen
to discuss alternatives that would allow the completion of Dell Road during the 1996 construction season.
• It is Eden Prairie's understanding that the proposed storm water quality pond will be constructed
concurrent with the construction of the proposed CSM buildings and infrastructure. Additionally, it is
Eden Prairie's understanding that the proposed pond will be designed and built in accordance with NURP
standards and with the conclusions of a study entitled Multi -site Drainage Study Southwestern Eden
Prairie, prepared by Sathre Bergquist, Inc. and dated March of 1990. Said study limits run -off from this
site to a maximum of 38.4 cfs and allows for a storage capacity of 12.5 acre feet.
Again, thank you for the opportunity to comment on this plan and please call Alan Gray or myself so that we may
meet with Chanhassen staff to discuss the Dell Road construction schedule.
Sincerely,
Trey John, n
for Engineering Technician
JJ:ssa
cc: Charles Folch, Chanhassen City Engineer
[`7. PAI AXh1Y0&tZt'iV 4r:/.4",VAA.EA
Dsk.JJ.CSM- Corp.ltr
Recycled Paper
RECEIVED
OCT 2 6 1995 ,
L I I
MEMORANDUM
CITY OF
CHANHASSEN
690 COULTER DRIVE • P.O. BOX 147 • CHANHASSEN, MINNESOTA 55317
(612) 937 -1900 • FAX (612) 937 -5739
TO: Sharmin Al -Jaff, Planner II
FROM: Steve A. Kirchman, Building Official
DATE: October 23, 1995
MO
�3 ff
SUBJECT: 95 -18 SUB, 95 -18 SPR, 95 -4 VAQ and 95 -5 WAP (CSM Corporation)
:
I was asked to review the site plan proposal stamped "CITY OF CHANHASSEN, RECEIVED,
OCT 02 1995 CHANHASSEN PLANNING DEPT "'for the above referenced project.
Although I won't add conditions to the proposed subdivision, ,I wish to point out the soil conditions as
detailed in the Carver County Soil Survey
The Soil Survey indicates that this "property consists mostly of GI
Both soils are in the worst groups for building construction, and
special foundation designs . „��
I would like to request that you relay to the developers and desg
as possible to disc„ `ri tnerciat bu d rig perrnitAf> refiner
t�— f -
soil and Cordova silty clay loam.
require extensive soil correction or
desire to meet with them as early
CITY OF
CHANHASSEN
690 COULTER DRIVE • P.O. BOX 147 • CHANHASSEN, MINNESOTA 55317
(612) 937 -1900 • FAX (612) 937 -5739
TO: Sharmin Al -Jaff, Planner II
FROM: Jill Sinclair, Forestry Intern'
DATE: October 17, 1995
SUBJ: CSM Corporation Landscape Plan
The landscaping plan for the CSM Corporation development has been reviewed. The
applicant is providing a total of 157 overstory ornamental, and evergreen trees. Species
selection is diverse and well- represented by tei are under utilized in most landscape
plantings. Applicant may want to consider 4 ec - m male plants plant schedule ts on the
P s g• PP � Y I? �' g P P
for two species, Kentucky coffeetree and Amur corktree. In locations where these trees
are planted near a parking area, a non -seed, earin &ariety would be appropriate.
In the east parking lot, applicant must provide two lane
city ordinance. In the central parking lot, one landsca
the south side of the development, additional screening
loading area. Screening elements may include berms
evergreen trees as well as extending the landscaped are
peninsulas that mirror the peninsulas that extend south
aped peninsulas as required by
peninsula is also required. On
needed around the truck
planting of ornamental and/or
long East lake Drive into
the central parking lot.
1. Applicant' de two landscaped peni
2. Applicant must provide one,
in
lot.
3. Applicant must increase screening of truck»loading area along East Lake Drive.
*
Screening may include berms, ornamental, ci evergreen trees. An extended peninsula
parallel to the entryway may also be considered on the condition that it does not impede
truck access to the loading areas.
MEMORANDUM
CITY OF CHANHASSEN
690 COULTER DRIVE
CHANHASSEN, MN 55317
(612) 937 -1900
' DEVELOPMENT REVIEW APPLICATION
J APPLICANT : r.RM TNVF.STnRS, Twr OWNER: DATASF.R`I- TN('_
DRESS: 2575 UNIVERSITY AVE.W., STE.150 ADDRESS: 12125 TECHNOLOGY DR.
1 ST. PAUL, MN 55114 -1024 EDEN PRAIRIE, MN 55344
'TELEPHONE(Daytime) 646 -1717 TELEPHONE: 829 -6553 (JIM PAULE
1.
Comprehensive Plan Amendment
11. x Vacation of ROW /Easements
2 @ $100 /EA = $200.00
2.
Conditional Use Permit
12. Variance
3.
Interim Use Permit
Y3. x Wetland Alteration Permit
$275.00
4.
Non - conforming Use Permit
14. Zoning Appeal
5.
Planned Unit Development
15. Zoning Ordinance Amendment
6.
Rezoning
7.
Sign Permits
8.
Sign Plan Review
x Notification Signs $50 - FEE
$100 - DEPOSIT
9.
x Ste Plan Review $1,530
X Escrow for Filing Fees/Attomey Cost' $50
($50 CUP /SPR/VACNAR/WAP /Metes $400
and Bounds, $400 Minor SUB)
10.
x Subdivision $475
TOTAL FEE $ 3,080. 00
A list of all property owners within 500 feet of the boundaries of the property must
Included with the application.
Twenty -six full size folded copies of the plans must be submitted.
' Wh" X 11" Reduced copy of transparency for each plan sheet.
NOTE - When multiple applications are processed, the appropriate fee shall be charged for each application.
« C.......... —.If 1... -.4-4 4 s -- -46- -- ...,..::.....:.,.... N......i. ♦F..+ an,minnrrnnt MrHrnrf
. PROJECT NAME CHANHASSEN BUSINESS PARK
LOCATION STATE HIGHWAY 5 & DELL RD.
LEGAL DESCRIPTION SEE ATTACHED
PRESENT ZONING HC 1 OVERLAY OF IOP
REQUESTED ZONING NO CHANGE
PRESENT LAND USE DESIGNATION IOP
REQUESTED LAND USE DESIGNATION NO CHANG
REASCN FOR THIS REQUEST
This application must be completed in full and be typewritten or clearly printed and must be accompanied by all information
and plans required by applicable City Ordinance provisions. Before filing this application, you should confer with the
Planning Department to determine the specific ordinance and procedural requirements applicable to your application.
This is to certify that I am making application for the described action by the City and that I am responsible for complying
with ail City requirements with regard to this request. This application should be processed in my name and I am the parry
whom the City should contact regarding any matter pertaining to this application. I have attached a copy of proof of
ownership (either copy of Owner's Duplicate Certificate of Tdle, Abstract of Title or purchase agreement), or I am the
authorized person to make this application and the fee owner has also signed this application.
I will keep myself informed of the deadlines for submission of material and the progress of this application. I further
understand that additional fees may be charged for consulting fees, feasibility studies, etc. with an estimate prior to any
authorization to proceed with the study. The documents and information I have submitted are true and correct to the best
of my knowledge.
Signature of A6oIIcW Date
Signature of Fee
Date
Application Received on Fee Paid O. DC' Receipt No. 5 50
The applicant should contact staff for a copy of the staff report which will be available on Friday prior to the
meeting. If not contacted, a copy of the report will be mailed to the applicant's address.
1
IJ
it
EXHIBIT A
TO PURCHASE AGREEMENT
BY AND BETWEEN
DATASERV, INC. ( "Seller ")
AND
CSM INVESTORS, INC. ( "Buyer')
Legal Description of the Property:
Parcel 1
That part of the following described property which lies north of East Lake Drive:
' The North 1/2 of the Northwest 1/4 of Section 18, Township 116 North, Range 22 West, of
the 5th Principal Meridian, except that part lying and being within the right of way of
State Highway 05 and except the following described tracts:
I. Beginning at a point in the North line of said Section 18, Township 116, Range 22,
1249.34 feet east from the Northwest corner of said Section 18, thence East along said
' North Line of said Section 18, 180 feet thence South and parallel to the West line of
said Section 18, 317 feet; thence West 180 feet; thence North 317 feet to the point of
beginning.
2. The east 180 feet of the West 1249.34 feet of the North 317 feet of the Northwest 1/4
of Section 18, Township 116, Range 22.
' 3. A strip of land 60.00 feet in width over and across that part of the North Half of
the Northwest Quarter of Section 18, Township 116 North, Range 22 West, Hennepin County,
Minnesota. The centerline of said strip of land is described as follows:
' Commencing at the Northwest corner of said Sectlon 18; thence South 00 degrees 02
minutes 58 seconds East, assumed bearing, along the West line of said North Half. of
Northwest Quarter 614.34 feet to the point of beginning of the centerline to be
described; thence Northeasterly 113.62 feet along a non - tangential curve, concave to the
Northwest, having a radius of 300.00 feet, a central angle of 21 degrees 41 minutes 58
seconds, and the chord of said curve bears North 51 degrees 32 minutes 47 seconds East;
thence Northeasterly and Easterly 264.37 feet along a reverse curve, concave to the
Southeast, having a radius of 300.00 feet and a central angle of 50 degrees 29 minutes
25 sec:ndn; thence South a8 degrees 48 minutes 48 seconds East 360.00 feet; thence
Easterly and Southeasterly 419.22 feet along a tangential cur -re, concave to the
' Southwest, having a radius of 750.00 feet and a central angle of 32 degrees 01 minutes
33 seccnda; thence Southeasterly and Easterly 415.65 feet along a reverse curve concave
to the Northeast, having a radius of 750.00 feet and a central angle of 31 degrees 45
' minutes 12 seconds; thence South 88 degrees 32 minutes 27 seconds East 984.42 feet to a
point on the East line of said North Half of the Northwest Quarter distant 671.45 feet
South of the Northeast corner thereof and said centerline there terminating.
