2d. Approve Revised Development Contract Form1 1 1 MEMORANDUM n J i � I J 1 arc. CITY OF CHANHASSEN 690 COULTER DRIVE • P.O. BOX 147 • CHANHASSEN, MINNESOTA 55317 (612) 937 -1900 • FAX (612) 937 -5739 TO: Charles Folch, City Engineer FROM: Dave Hempel, Assistant City Engineer 1 DATE: March 23, 1994 SUBJ: Approve Revised Development Contract Form File No. PW -132 Action by City Administrator Endorsed M o d if icd Rejecter Dsl - q Date Submitted to COmm Date "Rt'b -''.ted to COMA 3 Z. c �h Over the years as the City has used this format on numerous developer - installed improvement projects, a number of refinements and changes were deemed appropriate. We have asked the City Attorney's office to revise the development contract form accordingly. The proposed additions to the development contract are shown in shaded with the deletions of the existing development contract language shown by a line crossed through it (strikeout). Staff recommends that these modifications be approved accordingly by the City Council ktm Attachment: Revised Development Contract form dated 3122/94. g: \eng \dave \cc\dev cont OFFICIAL ENGINEERING COPY Received Revision No. Approved b ity Engineer Oat 1 CITY OF CHANHASSEN DEVELOPMENT CONTRACT (Developer Installed Improvements) SPECIAL PROVISIONS AGREEMENT dated , 19 , by and between the CITY OF CHANHASSEN, a Minnesota municipal corporation (the "City "), and (the "Developer "). 1. Request for Plat Approval. The Developer has asked the City to approve a plat for (referred to in this Contract as the "plat "). The land is legally described on the attached Exhibit "A ". ' 2. Conditions of Plat Approval. The City hereby approves the plat on condition that the Developer enter into this Contract ' and furnish the security required by it. 3. Development Plans. The plat shall be developed in accordance with the following plans. The plans shall not be ' attached to this Contract. With the exception of Plan A, the plans may be prepared, subject to City approval, after entering the Contract, but before commencement of any work in the plat. If the plans vary from the written terms of this Contract, the written terms shall control. The plans are: Plan A - -Plat dated 19 prepared by and approved by the Chanhassen City Council on 19 ' Plan B -- Grading, Drainage and Erosion Control Plan dated 19 , prepared by Plan C- -Plans and Specifications for Improvements dated 19 , prepared by Revised 3/22/99 SP -1 ATTACHMENT 1 1 Plan D -- Plan E -- 4. Improvements. The Developer shall install and pay for the following: A. Sanitary Sewer System B. Water System C. Storm Water Drainage System D. Streets E. Concrete Curb and Gutter F. Street Signs G. Street Lights H. Site Grading I. Underground Utilities (e.g. gas, electric, telephone, CATV) J. Setting of Lot and Block Monuments K. Surveying and Staking L. M. S. Time of Performance. The Developer shall install all required improvements by November 15, 19 The Developer may, however, request an extension of time from the City. If an extension is granted, it shall be conditioned upon updating the security posted by the Developer to reflect cost increases and the extended completion date. 6. security. To guarantee compliance with the terms of this Contract, payment of special assessments, payment of the costs of all public improvements, and construction of all public improvements, the Developer shall furnish the City with a letter of credit from a bank, cash escrow, or equivalent ( "security ") for $ The amount of the security was calculated as 1100 of the following: Sanitary sewer . . . . . . . . . . . . . $ Watermain . . . . . . . . . . . . . . . . $ SP -2 L i fl ' days prior to the expiration of the security, the City may also draw it down. If the security is drawn down, the draw shall be used to cure the default. With City approval, the security On -site storm sewer . . . . . . . . . . . $ reduced from time to time as financial obligations are paid, Streets . . . . . . . . . . . . . . . . . $ ' 10% of Street lights and signs . . . . . . . . . $ all improvements are complete and Erosion control $ Engineering, surveying, and inspection $ ' Landscaping . . . . . . . . . . . . . $ notices to the Developer shall be in Iron Monuments . . . . . . . . . . . . . $ TOTAL COST OF PUBLIC IMPROVEMENTS . . . . $ This breakdown is for historical reference; it is not a restriction ' on the use of the security. The security shall be subject to the approval of the City. The security shall be for a term ending December 31, 19 The City may draw down the security, without ' notice, for any violation of the terms of this Contract. If the required public improvements are not completed at least thirty (30) ' days prior to the expiration of the security, the City may also draw it down. If the security is drawn down, the draw shall be ' writing, and