1c. Receive Supplemental Feasibility Report for Powers Blvd.CITY OF Id- CHANHASSEN 690 COULTER DRIVE • P.O. BOX 147 • CHANHASSEN, MINIEtSoO�Ti�i553dm (612) 937 -1900 • FAX (612) 937 -5739 Endorsed__ Rm de i - -- TO: Don Ashworth, City Manager Date SOm itted to commission FROM: Charles Folch, Director of Public Works Q__ Date Sul­ tted to Council DATE: December 7, 1995 SUBJ: Receive Supplemental Feasibility Report for Powers Boulevard (County Road 17) from Trunk Highway 5 to Lyman Boulevard; Set Public Hearing Date Project No. 93 -29 Attached is the supplemental feasibility report for pe bove Alta PP - referenced project. This project is a cooperative effort between the City and County, h6weVer, Carver County is administrating the improvemen pr otect. The project engineer has provided a ne synopsis of the history of this T oposed improvement project and a description of the primary project elements as proposed. Estimated project costs and project financing information`is also provided. Since the adjacent industrial /commercial properties on the north'end of the project and some residential properties on the south end of the project are proposed for special assessments, it is necessary that a public hearing be held regarding this feasibility report. All of the property owners proposed for special assessments will be sent written notification of the public hearing as well 4s notice placed in the Villager newspaper. The project engineer will be present at the public hearing to provide a detailed presentation of this feasibility report and respond to any questions as necessary. In the meantime, if any of the Council members should have questions regarding the contents of this report, please feel free to contact me. MEMORANDUM c: Dave Hempel, Assistant City Engineer Roger Gustafson, Carver County Bill Weckman, Carver County Jon Horn, BRW Greg Brown, BRW ' gAeng \chazles \cc \powers.cc MEMORANDUM cc I B R W INC Planning ' Transportation Engineering Urban Design Thresher Square 1 1 700 Third Street So. Minneapolis, MN 55415 612/370 -0700 Fax 612/370 -1378 Denver Milwaukee Minneapolis Orlando Phoenix t, November 30, 1995 Mr. Charles Folch, PE m Director of Public Works , City of Chanhassen Chanhassen, MN 55317 RE: CSAH 17 (Powers Boulevard) Improvements City Project 93 -29 Dear Charles: A public hearing was held on April 27, 1992, for the above - referenced project, which included the reconstruction of CSAH 17 (Powers Boulevard) from Highway 5 to approximately 2,200 feet south. At that time, the Council elected to reject the project due to concerns associated with the lack of any County funding. The City subsequently entered into a Cooperative Agreement with Carver County to upgrade a number of County roadways within the City, including CSAH 17. As a result of this agreement, CSAH 17 was scheduled for reconstruction during 1995. The project scope was extended to include the reconstruction of CSAH 17 an additional 5,600 lineal feet to the south to Lyman Boulevard. A feasibility study for the reconstruction project was presented to the City Council in December, 1994, and a public hearing was held on January 9, 1995, however the project was postponed until 1996 by the City due to funding concerns. It is our understanding that these funding concerns have been resolved and that the City and County would like to proceed with the CSAH 17 improvements for construction in 1996. Portland San Diego An Environmental Assessment Worksheet (EAW) was completed and approved in September, 1994 Seattle for the project. The preparation of the EAW was mandatory as a result of the nature and length of the project. The EAW did not identify any environmental issues that warranted the preparation of an Environmental Impact Statement