Loading...
Administrative Section1 1 1 1 1 1 1 1 1 1 1 1 1 ADMINISTRATIVE SECTION Letter from JMS Companies, dated October 18, 1995. Letter to Sharmin Al -Jaff, dated October 15, 1995. Letter to Dave Drealan, dated October 18, 1995. Memo to from Scott Harr, re: Shorewood Survey Evaluation Comments, Animal Control, dated October 5, 1995. Letter from Jeff Swedlund, dated October 1, 1995. JMS COMPANIES 80 West 78th Street, Suite 133 Chanhassen, MN 55317 Office 612- 949 -3630 Fax 612- 949 -3730 Wednesday, ctober 18 1995 1 Y> > Todd Hoffman City of Chanhassen 690 Coulter Dr. Chanhassen, MN 55317 Re: Forest Meadow Plat and Outlot A Dear Todd: As a follow up to our phone conversation of October 12, 1995 in regards to the outlot A or park area concept plans drawn by your consultant. I am very concerned about the course that you have been determined to take regarding the grading of the outlot. If I understood you correctly your consultant erred in the two plans for the park - area by assuming that the grades on our plan were at one foot intervals. This would effectively double his estimates of material to be removed from the site. At the city council meeting both plans were acceptable layouts for the park. The layout with the least grading was the design of your preference. At the council meeting this plan would have generated less then 3000 cubic yards of fill material for our development. A secondary plan is a grading plan that would have generated approximately 6000 cubic yards of material. Both plans seemed to satisfy the council. The issue of concern to the council as brought up by you and your consultant was the accuracy of our grading plan which has approximately 12,000 to about 13000 cubic yards of material being removed from the park. This material is required on our development. In your memo to council it was inferred that our grading plan would remove trees and that the grading would create a site that would be substantially lower then Galpin Blvd. We represented to the council a conservative number of 15,000 cubic yards of material required to be removed from the outlot. Our plan in reality is between 12,000 and 13,000 cubic yard of material removed. I represented to the council that we would grade to our elevations plus or minus one foot. I provided the council a cross section of the grading plan that indicated that the elevations were at least level with Galpin Road or higher. Your consultants error places his secondary plan in excess of 12,000 cubic yards of JMS Equities, Inc. I JMS Homes I JMS Realty JMS Development Corporation 14725, Limited 1: It is my opinion that you have made this a personal issue and have disregarded any ' attempts at compromise or failed to see the impact of your consultants error. I have tried to deal fairly with the city on the sale of this land for a park. ' Your sudden insistence of a single concept for this area will cost the city substantially more money. Sincerely, ' material to be removed from the site. This confirms that our grading plan does not leave the site too low and we will not be removing trees within the outlot area. The course that you appear to be taking the city is the condemnation process of outlot ' A. The resolution that we offer to the city is to allow us to grade outlot A to our approved grading plan. Your own consultant confirms that there is an adequate amount ' of material to be removed from the site and have property that is usable for a park. It is my opinion that you have made this a personal issue and have disregarded any ' attempts at compromise or failed to see the impact of your consultants error. I have tried to deal fairly with the city on the sale of this land for a park. ' Your sudden insistence of a single concept for this area will cost the city substantially more money. Sincerely, ' David L. Sebold cc: Following list City Council ' Mayor Don Ashworth 1 Gary Eidson REIVE October 15, 1995 OCT 181995 Sharmin Al -Jaff Planning Department 111AM,; o0r,-v City of Chanhassen 690 Coulter Drive Chanhassen, MN. 55317 Ref: 1 Preliminary plat of Golden Glow Acres Ref: 2 Alternative Development for Ravis property and adjoining parcels LUR File No. 95 -4 Dear Ms. Al -Jaff: In response to the proposed approval of Ref: 1, the City Staff developed five alternate area development proposals as documented in Ref:2. The City Staff also designated one of the five alternatives (Option E) as the preferred method of area development. The undersigned property owners whose property adjoins the proposed plat and would be most impacted by Option E are unanimously opposed to Option E. The reasons for this are as follows: 1. Constructing a public street down the middle of these subject properties is detrimental to the Kerber and Petersen properties. In the case of the Kerber property the lot values would be significantly impacted, due to the loss of walk -out topologies and is estimated to double the development cost. The Petersen property would gain one lot which is of marginal economic value. Both Robert Petersen and Larry Kerber are opposed to Option E. 2. The addition of a cul -de -sac to the Ravis property has been estimated to cause a 20% decrease in the value of the existing home and a significant decrease in the value of proposed Lot 2. 3. Mr. Kohman desires any development to have minimal impact on his property. The cul -de -sac will cause significant traffic noise to the family areas of the Petersen, Ravis and Kohman properties. The adjacent property owners recommend the following alternative and support approval of the preliminary plat of Golden Glow Acres with the following conditions: 1. The applicant shall be responsible for extending water to the north line of Lot 2. Sharmin Al -Jaff October 15, 1995 Page 2 2. The City Council grant a variance to allow for five houses on a private driveway as provision for possible development concurrently or in the future by William Infanger. Russell Kohman has indicated no desire to subdivide his lot now or in the future. 3. The Ravises agree to grant to William Infanger access to the private driveway and utilities (water and sewer) should it be needed concurrent with the Golden Glow development or as part of a future Infanger development. The cost to him will not exceed 25% of the cost of the water, sewer and driveway specific development and construction costs of Golden Glow Acres. We are willing to meet with City Staff to discuss the above matters as soon as a meeting can be arranged. s William and ulia n I r 670 P.6wers Boulevard `Larry affd Kathleen Kerber 642nbPookers Boulevard ' 46V"C� Russell Kohman 6730 Powers Boulevard Robert and Lois Petersen 6650 Powers Boulevard 4r(es and Norma Ravis 6660 Powers Boulevard cc: Kate Aarenson, Planning Director -- -Hon. Don Chmiel - -- City Council members, City of Chanhassen - -- Jeremy Steiner CITY OF CHANHASSEN 1 1 690 COULTER DRIVE • P.O. BOX 147 • CHANHASSEN, MINNESOTA 55317 1 (612) 937 -1900 • FAX (612) 937 -5739 October 18, 1995 Mr. Dave Drealan, Director Planning and Zoning Department Carver County Courthouse 600 East 4th Street, Box 16 Chaska, MN 55318 -2185 Dear Dave: This request is being submitted in response to your�bctober 10, 1995 letter regarding the BWSR grant for administration of the Wetlands Conservation Act. As you are well aware, Chanhassen is very proactive in the natural resource department. In addition to the administration of the WCA, we are going to set up a plan to modify the City's existing Surface Water Management Plan to meet the state and federal agency requirements to provide a "one stop shopping" scenario. We are also in the planning stages of starting a monitoring program. ,This includes the purchase and use of monitoring equipment, analysis of samples, and calibration of our water quality model in an attempt to identify wetland protection needs M We have received a Wetland Conservation