That part of Tract A described below:
Tract A. The north 317 feet of the east 360 feet of the west 1429.34 feet of the
North Half of the Northwest Quarter of Section 18, Township 116
North, Range 22 West, Hennepin County, Minnesota;
which lies southerly of Line I described below:
Line 1. Beginning at Right of Way Boundary Corner B21 as shown on ,
Minnesota Depar *.merit of Transportation Right of Way Plat No. 27 -48 as
the same is on .c and of record in the office of the County Recorder in
and for said county; thence run westerly, along the boundary of said
pig., on an azimuth of 271 degrees 27 minutes 33 seconds for 183.96
feet to Right of Way Boundary Corner B22; chence on an azimuth of 271 '
degrees 27 minutes 33 seconds for 360.13 feet to Right of Way
Boundary Corncr B25 and there terminating; ,
� 17
'
The Submittal
CSM CORPORATION
CHANHASSEN EAST BUSINESS CENTER
'
DELL ROAD AND TRUNK HIGHWAY 5
CHANHASSEN, MINNESOTA
'
Project Narrative
Submitted Monday, October 2, 1995
'
Introduction
This project narrative is submitted on behalf of CSM Corporation for a proposed
'
development located in the southwest corner of Dell Road and Trunk Highway (T.H.) 5 in
the City of Chanhassen. The first phase of this development consists of two (2)
office /warehouse buildings. Each building is approximately 64,000 square feet, or a total
of 128,000 square feet. Future development plans will be based on market conditions.
'
CSM Investors, a Minnesota Corporation, is celebrating it's 20th anniversary this year.
CSM is actively engaged in the acquisition, development, leasing, financing, property
'
management, and sale of real estate in fourteen Western and Midwestern states. CSM's
current portfolio includes the ownership and management of approximately 3,000,000
square feet of industrial space, 2,500,000 square feet of retail space, and 6,000 apartment
units. CSM's philosophy has been to acquire and develop real estate for long term
ownership.
' RLK Associates, Ltd. is serving as site planner and engineering consultant for this project.
RLK Associates is a planning, design and engineering firm located in Minnetonka. The
firm has extensive previous experience in working with.the City of Chanhassen. Steven
' Schwanke and John Dietrich are the principal contacts for this project.
'
The Submittal
This submittal is for a preliminary plat of approximately 21.3 acres of property located at
the southwest corner of Dell Road and T.H. 5. The subject property is guided for
"Office/Industrial" land uses and is zoned Industrial Office Park. As a result, we believe a
rezoning and Comprehensive Guide Plan amendment are not required for the proposed
'
development.
The material submitted with this narrative includes a completed application form for a
'
preliminary plat /site plan approval, list of pro , rties with names and addresses within 500
feet
of the property, and a check for $1,K6.00. Additionally the plan sheets being
submitted include: �?
' October 1995 NARRATIVE
RLK Associates, Ltd. - 1- for CSM Corporation
Sheet 1 of 9:
Cover Sheet
Sheet 2 of 9:
Existing conditions plan
Sheet 3 of 9:
Preliminary plat (Chanhassen East Business Center)
Sheet 4 of 9:
Preliminary site plan
Sheet 5 of 9:
Preliminary grading, drainage, & erosion control plan
Sheet 6 of 9:.
Preliminary utility plan
Sheet 7 of 9:
'Preliminary landscape plan
Sheet 8 of 9:
Architectural building elevations
Sheet 9 of 9:
Landscape detail sheet
Existing Conditions Plan
The subject property under CSM's option is approximately 21.3 acres in size. The
property is bounded by T.H. 5 to the north, Dell Road to the east, East Lake Drive to the
south, and several commercial properties including the Emission Testing facility to the
west. The subject parcel 'is being subdivided from DataSery Corporation which at this
time is intending to retain the property south of East Lake Drive. The site has a flat to
rolling topography which ranges 10 + feet in elevation, and contains no known unique
wildlife or plant species. Currently one wetland in the central area of the site has been
identified and a second area at the northeast corner of the site within the Mn/DOT
drainage and utility easement has not been classified as a wetland.
Preliminary Plat
Three lots are being proposed on the property controlled by CSM as part of the
preliminary plat identified as Chanhassen East Business Center. The fourth parcel Outlot
B is located on the DataSery property:
* Block 1, Lot 1 consists of 5.43 acres and accommodates a 64,000 square
foot building;.
* Block 1, Lot 2 consists of 4.8 acres and accommodates a 64,000 square
foot building;
* Outlot A consists of 11.1 acres and is for future development;
* Outlot B consists of 3.7 acres and is for the construction of a regional
stormwater pond pursuant to the City's recently adopted Stormwater
Management Plan. Outlot B is not part of the applicants property, but is
shown as part of this plat because of the necessity to create the regional
stormwater pond.
Selected existing easements within Outlot A are proposed to be vacated which were
formerly in place for roadway and utility services.
October 1995
NARRATIVE
RLK Associates, Ltd. -2- for CSM Corporation
Preliminary Site Plan
' The site plan for Phase I consists of two (2) ffice /warehouse buiWin s. Each building ) g g is
64,000 square feet for a total of 128,000 square feet. Sufficient parking has also been
' provided as part of this development. The code requires 123 parking stalls for each
building, and this is the amount provided. Truck parking is provided along the south side
of the building, and is completely screened from Highway 5 by the building. The truck
' parking is sufficiently screened from East Lake Drive by using plant materials and
berming. The site plan has located parking between the building and Highway 5. The
parking areas on the north side of the buildings are necessary for the successful marketing
of this project. The parking lots are screened from Highway 5 through the combination of
3-4' berms and plant material. All code requirements have been met, and no variances or
conditional use permits are required as part of this development
Preliminary grading, drainage, and erosion control plan
' The City of Chanhassen stormwater management plan has established the need for a
regional stormwater pond to be constructed in conjunction with any development on the
CSM or DataSery property. The CSM proposal is to utilize the existing storm sewer
infrastructure connections into East Lake Drive for the parking lots and building storm
sewer. The grading/storm sewer plan will also utilize the existing drainage ditch within an
existing drainage and utility easement on the DataSery property to channel the water to
the new stormwater pond in Outlot B. CSM is prepared to construct the stormwater pond
in conjunction with the Phase I development. Final agreement on the stormwater pond
size, location, and ownership will have to be resolved between the City, DataServ, and
CSM.
' The entire north and east perimeter of the site facing Highway 5 and Dell Road will have
undulating berms for screening of the parking areas proposed. A result of the berming is
the necessary grading of the area within the drainage and utility easement at the Northeast
' corner of the site. A sufficient collection area will remain to collect the storm water run -
off from Highway 5 and maintain its current flow toward Dell Road. Coordination
between the berming, landscaping, and image for the gateway, will have to be resolved as
' these plans are being reviewed.
Construction elements, such as, silt fencing and rock entrances will be prepared according
' to the City of Chanhassen requirements.
' Preliminary utility plan
The utility plan provides the subject property with sanitary sewer, water and stormwater
facilities of sufficient size and depth to support the anticipated uses in the two (2)
buildings. These utilities will be connected to existing public utilities located in East Lake
Drive.
October 1995 NARRATIVE
' RLK Associates, Ltd. -3- for CSM Corporation
L�
East Lake Drive has sufficient infrastructure for watermain and sanitary sewer to service
this site. Existing stubs for the sanitary sewer are proposed to be utilized. It is anticipated ,
new. 8" taps will be completed on the existing 12" watermain, for the proper water
distribution of the two sites. The watermain will loop both buildings and all Are hydrants
will be installed acceptable to the Fire Marshals recommendation. '
Preliminary landscape plan
,
Both the Highway 5 corridor study,and landscape code requirements were reviewed prior
to developing the landscape plan. The plan as designed will complement the berming and
architectural facades along Dell Road and Highway 5. The plan as proposed is proactive
in suggesting a palette which will be followed in future phases as well as suggesting a
heavily landscape gateway at Dell Road and Highway 5. The plan utilizes a linear row of
overstory trees along the perimeter and incorporate clusters of plant grouping for year
'
round color and interest. A viewshed has been established between buildings 1 and 2 and
the primary viewshed to the DataSery property will be developed between Lot 2 and
,
Outlot A. The plant material selected utilizes ornamental, coniferous, and overstory trees
with a strong emphasis on sugar maples and species from the City's recommended list.
'
Architectural building elevations
The building facades are proposed to have recesses and projections on the corners to ,
prevent a undulating multiple plane surface. The main entries will be setback in the facade
with wing walls and foundation plantings.
