1e. Lift Station 11: Approve Quote0
CITY OF
CHANNASSEN
7700 Market Boulevard
PO Box 147
Chanhassen, MN 55317
Administration
Phone: 952.227.1100
Fax: 952.227.1110
Building Inspections
Phone: 952.227.1180
Fax: 952.227.1190
Engineering
Phone: 952.227.1160
Fax: 952.227,1170
Finance
Phone: 952.227.1140
Fax: 952.2271110
Park & Recreation
Phone: 952.227.1120
Fax: 952.227.1110
Recreation Center
2310 Coulter Boulevard
Phone: 952.227.1400
Fax: 952.227.1404
Planning &
Natural Resources
Phone: 952.227.1130
Fax: 952.227.1110
Public Works
1591 Park Road
Phone: 952.227.1300
Fax: 952.227.1310
Senior Center
Phone: 952.227.1125
Fax: 952.227.1110
Web Site
wwad.chanhassen.mn.us
MEMORANDUM
TO: Todd Gerhardt, City Manager
FROM: Paul Oehme, Director of Public Works /City Engineer
1
DATE: June 13, 2011 Q
� C?
SUBJ: Lift Station No. 11: Approve Quote for Electrical Panel and Pumps`
PROPOSED MOTION
"The City Council approves quote in the amount of $25,035.00 to Quality Flow
Systems, Inc. for pumps, electrical equipment and installation of equipment at
Lift Station # 11."
City Council approval requires a simple majority vote of the City Council
present.
BACKGROUND
Annually, the City considers replacement of equipment for lift stations that are
old, unreliable or of in need of upgrades. These replacements are designed to
make the sanitary lift station network more reliable and reduce the likelihood of
emergency calls and the potential for sewer backups. Currently, the City
maintains 31 lift stations in the system\ The repairs for the lift station were
generally identified in the 2008 Sanitary Sewer Comprehensive Plan and have
recently been refined based on recent identified needs in the system.
DISCUSSION
This year's proposed improvement is to replace the electrical panel at Lift Station
#11. Lift Station #I I is located on Utica Lane next to Lake Ann. Staff had
planned to replace the electrical panel at Lift Station #10 as well this year
however after reviewing the needs of this station, more electrical and piping work
is necessary than what was budgeted for. It is proposed to delay the work on Lift
Station #10 until 2012. Lift Station #1 i electrical panel is 12 years old, however,
the electrical components are in need of replacement so the controls can better
communicate with the SCADA system and replacement of level transducers are
needed at this time. Lift station #11's controls are unable to transmit the station's
wet well level to the supervisory control system. This information is critical in
power outages to determine which of the 31 stations needs to be generated and
pumped down to avoid sanitary sewer over flows. This information enables City
utility staff to generate stations only when needed rather that just dedicating one
generator full time.to the station. This mode of operation allows generators to
g:\eng \publict JgJdJ 1sp " W?Aay-y &"fffldomorrow
Todd Gerhardt
Lift Station No. 11: Approve Quote
June 13, 2011
Page 2
cover more area with less equipment, and more efficiently during power outages. The upgraded
controls also allow a utility operator access to historical pumping and level trend data at the
station to aid in trouble shooting. The proposed panels are of standard city specification,
constructed of stainless steel for low maintenance, and contain parts interchangeable with the
majority of Chanhassen's lift stations.
Staff has received two quotes for this work as follows:
Funding for the replacement of the electrical panel and pumps was budgeted for in the 2012
Capital Improvement Plan SS -017.
Attachment: 1. CIP sheet
2. Resolution
Kevin Crooks, Utility Superintendent
gAeng \public \pw055 - lift stations (general) \bkg Is annual rehabs -lsl l pump.doc
Pumps and Electrical Panel
Quality Flow Systems,
Inc.
USEMCO
Lift Station #11:
$25,035.00
$43,940.00
Funding for the replacement of the electrical panel and pumps was budgeted for in the 2012
Capital Improvement Plan SS -017.
Attachment: 1. CIP sheet
2. Resolution
Kevin Crooks, Utility Superintendent
gAeng \public \pw055 - lift stations (general) \bkg Is annual rehabs -lsl l pump.doc
Capital Improvement �T
P 2011 thru 2015 Department Sanitary Sewer Improvements
1Y1
City of Chanhassen, 1�1 Contact Paul Oehme
Project # SS-017 Type Improvement
Useful Life Unassigned
Project Name Sanitary Lift Station Rehabilitation Program Category Utilities
Account #1 701 - 7025 -4751 Account #3 Priority n/a
Account #2 Account #4
Description Total Project Cost: $585,000
The sanitary lift station rehabilitation program is designed to minimize sewer backups and emergency calls due to failed lift station equipment. The
City currently maintains 31 lift stations. Many of these lift stations-are high service pumps and need frequent servicing. The program will service
or replace pumps, pipe gallery, and electrical components as needed. The proposed lift stations scheduled for improvements over the next 5 years
are as follows:
2011 - #10 and #11
2012 - # 16 and #21
2013 - #1, #22 and #25
2014 - #23
2015 - #17
J
Reduce emergency calls and potential sewer backups.
Prior Expenditures
300,000 1 Maintenance
Total
Prior Funding Sources
300,000 i Sewer Utility Fund
Total
Budget Impact/Other .
2011 2012 2013 2014 2015 Total
90,000 50,000 65,000 40,000 40,000 285,000
Total 90,000 50,000 65,000 40,000 40,000 285,000
2011 2012 2013 2014 2015 Total
90,000 50,000 65,000 40,000 40,000 285,000
Total 90,000 50,000 65,000 40,000 40,000 285,000
101
CITY OF CHANHASSEN
CARVER AND HENNEPIN COUNTIES, MINNESOTA
DATE: June 13, 2011 RESOLUTION NO: 2011-
MOTION BY: SECONDED BY:
A RESOLUTION APPROVING A QUOTE FOR
LIFT STATION #11 REHABILITATION
PW055K1
WHEREAS, quotes were received for the Lift Station #11 Rehabilitation Project; and
WHEREAS, it appears the quote from Quality Flow Systems, Inc. in the amount of
$25,035.00 is the lowest responsible quote.
NOW THEREFORE, BE IT RESOLVED by the Chanhassen City Council:
1. The mayor and clerk are hereby authorized and directed to approve the quote from Quality
Flow Systems, Inc. in the amount of $25,035.00 for the Lift Station #11 Rehabilitation
project (PW055K1).
Passed and adopted by the Chanhassen City Council this 13 day of June, 2011.