Act General Permit 17 Implementation Grant 'from BWSR. Enclosed is the work plan. We will be purchasing the monitoring equipment with that grant match; however, we did not request funding for the program's implementation. Therefore, I think it is appropriate to include this funding in our request for the WCA grant. ,The following table outlines the cost of our wetlands program: � I hope this information is suitable for the County Board's approval. I understand that the County 1 can match up to half of the City's cost of the WCA implementation, but this will be based on the 1 Mr. Dave Drealan October 18, 1995 Page 2 total requests. I would like to know what kind of report you will need on City expenditures. Since most of the money is associated with personal time, I am assuming I could show you the City's report from our Storm Water fund. Thank you for your cooperation. Sincerely, CITY OF CHANHASSEN Diane Desotelle, PE Water Resources Coordinator DD:ktm c: Mayor and City Council Kate Aanenson, Planning Director Charles Folch, Director of Public Works SWMP 11E - Surface Water Management Plan Funding Sources g:\eng\diane \wetlands \carver95.grt WETLAND CONSERVATION ACT GENERAL PERMIT 17 IMPLEMENTATION ' CITY OF CHANHASSEN WORK PLAN AND BUDGET INTRODUCTION The City of Chanhassen has prepared the following work plan as part of the General Permit 17 Wetland ' Regulatory Simplification Grant for the Board of Water and Soil Resources. The City has been striving to obtain local one stop shopping for the administration of all wetland impacts, but has failed to receive ' any recognition for its Surface Water Management Plan (SWMP) let alone comments for what is needed to allow one permit application to work. The City plans to identify the steps needed in order to make this ' happen so all LGUs can move forward in this direction. Furthermore, the City plans to purchase some water quality equipment in order to analyze the water quality at pilot sites in the City. This will help us calibrate the modeling in the City and identify the effectiveness of the SWMP's water quality criteria on , the various types of wetlands. CATEGORY 1 IMPLEMENTATION Goal: Implementation of GP -17 ' Action Items: 1. Implement program according to the GP -17 guidelines 2. Obtain necessary training to implement program. 3. Coordinate projects with Army Corp. of Engineers. 4. Publicize program to public. Budget LGU Share Grant Total Staff $3,500 $3,500 $7,000 Training $500 $500 $1,000 Total I 1 1 $8,000 I Ll C CATEGORY 2 IMPLEMENTATION Goal: Methodology for Local Government One Stop Shopping Action Items: 1. Ongoing analysis of the requirements of the state and federal agencies to provide one stop shopping. 2. Set up a plan to modify the City's existing Surface Water Management Plan to meet the state and federal agency requirements to provide one stop shopping for all wetland impacts. Budget LGU Share Grant Total Staff $500 $500 $1,000 Consultant $1,000 $1,000 $2,000 Total 1 1 $3,000 CATEGORY 3 IMPLEMENTATION Goal: Purchase monitoring equipment to help calibrate the City's SWMP modeling. Determine if the SWMP wetland maintenance program based on functions and values is working. _ Action Items: 1. Purchase Monitoring Equipment Budget LGU Share Grant Total Equipment $4,500 $4,500 $9,000 Total $9,000 gAeng\diane \wedands\95grtw1L pin CITY OF CHANHASSEN 690 COULTER DRIVE • P.O. BOX 147 • CHANHASSEN, MINNESOTA 55317 (612) 937 -1900 • FAX (612) 937 -5739 MEMORANDUM TO: Bob Zydowsky, Public Safety Officer CSOs /Animal Control FROM: Scott Harr, Public Safety Director Vj D ATE: October 5, 1995 U � SUBJ: Shorewood Survey Evaluation Comments Regarding Animal Control Attached please find the results of this year's p lease d that every category pertaining to min effort to make this happen. Keep up the goo( out by the City of Shorewood. I am y nproved! I really appreciate everybody's SH:cd PC: Mayor & City Council Public Safety Commis. Don Ashworth, City, M g .