Exterior materials for all buildings have been chosen with low maintenance and long term '
attractiveness in mind, corner accents, pergola's and striping are face brick. The
background walls are integrally colored decorative masonry with a clear sealer applied. ,
All glazing is gray tinted aluminum frames. Metal roofs and flashing are to be factory
finished galvanized steel with a 20 year painted finish. i
Related Issues '
• Stormwater Ponding. The City's Stormwater Management Plan shows the subject
property directing stormwater to a regional pond located in the southwest corner of '
East Lake Drive and Dell Road. The preliminary grading and erosion control, and
utility plans submitted as part of this proposal directs stormwater runoff to the City's
proposed regional stormwater pond. This pond, however, has not been constructed '
and is proposed to be located on land owned by Dataserv. CSM Corporation and
Datasery continue to discuss the most expedient means for constructing the regional
stormwater pond consistent with the City's Stormwater Management Plan. '
October 1995 NARRATIVE ,
RLK Associates, Ltd. -4- for CSM Corporation
Environmental Assessment Worksheet. We have been advised by City staff that an
' Environmental Assessment Worksheet (EAW) will not be required for the proposed
project. City staff has indicated that the mandatory threshold for a project like the one
being proposed is 300,000 square feet of building space. The proposed project is for
only 124,000 square feet of building. Future phases of development will be based on
market demand.
1
' October 1995 NARRATIVE
RLK Associates, Ltd. -5- for CSM Corporation
Chanhassen Business Center
Si nage Criteria
All signage to be individual painted channel type lettering and logo. Siganage area to
conform with City of Chanhassen Sign Ordinance.
Paint Colors
Text: "Signs by Design - Special Almond"
Contact: Automotive Refinishing Technologies
600 W. Lake Street
Minneapolis, MN 55408
Logo: One character logo color may be determined by Tenant subject to
landlord's approval.
White backlit neon is optional.
Maximum letter size: 24" Maximum logo size: 30" high
All exterior signage is the Tenant's responsibility.
Sign band area to be centered over Tenant entrance.
EXTERIOR BLDG
.125" CLEAR LE
(NEON ONLY)
.070" PAINTED
CHANNEL
LETTER
NEON (OPTIONAL
Chanhassen Business Center
I.
Truck Court Area
1) Exterior Service Door: Tenant provides 12" x 24" x.060" thick
plex sign panel, painted owner specified color, with 4" high
address numbers, 2" high tenant name copy, applied
subsurface. Sign panel to be mounted using 3M double -sided
vinyl tape, at location as indicated on Attachment 1.
2) Exterior Dock Door: Tenant provides a 24" x 60" x 1/2" thick
wood MDO sign panel, painted owner specified color, with
maximum of 6" high, applied vinyl copy, first surface. Panel to
be mounted above dock door(s), or as approved by owner.
Panel to be directly bolted to exterior wall. Refer to
Attachment 2 for standard sign layout.
II.
Approval Process
1) Two copies of a sign layout drawing must be submitted by
tenant to the building owner. Approval must be granted by the
owner prior to sign installation.
2) Tenatn may solicit bids from sign manufacturers of their
selection.
3) Owner reserves the right to approve alternative signage when
deemed appropriate in its sole discretion.
Chanhassen Business Center
Attachment 2
7:
C(:::)
.G
Chanhassen Business Center
d el.
Z
ZI/Z
MI
r I - C I
Attachment I
10/24/95 TUE 15:26 FAX 612 646 2404 CSM CORPORATION 0]002 I
C S M:
CSM Corporation, formerly Colonial Services & Management, Inc., was incorporated on '
December 3, 1976 under the laws of the State of Minnesota. It is engaged in the acquisition,
development, leasing, financing, properly management, and sale of real estate in Colorado,
Illinois, Iowa, Kansas, Minnesota, Missouri, North and South Dakota, Wisconsin, Wyoming,
and Oregon. CSM Corporation is a licensed real estate broker in the ,State of Minnesota.
CSM Investors, Inc. was incorporated October 28, I981. It's primary purpose is to acquire '
and/or develop real estate. CSM Investors relies on CSM Corporation for propeM
management services.
CSM and its affli ates are currently the owners, management and leasing agents '
S g or over g f
3,900 apartment and townhome units. In addition, GSM Corporation and its affiliates, own
and manage eighteen shopping centers totaling a leasable area of over 753,600 square feet,
54, 000 square feet of offlce space, and 959, 700 square feet of office /warehouse /showroom
space, and 1,410,500 square feet of warehouse space, and a 162 unit hotel.
I I
CITY OF
CHANHASSEN
690 COULTER DRIVE • P.O. BOX 147 • CHANHASSEN, MINNESOTA 55317
(612) 937 -1900 • FAX (612) 937 -5739
MEMORANDUM
TO: Sharmin Al -Jaff, Planner II
FROM: Mark Littfin, Fire Marshal
DATE: October 18, 1995
t SUBJ: 2 - 64,000 Sq. Ft. Buildings
CSM Corporation
I have reviewed the site plan for the above projecf In order to comply with the Chanhassen Fire
Department/Fire Prevention Division, I have the followmg fire code or city ordinance /policy requirements.
The site plan review is based on the available information" :submitted at this time. As additional plans or
changes are submitted, the appropriate code or policy items: Will be addressed.
' 1. Additional fire hydrants will be required. One fire hydrant must be relocated. Contact Fire
Marshal for exact changes and modification.
2. "No Parking Fire Lane" signage and yellow curbing must be provided Contact Fire Marshal for
exact "Fire Lane" areas.
' 3. P.I.V. (Post Indicator Valves) must be installed. Show on utility plans.
4. A ten foot clear space must be provided for around fire hydrants.
Y M7
o �.�N "r Minnesota Department of Transportation
r Metropolitan Division '
01 Waters Edge Building
y t 1500 West County Road B2
OF TR Roseville, Minnesota 55113 ,
November 14, 1995 '
61
Sharmin Al -Jaff
Planning Department
City of Chanhassen
690 Coulter Drive
PO Box 147
Chanhassen MN 55317
Dear Sharmin A] -Jaffa
'
SUBJECT: CSM Corporation
,
Preliminary Plat Review P/95 -091
Southwest Quadrant of TH 5 & Dell Road -
Chanhassen, Carver County
'
CS 1002
The Minnesota Department of Transportation (Mn/DOT) has reviewed the CSM Corporation 1
preliminary plat in compliance with Minnesota Statute 505.03, subd. 2, Plats. We find the plat
acceptable for further development with consideration of the following comments.
• We are processing reconveyance of arcel 2 to the city. Access control will be established '
P Y
along the north boundary of the parcel restricting direct access to TH 5. Questions may
be directed to John Hippchen of our right of way section at 779 -1261. ,
• A Mn/DOT permit_ evil] be required to alter TH 5 right of way as indicated by the grading
plan. In addition, any other use of, or work within Mn/DOT right of way will require an
approved Mn/DOT permit. The permit necessary depends on the nature of the proposed
work. Bill Warden, of our permits section, may be contacted at 582 -1443 for information
regarding the permit process.
If you have any questions regarding this review please contact me at 582 -1387. '
Sincerely,
Cyrus Knutson
Transportation Planner
An Equal Opportunity Employer
Planning Commission Meeting - November 1, 1995
' Conrad: I just want to make sure staff, no I want to make sure we were closing in, if we
could, but I think... examine other alternatives. There are many alternatives.
Mancino: Thank you.
PUBLIC HEARING:
PRELIMINARY PLAT OF APPROXIMATELY 61 ACRES OF PROPERTY INTO 3 LOTS
AND 2 OUTLOTS, SITE PLAN REVIEW OF TWO 64,000 SO FT BUILDINGS:
WETLAND ALTERATION PERMTTLAND VACATION OF AN EXISTING RIGHT-OF-
WAY AND UTILITY EASEMENT ON PROPERTY ZONED IOP AND LOCATED IN THE
SOUTHWEST CORNER OF DELL ROAD AND HIGHWAY 5 CSM CORPORATION.
Public Present:
C
0
Name Address
Murray Kornberg
2575 University Avenue, St. Paul
Jim Paulet
12125 Technology Dr, Eden Prairie
Mark Kusnierek
9369 126th Street, Savage
Steve Schwanke
6110 Blue Circle Drive, Mtka.
Howard Dahlgren
2360 Aquila Avenue No, Golden Valley
Tom Rockford
CSM Corporation
John Dietrick
RLK Associates
Shatmin Al -Jiff presented the staff repoit on this item.
Mancino: Any questions for staff at this point? Commissioners?
Commissioner Farmakes asked a question that could not be heard on the tape regarding the
berm on Highway 5.
Al -Jaffa The berm meanders between 4 and 6 feet.
Mancino: But it doesn't show it meandering.
Farmakes: Well yeah here, it covers up half the building.
Mancino: So it's something we should ask the applicant.
Applicant: I would be happy to address that.
43
Planning Commission Meeting - November 1, 1995
Mancino: Okay. Thank you. Any other questions. The applicant will answer that for you.
Farmakes: The tenant mix on this. Are you looking at the signage plan based on maximum
tenancy or?
Al -Jaffa They will have, at this point the only thing that we know is, they foresee 33% office
space and the rest being office warehouse.
Aanenson: When we first saw this plan, it's a little bit different than what we've seen in a
traditional office. Basically what we've seen in the past is build to suit. Something that takes
up the whole space. There certainly is a market nitch for this in the community. That was
one of our first concerns was, as you recall the history of when we had the Medical Arts
building that came in. The signs went up. Nobody intended that to happen. We originally
envisioned that to just say Medical Arts building and people would know. We certainly
understand that their need on Highway 5 is a little bit different type of thing and you've got
specific people that have kind of flexible spaces. People are going to be moving in and out.
