Loading...
3e. Lyman Blvd Street Reconstruction and Lake Riley Area Trunk Utility Improvements-Receive Feasibility Report and Call Public Hearingt 1 1 1 1 CITY OF CHANHASSEN 690 COULTER DRIVE • P.O. BOX 147 • CHANHASSEN, MINNESOTA 55317 (612) 937 -1900 • FAX (612) 937 -5739 MEMORANDUM TO: Don Ashworth, City Manager FROM: Charles Folch, Director of Public Works /City Engineer DATE: May 3, 1994 SUBJ: Receive Feasibility Report on Lyman Boulevard Street Reconstruction and Lake Riley Area Trunk Utility Improvements in Sections 13 and 24; Call Public Hearing - Project No. 93 -32 A o Attached is the feasibility study for the Lyman' Boulevard Street Reconstruction and Lake Riley Area Trunk utility Improvements in Sections b and X24. Many of the Council may recall that this feasibility study resulted from a joint petition for public improvements from property owners and/or developers amassing nearly 300 acro's"' of land in #his area. The feasibility study outlines the specific project elements, i.e. trunk sanitary sewer, dunk watermain, the reconstruction of Lyman Boulevard to an urban roadway th curb and gii , ,pr and storm drainage facilities and a . high capacity sanitary sewer lift station. Estimated project costs, schedule and associated financing including special assessmi6iits to benefitting properties are also provided. At this time, it is staffs' recpriir`i endation that the City C report for the Lyman 36ulevard Street Reconstruction Improvements in Sections -I3 °:and3, 4 93 -3 regular meeting qn lUtonday ,Tour 3 E4q 4 4t hirh tub ..:...e". T in depth presentafiori on the feasibility study. jms/ktm� S� ; Attachment: Feasibility Study c: Dave Mitchell, OSM Dave Hempel, Assistant City Engineer Jerry Boucher, Utility Superintendent Mike Wegler, Street Superintendent gAeng\charles \- Mkriley formerly receive the feasibility ake Riley Area Trunk Utility all for a public hearing at the rolect engineer will provide an