\s9etyNsh\shorew MAYOR Robert Bean COUNCIL Kristi Stover r Bruce Benson Jennifer McCarty ' CITY OF Doug Malam SHOREWOOD - 5755 COUNTRY CLUB ROAD • SHOREWOOD, MINNESOTA 55331 -8927 • (612) 474 -3236 September 22, 1995 Mr. Scott Harr ' Public Safety Director City of Chanhassen 690 Coulter Dr. P.O. Box 147 Chanhassen, MN 55317 ' Dear Scott: The responses to our 1995 community survey have been evaluated and organized by department. I am sending the information that was compiled pertaining to your area of work with the City of Shorewood. Some of the comments and ratings may be interesting and/or helpful to you in your continued ' service to our residents. Sincerely, U . Connie Basty r City of Shorewood A Residential Community on Lake Minnetonka's South Shore CITY OF SHOREWOOD JULY 1995 SURVEY EVALUATION COMMENTS ANIMAL CONTROL Three Year Statistics of % Satisfied Animal Control 1993 1994 1995 Helpfulness of inspection personnel 69% 87% 76% Helpfulness of animal control 49% 49 0 10 647o Inspection service overall 74% 84% 76% Inspection courteousness /professionalism 73% 82% 81% Animal control overall service 41.0% 33.3% 53.2% Animal control response time to call 43.6% 41.9% 50.0% Animal control courteousness /professionalism 74.5% 61.5% 77.1% Written Comments 1 Just barges in with no prior notice. 2 Something has to be done about the deer population (over population) they are ruining all of our neighborhood gar and flowers -- and a menace on the roads!! Whv doesn't Shorewood City respond to this ? ?? 3 I see too many loose dogs. 4 We need more animal control - we have dogs running all the time. 5 It takes too long to get to Shorewood from Chanhassen to hear a dog that is a "nuisance barker". 6 Animals always run wild in my area! 7 The animal complaint call was on the weekend, so police personnel were involved instead of Animal Control. 8 2H Animal Control. Lousy 9 4C -1 thru C -3 Animal Control. Worse 10 Barking Does 11 I would really appreciate a flyer on horse regulations and fencing. - 474 -8848 As a single parent supporting my child with my teaching income, I hope very much to be able to keep my well rather then hitching up to City water which would be unaffordable. She would like to have feedback. 12 Lots of dogs running around Woodside Rd. 13 Animal control is helpful but we have approximately 5 -7 dogs who run free on Murray St. and Galpin Lane. I October 1, 1995 Scott Harr City of Chanhassen Public Safety Director P.O. Box 147 Chanhassen, Mn. 55317 Dear Scott: Swedlund e-, Septic - Service w k S� � ,c X Thank you for taking the time to talk with me last Monday morning. I'm writing this letter just to summarize our conversation. You remember about a year and a half ago when we had a very different conversation regarding some complaints I had concerning your inspection department, i.e. scheduling and personnel. You assured me at that time that things would be corrected and I'm de- lighted to acknowledge that things have indeed been corrected! The cooperation I receive from the girls on the phones scheduling inspections is outstanding. Randy Debner, in his first year of septic inspecting, has shown great ability and is very cooperative. Steve Kirchman is extremely pleasant, well organized, very informed and is the politest inspector I've ever had the pleasure of dealing with. As far as I'm concerned, Scott, you and your team are No. I!! Sincerely, Je f Swedlund Swedlund Septic Service �r � ' Swedlund Septic Service • 9520 Laketown Road • Chaska, NW 55318 • 442 -5855 STATE <CERTIFIED l� J 7 u U T -1U'n • Chanhassen Recreation Center Budget and Change Orders Recreation Center Road Project Budget $2,300,000.00 $1,500,000.00 Original Contract $2,144,000.00 $1,427,000.00 ***Change Orders: No. 1 5,796.00 No. 2 3,937.68 No. 3 5,887.68 No. 4 19,414.50 No. 5 18,257.00 No. 6 5,846.40 No. 7 5,770.08 No. 8 26,632.00 No. 9 11,000.00 No. 10 4,967.04 No. 11 5,898.96 No. 