Maybe it's a start up company. Eventually find another place so we certainly understand the
market that they're trying to hit and believe if we can get the appropriate signage and the
right scale, that it makes sense for this type of a building. So we don't know, as Sharmin ,
indicated, all their users yet. But it's a tenant, at least my understanding, of flexible space.
Some people may need loading spaces. Some people may not but.
Farmakes: So I'd imagine we'd look at it based on maximum tenants for the maximum
amount of signage.
Aanenson: Right. Yeah, you're correct. And that's what Sharmin asked for and that's what
she's saying that was delivered. We wanted to see that package. What ultimately was, if it
was maximized, what the sign band would look like.
Farmakes: The reason I bring it up is that we haven't quite seen anything like that on the I
highway at this point.
Aanenson: Except for the Merit building.
Farmakes: For the exception of a few buildings. If we go up 169, and we go up 494 we see
it, quite a bit of it. Several small companies with the signage in a row lined up and down
that close to the highway. Since our drawings don't have that, and we're talking about
Highway 5 standards and the issue and intent of the design, what we're trying to avoid. It's
something of a concern for me when I look at this because we always seem to run up against
44 r
1
Planning Commission Meeting - November 1, 1995
the problem, it seems to me when I think about these things is, is it an office building or is it
retail and now is it a warehouse or is it an office building and, but it looks like it's retail.
Mancino: And it will have showrooms so it is going to be.
Farmakes: Well several small, I don't know, how many did we count out there?
Al -Jaff Eleven. On the north side.
Farmakes: So the general appearance would be similar, it would seem to me, like Byerly's or
something where you've got several small signage in a row. Different colors. Different.
Mancino: Type face.
Farmakes: Type faces and logos and so on.
Aanenson: Yeah, that was why we asked for the sign package. We saw that problem that you
would struggle with that, as similarly we did, when it first came in but again, we feel like
there is a nitch for this in the community. We support it but we all had the same concerns
that you do and hopefully we can get the right standards there.
Farmakes: When you looked at the berming in relationship to the Highway 5 standards and
talking about the issues of putting parking adjacent to TH 5, this looks pretty good but when
you're talking about the depths of the berm that you talked about, it seems like this is over
enhanced.
Mancino: No. That's a real. Look at those trees. Those are 40 foot trees.
Farmakes: What are your feelings on that?
Al -Jaffa I asked for the grading plan to be shown on those drawings and that's what the
applicant has put together. The trees are 5 years old.
Farmakes: I guess so, if I'm on the other side of the highway, perhaps standing in the
drainage ditch. That's probably what it would look like...
Mancino: And you can be very specific about these so. Any other questions for staff at this
point? Does the applicant wish to address the Planning Commission or their designee.
45
Planning Commission Meeting - November 1, 1995
Tom Rockford: Thank you Madam Chair and members of the commission. My name's Tom
Rockford. I'm representing CSM Corporation, the applicant. I'd like to introduce at this time
other representatives of CSM and our consultants at this time. Murray Kornberg is here
representing CSM. Murray is the Vice President of CSM. Mark Kusnierek is one of staff
architects and he will be walking you through part of the building and site plan. And
representing our consultants, RLK are John Dietrick and Steve Schwanke and John will be
walking you through the site plan and be happy to answer any of the questions or concerns
you have that you've raised to date. What I'd like to do at this time is give you a brief
history of CSM. Kind of who we are and what we do and also a little bit of the history on
this particular project. I did omit to introduce one other person who is here and that is Jim
Paulet who represents DataServ. Obviously the owner of this parcel. CSM Corporation has
been in business for about 20 years. We're actually celebrating our 20th birthday this year.
20th anniversary. We were established in business as Colonial Services and Management
back in 1975 and basically we are a real estate and investment firm doing business in about
14 states across the country. CSM Investors was formed in 1981 as a vehicle to do the
acquisition and development work. CSM Investors relies heavily on CSM Corporation for the
property management of all the properties that we own. Over the last 4 or 5 years CSM has
probably been one of the most active local developers in the Minneapolis -St. Paul area. Over
that period of time we've developed over a million square feet of industrial space. Very
similar to the type of product that we're proposing for this site. Some of the projects that are
ongoing that CSM is working on right now that you may be familiar with include the Golden
Triangle Business Center in Eden Prairie, which is 150,000 square feet of office warehouse.
This is located on Washington Avenue and 76th Street. Just north of the Minnesota Vikings
practice facility at Winter Park. Again, it's a product that is very similar in what we're
envisioning for the site here in Chanhassen. We're also just finishing up Vernon Shops which
is a small 20,000 square foot commercial project on 50th and Vernon in Edina. Just have
started Phase II of the shops at Lyndale in Richfield right on 494 and Lyndale Avenue South.
About 107,000 square feet of commercial space. And in the process of kicking off probably
one of our biggest projects to date which is Boulevard Gardens in Minnetonka. A mixed use
project that consists of about 250,000 square feet of commercial space, along with some
multi - family. And that's located at 394 and Hopkins Crossroads. So we are quite busy. As I
mentioned, or as I probably haven't mentioned, we own and we manage all our real estate.
And we are in it for the long haul. We are not someone who is in the business to make a
buck today and gone tomorrow. We have been and will be around for a long time. Our
current portfolio consists of about 3 1/2 million square feet of industrial space. Around 2 1/2
million square feet of commercial space, and upwards of 6,000 multi - family apartment units.
We also have a small, about 160 unit hotel that we manage. That we own and manage.
Relative to this site we've been in negotiations with DataSery for probably 2+ years on this
site here in Chanhassen. We've never developed any property in Chanhassen. We're very
bullish on the site. We're very interested and optimistic of what we can do at the gateway to
46 1
Planning Commission Meeting - November 1, 1995
1
' the Eden Prairie, excuse me, the Chanhassen site there on Dell and Highway 5. And very
proud of the product that we do and we feel very sure that you will be equally as proud of
this product. I guess at that I'd like to turn it over to John Dietrick from RLK who can walk
' you through the site plan. And again, if you have any questions, please feel free to ask.
We'd be happy to answer them for you.
John Dietrick: Thank you Tom. Is this an okay location for the board? Facing the cameras.
Thank you. As Tom had mentioned, my name's John Dietrick. I'm from RLK Associates and
we have worked with CSM, Murray in regards to laying out the site and being responsible for
the site planning and ... civil engineering and traffic reports that have been submitted to date.
We are excited about the Phase I development at the northeast corner of East Lake Drive and
Dell Road for the CSM property. The Phase I development as has been submitted is
' approximately 10+ acres, which is about 1/2 of the 21.3 acres that CSM is looking to
eventually acquire from DataSery property, which is all north of East Lake Drive. This Phase
I development is going to initiate a few items that need to be addressed in the overall site
' development for this eastern corner of Chanhassen. One of those is the replatting of the
property, as Sharmin had indicated where we're looking to call it the East Chanhassen
Business Center. Secondly would be the storm water ponding down in the southeast corner
of the site that will essentially pull a majority of the water from the CSM property and from
the future DataSery property. We are working at this time with city staff for the actual
' configuration, design and location of how that property eventually looks so Outlot B as we
are proposing it at this time may change a little bit, depending on the actual size of that pond.