or would result in a delay in the project construction. Two related projects have been completed to date. A surcharging embankment project was completed during 1994 to allow the roadway to be widened over an area of poor soils. A wetland mitigation project was completed this summer which provided for all of the wetland mitigation requirements for the project. The scope of the project has been expanded since the 1994 feasibility study was completed. At City and /or County staff s request, the following items of work have been included: • Concrete sidewalk along Park Road (City) • Concrete maintenance strip behind median curbs (County) • Sanitary sewer has been included south of Lake Susan Hills Drive (south) (City) • Reconstruction near Trunk Highway 5 intersection including signal modifications (County) • Construction staging has been modified to enable the project to be constructed under traffic. The 1994 feasibility study assumed that the roadway could be closed to traffic during construction however two other major roadway projects will be underway in the vicinity concurrently with this project making a closure of CSAH 17 unfeasible. (County, City) Mr. Charles Folch November 30, 1995 Page 2 The following amendments to the December 1994 feasibility study summarize the revised costs, funding and assessment methodologies for the project, incorporating the scope changes listed above and considering 1996 construction costs. PROJECT COSTS Costs to implement the County Road 17 Improvement Project fall into three primary categories. They are: A. Construction Costs B. Land Acquisition/Easement Costs C. Indirect Costs We will attempt to define these costs as'estimated for this project in the following sections: A. Construction Costs • Estimated Improvements Construction Cost Sanitary Sewer Improvements $ 53,000.00 Watermain Improvements $ 148,340.00 Storm Drainage Improvements $ 569,710.00 Roadway Improvements $ 2,081,075.00 Pathway Improvements $ 182,625.00 Streetlighting Improvements $ 250,000.00 Landscaping Improvements $ 125.000.00 Total Construction Cost $ 3,409,750.00 B. Land Acquisition/Easement Costs Additional land acquisition for roadway right -of -way is not anticipated for this project; however, storm drainage easements and temporary construction easements will be required in some areas for pond construction, storm sewer construction and embankment cuts and fills. Total Estimated Easement Cost $ 5,000.00 C. Indirect Costs The indirect costs for the project, consisting of engineering, planning, legal, fiscal, appraisal, consultant fees, City and County staff expenses, publication and meeting costs and other miscellaneous expenses for the total project are estimated to be 30 percent of the construction costs. Total Estimated Indirect Cost $ 1,022,925.00 ' TOTAL ESTIMATED PROJECT COST $ 4,437,675.00 Mr. Charles Folch November 30, 1995 Page 3 Assessments are proposed to be made to the commercial properties along the northern ' portion of the project area for watermain, storm drainage and roadway improvements. No special assessments are proposed for pathway, landscaping, or streetlighting improvements. This is consistent with the proposed assessment methodologies considered as a part of the ' 1992 feasibility study re- initiation for the project. No assessments are proposed for the residential properties along the middle portion of the project area. Trunk area assessments are proposed to be made to the residential properties along the southern portion of the project area for watermain and sanitary sewer. 