12 5,917.44 Total Change Orders $99,910.00 $19,414.50 Total Construction $2,243,910.00 $1,466,600.00 Over/Under *$56,090.00 * *$33,400.00 * Reserve — Arbitration ** Reserve— Bonding Costs ** *See attachment for description of change orders. MODIFICATIONS LOG 09- Oct -95 HAMMEL GREEN AND ABRAHAMSON. INC. , CONSTRUCTION ADMINISTRATION COMMISSION NUMBER: 1400.003.00 NEW ELEMENTARY - CHANHASSEN CP -2 PAGE 1 DATE ISSUED/ DATE RECD DATE APPV'D STATUS A/C /A/O MOD DESCRIPTION INITIATED BY /AMOUNT /AMOUNT C.O. # FNL APPVL REMARKS CO01 ALTERNATES #3 SKYLIGHTS AND 10- Jun -94 10- Jun -94 10- Jun -94 #5 TEMPERATURE CONTROLS $24,150.00 $24,150.00 1 24- Jul -94 C005 EXCVATE ADD. TOPSOIL/MUCK 20- Nov -94 18- Dec -94 $36,514.00 $36,514.00 5 MOD001 ALTERNATE NO.3 PRICE REVISION 17- Jun -94 I 20- Jun -94 NOT ACCEPTED ($9,300.00) 0 MOD002 ALTERNATE FOR WASCO LOW -RISE 17- Jun -94 20- Jun -94 NOT ACCEPTED BARREL VAULT SKYLIGHT ($11,700.00) 0 MOD003 IMPORT GRANULAR FOR MUCK 11- Apr -95 08- Jun -95 $53,264.00 $53,264.00 8 MOD004 SITE ACCESS 21- Apr -95 08- Jun -95 - $22,000.00 $22,000.00 9 RFP0011 CREDIT FOR USING TOTAL DIRECT 25- Jul -94 18- Oct -94 DIGITAL CONTROLS AND BOILER STACK REVISIONS ARCHITECT ($1,894.00) ($1,894.00) 2 15- Nov -94 RFP002 LOCATE HOLLOW METAL DOOR/ 11- Jul -94 WINDOW FRAMES TO THE FACE OF BURNISHED CMU WALL ARCHITECT 0 RFP003 PROVIDE ZIEGLER EMERGENCY 20- Jul -94 28- Jul -94 18- Oct -94 GENERATOR ENGINEER ($1,850.00) ($1,850.00) 2 15- Nov -94 RFP004 DELETE CAVITY MORTAR 22- Jul -94 COLLECTION ARCHITECT 0 RFP005 WIRE FABRIC SUBSTITUTION 15- Aug -94 29- Aug -94 18- Oct -94 ARCHITECT ($1,300.00) ($1,300.00) 2 15- Nov -94 RFP006 FOOTING STEP ADJUSTMENTS 19- Aug -94 05- Oct -94 18- Oct -94 ENGINEER $6,641.00 $6,641.00 2 15- Nov -94 RFP007 FIRE HYDRANTS 19- Aug -94 07- Sep -94 18- Oct -94 INCLUDES RFP #10 AND SI #6 CODE $9,450.00 $9,450.00 2 15- Nov -94 RFP008 PARK SHELTER ROOF EDGE 22- Aug -94 18- Oct -94 22- Feb-95 REVISIONS ARCHITECT $0.00 $0.00 6 PAGE 1 MODIFICATIONS LOG 09- Oct -95 HAMMEL GREEN AND ABRAHAMSON. INC. CONSTRUCTION ADMINISTRATION ' COMMISSION NUMBER: 1400.003.00 NEW ELEMENTARY - CHANHASSEN CP -2 u u I I u DATE ISSUED/ DATE RECD DATE APPV'D STATUS MOD # DESCRIPTION INITIATED BY /AMOUNT /AMOUNT C.O. # A/C/A/O FNL APPVL REMARKS RFP009 CONCRETE PADS AND FUEL TANK 22- Aug -94 18- Oct -94 22- Feb-95 FOOTINGS ARCHITECT $1,120.00 $1,120.00 6 RFPO10 CIVIL. REVISIONS 22- Aug -94 07- Sep-94 18- Sep -94 INCLUDED IN RFP 7 AND SI 11 ENGINEER $0.00 $0.00 2 15- Nov -94 RFPOI I RELOCATION OF STORM SEWER 26- Sep-94 08- Sep-94 18- Oct -94 R ENGINEER $4,782.00 $4,725.00 3 15- Nov -94 RFP012 INSTALL STEEL SILL ANGLES 24- Oct -94 28- Nov -94 22- Feb-95 R ARCHITECT $1,809.00 $1,809.00 6 RFP013 PROVIDE ADDITIONAL MATERIAL 01- Sep -94 07- Oct -94 18- Oct -94 INCLUDED WITH FOR FILL AT THE S.W. & ME �. RFP 1 g CORNERS OF THE SITE ENGINEER $39,497.00 $39,029.00 4 15- Nov -94 RFP014 REVISE TOILET AND BATH 12- Sep -94 17- Oct -94 22- Feb -95 ACCESSORIES ARCHITECT $135.00 $135.00 6 RFP015 DELETE SPECIFIED FIRE BLANKET 13- Sep -94 07- Oct -94 18- Oct -94 AND CABINET ARCHITECT ($74.00) ($74.00) 2 15- Nov -94 RFP016 CHANGE V.B. TO PORCELIAN 22- Sep -94 02- Feb -95 22 -Mar-95 TILE IN SELECTED ROOMS R ARCHITECT $2,067.00 $2,067.00 7 RFP017 HARDWARE REVISIONS AT DOORS 23- Sep -94 28- Oct -94 22- Feb-95 125A -D ARCHITECT $628.00 $628.00 6 RFP018 REVISE GRADES AND PLAYING 23- Sep -94 07- Oct -94 18- Oct -94 INCLUDED WITH FIELD AT N.E. CORNER OF SITE RFP 13 ENGINEER $0.00 $0.00 0 RFP019 FLOOR AND BASE REVISIONS IN 26- Sep-94 20- Oct -94 22- Feb-95 214.1 AND 215.1 ARCHITECT $341.00 $341.00 6 RFP020 DELETE FLOOR BOX ROOMS 30- Sep -94 A110 -13110 ENGINEER 0 RFP021 INSTALL ACOUSTIC DECK INSUL. 