But it will be built to the NURP standards and Walker standards for the proper water quality
' and water quantity issues. Thirdly, it's going to precipitate the gateway statement for the city
of Chanhassen. We're very excited about having an opportunity to start to set that stage for
the gateway for Highway 5 as visitors and residents start to come traveling through Eden
Prairie and into the site. Into the city, excuse me. And I will be quickly walking you
through the site plan issues. Landscaping, parking arrangements, berming and screening and
then I have some perspective sketches. The ones that were handed around to put on the
1 overhead and I'll be happy to address any specific questions in regard to those. Mark
Kusnierek will then address the architectural elements and the signage elements for the
building and ... proposed building materials at that time. The site design, as we've chosen to
' look at it, was to try and place the building a few feet below grade of Highway 5 so they are
set down into the landscape and then utilize the space between the parking and the property
line to the north for berming and proper screening of the parking. We realize the parking is a
sensitive issue along Highway 5 and we've taken great care to look at how to break up those
intimate parking lots, as we're calling them, with landscaping and with berming so that the
buildings will read, the parking will be suppressed and that we have the ability to service the
proper office users and clients of these buildings with easy accessible parking that would
circulate around and through the site. Currently MnDot is about, owns property about 70 feet
47
Planning Commission Meeting - November 1, 1995
in width from the edge of the roadway. The parking is set back from the property line 35 -45
feet, which allows for some significant berming and then the buildings are set back
approximately 115 feet from the property line. In total the buildings are about 185 feet from
the edge of roadway for the Phase I development. The landscaping that we have proposed on
'
the perimeter of the site is where we will try to concentrate the key elements so that we can,
the plant materials that have been chosen were from the pallet of the preferred planting list
from the city where we're looking to use significant hardwoods of maples, oaks, hackberries,
locust, shag bar hickories along with conifer plantings and low shrub massings. Trying to
look at clustering of the plant material and utilizing ornamental and flowering crab apple trees
so that we can have seasonal color along with the winter color of the evergreens. We also
wanted to start setting up a pallet of a strong boulevard overstory planting tree that would
encompass and ring the entire site. With this landscape we're excited about looking at
extending out the gateway beyond our property line. I know the staff report talks about no
planting or berming within public right -of -ways. We feel that's an issue that we should
address and we should work cooperatively with the city and MnDot so that this gateway
treatment of landscaping will be fully addressed, because MnDot currently owns property that
t
goes 40 to 60 feet in from the corner and I think it would be a win /win situation to try and
pull that landscaping out of the public right -of -way of course under close supervision and
working with the city. We've also suggested extending the irrigation out to the back of the
sidewalk along Dell Road so that we have an opportunity to maintain that landscaping and
keep it green and beautiful throughout the year. Again, that's an image we want to present
for the CSM project and we feel that's an image that the city would like to see also. In terms
,
of the landscaping coming around the site, we're concentrating the landscaping more on
overstory trees, especially along East Lake Drive. We have indicated we would do some
additional conifer plantings in order to help screen some of the views coming off of East
,
Lake Drive for the service and loading areas that are completely screened from Dell Road and
Highway 5. The parking that we have looked at has been woven throughout the site with
joint accesses between the two buildings and at the far western side. We anticipate that
,
would be a joint access for the future development of Outlot A. By having a one bay wide
parking lot, we have maximized the area between the parking and the property line that we
can provide screening so that those parking lots will be hidden. In terms of heights of berm,
we have a 4 to 5 foot high berm height along Highway 5. Along Dell Road we have a 6 foot
high berm. Along East Lake Drive we have a 6 foot high berm in the areas of the loading
'
dock and it goes down to about a 4 foot high berm in the areas between East Lake Drive and
where the loading service areas are not located. The berm height is set so that the parked
cars will be screened from view. It will screen a portion of the building. Approximately 3 to
4 feet up on the building. We feel that it's still an acceptable view shed for the building but
yet we can suppress the amount of cars that will be seen. The entire perimeter of the parking
will not been seen along Highway 5. Perhaps upper edges of roofs would be seen in certain
locations. Dell Road would be completely screened. The parking itself has a number of
48
h]
1
Planning Commission Meeting - November 1, 1995
peninsulas scattered along the north side of the property and also we're setting it up along the
far western side between the future Outlot A. We anticipate this would be a major view shed
corridor between the buildings where there'd be a much wider spacial dimension than what we
have between the two central buildings at this time. We are also requesting to leave the
central parking area and the eastern parking area as they are designed without adding
landscape peninsulas within these two areas. We feel with the one bay width, we are meeting
the intent of the ordinance by clustering the green areas and landscaping and screening the
parking lot on the perimeter. With the overall site plan that we also look at the exterior
lighting that will be done and be kept in scale with the building and we will use colors that
will be compatible to the window emollient and with the signage colors that Mark will be
addressing. With that I'd like to quickly just go through the perspective sketches and I'll be
doing those on the overhead. There will be four perspective sketches that we will present.
The first three will be looking west towards the site. East of Dell Road. Essentially at the
Dell Road intersection for B. C would be looking more straight on to the building from
Highway 5 and D would be looking east back towards Dell Road from the eastbound lane of
Highway 5. A at this time picks up the existing oaks that are over on the Tandem site in
Eden Prairie and starts to see how the building profiles will look as they're set into the
landscape. Again the profile of the buildings are approximately 22 feet in height?
Audience: 24 at the max.
John Dietrick: 24 max. But the floor elevation is set down from the location, or elevation of
the roadway to provide a little bit lower profile. The tree massings are probably more in the
5 to 10 year range. Not the 5 year range. When you're doing sketches, you take a 60 foot
tree and show it at full view or when it goes in at you know 10 feet so you have to, there's a
little bit of license here but I'd say the plant material has been set up to be in the 5 to 10 year
time frame from the day of planting. But you can start to see the building hedge line and the
roofing. Perspective B. Again, to look at how the site is going to be viewed from the
intersection of Dell Road where you have the existing traffic signals out there and with the
corner landscaping, we hope to keep that profile open. Again have the row of trees which are
sugar maple to start to fill out and eventually provide a ... and a backdrop to what that gateway
concept for the landscaping will be. Perspective C looks at the building and how it's going to
be read with the berm that will be running on the south side of Highway 5 and on the south
side of the MnDot property. We again will be coming up on the building approximately 3 to
4 feet in that location and once we start putting in the clustering of plant material, the
ornamentals and the conifers, there will be peaks and view sheds into the building so that
there will be added interest to go along with that facade as the building has it's indentations
and color scheme between the signage panels and the ... The fourth perspective looks west. Is
viewing east from approximately the eastern or western property line of the future Outlot A.
The berm is higher at this location. The road and topography does drop from the 934 range
49
Planning Commission Meeting - November 1, 1995
down to the 920 range by the time we get down to the Dell Road corner. The floor
elevations are 923 -925 and we anticipate Outlot A will also be stepping up. The berm here
as seen from the eastbound lane will screen this building a little bit more as the grading plan
is drawn at this time. Perhaps it's a little too high ... these are the grades that are shown on the
grading plan and this is the perspective that you would see with that grading plan as we are
proposing it at this time. With that I would like to turn it over to Mark who will talk to the
signage issue, or I would be happy to address any questions at this time also.
Mancino: Any questions from staff at this time? I mean commissioners. Thank you.
Mark Kusnierek: I'm Mark Kusnierek. I'm the project architect for CSM Corporation. On
the issues of the signage for the building, CSM as a corporation wants to provide signage for
our tenants but make it pleasing to the eye. Our signs are of one single color. We do not
allow multi color signs within those. I have brought examples of other projects and signs that
we do provide. I'll pass them around. These signs, when they need to go up, the tenant will
have to come in for their individual sign permit at that time. Your question about the
multiple signs being along these elevations. We do not perceive a whole lot of signs because
our tenants tend not to be of small square footage. The depth of these buildings, these will
be large square footage... Within the staff recommendations I wanted to get into a little bit
more with letter (h) where it states individual letters may not exceed 2 feet in height. We
also propose that with our sign criteria that a logo of 30 inches in height. This would also be
of the same color as the individual letter sign. We also provide as a back -up to the staff
report, how they would be constructed and lit. These are back lit signs which is a halo light
that is approximately 3 to 4 inches of light that surrounds the individual letter and /or logo as
the tenants would like it. That brings up the issue of letter (f) which no illumination signs
within the development may be viewed from a residential section south and west. To the
south we do not perceive any signs. To the west there is the possibility that signs would be
along this edge. At this time we don't believe it is an issue because Outlot A is not
developed as of yet and we would like to bring it up at that time. Also the fact that
DataServ's building would also be blocking some of the view from the west. The staff has
explained the building exterior as well as the computer generated drawings show what the
materials will look like as well the material board... I do not wish to explain into that any
further unless you any have specific questions towards that. Any questions?
Mancino: Any questions from commissioners? Seeing none, thank you.
Mark Kusnierek: Thank you very much.
50
1
L
1
1
Planning Commission Meeting - November 1, 1995
Mancino: Anyone else from the applicant wishing to address? Okay, thank you. Thank you
for such a complete presentation. May I have a motion to open this for a public hearing and
a second please.
Meyer moved, Fwmakes seconded to open the public hewing. The public healing was
opened.
' Mancino: Anyone wishing to address the Planning Commission at this time, please do.
Jim Paulet: Members of the commission, my name is Jim Paulet. I represent DataServ.
We're located at 19011 Lake Drive East and we are the sellers in this land transaction. We've
been working with CSM for a couple of years now and we would like to voice our support
for CSM's plans. And I'd also like to add that in the time that we've worked with CSM,
we've also developed a very favorable impression of CSM Corporation. And that is really my
primary reason for getting up here. Getting up here to voice my support for the plan. There
are however a few unresolved economic issues present in the report, which greatly affect
DataSery and I'd like to point them out if I could for your consideration. The first one is
really between DataSery and the CSM Corporation. I just wanted to point out that DataSery
is currently working with CSM on the distribution of payment for it's surface water
management plan. Second issue is DataSery would like to know, or needs to know that if,
and this is in Section 2 -1. DataSery needs to know if the replatting of our site south of Lake
Drive East is required in this plan, will require the payment of a park dedication fee upon
completion so it's just an issue we'd like to ... unresolved, we'd like to talk about. We'd also
' like to know going forward how the city plans to finance the completion of Dell Road as it's
also indicated in the plan that is a requirement that Dell Road be completed. Another issue is
Section 2 -5. We'd like to know more about DataServ's responsibilities concerning the
applying for permits for storm water management. Since the substantial portion of the
ponding is going to take place on our site, I guess we need to know what our responsibilities
are, and those are still unresolved. I'd like to point out that DataSery does not want these
' issues to delay the approval of this plan. We clearly have an interest in the success of this
project. We feel however that we would be remiss if we did not point out the need to clarify
and ultimately resolve some of these issues going forward. Thank you.
' Mancino: Thank you. Anyone else wishing to address?
Tom Rockford: If I may, I'd just like to comment on the one point that Jim brought up
relative.to Dell Road. We did meet with Todd Gerhardt this afternoon and with Dave and we
think we have come to an understanding as to how we can proceed on that. I'd like to
' address that in the development agreement that will obviously come an agreement. We don't
view that as an issue.
51
Planning Commission Meeting - November 1, 1995
Mancino: Maybe Mr. Paulet needs to know a little bit about that.
Tom Rockford: Then we will certainly bring him up to speed on that.
