Loading...
1a. Accept Sanitary Sewer and Water Imporvements in The Woods at LongacresCITY OF 4z, CHANHASSEN 690 COULTER DRIVE • P.O. BOX 147 • CHANHASSEN, MINNESOTA 55317 (612) 937 -1900 • FAX (612) 937 -5739 TO: Charles Folch, Director of Public Works /City Engineer FROM: Dave Hempel, Assistant City Engineer k DATE: December 4, 1995 Action by City Administrator Endorsed —.i/ �lodi�ed� ate 2 Ike Submitted to Comriission Detf Submitted to Council / 2 -/1 -% SUBJ: Accept Sanitary Sewer and Water Improvements in The Woods at Longacres Project No. 93 -28 Staff has received a letter from Mr. Ken Adolf, Ti6iect Engineer with Schoell & Madson, Inc., requesting the City consider acceptance of the public utility improvements in the above - referenced project. According to Mr. Adolf, the public utility improvements have been completed in accordance with the approved plans and specifications including the first lift of bituminous asphalt. The public utility improvements have been tested and approved by City staff. Staff has performed a walk - through inspection of the project and found that some minor adjustments are required by the contractor prior to final acceptance by the City. For the record, the utility portion of the project shall include only the watermain and sanitary sewer system except for the 10 -inch sanitary sewer line extension north of the project across the wetland. The storm sewer and ponding facilities shall be considered for acceptance upon completion of the final wear course (streets) in 1996. ktm Attachments: 1. Letter from Ken Adolf of Schoell & Madson, Inc. dated November 22, 1995. 2. Location map. OFFICIAL ENG NEMRING COPY Received c: Mr. David Hinners, Lundgren Bros. Construction, Inc. _ -- Revision NJ. I gAeng\projects \woods \uti1.cc 1 Approved L-y C , Engineer Date Approved by City Council Date MEMORANDUM SCHOELL & MADSON, INC. ENGINEERS • SURVEYORS • PLANNERS SOIL TESTING • ENVIRONMENTAL SERVICES 1 05B WAYZATA BOULEVARD • SUITE 1 • MINNETONKA, MN 55305 -1525 (6 121 546 -7601 • FAX (6'121 546.9065 City of Chanhassen c/o Mr. David Hempel Assistant City Engineer 690 Coulter Drive P.O. Box 147 Chanhassen, MN 55317 Gentlemen: November 22, 1995 CITY OF CHANHAWN M� 070 NOV 2 1 7 1995 RGINJEER1 N DEPT, Subject: The Woods At Longacres Project No. 93 -28 The construction of all public improvements on the subject project has been completed except for the bituminous wearing course and the 10 -inch sanitary sewer extension north of the project across the wetland. This sanitary sewer is under contract and will be constructed this winter by Widmer, Inc. when the disruption to the wetland can be minimized. This sewer is required for the next development phase. Also, punch list items have been completed. Representatives of Schoell & Madson, Inc. provided construction staking and observation of the public improvements. On this basis, we certify that the public improvements were constructed in substantial compliance with the City approved plans and specifications. On behalf of Lundgren Bros. Construction, Inc., we are requesting City acceptance of the completed utilities. Please contact me with any questions. Very truly yours, SCHOELL & MADSON, INC. rx��EyMi A Kenneth Adolf, P.E. KEA/cj MN Reg. No. 12408 cc: Dave Hinners, Lundgren Bros. Construction, Inc. AFFIRMATIVE ACTION • EQUAL OPPORTUNITY EMPLOYER ri�� ■ LAKE HARRISON �. N LAKE G I // LAKE A LA rn CP I