shall be either hand delivered to the Developer, its employees or agents, or mailed to the Developer by registered mail ' at the following address: Notices to the City shall be in writing and shall be either hand ' delivered to the City Manager, or mailed to the City by registered mail in care of the City Manager at the following address: Chanhassen City Hall, 690 Coulter Drive, P.O. Box 147, Chanhassen, Minnesota 55317, Telephone (612) 937 -1900. SP -3 used to cure the default. With City approval, the security may be reduced from time to time as financial obligations are paid, but in no case shall the security be reduced to a point less than 10% of the original amount until all improvements are complete and accepted by the City. 7. Notice. Required notices to the Developer shall be in ' writing, and shall be either hand delivered to the Developer, its employees or agents, or mailed to the Developer by registered mail ' at the following address: Notices to the City shall be in writing and shall be either hand ' delivered to the City Manager, or mailed to the City by registered mail in care of the City Manager at the following address: Chanhassen City Hall, 690 Coulter Drive, P.O. Box 147, Chanhassen, Minnesota 55317, Telephone (612) 937 -1900. SP -3 8. other Special Conditions. (This section to include conditions of approval from the plat review and plan and specification review process). 9. General Conditions. The general conditions of this Contract, approved by the City Council on February 22, 198&WAP ' W,�j�, are attached as Exhibit "B" and incorporated herein. SP -4 I� ' ( SEAL) CITY OF CHANHASSEN BY: Donald J. Chmiel, Mayor AND: Don Ashworth, City Manager DEVELOPER: BY: Its ' STATE OF MINNESOTA ) ( ss. COUNTY OF CARVER ) The foregoing instrument was acknowledged before me this day of , 19 , by Donald J. Chmiel, Mayor, and by Don Ashworth, City Manager, of the City of Chanhassen, a Minnesota ' municipal corporation, on behalf of the corporation and pursuant to the authority granted by its City Council. ' NOTARY PUBLIC ' STATE OF MINNESOTA ) ( ss. COUNTY OF ) The foregoing instrument was acknowledged before me this day of 19 , by NOTARY PUBLIC ' DRAFTED BY: Campbell, Knutson, Scott & Fuchs, P.A. 317 Eagandale Office Center 1380 Corporate Center Curve Eagan, Minnesota 55121 (612) 452 -5000 SP -5 EXHIBIT "A" I LEGAL DESCRIPTION OF SUBJECT PROPERTY: I 1 SP -6 1 STATE OF MINNESOTA ) ' ( ss. COUNTY OF ) The foregoing instrument was acknowledged before me this day of 19 , NOTARY PUBLIC DRAFTED BY: Campbell, Knutson, Scott & Fuchs, P.A. 317 Eagandale Office Center 1380 Corporate Center Curve Eagan, Minnesota 55121 ' (612) 452 -5000 SP -7 CONSENT ' fee owners of which is of all or part of governed by the the subject property, the development foregoing Development Contract, affirm and consent to the provisions thereof and agree to be bound by the provisions as the same may apply to that portion of the subject property owned by them. Dated this day of , 19 STATE OF MINNESOTA ) ' ( ss. COUNTY OF ) The foregoing instrument was acknowledged before me this day of 19 , NOTARY PUBLIC DRAFTED BY: Campbell, Knutson, Scott & Fuchs, P.A. 317 Eagandale Office Center 1380 Corporate Center Curve Eagan, Minnesota 55121 ' (612) 452 -5000 SP -7 1 CITY OF CHANHASSEN DEVELOPMENT CONTRACT (Developer Installed Improvements) EXHIBIT "B" ' 1. Right to Proceed. Within the plat or land to be platted, the Developer may not grade or otherwise disturb the earth, remove , trees, construct sewer lines, water lines, streets, utilities, public or private improvements, or any buildings until all the ' following conditions have been satisfied: 1) this agreement has been fully executed by both parties and filed with the City Clerk, ' 2) the necessary security and fees have been received by the City, 3) the plat has been recorded with the County Recorder's Office of the County where the plat is located, and 4) the City Engineer has issued a letter that the foregoing conditions have been satisfied and then the Developer may proceed. 1 2. Phased Development. If the plat is a phase of a multi- phased preliminary plat, the City may refuse to approve final plats , of subsequent phases if the Developer has breached this Contract and the breach has not been remedied. Development of subsequent phases may not proceed until Development Contracts for such phases are approved by the City. ' 3. Effect of Subdivision Approval. For two (2) years from ' the date of this Contract, no amendments to the City's Comprehensive Plan, except an amendment placing the plat in the ' current urban service area, or official controls shall apply to or affect the use, development density, lot size, lot layout or , dedications of the approved plat unless required by state or federal law or agreed to in writing by the City and the