03- Oct -94 23- Dec -94 15- Aug -95 ARCHITECT $7,718.00 $7,718.00 12 RFP022 UNSUITABLE SOIL AT MECHANICAL 06- Oct -94 23- Sep-94 18- Oct -94 TRENCHES ARCH/ISD112 $19,900.00 $19,807.00 3 15- Nov -94 PAGE 2 MODIFICATIONS LOG 09- Oct -95 HAMMEL GREEN AND ABRAHAMSON, INC. ' CONSTRUCTION ADMINISTRATION COMMISSION NUMBER: 1400.003.00 NEW ELEMENTARY - CHANHASSEN CP -2 ' DATE ISSUED/ DATE REC'D DATE APPV'D STATUS A/C /A/O MOD # DESCRIPTION INITIATED BY /AMOUNT /AMOUNT C.O. # FNL APPVL REMARKS RFP023 EXIT LIGHT REVISIONS 17- Oct -94 05 -Jan-95 CODE $0.00 0 RFP024 ROOM 125 MASONRY OPENING 18- Oct -94 20- Nov -94 22- Feb -95 CLARIFICATIONS CODE $993.00 $993.00 6 RFP025 FIRE EXTINGUISHER REVISIONS 24- Oct -94 29- May -95 18- May -95 CODE $2,703.00 $2,703.00 10 RFP026 HOLD -OPENS 27- Oct -94 28- Nov -94 22- Feb -95 ARCHITECT $2,124.00 $2,124.00 6 RFP027 DOOR SCHEDULE REVISIONS 31- Oct -94 04- Jan -94 22- Feb -95 CODE $3,361.00 $3,361.00 6 RFP028 RECESSED LOCK BOX 02- Nov -94 27- Mar -95 18- May -95 CODE $219.00 $219.00 10 RFP029 RELOCATE EXIT SIGNS 02- Nov -94 28- Nov -94 22- Feb -95 CODE $3,502.00 $3,502.00 6 RFP030 CODE RESPONSE 02- Nov -94 01- Dec -94 CODE $0.00 $0.00 0 RFP031 FIRE LANE PAINTING 02- Nov -94 04 -Jan-94 22- Feb -95 CODE $1,172.00 $1,172.00 6 RFP032 CODE RESPONSES 14- Nov -94 28- Feb -95 22 -Mar-95 CODE $17,765.00 $15,295.00 7 RFP033 FIRE DAMPER REVISIONS 15- Nov -94 05 -Jan-95 22- Feb -95 ARCHITECT ($1,382.00) ($1,382.00) 6 RFP034 EXHAUST DUCT ENCLOSURE 09- May -95 26- May -95 18- Jul -95 R2 I CODE $4,177.00 $4,177.00 11 RFP035 ADD A FIRE DAMPER TO SUP. DUCT 22- Nov -94 22- Dec -94 22- Feb -95 CODE $226.00 $226.00 6 RFP036 REVISED DR. HARDWARE #14013 01- Dec -94 22- Dec -94 22- Feb -95 ARCHITECT $242.00 $242.00 6 PAGE 3 ' MODIFICATIONS LOG 09- Oct -95 ' HAMMEL GREEN AND ABRAHAMSON. INC. CONSTRUCTION ADMINISTRATION ' COMMISSION NUMBER: 1400.003.00 NEW ELEMENTARY - CHANHASSEN CP -2 J DATE ISSUED/ DATE RECD DATE APPV'D STATUS MOD # DESCRIPTION INITIATED BY /AMOUNT I /AMOUNT C.O. # A/C/A/O FNL APPVL REMARKS RFP037 MODIFY H.M. WDW. FRAME 01- Dec -94 22- Dec -94 22- Feb -95 ARCHITECT $2,923.00 $2,923.00 6 RFP038 REVISE TO WIDE STILE DOORS 01- Dec -94 30 -Jan-95 18- May -95 ADD. INFO REQ'D. ARCHITECT $12,864.00 $7,034.00 10 RFP039 REVISE TYPE I ROOF INSUL 01- Dec -94 14- Feb -95 22- Mar -95 LETTER SENT CONTR. ($16,600.00) ($8,300.00) 7 RFPO40 ADD 6 MIL POLYVAPOR RETARDER 01- Dec -94 - 22- Dec -94 22- Feb-95 ARCHITECT ($1,250.00) ($1,250.00) 6 RFPO41 DELETE PROJECTION SCREEN RM 22 01- Dec -94 03- Apr -95 18-May-95 Architect ($905.00) ($905.00) 10 RFPO42 REVISE EIFS TO SOFT SYSTEM 01- Dec -94 14- Dec -95 22- Mar -95 Architect ($10,806.00) ($10,806.00) 7 RFPO43 REVISE SMOKE DETECTOR/FIRE 05- Dec -94 ALARMS 05 -Jan-95 22- Feb -95 CODE $1,608.00 $1,608.00 6 RFPO44 EZ LOCK SAFETY BELTS @BBASKETS 12- Dec -94 17- Jan -95 22- Feb -95 Architect $3,360.00 $2,835.00 6 RFPO45 ADD FIRE DAMPERS 12- Dec -94 05- Jan -95 22- Feb-95 CODE $2,665.00 $2,665.00 6 RFPO46 ADD 100A- 3PCIRCUT FOR PARK 13- Dec -94 05 -Jan-95 22- Feb -95 SHELTER CITY $1,044.00 $1,044.00 6 RFPO47 ADD OUTLETS @WKRMJSWITCH 14- Dec -94 05 -Jan-95 22- Mar -95 COMPUTER MONITORS ISD112 $5,933.00 $4,908.00 7 RFPO48 T CONDUIT BELOW BUS DROP -OFF 19- Dec -94 06- Jan -95 22- Feb -95 ISD112 $264.00 $264.00 6 RFPO49 SPLIT HYDRONIC HEATING LOOP 23- Dec -94 31- Jan -95 22- Mar -95 CONTR ($3,285.00) ($3,285.00) 7 RFP050 REVISED FIRESTOPPING 03 -Jan-95 20- Mar -95 G.C. REVIEW COSTS CODE $17,300.00 $0.00 0 PAGE 4 MODIFICATIONS LOG 09- Oct -95 , HAMMEL GREEN AND ABRAHAMSON. INC. ' CONSTRUCTION ADMINISTRATION COMMISSION NUMBER: 1400.003.00 NEW ELEMENTARY - CHANHASSEN CP -2 ' DATE ISSUED/ DATE RECD DATE APPV'D STATUS A/C /A/O MOD # DESCRIPTION INITIATED BY /AMOUNT /AMOUNT C.O. # FNL APPVL REMARKS RFP051 MOVE GAS VALVE @KITCHEN 06 -Jan-95 06- Feb -95 22- Mar -95 CODE $1,608.00 $1,518.00 7 RFP052 LITES @DISPLAY CASES 12 -Jan-95 31 -Jan-95 22- Mar -95 ENGINEER $1,558.00 $1,426.00 7 RFP053 CASEWORK REVISIONS 19 -Jan-95 06- Feb -95 22- Mar -95 ARCHASD. $539.00 $539.00 7 RFP054 ADD FIRE DAMPERS 19- Jan -95 13- Feb -95 22- Mar -95 CODE $1,127.00 $947.00 7 RFP055 ADD