1 The construction cost for this project as outlined in the Cooperative Agreement between Chanhassen ' and Carver County was estimated to be $3,120,000.00. The current estimated construction cost is $3,409,750.00 as shown above. It should be noted that the current total estimated cost includes watermain, sanitary sewer, construction staging, and additional pathway improvements which were 1 not included in the Cooperative Agreement cost estimate. Detailed costs estimates for the proposed improvements are attached. I PROJECT FUNDING ' The Project costs are proposed to be financed through a combination of special assessments and the funding arrangements identified in the joint powers agreement between the City and Carver County. The following table summarizes the estimated project costs for the various improvements and 1 provides a breakdown of the amounts to be financed through special assessments vs. the arrangements of the joint powers agreement. ' Assessable/Hookup City /County Total Improvement Costs Costs Costs Construction Costs Sanitary Sewer $40,950.00 $12,050.00 $53,000.00 Watermain $67,025.00 $81,315.00 $148,340.00 Storm Drainage $88,125.00 $481,585.00 $569,710.00 Roadway Improvements $883,200.00 $1,197,875.00 $2,081,075.00 Pathway Improvements $0.00 $182,625.00 $182,625.00 Streetlighting Improvements $0.00 $250,000.00 $250,000.00 Landscaping Improvements $0.00 $125.000.00 $125.000.00 Subtotals $1,079,300.00 $2,230,450.00 $3,409,750.00 ' Land Acquisition /Easement Costs $0.00 $5,000.00 $5,000.00 Indirect Costs (30 %) $323.790.00 $699.135.00 $1.022.925.00 ' Totals $1,403,040.00 $3,034,585.00 $4,437,675.00 Assessments are proposed to be made to the commercial properties along the northern ' portion of the project area for watermain, storm drainage and roadway improvements. No special assessments are proposed for pathway, landscaping, or streetlighting improvements. This is consistent with the proposed assessment methodologies considered as a part of the ' 1992 feasibility study re- initiation for the project. No assessments are proposed for the residential properties along the middle portion of the project area. Trunk area assessments are proposed to be made to the residential properties along the southern portion of the project area for watermain and sanitary sewer. 1 ' Mr. Charles Folch November 30, 1995 Page 4 ASSESSMENTS The proposed methods of assessment, areas to be assessed and amounts to be assessed have been determined though meetings with City staff. Assessment amounts are intended to be consistent with existing City assessment policies where applicable, or consistent with normally anticipated assessment rates experienced in similar projects. Methodology, rates, areas to be assessed, credits, etc., can be revised from those illustrated in this report at the discretion of the City Council. Preliminary assessment rolls for this project are attached based upon the assessment methodologies detailed below. Assessment Roll A details proposed assessments to the commercial properties along the northern portion of the project area. Assessment Roll B details proposed assessments to the residential properties along the southern portion of the project. ASSESSMENT METHODOLOGY SanitM Sewer Trunk area assessments are proposed for sanitary sewer to be constructed for residential properties along the southern portion of the roadway at the rate of $1,050.00 per residential equivalent unit (REU). One trunk unit assessment for each homesteaded property would be assessed with this project. Additional trunk charges will be collected at the time property subdivision occurs. At such time that service connection is made, these properties will be required to pay lateral connection charges at the current year's rate. These charges are reviewed and modified annually based upon construction cost indices. Watermain Those commercial properties for which watermain services are to be constructed