Developer. Thereafter, notwithstanding anything in this Contract to the ' contrary, to the full extent permitted by state law the City may require compliance with any amendments to the City's Comprehensive Plan, official controls, platting or dedication requirements enacted after the date of this Contract. ' GC -1 t 4. Improvements. The improvements specified in the Special Provisions of this Contract shall be installed in accordance with City standards, ordinances, and plans and specifications which have been prepared and signed by a competent registered professional engineer furnished to the City and approved by the City Engineer. ' The Developer shall obtain all necessary permits from the Metropolitan Waste Control Commission and other agencies before ' proceeding with construction. The City will, at the Developer's expense, have one or more construction inspectors and a soil engineer inspect the work on a full or part -time basis. r he Developer shall instruct its 'q; �§'���engineerW' j j , to respond to questions from the City Inspectors) and to make periodic site visits to satisfy that the construction is being performed to an acceptable ' level of quality in accordance with the engineer's design. The Developer or his engineer shall schedule a preconstruction meeting at a mutually agreeable time at the City Council chambers with all parties concerned, including the City staff, to review the program for the construction work. Within sixty (60) days after the completion of the improvements and before the security is released, the Developer shall supply the City with the following: (1) a complete set of reproducible Mylar as -built plans, (2) two complete sets of blue line as -built plans, (3) two complete sets of utility tie sheets, (4) location of buried fabric used for soil stabilization, (5) location stationing and swing ties of all utility stubs, '''(6) bench mark network, ' S. Iron Monuments. Before the security for the completion of utilities is released, all monuments must be correctly placed in ' the ground in accordance with Minn. Stat. § 505.02, Subd. 1. The Developer's surveyor shall submit a written notice to the City certifying that the monuments have been installed. GC -2 I- 6. License. The Developer hereby grants the City, its agents, employees, officers and contractors a license to enter the plat to perform all work and inspections deemed appropriate by the City in conjunction with plat development. 7. Site Erosion Control. Before the site is rough graded, and before any utility construction is commenced or building permits are issued, the erosion control plan, Plan B, shall be implemented, inspected, and approved by the City. The City may impose additional erosion control requirements if they would be beneficial. All areas disturbed by the excavation and backfilling operations shall be reseeded forthwith after the completion of the work in that area. Except as otherwise provided in the erosion control plan, seed shall be certified seed to provide a temporary ground cover as rapidly as possible. All seeded areas shall be fertilized, mulched, and disc anchored as necessary for seed retention. The parties recognize that time is of the essence in controlling erosion. If the Developer does not comply with the erosion control plan and schedule of supplementary instructions received from the City, the City may take such action as it deems appropriate to control erosion at the Developer's expense. The City will endeavor to notify the Developer in advance of any proposed action, but failure of the City to do so will not affect the Developer's and City's rights or obligations hereunder. No development will be allowed and no building permits will be issued unless the plat is in full compliance with the erosion control requirements. Erosion control needs to be maintained until vegetative cover has been restored, even if construction has been completed and accepted. After the site has been stabilized to where, in the opinion of the City, there is no longer a need for erosion control, the City will authorize the removal of the erosion control, i.e. hay bales and silt fence. The Developer shall remove and dispose of the erosion control measures. S. Clean up. The Developer shall maintain a neat and orderly work site and shall daily clean, on and off site, dirt and debris, including blowables, from streets and the surrounding area GC -3 r �I i L I II 1 u �Ll- that has resulted from construction work by the Developer, its agents or assigns. 