THERMAL EX HOT WATER 20 -Jan-95 23- May -95 18- Jul -95 CODE $1,553.00 $1,553.00 11 RFP056 MISC. ELEC. REVISIONS 06- Feb -95 07- Mar -95 18- May -95 ENGINEER $3,065.00 $2,795.00 10 RFP057 FIRE ALARM SYSTEM REVISIONS 07- Feb -95 24- Feb -95 18- Jul -95 FIRE MARSHAL $4,437.00 $4,437.00 11 RFP058 COMM. MTG. LITES /SITE LITES 09- Feb -95 27- Mar -95 NOT ACCEPTED CITY CHAN. $26,012.00 $0.00 0 RFP059 LANDSCAPING REVISIONS 17- Apr -95 16- May -95 18- Jul -95 ACCEPTED R CITY CHAN. $3,168.00 $3,168.00 11 RFP060 DELETE SEED @ AREA FOUR 27- Feb -95 04- Apr -95 NOT ACCEPTED CITY ($16,464.00) $0.00 0 RFP061 EXPANSION LOOPS HOT H2O HEAT 27- Feb -95 20- Mar -95 18- May -95 ENGINEER $3,602.00 $3,360.00 10 RFP062 ELECTRIFY POWER ENTRY DOORS 01- Mar -95 24- May -95 15- Aug -95 ENGINEER $3,395.00 $0.00 13 RFP063 REVISECIRCUTS/HOMERUN LITES 08- Mar -95 27- Mar -95 18- May -95 ENGINEER $3,495.00 $3,495.00 10 RFP064 GYM GRAPHIC 16- Mar -95 03- Apr -95 NOT ACCEPTED CITY $3,045.00 $0.00 0 PAGE 5 MODIFICATIONS LOG 09- Oct -95 ' HAMMEL GREEN AND ABRAHAMSON. INC. CONSTRUCTION ADMINISTRATION COMMISSION NUMBER: 1400.003.00 NEW ELEMENTARY - CHANHASSEN CP -2 fl u 0 DATE ISSUED/ DATE RECD DATE APPV'D STATUS MOD # DESCRIPTION INITIATED BY /AMOUNT /AMOUNT C -O. # A/C/A/O FNL APPVL REMARKS RFP065 DEDUCT CT @ ROOM226 17- Mar -95 26- Apr -95 REVISE &RESUBMIT ARCHITECT $1,614.00 $0.00 0 RFP066 DELETE SEED &SOD @AREAS5 &7 20- Mar -95 04- Apr -95 NOT ACCEPTED ISD112 $40,282.00 $0.00 0 RFP067 INSTALL LARGER WDW @RM 221 20- Mar -95 NOT ACCEPTED CITY $0.00 $0.00 0 RFP068 DELETE CHASES @STU. LOCKERS 27- Mar -95 25- May -95 18- Jul -95 ARCHITECT $0.00 $0.00 11 RFP069 DUCT SMOKE DETECTOR 05- May -95 16- Jun -95 18- Jul -95 ENGINEER $2,109.00 $2,061.00 11 RFP070 SUBSTITUTE ASPHALT WALKS 05- May -95 23- May -95 NOT ACCEPTED ARCHITECT $8,279.00 $0.00 0 RFP071 ADD EMERG LITES/TIMECLOCKS 09- May -95 23- May -95 15- Aug -95 ENGINEER $7,196.00 $6,736.00 13 RFP072 REVISE F-6 SINKS 12- May -95 23- May -95 ACCEPTED ENGINEER $1,345.00 $0.00 0 RFP073 REVISE F -6 SINKS TO F -6A 12- May -95 23- May -95 18- Jul -95 ENGINEER $5,391.00 $5,391.00 11 RFP074 SITE IRRIGATION 25- May -95 NOT ACCEPTED ENGINEER $0.00 $0.00 0 RFP075 RETURN AIR ACCESS 30- May -95 10- Aug -95 15- Aug -95 ENGINEER $1,156.00 $983.00 12 RFP076 STORM SEWER REVISIONS 02- Jun -95 29- Jun -95 15- Aug -95 ENGINEER $0.00 $0.00 12 RFP077 REVISE SHT E400 DUCT SMOKE 23- Jun -95 04- Aug -95 15- Aug -95 DETECTORS ENGINEER $2,584.00 $2,384.00 12 RFP078 DELETE CONC WALKS @PLAYGRND 03- Jul -95 18- Jul -95 15- Aug -95 ISD112 ($863.00) ($863.00) 12 PAGE 6 MODIFICATIONS LOG 09- Oct -95 ' HAMMEL GREEN AND ABRAHAMSON. INC. ' CONSTRUCTION ADMINISTRATION COMMISSION NUMBER: 1400.003.00 NEW ELEMENTARY - CHANHASSEN CP -2 ' DATE ISSUED/ DATE RECD DATE APPV'D STATUS A/ClA/O MOD # DESCRIPTION INITIATED BY /AMOUNT /AMOUNT C.O. # FNL APPVL REMARKS RFP079 SHT M204 ADD TRANSFER GRILLE 10- Jul -95 10- Jul -95 15- Aug -95 CITY $189.00 $189.00 12 RFP080 FEEDER @SHELTER /FIXTURES 19- Jul -95 01- Aug -95 15- Aug -95 ENGINEER $9,541.00 $9,541.00 13 RFP081 ADD BREAKERS/FAN SWITCH 28- Jul -95 10- Aug -95 15- Aug -95 ENGINEER $1,119.00 $1,119.00 12 RFP082 MICROWAVE CASEWK/RET AIR 01- Aug -95 ISD/ENGINEER $0.00 $0.00 0 RFP083 DR RATINGS/TELE LINES/WIRE 15 - Aug - GLASS /COUNTERTOP CITY $0.00 $0.00 0 RFP084 KITCHEN AIR BALANCING EXTRA 25- Aug -95 25- Sep -95 28- Sep-95 - CODE $670.00 $670.00 13 RFP085 DELET E FIXTURE TIE WIRES 25- Sep -95 26- Sep -95 11- Oct -95 ISD112 ($3,200.00) ($3,200.00) 13 RFP086 ADD CHAIN LINK FENCE @ HWY 5 29- Sep -95 ISD112 $0.00 $0.00 0 RFP087 ADD FIRE ALARM DEVICES 06- Oct -95 CODE $0.00 $0.00 0 SI001 PLUMBING AND HVAC ITEMS 09- Jun -94 ENGINEER 0 S1002 FILL UNDER SIDEWALKS 07- Sep -94 CLARIFICATIONS R ENGINEER 0 SI003 REVISE FOOTING AND FOUNDATION 27- Jun -94 WALL DIMENSIONS ENGINEER 0 SIO04 WIRE JOINT REINFORCING 27- Jun -94 CLARIFICATIONS ARCHITECT 0 SI005 PROVIDE A 4" X 25" GLASS LITE