and, therefore, benefitting from this improvement will be assessed for the total cost of the watermain service. Watermain services are being provided to two properties at the total cost of $17,420.00. This cost includes two 8 inch services and one 12 inch service with wet -taps, piping, gate valves and fittings. Assessments are, therefore, as follows: Assessable Cost = $17,420.00 = $5,806.67 /Service Total Services 3 Trunk area assessments are proposed for water main to be constructed for residential properties along the southern portion of the roadway at the rate of $1,375.00 per residential equivalent unit (REU). One trunk unit assessment for each homesteaded property would be assessed with this project. Additional trunk charges will be collected at the time property ' Mr. Charles Folch November 30, 1995 Page 5 subdivision occurs. At such time that service connection is made, these properties will be required to pay lateral connection charges at the current year's rate. These charges are reviewed and modified annually, based upon construction cost indices. Storm Drainage Consistent with current City policy, one -half ( /z) of the cost of the storm sewer is proposed to be assessed. Storm drainage assessments are only proposed for the commercial properties along the northern portion of the project area. Assessments are proposed against all areas contributing to the new storm sewer system based upon the contributing drainage area, where benefit from the improvement can be demonstrated. Based upon a total storm drainage cost of $229,125.00, the storm drainage assessable cost is $114,562.50. The storm drainage assessment rate is, therefore, as follows: Assessable Cost = $114.562.50 = $5,069.14 /Acre Drainage Area 22.6 Acres Roadway Improvements Commercial properties abutting County Road 17 along the northern portion of the project area are proposed to be assessed for roadway improvements on a front footage basis, where benefit from the improvement can be demonstrated. Based upon a total roadway assessable cost of $1,148,160.00, the roadway assessment rate is as follows: Assessable Cost = $1348360.00 = $245.18/FF Total Front Footage (FF) 4,683 FF In order for the project to further proceed, the City Council must accept these amendments to the feasibility study and hold a public hearing for the project. It is our understanding that the businesses along the north end of the project are to be assessed as proposed in 1994, but the residential properties along the southern portion of the project will not be assessed. If the City Council wishes to proceed with the project, the following is a tentative project schedule: Accept Feasibility Study Public Hearing and Authorize Preparation of Plans and Specification Approve Plans and Specifications (Carver County) Concur with Plans and Specification Approval (Chanhassen) Bid Opening Award Contract (Carver County) Concur with Contract Award (Chanhassen) Begin Construction December 11, 1995 January 8, 1996 February 20, 1996 February 26, 1996 March 26, 1996 April 2, 1996 April 8, 1996 May 6, 1996 Mr. Charles Folch November 30, 1995 Page 6 Since the roadway is designated as a State Aid route, we will be required to submit the plans and specifications to MnDOT State Aid for their review and approval. We propose to submit the plans and specifications for their review by January 22, 1996. Any delays in the State Aid review process could result in some delays in the project schedule. Please let me know if you have any questions or we can provide any additional information. Sincerely, BRW, INC. Greg . Brown, PE Project Engineer GSB Attachments cc: Bill Weckman/Carver County Jon Horn/BRW File 2396A10 a N oo w Ln r 00 C A o0 �D [� N M a\ N y O O tn M N N N tn .