9. Acceptance and ownership of Improvements. Upon completion and acceptance by the City of the work and construction required by this Contract, the improvements lying within public easements shall become City property. After completion of the improvements, a representative of the contractor, and a representative of the Developer's engineer will make a final inspection of the work with the City Engineer. Before the City accepts the improvements, the City Engineer shall be satisfied that all work is satisfactorily completed in accordance with the approved plans and specifications and the Developer and his engineer shall submit a written statement attesting to same with appropriate contractor waivers. Final acceptance of the public improvements shall be by City Council resolution. 10. Claims. In the event that the City receives claims from laborers, materialmen, or others that work required by this Contract has been performed, the sums due them have not been paid, and the laborers, materialmen, or others are seeking payment out of the financial guarantees posted with the City, and if the claims are not resolved at least ninety (90) days before the security required by this Contract will expire, the Developer hereby authorizes the City to commence an Interpleader action pursuant to Rule 22, Minnesota Rules of Civil Procedure for the District Courts, to draw upon the letters of credit in an amount up to 125% of the claim(s) and deposit the funds in compliance with the Rule, and upon such deposit, the Developer shall release, discharge, and dismiss the City from any further proceedings as it pertains to the letters of credit deposited with the District Court, except that the Court shall retain jurisdiction to determine attorneys' fees. 11. Park and Trail Dedication. Prier to issuance of building permits for residential constructio the rat the Developer, its successors or assigns, shall pay to the City the park and trail dedication fees then in force pursuant GC -4 ; t o �C! Chanhasseenn C Cit C� y 6 Ordinances and City Coun resolutions. mm 12. Landscaping. Unless the lot already has one tree in the front yard of suitable species, the Developer or lot purchaser shall plant a tree in the front yard of every lot in the plat. Suitable trees include: Maples Ash Linden Bassweed Green Ash Birch ff&fteoj'�/ocust Ginkgo) Hackberry Kentucky Coffee Tree Oak WH IA111 Other species of trees may be approved by the building inspector. Trees which can cause a public nuisance, such as cotton producing trees, or can be a public hazard, such as bug infestation or weak bark, are prohibited. The minimum tree size shall be two and one -half (2z) inches caliper, either bare root in season, or balled and burlapped. The trees may not be planted in the boulevard (area between curb and property line). In addition to any sod required as a part of the erosion control plan, Plan B, the Developer or lot purchaser shall sod the boulevard area and all drainage ways on each lot utilizing a minimum of four (4) inches of topsoil as a base. Seed or sod shall also be placed on all disturbed areas of the lot. If these improvements are not in place at the time a certificate of occupancy is requested, a financial guarantee in the form of cash or letter of credit shall be provided to the City. GC -5 r After satisfactory inspection, the financial guarantee shall be returned. he City has r established the financial guarantee at $1, 999. 0 "NNW "'; however, this may be increased annually based upon cost. These requirements supplement, but do not replace, specific landscaping conditions that may have been required by the City Council for project approval. 13. warranty. The Developer warrants all work required to be performed by it against poor material and faulty workmanship for a period of two (2) years after its completion and acceptance by the t City. All trees, grass, and sod shall be warranted to be alive, of good quality, and disease free at the time of planting. All tee� �4, shall be warranted for twelve 12 months from the time of planting. The Developer or his contractors) ' shall post a letter of credit or other security acceptable to the City to secure the warranties at the time of final acceptance. 14. Lot Plans. Prior to the issuance of building permits, an acceptable Grading, Drainage, Erosion Control, and Tree Removal ' Plan shall be submitted for each lot as required in the Special Provisions, for review and approval by the City Engineer. Each plan shall assure that drainage is maintained away from buildings and that tree removal is consistent with City Ordinance. 15. Existing Assessments. Any existing assessments against ' the plat will be re- spread against the plat in accordance with City standards. I GC -6 1 16. Street Lighting. The Developer shall have installed and pay for street lights in accordance with City standards. A plan shall be submitted for the City Engineer's approval prior to the installation. Before the City signs the final plat, the Developer shall pay the City a fee of $200.00 for each street light installed in the plat. The fee shall be used by the City for furnishing ' electricity for each light for twenty (20) months. 