Mancino: Okay, thank you. Anyone else wishing to address the Planning Commission.
Seeing none, may I have a motion to close the public hearing and a second?
Farmakes moved, Meyer seconded to close the public healing. The public hearing was
closed.
Mancino: Staff, a couple of the questions that were brought up. Who's responsibility will it
be for the storm water management and what's going to happen in that outlot? Or Mr.
Hempel.
Hempel: Madam Chair. We met today with Mr. Rockford and some members of CSM
regarding the SWMP fees. What I call SWMP fees. Surface Water Management Plan. And
we will be looking at those fees closer to determine the actual credits that they have coming
when the final construction plans, as we get closer to that. To determine how much
additional ponding they actually are providing. What size pipes they are providing. Those
sorts of items so we can determine the credits back against the parcel. We would be crediting
the individuals or applicant that is installing the improvement. We would credit the
development that's before you tonight, Lot 1 and Lot 2. The remaining outlots, as they come
in to develop would be responsible for their own surface water management fees at that time.
Since the regional pond would be in place, the regional truck storm sewer would be in place,
there would be no further credits to be given to those outlots as they plat.
Mancino: Okay. And what about park dedication fees? Park and trail fees.
Al -Jaff: They did not pay it originally.
Mancino: They did not pay it originally?
Aanenson: We don't know.
Al -Jaff: We don't know that and they're not aware of whether they paid it or not.
Mancino: So you need to check and get a hold of Mr. Paulet and let him know those issues,
okay. Thank you. Comments and questions and recommendations from the commissioners.
Commissioner Mehl.
52
1
Ll
Ll
Planning Commission Meeting - November 1, 1995
Mehl: I think it's just a great looking project. At some point in time -here in the staff report
they referred to trash dumpster locations. I wonder where those are going to be and how
those are going to be hidden with wing walls or, are going to service several of the tenants. I
just wanted to bring that up.
Mancino: Okay.
Mark Kusnierek: As far as the trash enclosures, they would be back within the truck port
area, close to the buildings. They would be constructed of two wing walls coming out of the
same material as that of the back, which would be rock faced block with a wooden gate of a
decorative nature. So they would not be viewed from any room other than the interior truck
lots.
Mancino: Thank you. Commissioner Mehl, do you have any other questions or comments?
Mehl: Those blue pyramid objects on the roof, are those functional or decorative or, I'm
looking at these photos here and I'm having a hard time really visualizing them with respect
to their size versus the rest of the building. I'm trying to get a visualization as to.
Mancino: Proportionally?
Mehl: Yeah, proportionally. How they're going to look and there's one photo that doesn't
show them on here and a couple of these photos just show partially and I'm just curious as to
what their preference and I know we want to get some kind of a beveled roof element up
there and I'm just wondering if this was an attempt to do that.
Mancino: Okay. Mr. Kusnierek.
Aanenson: I'll show it on one of the overheads.
Mark Kusnierek: The elements that you're looking at are decorative in nature, to add a little
bit more emphasis, to also fit within the Highway 5 overlay that has been established by
Chanhassen.
Mancino: But they are specifically on the east and the west.
Mark Kusnierek: To define major corners within the building. We did not want to put the
emphasis within the ... area at that point because that has a secondary access within the project.
When the full project comes into phase, or Phase II. We want to put the emphasis on the...
53
Planning Commission Meeting - November 1, 1995
Mancino: So that decorative would be just on one corner of the building?
Mehl: Okay. So I understand that, it's going to be on the northeast corner and the northwest
corner.
Mark Kusnierek: There are two of them lying here and then there would be a single one
down here. Emphasizing this, and...
Mancino: And approximately how much proportionally will the pyramids be seen?
Mark Kusnierek: The 3D photos are fairly good renditions of them. They are, I believe they
are about...
Mehl: Okay, thank you. That's all the comments I have right at this point. I think it looks
like a well done project. It's going to look great over there.
Mancino: Commissioner Farmakes.
Farmakes: It's a nice quality building going in there... First of all I enjoy seeing the
materials. I want to say that again how much I personally am thrilled that we actually have
materials. And the, when I first saw this plat I was somewhat concerned about the issue of
berming. That's why I brought it up. earlier and the issue in regards to Highway 5. It's kind
of a bit unfortunate that we see a string of again kind of quasi retail type signage up and
down the highway again. That's what I thought we were trying to avoid. I'm not saying that
this is that. The signage plans, same color. Same type signs that the applicant is saying that
there won't be a maximum use but ... argue that here. The one thing that I found that over the
years that I've been here, typically that I'm most surprised of, is the actual berming. When
we discuss the issue of berming. I have been dumb founded that either we have approved it
with the thinking that something's actually covered, and it wasn't. And on the opposite
extreme, we approved something and it covers half of Carver County, in the case of
Minnewashta Landings. I was surprised by the height of that berm, and I approved it. But I
guess what I'm saying is, when I look at berming as a form of shielding buildings, it all
depends on where you're standing and what direction you're looking at. And hopefully that,
coupled with the distance back from the highway, and a reasonable amount of time to get the
landscaping to go, it's obvious that you've looked at that carefully and I can see that you've
addressed that issue. I'm, short of getting out there and putting up a little height line, I'm
going to trust your professional capabilities that that's going to be shielded and if you say this
is a reasonable expectation, what we're viewing here is factual, it seems to me that let's
address that issue. The one thing I'm somewhat concerned about would be how it was
shielded from the south, although as opposing to additional warehouse development and
54
Planning Commission Meeting - November 1, 1995
' primarily those large gaps in the southern exposure there with truck traffic coming in. I'm
concerned that those are just basically a flat warehouse side. I'd like to see perhaps
something up where if you had the trees and landscaping area, something again in the facade
' breaking up that square. More in line with what you're doing everywhere else on the
building, or at least something to give that relief from the corners.
1
Mancino: Are you talking about where the docks are? Where the trucks come in to the dock
area?
Farmakes: Correct.
Mancino: Will those, if I'm not mistaken, will be bermed in front.
Farmakes: Right, but what I'm saying is that if we're seeing the building itself from the top
of the buildings, we're assuming that the building's going to be all covered up there. And
getting back to my previous comment. I'm not exactly sure that that's the situation. That by
time you get up to the roof level that that's going to be covered up. And that's quite an
expanse—for the plans and look at the scope of that, that's quite a long straight line. And
again the berm, according to the plans, varies considerably from the entrance there off to the
side. So anyways. It's not something that I guess I'd sit down and vote to deny. So much of
the rest of the building is following within the lines of the guidelines, except for that southern
exposure there ... I think it's looking quite well and the only thing, as I said, I was
uncomfortable with was the parking along the highway, which is something I thought we
were avoiding but you've addressed that issue I think to where I'm comfortable...
Mancino: Commissioner Meyer.
Meyer: Let me just ask him. You're comfortable because of the berming that they've done
there?
Farmakes: If it looks like this plan, and I'm hedging that. I want to qualify that. I
personally have had trouble over the years when we've look at these things, and I've been
either surprised one way or the other. To give you an example, Byerly's. Supposedly we
bermed that somewhat, the parking lot. You can see the entire parking lot. Except for the
stop sign. That's the only thing that's probably bermed is when you're coming up to the stop
sign. The Minnewashta Landings. I was surprised by the height on that. And as I said
before, it's hard sometimes to in real terms get the scope of berming in relationship to the
building. And the ... looking pretty good. I don't see any cars there. In fact I see the majority
of the building is bermed. You can do it two ways. You can either say no parking along
55
Planning Commission Meeting - November 1, 1995
Highway 5 or you can talk about the issue that staff believes that that's a significant berm and
that's a representational issue.
Meyer: Okay.
Mancino: Any other comments?
Meyer:. Nothing else.
Mancino: Commissioner Conrad.
Conrad: I like it very much. Couple of quick questions. One to staff. Sharmin. Wetland
analysis. Were the wetlands not on our map? Meaning are these not inventoried wetlands
that we're talking about. And I'll say that, I'll tell you why. Somebody met with the Wetland
Conservation Act's designated technical evaluation panel. And I thought we had an ordinance
and so this refers to them and I'm kind of interested about how this played with our ordinance
and therefore my next assumption was, this was not an inventoried wetland and under an acre
and a half or whatever our regs are.
Al -Jaff: There was, what Diane Desotelle, our Water Resource Engineer looked at and said
this is a wetland and wanted other professionals to look at it and confirm whether it is or not.
And it was decided that no, it wasn't. And that's why the additional group of people were
brought in. And through the panel it was decided that this is not a wetland.
Conrad: Okay. It was not jurisdictional. What does that mean?
Aanenson: It was exempt. Diane was concerned. There was some ambiguity whether or not
it met the wetland criteria so she brought in another expert to validate whether it was or
wasn't and the opinion was that it was exempt.
Conrad: Okay. In terms of the, just a couple points in the staff report. What governs the
height of the letters? And height of the logo. They would like a 30 inch logo and do we
have a reg that says, it can only be this or was that sort of just staff saying.
Al -Jaff: The applicants submitted a criteria for their signage. So we took it and put it in the
form of a condition of approval. , Because of the location of the building, that's the only
reason why we did it this way. I mean if it was a planned unit development, then yes. We
would develop our own criteria. But in this case, only because of the location of the
building, this is going to be the first building that you see as you drive into Chanhassen and
56
1
C!