� CA y Q 69 v7 d Q _ _ O cn C r N 't O; N C O 0 v h E O vri eq 00 O N 00 > H d N N .+ ' 00 00 00 00 00 00 00 00 00 R M 69 N N N N N N N N 69 d C .. O 00 O, ccl E d [ a0 O M W O O O a n E I M O bq y d M N d cl C d O C 8 8 S 8 U O d c a"i W) kn tn kn tn b ° a S S M S S S S S g M o 0 o c o oN a oo v_ u E c d to o F � .G QO a CA w U � 3 o 3 d � � � o O kn h to to W N cz y c 1N V L O n N O S 0w0 M_ O O O N w T cd cd _U C y E o C o0 O O N c Q � C 3 � o v s - 0 0 p 00 0 o O y C cn M O S S S S C O 0. S g g � � o U N N N N N N N N C U ' � N H V � C � (L ti N+ O CZ M M •--' aE .� '�!' C .Y. i•• vi c a o o O O a G�. ° a a ° o CJ oa 3 b as 3 w ro m 3 cra 3 w d go b U a b o . 0 ~¢ X c N mix o Cd o Cd E cz Um o � ° :3 3 S o c o pC� p 5 b s b o b o o c O.N as O ..7 CL ..]a .7 U en UClac`n axd E- z ' m J O S Z W 2 U) U) ' W CD Q i 1 F- H Z W a � w y 0 O S C CL 3 S N N a > 0) o W o. J D W .0 0 7 y m0 a CU S LU d N 0C O cc a ' S E U w i �ar�3 Q,J c0 U) cn 0 0 0 0 0 0 0 O Lfi 0 LO � d N N N a _ N . 6 0 LO - C LU r :o r cli 6 r .E 69 fR Efl Efl E+9 EA FA J (C �ar�3 Q,J c0 U) cn p 0 0 0 p O O O C . C's LO LO Lo � C5 LO LO 0 LO r p C LU r :o r r r r r .E 69 fR Efl Efl E+9 EA FA J (C M p p O O O O O LO N N N N N N C C m � ~ O Ir y Iir y !T y T y I YY Co C W C 76 y O O 'm o O O '..''.m C O O O O O Cp O !m N p ' U) N y d p p. rn a y M to y 0 c0 y W c0 O O 0 O O O O Q a y V 6c) tO V 64 �ar�3 Q,J c0 U) cn c D O O O O O O O LO LO Lo LO C5 LO LO 0 LO r p C LU r :o r r r r r .E 69 fR Efl Efl E+9 EA FA M M CD v v U) v LO N N N N N N N m � O Ir y Iir y !T y T y I YY Co co co y O O 'm o O O '..''.m C O O O O O Cp O !m N p O ''m N O N y d p p. rn a y M to y 0 c0 y t� y c0 C o =a o- o o =a o =a o =a _ o -a o F- W ` L CV v co v N c6 :CV CO . N M : N ''. M Q 1 c D O r 0 0 I cc CC r p O N N � LO CO O M M M M M C ? C? C N N N N N N N O Ir y Iir y !T y T y ::r Y YY Co co co y O O 'm o O O '..''.m C O O O O O Cp O !m N p O ''m N O N y d p p. rn a N .y M to y 0 c0 y t� y c0 o a o =a o- o o =a o =a o =a _ o -a o F- a CO U . �C y O 0 E c C N c O a CU y co y m co (+ 7 U (0 y CU CL Y O O t Y C 7 a m rn cc c � U O � > 3 N (D cC O C �- O O a) O W W Q cc O C 0 y 6 L6 d O C' O —61 ti- T 1 1 1 1 1 1 1 1 1 1 1 1 1 1 COST ESTIMATE SANITARY SEWER Unit No. Item Unit Quanti Price Amount 1. 8" PVC SDR 35 LF 1,450 $20.00 $29,000.00 2. Standard Manhole EA 5 $1,500.00 $7,500.00 3. 4" DIP Forcemain LF 1,100 $15.00 $16,500.00 Construction Cost $53,000.00 30% Admin. Cost $15,900.00 Total Project Cost $68,900.00 ' No. Item ' 1. Connect to Existing Watermain 2. 18" DIP CL 52 Price 3. 12" DIP CL 52 ' 4. $500.00 8" DIP CL 52 LF 5. 6" DIP CL 52 $78,750.00 6. 8" Wet Tap $24.00 7. Hydrant w /Gate Valve 180 8. DIP Fittings LF 9. Abandon Existing 18" DIP $1,350.00 10. 12" Wet Tap $2,500.00 11. 8" Gate Valve 5 12. 12" Gate Valve ' 13. 18" Butterfly Valve 1 LF 400 $6.50 $2,600.00 EA 1 $3,500.00 $3,500.00 EA 6 $650.00 $3,900.00 EA 1 COST ESTIMATE WATERMAIN IMPROVEMENTS Unit Unit Quanti Price Amount EA 3 $500.00 $1,500.00 LF 2,250 $35.00 $78,750.00 LF 40 $24.00 $960.00 LF 180 $21.00 $3,780.00 LF 75 $18.00 $1,350.00 EA 2 $2,500.00 $5,000.00 EA 5 $1,800.00 $9,000.00 LB 10,000 $2.50 $25,000.00 LF 400 $6.50 $2,600.00 EA 1 $3,500.00 $3,500.00 EA 6 $650.00 $3,900.00 EA 1 $1,000.00 $1,000.00 EA 3 $4,000.00 $12,000.00 Construction Cost $148,340.00 30% Admin. Cost $44,502.00 Total Project Cost $192,842.00 COST ESTIMATE STORM DRAINAGE IMPROVEMENTS NORTHERN SYSTEM - ASSESSABLE COSTS Unit No. Item Unit Quanti Price Amount 1. Connect to Existing Storm Sewer EA 4 $1,000.00 $4,000.00 2. Remove Existing Pipe /Culvert LF 1,000 $10.00 $10,000.00 3. 12" RCP LF 1,425 $22.00 $31,350.00 4. 15" RCP LF 250 $24.00 $6,000.00 5. 18" RCP LF 296 $27.50 $8,140.00 6. 24" RCP LF 60 $34.00 $2,040.00 7. 30" RCP LF 942 $42.50 $40,035.00 8. 