IN 30- Jun -94 TYPE C DOORS ARCIUTECT 0 PAGE 7 r D � �J F L ' MODIFICATIONS LOG 09-Oct-95 Oct 95 ' HAMMEL GREEN AND ABRAHAMSON. INC. CONSTRUCTION ADMINISTRATION ' COMMISSION NUMBER: 1400.003.00 NEW ELEMENTARY - CHANHASSEN CP -2 i L i DATE ISSUED/ DATE RECD DATE APPV'D STATUS A/C/A/O MOD # DESCRIPTION INITIATED BY /AMOUNT /AMOUNT C.O. # FNL APPVL REMARKS SI006 SOUTH FRONTAGE ROAD SECTION 05- Jul -94 07- Oct -94 18- Oct -94 ENGINEER $5,434.00 $5,434.00 2 15- Nov -94 SI007 CHANGE COLUMN AT GRID E9 FROM 06- Jul -94 E9 TO TYPE 5 ON PAGE S200 ENGINEER 0 SI008 MISCELLANEOUS STRUCTURAL 11- Jul -94 CLARIFICATIONS ENGINEER 0 SI009 STEEL SILL ANCHOR CLARIFICATIO 1 I- Jul -94 ARCHITECT 0 SI010 ROOMS C109 AND C110 WALL FINISH 11- Jul -94 TO BE CMU2 ARCHITECT 0 SI011 RELOCATION OF STORM SEWER 18- Jul -94 07- Sep -94 18- Oct -94 INCLUDED WITH LINES RFP 10 AND SI 11 ENGINEER $0.00 $0.00 0 SI012 LAY OUT COORDINATE 05- Aug -94 CLARIFICATIONS FOR BLUFF CREEK PARK SHELTER ENGINEER 0 SI013 CASEWORK REVISIONS TO ALLOW F 15- Aug -94 FIN TUBE ARCHITECT 0 SIO14 MORTAR TYPE CLARIFICATIONS 19- Aug -94 ARCHITECT 0 SI015 CONCRETE EQUIPMENT PAD 22- Aug -94 LOCATION CLARIFICATIONS ENGINEER 0 SI016 CIVIL REVISIONS 25- Aug -94 ENGINEER 0 SIO17 S.O.G. CONTROL JOINT 30- Aug -94 ENGINEER 0 SI018 STORM AND SANITARY SEWER 06- Sep -94 UTILITY CHANGES ENGINEER 0 SI019 RELOCATE TELECOMMUNICATIONS 12- Sep -94 03- Oct -94 18- Jul -95 CONDUIT ENGINEER $472.00 $472.00 11 PAGE 8 MODIFICATIONS LOG 09- Oct -95' HAMMEL GREEN AND ABRAHAMSON. INC. ' CONSTRUCTION ADMINISTRATION COMMISSION NUMBER: 1400.003.00 NEW ELEMENTARY - CHANHASSEN CP -2 ' DATE ISSUED/ DATE RECD DATE APPV'D STATUS A/C /A/O MOD # DESCRIPTION INITIATED BY /AMOUNT /AMOUNT C.O. # FNL APPVL REMARKS SIO20 BASKETBALL BOACKBOARD 22- Sep -94 19- Oct -94 22- Mar -95 CIRCUITING CHANGE ENGINEER $653.00 $653.00 7 SIO21 CARPET SCHEDULE 26- Sep -94 ARCHITECT 0 SIO22 TEMPORARY HEAT SYSTEMS 27- Sep -94 COMPLIANCE ARCHITECT 0 SIO23 FIRE DEPT POLICY 27- Sep -94 ARCHITECT 0 SIO24 FIRE ALARM SYSTEM COMPLIANCE 27- Sep -94 31- Jan -95 22- Mar -95 R ENGINEER $4,406.00 $3,725.00 7 SIO25 STORYTELLING AREA FRAMING 24- Oct -94 30- Nov -95 15- Aug -95 PLAN R ARCHITECT $354.00 $354.00 12 SIO26 COLOR SCHEDULE 28- Oct -94 06- Feb -95 22- Mar -95 ARCHITECT $12,474.00 $12,474.00 7 SIO27 COLOR SELECTIONS 11- Nov -94 ARCHITECT $0.00 $0.00 0 SIO28 RELOCATE PROJECTION SCREEN 01- Dec -94 ARCHITECT $0.00 $0.00 0 SIO29 EXPOSED DUCT HANGERS 09- Feb -95 R ARCHIECT $0.00 $0.00 0 SI030 COLOR SCHEDULE CLARIFICATION 29- Dec -94 ARCHITECT $0.00 $0.00 0 SI031 PLUMBING FIXTURE CLARIFY 03 -Jan-95 ARCHITECT $0.00 $0.00 0 SI032 EXIT LITE CLARIFICATIONS 24 -Jan-95 07- Mar -95 22- Mar -95 ENGINEER $1,624.00 $1,624.00 7 SI033 GYP.BD. PARTITION HEAD DET. 30 -Jan-95 ARCHITECT $0.00 $0.00 0 PAGE 9 MODIFICATIONS LOG 09- Oct -95 HAMMEL GREEN AND ABRAHAMSON. INC. CONSTRUCTION ADMINISTRATION COMMISSION NUMBER: 1400.003.00 NEW ELEMENTARY - CHANHASSEN CP -2 DATE ISSUED/ DATE RECD DATE APPV'D STATUS MOD # DESCRIPTION INITIATED BY /AMOUNT /AMOUNT C.O. # A/C/A/O FNL APPVL REMARKS SI034 SMOKE DETECTOR CLARIFICATION 07- Feb -95 ENGINEER $0.00 $0.00 0 SI035 MISC. MECH. CLARIFICATIONS 15- Feb -95 ENGINEER $0.00 $0.00 0 SI036 IMC RM 126 RADIATION CONTROLS 16- Feb -95 ENGINEER $0.00 $0.00 0 SI037 PARK SHELTER COLOR SCHED. 15- Mar -95 ARCHITECT $0.00 $0.00 0 SI038 REVISE MOTOR SHORT CIRCUT 21- Mar -95 03- Apr -95 18- Jul -95 PROTECTION ENGINEER $3,500.00 $2,663.00 11 SI039 GLAZED MASONRY SIGNAGE 07- Apr -95 10- Jul -95 15- Aug -95 ARCHITECT $276.00 $276.00 12 SIO40 CONC PAVING CLARIFICATIONS 19- Apt -95 ARCHITECT $0.00 $0.00 0 SI041 PIPE LABELING SPECS 28- Apr -95 ENGINEER $0.00 $0.00 0 SI042 DELETE MOTORIZED DAMPERS 02- May -95 ENGINEER $0.00 $0.00 0 SI043 CONCRETE PIER ADDED 05- Jun -95 ENGINEER $0.00 $0.00 0 SI044 FIRE DEPT. POLICY 06- Jun -95 ARCHITECT $0.00 $0.00 0 SI046 FIR PAINT COLORS 27- Jul -95 ARCHITECT $0.00 $0.00 0 PAGE 10