Planning Commission Meeting - November 1, 1995
we wanted to make sure that there is some rhythm and rhyme to the signage as you drive
down the highway.
Conrad: Okay. Okay. So if we decide to allow a 30 inch logo, we're not breaking an
ordinance someplace?
I Al -Jaffa No.
IJ
n
Aanenson: This came from their direction.
Conrad: Okay, good. When I came in here I was real worried about signage. That was
probably my biggest concern and they did a very nice job, in terms of presentation. It really
took, I was very worried we were going to have a smattering of different looks out there and
it's very nice. At least if it follows, maybe the pictures that were floated around. That's some
good quality stuff and I like that. If we can follow that, then I'd feel comfortable allowing a
30 inch logo if that's what they're thinking their tenants would like.
Mancino: And the same color as the lettering.
Conrad: Absolutely. Yeah. So again what I see is what I really like. It's real nice. I don't
know what to say about the signage on the west side of the site. I don't know how to reword
something there. I see a need. I don't know that we are impacting residents. I just, I don't
know how to deal with that one. That's (f) in number 2.
Mancino: But if we aren't impacting residents, they can have it.
Conrad: That's pretty much my philosophy, but I don't. I guess that's a wording that
somebody could probably put in there, yeah. The landscape peninsulas in number 3. Staff,
could you tell me about. that. Is that just breaking something up that we think needs to be
broke up?
Al -Jaffa Actually I'll discuss this very quickly. This is the area where the landscape island
would need to go, according to our ordinance. We met with the applicant and they indicated
that if they did locate the island, let's assume in those two locations, they'll end up using
parking spaces. Losing parking spaces. The only other alternative for them to locate the
parking would be back where the screening for the loading areas would be located. If it's an
alternative between islands along the east portion of the site or berming to screen the loading
dock, we'd prefer that this remain and just exclude those islands. We had to point it out
because it's in ordinance.
57
11
Planning Commission Meeting - November 1, 1995
Conrad: It is? Okay. I think that's it. I like the project. It's very nice.
Mancino: Commissioner Skubic.
Skubic: Yes. I think it's a very nice project also. Very nice site plan. Nice architectural
building. I like it and I certainly support industrial development in Chanhassen when it's
done this well. The signage, I appreciate the applicants bringing in some photos of some
comparable signs and also the renderings. It seems to me that the signage is going to be
obscured most of the year by the landscaping anyway. Couple things I'd like to get some
clarification on. As I understand it, the land to the south of Lake Drive was retained by
DataSery with the exception of Outlot B. Is that likely to be developed by DataSery or
somebody else? Or further subdivided in the future?
Aanenson: Yes. DataSery will probably be building on that site.
Skubic: And it's not part of this subdivision?
Aanenson: You're talking about the south of Lake Drive, correct? Yes. -
Skubic: And regarding the responsibility for the payment for the traffic signals, specified
developers and /or property owners. Is there somewhere in the process where they'll be further
defined?
Hempel: The language that we inserted here at the 12th hour on that condition. It's kind of
an after our meeting this afternoon. We didn't know how much to put into security. As
Sharmin mentioned at the beginning. We didn't know how long the security was going to
have to be held. We didn't know, depending on the land use of what goes in out here. Even
if a traffic signage will meet warrants at the year 2005, 2007, so there's a lot of what ifs out
there so we kind of threw in a blanket one here and said, if a traffic signal is warranted, the
city installs it. We assess it back to the benefitting property owners. Benefitted ratio and this
way they're open to that. We're able to assess them without a public hearing process. There's
no way to be more specific at this time. This meets our needs from a legality standpoint as
far as being able to assess for the traffic signal in the future. Meets their needs of not having
to put up security at this time. It seems to be a win /win situation.
Mancino: Thank you. Again, thank you for such a complete presentation. It answered so
many questions and I think it's a wonderful design for the entrance to Chanhassen. And I
know that staff and the applicant have worked hard on this. A few of the questions that were
asked I would just, so that Mr. Dietrick knows, I would support certainly enhanced
landscaping in MnDot right -of -way but I can't grant it to you. In fact what does happen
u
1
C—J
n
58 1
Planning Commission Meeting - November 1, 1995
' staff? Is that something that the applicant deals with MnDot on? Does the city get involved
in that at all?
' Aanenson: We found out what happens when you enhance our landscaping.
Mancino: Oh, what happened?
Hempel: We got called when we did Perkins recently. They are very concerned about the
landscaping in the right -of -way. That's something the applicant will have to work with
MnDot and enter into a cooperative agreement potentially for that.
Mancino: That's up to you but I just wanted you to know that I'd certainly support that. The
' landscape peninsulas on the east side that you asked about on Dell Road. I, like some other
people, I mean this is hard. It's, this Block 1, Lot 1 building has three street sides, if you
will. Three entrance sides that everyone can see. I would suggest, make a different
suggestion to staff and that is that, we are obviously trying to buffer the lot.
Overstory boulevard trees that are deciduous, do not really buffer the parking lot. So my
' suggestion would be that along the east side of Dell Road there, that the perimeter of that
parking area be lined with a low arborvitae. Something coniferous. That's year round. It
doesn't get any taller than 6 to 8 feet. Therefore you will screen the parking lot and you can
still also have the deciduous boulevard trees next to Dell Road, and I think that that would
work out well and not put in any islands. That would be my suggestion. Secondly, I too am
concerned about, as Commissioner Farmakes was, about the berming and making sure that we
' don't see the parking area from Highway 5 because it was a major issue for us on the
Highway 5 task force. And so again when I hear of a 4 foot berm, I know 4 feet doesn't
cover the height of a car so I would like to see 5 or 6 berm and some of those, or a lot of the
' plantings be at the top of the berm and making the berm wide enough so that you can
actually get trees, balled and burlapped trees in there. Also for staff and the applicant, I do
see that the sizes of the trees are not what meets our ordinance. So there are coniferous trees
must average 7 feet so that we get different height plantings. We don't have just 6 foot, and I
know you'll refine that but just so you're aware of that. My concern from East Lake Drive is
of the dock area, and again I would like to see berming there and a deciduous, or a coniferous
' tree coverage so that you can't see through the docks from East Lake Drive. And that could
be the 12 feet on center or double row so that there is very opaque buffering. I don't think I
have any other issues or any other questions that you asked us to look at. Those would be
my only suggestions. Look forward to seeing the building. Motions. Let's see, we need a
motion on the site plan review please.
' Conrad: I'll make a motion that the City Council approves, that the Planning Commission
approves Site Plan Review 995 -18 as shown on the site plan received October 2, 1995 subject
' 59
Planning Commission Meeting - November 1, 1995
to the conditions of the staff report with the following changes. To number 2, letter (f). That
the signage on the west side of the site will be allowed or declined based on visibility to the
neighborhoods residents. Change to (h). That in addition to what staff has, that the logos
would be permitted to 30 inches, provided the standards are carried out for this signage that
are comparable to the quality of the examples presented at tonight's meeting, and I'm sure
there could be a better way of stating that, but that's the intent. Point number 3. Madam
Chair, I buy what you said. I just don't know how to rework what's there so if you'd like to
make a friendly amendment after I close, I think that might be appropriate.
Mancino: Okay.
Conrad: Those are my comments for the site plan.
Mancino: Friendly amendment to 3 would read, applicant must provide perimeter coniferous
landscaping in the east parking lot, and I would say on Dell Road. And that the screening of
the truck loading area along East Lake Drive, or both of them, must be increased and include
coniferous double row screening the entire length of the dock area. Screening may include
berms, ornamental and evergreen trees. Let's just say screening may include coniferous trees.
And we'll go ahead and keep in extended peninsula parallel to the entryway. It could be
considered.
Farmakes: May I ask for clarification?
Mancino: Yes.
Farmakes: The issue on west side signage. If there's no frontage on the west side, are we
violating any issues of ordinances?
Al -Jaff: We're limiting each building to two frontages. To two sides.
Farmakes: But if we have signage, if the signage is limited to two, even though there's no
frontage on the west side.
Mancino: Street frontage. So they couldn't put signage on the west side anyway?
AI -Jaff: The ordinance reads.
Farmakes: You may want to clarify that.
Al -Jaff: One sign per street frontage.
�I
1
- 7
L
60 1
1
1
Planning Commission Meeting - November 1, 1995
Farmakes: Or we can add to that, if it doesn't violate other ordinances. Because I think
we've denied other applicants.
Aanenson: So say consistent with the city's sign ordinance.
Conrad: Very definitely.
Mancino: So we really don't even need.
Conrad: My addition. Well.
Mancino: Do you want to just keep it in there?
Conrad: Based on, yeah. Let's keep it in but also we should add, based on ordinance. Based
on our sign ordinance.
Mancino: Okay. A second to the motion?
Farmakes: I'll second the motion.
Mancino: Any discussion on the motion?
Cont-ad moved, Farmakes seconded that the Planning Commission recommends approval of
Site Plan Review 995 -18 as shown on the site plan received October 2, 1995, subject to the
following conditions:
1. The materials used to screen the trash enclosure shall be the same type of brick used on
the building.
2. Signage criteria:
a. Each building shall share one monument sign. Monument signage shall be subject to
the monument standards in the sign ordinance.
b. Wall signs are permitted on no more than two street frontages as shown on the sign
plan dated November 1, 1995.
c. All signs require a separate permit.