36" RCP LF 194 $52.50 $10,185.00 9. 15" RC Apron w/Trashguard EA 2 $750.00 $1,500.00 10. 24" RC Apron w /Trashguard EA 2 $1,500.00 $3,000.00 11. 36" RC Apron w/Trashguard EA 1 $3,000.00 $3,000.00 12. 58" RC -A Apron w /Trashguard EA 2 $5,500.00 $11,000.00 13. Construction CB(2'x3') EA 10 $1,000.00 $10,000.00 14. Construct MHCB (48 ") EA 15 $1,250.00 $18,750.00 15. Construct MHCB (60 ") EA 3 $1,750.00 $5,250.00 16. Construct MHCB (72 ") EA 1 $3,500.00 $3,500.00 17. 4" Perforated PVC Pipe Drain LF 400 $7.50 $3,000.00 18. Riprap Cy 50 $50.00 $2,500.00 19. Construct Skimmer EA 2 $1,500.00 $3,000.00 Construction Cost $176,250.00 30% Admin. Cost $52,875.00 Total Project Cost $229,125.00 COST ESTIMATE STORM DRAINAGE IMPROVEMENTS SOUTHERN SYSTEM - NONASSESSABLE COSTS Unit Item Unit Ouanti Price Amount Connect to Existing Storm Sewer EA 4 $1,000.00 $4,000.00 Remove Existing Pipe /Culvert LF 1,500 $10.00 $15,000.00 12" RCP LF 1,350 $22.00 $29,700.00 15" RCP LF 1,000 $24.00 $24,000.00 18" RCP LF 244 $27.50 $6,710.00 21" RCP LF 1,325 $30.00 $39,750.00 24" RCP LF 700 $34.00 $23,800.00 30" RCP LF 150 $42.50 $6,375.00 36" RCP LF 450 $52.50 $23,625.00 42" RCP LF 200 $100.00 $20,000.00 48" RCP LF 200 $125.00 $25,000.00 15" RC Apron w /Trashguard EA 2 $750.00 $1,500.00 18" RC Apron w /Trashguard EA 3 $1,000.00 $3,000.00 24" RC Apron w /Trashguard EA 7 $1,750.00 $12,250.00 30" RC Apron w/Trashguard EA 1 $2,500.00 $2,500.00 48" RC Apron w/Trashguard EA 1 $4,000.00 $4,000.00 Construct CB (2'x3') EA 9 $1,000.00 $9,000.00 Construct MHCB (48 ") EA 40 $1,250.00 $50,000.00 Construct MHCB (60 ") EA 3 $1,750.00 $5,250.00 Construct MHCB (72 ") EA 2 $2,500.00 $5,000.00 Construct MHCB (84 ") EA 3 $3,500.00 $10,500.00 Outlet Control Structure EA 3 $3,500.00 $10,500.00 4" Perforated PVC Pipe Drain LF 1,000 $7.50 $7,500.00 Random Riprap Cy 200 $50.00 $10,000.00 Erosion Control LF 1,500.00 $3.00 $4,500.00 Pond Construction LS 1 $40,000.00 $40,000.00 Construction Cost $393,460.00 30% Admin. Cost $118,038.00 Total Project Cost $511,498.00 COST ESTIMATE ROADWAY IMPROVEMENTS NORTHERN PORTION - ASSESSABLE COSTS I No. Item Unit Unit Ouanti Price Amount ' 1. Pavement Removal SY 24,000 $2.00 $48,000.00 2. Miscellaneous Removals LS 1 $5,000.00 $5,000.00 3. Curb and Gutter Removal LF 5,000 $2.50 $12,500.00 4. Clear and Grub TREE 6 $150.00 $900.00 5. Mobilization LS 1 $45,000.00 $45,000.00 6. Common Excavation CY 31,500 $2.00 $63,000.00 7. Subgrade Excavation CY 21,500 $2.00 $43,000.00 8. Select Granular Borrow CY 22,000 $5.00 $110,000.00 9. Bituminous Wear Course TON 2,700 $24.00 $64,800.00 10. Bituminous Binder Course TON 2,450 $22.00 $53,900.00 11. Bituminous Base Course TON 2,450 $20.00 $49,000.00 12. Bituminous Tack Coat GAL 2,200 $1.50 $3,300.00 Aggregate Base Class V TON 6,800 $8.00 $54,400.00 ' 13. 14. B624 Curb and Gutter LF 10,450 $8.00 $83,600.00 15. 3" Concrete Median SF 2,500 $2.00 $5,000.00 16. 3" Concrete Maintenance Strip SF 3,600 $2.25 $8,100.00 ' 17. 7" Concrete Driveway SF 1,200 $3.00 $3,600.00 18. Seeding AC 3.2 $750.00 $2,400.00 19. Sodding SY 10,200 $1.75 $17,850.00 ' 20. Traffic Control LS 1 $55,000.00 $55,000.00 21. Signing SF 325 $30.00 $9,750.00 22. Striping LF 8,200 $.25 $2,050.00 Erosion Control LF 6,000 $3.00 $18,000.00 ' 23. 24. Guardrail LF 300 $15.00 $4,500.00 25. Rigid Steel Conduit LF 500 $12.00 $6,000.00 73" RCP -Arch LF 100 $186.00 $1 8,600.00 ' 26. 27. 73" RCP Apron Install EA 2 $750.00 $1,500.00 28. 10'x9' Box Culvert LF 56 $350.00 $19,600.00 29. 10'x9' Box End Section Install EA 2 $1,750.00 $3,500.00 30. 58" RCP -Arch LF 130 $120.00 $15,600.00 31. 