17. Street Signs ff All street name' -rre& traffic signs required by the City as a part of the public improvements shall be furnished and installed by the City at the sole expense of the Developer. 18. House Pads. The Developer shall promptly furnish the City "as- built" plans indicating the amount, type and limits of fill on any house pad location. 19. Responsibility for Costs. A. The Developer shall pay an administrative fee in 1 conjunction with the installation of the plat improvements. This fee is to cover the cost of City Staff time and overhead for items such as review of construction documents, preparation of the Development Contract, monitoring construction progress, processing pay requests, processing security reductions, and final acceptance of improvements. This fee does not cover the City's cost for resident construction inspections. The fee shall be shall be calculated as follows: i) if the cost of the construction of public improvements is less than $500,000, three percent (3%) of construction costs; ii) if the cost of the construction of public improvements is between $500,000 and $1,000,000, three percent (3 %) of construction costs for the first $500,000 and two percent (2 %) of construction costs over $500,000; .YiGQll iii) if the cost of the construction of public improvements. over $1,000,000, two and one-half percent (2k%) of construction costs for the first $1,000,000 and one and one -half percent (1;%) of construction costs over $1,000,000. Before the City signs the final plat, the Developer shall deposit with the City a fee based upon construction estimates. After construction is completed, the final fee shall be determined based i upon actual construction costs. The cost of public improvements is defined in paragraph 6 of the Special Provisions. B. In addition to the administrative fee, the Developer ' shall reimburse the City for all out -of- pocket costs incurred by the City for providing resident construction inspections. This ' cost will be periodically billed directly to the Developer based on the actual progress of the construction. Payment shall be due in accordance with Article 17E of this Agreement. C. The Developer shall hold the City and its officers I and employees harmless from claims made by itself and third parties for damages sustained or costs incurred resulting from plat approval and development. The Developer shall indemnify the City and its officers and employees for all costs, damages, or expenses which the City may pay or incur in consequence of such claims, including attorneys' fees. D. In addition to the administrative fee, the Developer shall reimburse the City for costs incurred in the enforcement of this Contract, including engineering and attorneys' fees. I E. The Developer shall pay in full all bills submitted to it by the City for obligations incurred under this Contract within thirty (30) days after receipt. If the bills are not paid on time, the City may halt all plat development work and construction, including but not limited to the issuance of building permits for lots which the Developer may or may not have sold, 11 GC -8 until the bills are paid in full. Bills not paid within thirty (30) days shall accrue interest at the rate of at per year. F. In addition to the charges and special assessments referred to herein, other charges and special assessments may be imposed such as, but not limited to, sewer availability charges ( "SAC "), City water connection charges, City sewer connection charges, and building permit fees. � r iU/ r U /O/ r ✓/ of rr� 20. Developer's Default. In the event of default by the Developer as to any of the work to be performed by it hereunder, the City may, at its option, perform the work and the Developer shall promptly reimburse the City for any expense incurred by the City, provided the Developer is first given notice of the work in default, not less than four (4) days in advance. This Contract is a license for the City to act, and it shall not be necessary for the City to seek a Court order for permission to enter the land. When the City does any such work, the City may, in addition to its other remedies, assess the cost in whole or in part. 21. Miscellaneous. A. Construction Trailers Placement of on -site construction trailers and temporary job site offices shall be approved by the City Engineer as a part of the pre - construction meeting for installation of public improvements. Trailers shall be removed from the subject property within thirty (30) days following the acceptance of the public improvements unless otherwise approved by the City Engineer. Celi=� 1 B. Postal Service The Developer shall provide for the maintenance of postal service in accordance with the local Postmaster's request. C. Third Parties Third parties shall have no recourse 1 against the City under this