Loading...
3i. Set Public Hearing Date to Reinitiate Phase I Galpin Blvd and McGlynn Road Extension.7 CITY OF 3 = CHANHASSEN 690 COULTER DRIVE • P.O. 8OX 147 • CHANHASSEN, MINNESOTA 55317 (612) 937 -1900 • FAX (612) 937 -5739 A ,, a ci r TO: Don Ashworth, City Manager FROM: Charles Folch, Works/City g ! 1 ' Director of Public Works /Ci Engineer er l DATE: January 3, 1995 c1ion y qty .dmn rafa EndorscQ- r J+ to Cc 0VA SUBJ: Set Public Hearing Date to Reinitiate Phase I of the Galpin Boulevard and McGlynn Road Extension - Project No. 93 -26A At their regular meeting on Monday, February 2 study and authorized preparation. of plans and c Highway 5 South Frontage Road, Project o. S anticipated construction to begin during th ate factors have delayed the start of this project e. the turn lane improvements at the intersectig of Tri coordination of the Galpin Boulevard im 'vements the City Council accepted the feasibility ions for the Galpin Boulevard and Trunk i. At that time, the project schedule ner of 1994. However, some external ition of the temporary traffic signals and tlighway 5 and Galpin Boulevard, the z runk Highway 5 south to Timberwood Drive (city project) in conjunction w; the Carver Co 'ty project on Galpin Boulevard from Timberwood Drive south to Lyman `ulevard scheduled 6r 1995, and subsequent delays to the development schedule of adjacent roperties through whi some of the public improvements must traverse. As a result, it ot possible to start this P " ject during the 1994 calendar year. —v State Statute 429 re j1ard;g public improvements projects w h are to be financed in part wit special assessment q ftfAW. i bbl rovement be let within one year of the Council f 1 ri It g n, 11, and specifications). It appears at this this project will not be formally let throug an aw of bid process until late March of 1995 T. roximately one month beyond th ar window which will expire on February 28, 1995. d er' . < - o as , 4 - er delays in this process, it seems prudent to schedule a public hearin ave the City Council reorder this project at its regular meeting on Monday, February 95. Property owners proposed for special assessments associated with Phase I of this p t will be notified as required. This is more or less a formality to ensure that all the I's and T's are dotted and crossed associated with this project. Later this year if adjacent petitioning property owners show stronger development commitments (via preliminary plats), the remaining portion (Phase II) of the overall project can then be ordered. MEMORANDUM Don Ashworth January 3, 1995 Page 2 The only action required by the Council at this time is to set a public hearing for the reinitiation of Phase I of this project for their regular meeting on February 13, 1995. At that meeting, the project engineer from Barton- Ashhman will give an update presentation on the proposed primary elements associated with this improvement project and the revised costs and construction schedule. It is therefore recommended that the City Council set a public hearing to reinitiate Phase I of the Galpin Boulevard (from Trunk Highway 5 south to Timberwood Drive and McGlynn Road from Galpin Boulevard east to the west leg of Bluff Creek) Improvement Project No. 93 -26A at their regular meeting on Monday, February 13, 1995. jms Attachment: Location map c: Dave Hempel, Assistant City Engineer James Unruh, Barton- Ashman School District No. 112 g Aeng\charles \cc \galpin.ph L- wm 0- 00 boom "Mml ImM• "TT�rm ""mMw BuY �r ' V %"AAL.01,14 LO Idt. t"d Ong DL&cA Lahr 0 LAKE Ann INNZ"r4x $T- LO E SBACH p I i M I p DE KWK A LOWER LAKE' NX r zu 1 LM - It V-7 X 01 Niw A 9 AY fi �� C� r: m P � E k.y rim LAW a Ndeon Bay m CEUI L say 340 LAU ef :4 L &I d" 4gond Laka C; AL I L $Z Poo Adad SL L&A lk kwthead !:< S� enw.od : an4en M(And it, L 0 1 'a. 14 • -, LAU .3 (D ,ftmn .&W LAA# Ann : $:.,- • —d VIS• • St. let" St. w VIMMA ...... KDRU LaAe PRAIRIE CA4 R&M JK"y 'O OF w4ummana L AU .4" LAAW Hdmwnd MOM E H� 16 N FEASIBILITY STU DY TH 5 South Frontage Road 1 1 MILE @ CITY OF CHANHASSEN (from Ge . IpIn Boulwwdto Audu Fon Road) FIGURE I 1 w ////Mk ■^RTON-ASCHMAN ASSOCMTErft INC- Gal in Boulevard (CSAH 19) Project Location E PAMIIOIV TRANSPORTATION CROUP (from TimborwoodDrIve to TH 5)