58" RCP Apron Install EA 4 $600.00 $2,400.00 32. Signal Modifications LS 1 $1,500.00 $15.000.00 ' Construction Cost $844,850.00 30% Admin. Cost $253,455.00 ' Total Project Cost $1,098,305.00 COST ESTIMATE ROADWAY IMPROVEMENTS SOUTHERN PORTION - NONASSESSABLE COSTS Unit Item Unit Ouanti Price Amount Pavement Removal SY 15,000 $2.00 $30,000.00 Miscellaneous Removals LS 1 $10,000.00 $10,000.00 Clear and Grub TREE 50 $150.00 $7,500.00 Mobilization LS 1 $60,000.00 $60,000.00 Common Excavation CY 13,400 $2.00 $26,800.00 Subgrade Excavation CY 33,400 $2.00 $66,800.00 Select Granular Borrow CY 48,350 $5.00 $241,750.00 Bituminous Wear Course TON 4,150 $24.00 $99,600.00 Bituminous Binder Course TON 4,150 $22.00 $91,300.00 Bituminous Base Course TON 4,150 $20.00 $83,000.00 Bituminous Tack Coat GAL 3,700 $1.50 $5,550.00 Aggregate Base Class V TON 15,700 $8.00 $125,600.00 B624 Curb and Gutter LF 19,350 $8.00 $154,800.00 4" Concrete Median SF 4,000 $2.00 $8,000.00 4" Concrete Maintenance Strip SF 5,400 $2.25 $12,150.00 7" Concrete Driveway SF 320 $3.00 $960.00 Seeding AC 13 $750.00 $9,750.00 Sodding SY 17,500 $1.75. $30,625.00 Traffic Control LS 1 $85,000.00 $85,000.00 Signing SF 550 $30.00 $16,500.00 Striping LF 15,000 $.25 $3,750.00 Erosion Control LF 9,000 $3.00 $27,000.00 Rigid Steel Conduit LF 120 $12.00 $1,440.00 Construction Cost $1,197,875.00 30% Admin. Cost $359,362.50 Total Project Cost $1,557,237.50 COST ESTIMATE ' ROADWAY IMPROVEMENTS LAKE DRIVE - ASSESSABLE COSTS Unit No. Item Unit Quanti Price Amount 1. Pavement Removal Sy 1,200 $2.00 $2,400.00 ' 2. Mobilization LS 1 $5,000.00 $5,000.00 3. Common Excavation Cy 1,400 $2.00 $2,800.00 4. Bituminous Wear Course TON 150 $24.00 $3,600.00 Bituminous Binder Course TON 150 $22.00 $3,300.00 ' 5. 6. Bituminous Base Course TON 200 $20.00 $4,000.00 7. Bituminous Tack Coat GAL 150 $1.50 $225.00 Aggregate Base Class V TON 500 $8.00 $4,000.00 ' 8. 9. B624 Curb and Gutter LF 900 $6.00 $5,400.00 10. Seeding AC 0.5 $750.00 $375.00 Sodding Sy 1,000 $1.75 $1,750.00 ' 11. 12. Traffic Control LS 1 $500.00 $500.00 13. Signing SF 50 $30.00 $1,500.00 Striping LF 2,000 $.25 $500.00 ' 14. 15. Erosion Control LF 1,000 $3.00 $3,000.00 ' Construction Cost $38,350.00 30% Admin. Cost $11,505.00 Total Project Cost $49,855.00 COST ESTIMATE PATHWAY IMPROVEMENTS Unit Unit Quanti Price SF No. Item ' 1. Bituminous Walk (8' wide) TON 2. Concrete Walk (6' wide) ' 3. Aggregate Base Class V LS 4. Sodding SF 5. Retaining Wall with Railing ' 6. Modular Block Retaining Wall 30% Admin. Cost Total Project Cost COST ESTIMATE PATHWAY IMPROVEMENTS Unit Unit Quanti Price SF 135,000 $0.50 SF 25,000 $2.00 TON 4,500 $8.00 Sy 2,500 $1.75 LS 1 $7,500.00 SF 1,150 $15.00 Construction Cost 30% Admin. Cost Total Project Cost Amount $67,500.00 $50,000.00 $36,000.00 $4,375.00 $7,500.00 $17,250.00 $182,625.00 $54.787.50 $237,412.50 COST ESTIMATE STREET LIGHTING Unit No. Item Unit Quanti Price Amount I . Lighting Standards EA 70 $2,800.00 $196,000.00 2. Service Panel EA 3 $3,000.00 $9,000.00 3. Wiring LF 50,000 $0.90 $45,000.00 Construction Cost $250,000.00 30% Admin. Cost $75,000.00 Total Project Cost $325,000.00 COST ESTIMATE LANDSCAPING Unit No. Item Unit Ouanti Price Amount 1. Summit Ash TREE 33 $300.00 $9,900.00 2. Norway Maple TREE 34 $300.00 $10,200.00 3. Purple Ash TREE 48 $300.00 $14,400.00 4. Red Oak TREE 35 $350.00 $12,250.00 5. Hackberry TREE 39 $300.00 $11,700.00 6. Black Hills Spruce TREE 20 $250.00 $5,000.00 7. Balsam Fir TREE 31 $250.00 $7,750.00 8. Austrian Pine TREE 6 $250.00 $1,500.00 9. Amur Maple TREE 35 $300.00 $10,500.00 10. Japanese Tree Lilac TREE 20 $350.00 $7,000.00 11. Profusion Crab TREE 34 $300.00 $10,200.00 12. Snow Crab TREE 38 $300.00 $11,400.00 13. Red Splendor Crab TREE 24 $300.00 $7,200.00 14. Red Bud TREE 20 $300.00 $6,000.00 Construction Cost $125,000.00 30% Admin. Cost $37.500.00 Total Project Cost $162,500.00