3e. Lyman Blvd Street Reconstruction and Lake Riley Area Trunk Utility Improvements-Receive Feasibility Report and Call Public Hearingt
1
1
1
1
CITY OF
CHANHASSEN
690 COULTER DRIVE • P.O. BOX 147 • CHANHASSEN, MINNESOTA 55317
(612) 937 -1900 • FAX (612) 937 -5739
MEMORANDUM
TO: Don Ashworth, City Manager
FROM: Charles Folch, Director of Public Works /City Engineer
DATE: May 3, 1994
SUBJ: Receive Feasibility Report on Lyman Boulevard Street Reconstruction and Lake
Riley Area Trunk Utility Improvements in Sections 13 and 24; Call Public
Hearing - Project No. 93 -32 A o
Attached is the feasibility study for the Lyman' Boulevard Street Reconstruction and Lake Riley
Area Trunk utility Improvements in Sections b and X24. Many of the Council may recall that
this feasibility study resulted from a joint petition for public improvements from property owners
and/or developers amassing nearly 300 acro's"' of land in #his area. The feasibility study outlines
the specific project elements, i.e. trunk sanitary sewer, dunk watermain, the reconstruction of
Lyman Boulevard to an urban roadway th curb and gii
, ,pr and storm drainage facilities and a
.
high capacity sanitary sewer lift station. Estimated project costs, schedule and associated
financing including special assessmi6iits to benefitting properties are also provided.
At this time, it is staffs' recpriir`i endation that the City C
report for the Lyman 36ulevard Street Reconstruction
Improvements in Sections -I3 °:and3, 4 93 -3
regular meeting qn lUtonday ,Tour 3 E4q 4 4t hirh tub
..:...e". T
in depth presentafiori on the feasibility study.
jms/ktm�
S� ;
Attachment: Feasibility Study
c: Dave Mitchell, OSM
Dave Hempel, Assistant City Engineer
Jerry Boucher, Utility Superintendent
Mike Wegler, Street Superintendent
gAeng\charles \- Mkriley
formerly receive the feasibility
ake Riley Area Trunk Utility
all for a public hearing at the
rolect engineer will provide an