Contract. D. Breach of Contract Breach of the terms of this t Contract by the Developer shall be grounds for denial of building permits, including lots sold to third parties. E. Severabilit . If an portion, sect' v y p ion, subsection, sentence, clause, paragraph, or phrase of this Contract is for any reason held invalid, such decision shall not affect the validity of the remaining portion of this Contract. F. Building Permits Building permits will not be issued fer eenstrueting hemes in the plat until sanitary sewer, watermain, and storm sewer have been installed, tested, and accepted by the City, and the streets needed for access have been paved with a bituminous surface. IH 1 G. Waivers /Amendments The action or inaction of the City shall not constitute a waiver or amendment to the provisions of this Contract. To be binding, amendments or waivers shall be in writing, signed by the parties and approved by written resolution of the City Council. The City's failure to promptly take legal action to enforce this Contract shall not be a waiver or release. H. Release This Contract shall run with the land and may be recorded against the title to the property . After the Developer has completed the work required of it under this Contract, at the Developer's request the City Manager will issue a Certificate of Compliance. Prior to the issuance of such a certificate, individual lot owners may make as written request for a certificate applicable to an individual lot allowing a minimum of ten (10) days for processing. GC -10 I. Insurance Developer shall take out and maintain until six (6) months after the City has accepted the public improvements, public liability and property damage insurance covering personal injury, including death, and claims for property damage which may arise out of Developer's work or the work of its subcontractors or by one directly or indirectly employed by any of them. Limits for bodily injury and death shall be not less than $500,000 for one person and $1,000,000 for each occurrence; limits for property damage shall be not less than $2G8,eGG ,� for each occurrence; or a combination single limit policy of $1,000,000 or more. The City shall be named as an additional insured on the policy, and the Developer shall file with the City a certificate evidencing coverage prior to the City signing the plat. The certificate shall provide that the City must be given ten (10) days advance written notice of the cancellation of the insurance. The certificate may not contain any disclaimer for failure to give the required notice. J. Remedies Each right, power or remedy herein conferred upon the City is cumulative and in addition to every other right, power or remedy, expressed or implied, now or hereafter arising, available to City, at law or in equity, or under any other agreement, and each and every right, power and remedy herein set forth or otherwise so existing may be exercised from time to time as often and in such order as may be deemed expedient by the City and shall not be a waiver of the right to exercise at any time thereafter any other right, power or remedy. K. Assignability The Developer may not assign this Contract without the written permission of the City Council. The Developer's obligation hereunder shall continue in full force and effect even if the Developer sells one or more lots, the entire plat, or any part of it. L. Construction Hours The normal construction hours under this contract shall be from 7:00 a.m. to 7:00 p.m. on weekdays, from 9:00 a.m. to 5:00 p.m. on Saturdays with no such GC -11 1 activity allowed on Sundays or any recognized legal holidays. Operation of all internal combustion engines used for construction or dewatering purposes beyond the normal working hours will require City Council approval. Under emergency conditions, this limitation may be waived by the consent of the City Engineer. Any approved work performed after dark shall be adequately illuminated. M. Access All access to the plat prior to the City accepting the roadway improvements shall be the responsibility of the Developer regardless if the City has issued building permits or occupancy permits for lots within the plat. I N. Street Maintenance The Developer shall be responsible for all street maintenance until streets within the s :_. _ __ p are accepted by the City. Warning signs shall be placed by the Developer when hazards develop in streets to prevent the public from traveling on same and directing attention to detours. If streets become impassable, the City may order that such streets shall be barricaded and closed. The Developer shall maintain a smooth roadway surface and provide proper surface drainage. The Developer may request, in writing, that the City plow snow on the streets prior to final acceptance of the streets. The City shall have complete