61
Planning Commission Meeting - November 1, 1995
d. The signage will have consistency throughout the development and add an
architectural accent to the building.
e. Consistency in signage shall relate to color, size, materials and heights.
f. No illuminated signs within the development may be viewed from the residential
section south. Signage on the west side of the building will be allowed or declined
based on visibility to the neighboiboods residents, and consistent with the city's sign
ordinance.
g. Back lit individual letter signs are permitted.
h. Individual letters may not exceed 2 feet in height, and logos shall not exceed 30
inches in height and consistent with the standards for the signage.
i. Only the name and logo of the business occupying the unit will be permitted on the
sign.
j. The applicant must obtain a sign permit prior to erecting the signs on site. One stop
sign must be posted on the driveway at the exit point of both sites. A detailed sign
plan incorporating the method of lighting, acceptable to staff should be provided
prior to requesting a sign permit.
3. The applicant must provide two landscaped peninsulas in the east parking lot and one in
the central parking. Screen of the truck loading area along East Lake Drive must be
increased to include coniferous double row screening the entire length of the dock area.
Screening may include berms, ornamental and coniferous trees. The applicant must
provide perimeter coniferous landscaping in the east paiiang lot, along Dell Road.
4. The applicant shall enter into a site plan contract with the city and provide the necessary
financial securities as required for landscaping.
5. Fire Marshal conditions:
a. Additional fire hydrants will be required. One fire hydrant must be relocated.
Contact Fire Marshal for exact changes and modifications.
b. "No Parking Fire Lane" signage and yellow curbing must be provided. Contact Fire
Marshal for exact "Fire Lane" areas.
62
Planning Commission Meeting - November 1, 1995
c. P.I.V. (Post Indicator Valves) must be installed. Show on utility plans.
d. A ten foot clear space must be provided around fire hydrants.
F
u
6. Concurrent with the building permit, a detailed lighting plan meeting city standards shall
be submitted.
7. Meet with the Building Official as requested in his attached memo to discuss.
8. The applicant will need to develop a sediment and erosion control plan in accordance
with the City's Best Management Practice Handbook and the Surface Water
Management Plan requirements for new developments. The building setback line and
erosion control fencing shall be denoted on the final grading and drainage plans prior to
final plat approval. The plan shall be submitted to the City for review and formal
approval.
9. All areas disturbed as a result of construction activities shall be immediately restored
with seed and disc - mulched or wood -fiber blanket or sod within two weeks of
completion of each activity in accordance with the City's Best Management Practice
Handbook.
10. The applicant shall upgrade /extend Dell Road south of Lake Drive East to the south city
limits as well as install a storm drainage system from Lake Drive East to the regional
pond site. All public utility and street improvements shall be constructed in accordance
with the latest edition of the City's Standard Specifications and Detail Plates. Detailed
street and utility plans and specifications shall be submitted for staff review and City
Council approval. The private utilities will be inspected by the City's Building
Department. The applicant and/or builder shall be responsible for obtaining the
necessary permits from the City.
11. The applicant shall provide detailed storm sewer calculations for 10 year and 100 year
storm events and provide ponding calculations for storm water ponds in accordance with
the City Surface and Storm Water Management Plan for the City Engineer to review and
approve prior to final plat approval. The applicant shall provide detailed pre - developed
and post developed storm water calculations for 100 year storm events and normal water
level and high water level calculations in existing basins, created basins, and /or creeks.
Individual storm sewer calculations between each catch basin segment will also be
required to determine if sufficient catch basins are being utilized. In addition, water
quality ponding design calculations shall be based on Walker's Pondnet model.
63
Planning Commission Meeting - November 1, 1995
12. The applicant shall apply for and obtain permits from the appropriate regulatory
agencies, i.e. Carver County, Watershed District, Metropolitan Waste Control
Commission, Health Department, Minnesota Pollution Control Agency, Minnesota
Department of Natural Resources, Army Corps of Engineers, and Minnesota Department
of Transportation and comply with their conditions of approval.
13. No berming or landscaping will be allowed within the right -of -way.
14. The lowest floor elevation of all buildings adjacent to wetlands and storm ponds shall be
a minimum of 2 feet above the 100 year high water level.
15. A regional water quality and water quantity pond shall be provided on site to pretreat
storm water runoff prior to discharging under Dell Road into the Eden Prairie wetland.
The proposed storm water pond must have side slopes of 10:1 for the first ten feet at the
normal water level and no more than 3:1 thereafter, or 4:1 throughout for safety
purposes. The stormwater pond shall be designed to 60% to 75% phosphorous removal
efficiently. A landscape plan providing upland and wetland plants to naturally blend
into the landscape is recommended.
16. Existing wells and /or septic systems on site will have to be properly abandoned in
accordance to City and Minnesota Department of Health codes /regulations.
17. The proposed commercial development of 21.3 acres of which 10.23 acres are being
developed shall be responsible for a water quantity and quality connection charges in
E accordance with the City's Surface Water Management Plan. These fees are payable to
the City prior to the City filing the final plat. The final water quality and quantity
connection fees will be determined based on final construction drawings.
18. The applicant shall report to the City Engineer the location of any drain tiles found
during construction and shall relocate or abandon the drain tile as directed by the City
Engineer.
19. The installation of traffic signals at the intersection of Lake Drive East and Dell Rod is
expected in the future. The developer shall be responsible or share the local cost
participation of this signal on a percentage basis based upon traffic generation from full
development of this site in relation to the total traffic volume of Dell Road. The traffic
signals, when they meet warrants, will be installed through a city public improvement
project. The developers and /or property owners shall waive any and all procedural and
substantive objections to the special assessment, including but not limited to hearing
requirements and any claim that the assessment exceeds the benefit to the properties.
64
�J
l
I I
Planning Commission Meeting - November 1, 1995
20. All roof top equipment must be screened in accordance with city,, ordinances.
21. The parking area for Lot 2 shall maintain a 10 foot side yard setback along the west
edge of the property.
All voted in favor and the motion carried unanimously.
Mancino: Second motion please for a subdivision.
Skubic: I'll make a motion that the Planning Commission recommends the City Council
approve the preliminary plat for Subdivision #95 -18 for Chanhassen East Business Center as
shown on the plat received October 1, 1995, with the following conditions as listed by the
staff, 1 through 8.
Aanenson: We added number 9. The cross over easement.
Skubic: 1 through 9.
Mancino: Second?
Meyer: I'll second that.
Mancino: Any discussion?
Skubic moved, Meyer seconded that the Planning Commission recommends the City Council
approve the preliminary plat for Subdivision 05 -18 for Chanhassen East Business Center as
shown on the plat received October 1, 1995, with the following conditions:
1. Park and trail dedication fees to be collected per city ordinance.
2. The applicant shall enter into a development contract with the City and provide the
necessary financial security to guarantee compliance with the terms of the development
contract.
3. All areas disturbed as a result of construction activities shall be immediately restored
with seed and disc - mulched or wood -fiber blanket or sod within two weeks of
completion of each activity in accordance with the City Best Management Practice
Handbook. All catch basins shall be protected with silt fence or hay bales until the
parking lot is paved.
65
1
Planning Commission Meeting - November 1, 1995
4. The applicant shall provide detailed pre - developed and post- developed stormwater
calculations for a 10 year and 100 year storm event, 24 hour duration. Individual storm
sewer calculations between each catch basin segment will also be required to determine
if sufficient catch basins are being utilized.
5. The applicant shall apply for and obtain permits from the appropriate regulatory
agencies, i.e. Carver County, Watershed District, Metropolitan Waste Control
Commission, Health Department, Minnesota Pollution Control Agency, Minnesota
Department of Natural Resources, Army Corps of Engineers, and Minnesota Department
of Transportation and comply with their conditions of approval.
6. The appropriate drainage and utility easements should be dedicated on the final plat for
all utilities and ponding areas lying outside the right -of -way. The easement width shall
be a minimum of 20 feet wide. Consideration shall also be given for access for
maintenance of the ponding areas.
7. The applicant shall dedicate on the final plat the necessary right -of -way for the upgrade
of Dell Road.
8. The site with the DataSery building shall be shown on the plat as Lot 2, Block 1.
9. The applicant shall dedicate across- access easement over Lots 1 and 2, Block 1, Lot 2,
Block 1 and Outlot A.
All voted in favor and the motion carried unanimously.
Mancino: This will go onto City Council.
Al -Jaffa On the 27th.
Mancino: November 27th. Thank you very much.
APPROVAL OF MINUTES: Farmakes moved, Meyer seconded to note the Minutes of the
Planning Commission meeting dated October 18, 1995 as presented.
CITY COUNCIL UPDATE:
Aanenson: Final plat plans and specifications and development contract was given for Halla
Great Plains Estates on the 23rd so we hope within 30 days that plat will be recorded. And
then conceptual and preliminary plat was given for Autumn Ridge 2nd. That was the one
..
0
I I
1
s ww iw w w■ w� w ww w w w w ■w w ww w ■w �w w
�o�RONT ELEVATION
�R1 SIDE ELEVATION
CITY OF CHANHASSEN
RECEIVED
NOV 01 1995
CHANHASStN PLANNING DEPT
MIECI NAME EOCA10" puwM BY: MK
STATE TRUNK HIGHWAY NO. 5 DATC: 10 /5I /q5 7E ,�
GHANHASSEN BUSINESS (.E NT`ER CHANHASSEN MINNE GSM Corporation
M