discretion to approve or reject the ' request. The City shall not be responsible for reshaping or damage to the street base or utilities because of snow plowing operations. ' The provision of City snow plowing service does not constitute final acceptance of the streets by the City. GC -12 6P. Soil Treatment Systems If soil treatment systems are required, the Developer shall clearly identify in the field and protect from alteration, unless suitable alternative sites are first provided, the two soil treatment sites identified during the platting process for each lot. This shall be done prior to the ' issuance of a Grading Permit. Any violation /disturbance of these sites shall render them as unacceptable and replacement sites will need to be located for each violated site in order to obtain a building permit. . variances By approving the plat, the Developer represents that all lots in the plat are buildable without the need ' for variances from the City's ordinances. Compliance with Laws Ordinances and Re ' @�• P Re g u lations . In the development of the plat the Developer shall comply with all laws, ordinances, and regulations of the following authorities: 1. City of Chanhassen; I 2. State of Minnesota, its agencies, departments and commissions; 3. United States Army Corps of Engineers; , 4. Watershed District(s); 5. Metropolitan Government, its agencies, departments and commissions. Proof of Title Upon request, the Developer shall furnish the City with evidence satisfactory to the City that it has ' the authority of the fee owners and contract for deed purchasers too enter into this Development Contract. ' Soil Conditions The Developer acknowledges that the City makes no representations or warranties as to the condition of the soils on the property or its fitness for construction of the improvements or any other purpose for which the Developer may make use of such property. The Developer further agrees that it will GC -13 indemnify, defend, and hold harmless the City, its governing body 1 members, officers, and employees from any claims or actions arising out of the presence, if any, of hazardous wastes or pollutants on the property, unless hazardous wastes or pollutants were caused to be there by the City. SID,. Soil Correction The Developer shall be responsible P P for soil correction work on the property. The City makes no representation to the Developer concerning the nature of suitability of soils nor the cost of correcting any unsuitable soil conditions which may exist. On lots which have no fill material a soils report from a qualified soils engineer is not required unless the City's building inspection department determines from observation that there may be a soils problem. On lots with fill ' material that have been mass graded as part of a multi -lot grading project, a satisfactory soils report from a qualified soils engineer shall be provided before the City issues a building permit for the lot. On lots with fill material that have been custom graded, a satisfactory soils report from a qualified soils engineer shall be provided before the City inspects the foundation for a building on the lot. GC -14 MEMORANDUM CITY OF CHANHASSEN 690 COULTER DRIVE • P.O. BOX 147 • CHANHASSEN, MINNESOTA 55317 (612) 937 -1900 • FAX (612) 937 -5739 TO: Don Ashworth, City Manager FROM: Dave Hempel, Assistant City Engineer DATE: March 18, 1994 SUBJ: Developer Requirements for Installation of Private Utility Service -File No. PW -336 1. Ron Jabs - Minnesota Valley Electric (492 -2313) The developer enters into a contract with them. Sometimes a deposit is required. It depends when the homes come on line. Most of the time the deposit is refunded. 2. Ron Moritz - United Telephone (448 -8378) No deposit or contract required. However, they have had some discussions about implementing some sort of contract. 3. Janice Mahah - Minnegasco (342 -5123) A deposit is required. The deposit is based on $3.00 /front foot of roadway. The developer is credited 150 feet for all homes under construction. The deposit is refunded on a quarterly basis up to a maximum of three years. If the development has municipal sewer and water then no deposit is required. They feel that in this scenario, the subdivision is usually built out within a couple of years. They do accept a cash escrow or letter of credit. 4. Cliff Stalke - NSP (470 -3323) NSP has just recently implemented a new policy not requiring a deposit for those developers who have a good track record with them. New developers are required to supply a promissory note. Credit is given for each new home under way. 5. Triax - A deposit is required with each development. The deposit is based on estimated total cost to Triax. Deposit is reimbursed back for homes completed on a quarterly basis. c: Charles Folch, City Engineer g:kngldav elm em os\devreq I r